Damour Canal Excavation-
Dorchester County, SC
Damour Canal Excavation-
Dorchester County, SC
J 0 IN T
PUBLIC NOTICE
CHARLESTON DISTRICT, CORPS OF ENGINEERS
69A Hagood Avenue
Charleston, South Carolina 29403-5107
and the
S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
OFFICE OF OCEAN AND COASTAL RESOURCE MANAGEMENT
1362 McMillan Avenue, Suite 400
Charleston, South Carolina 29405
REGULATORY DIVISION
Refer to: PIN # SAC 2012-0328-1 Q
July 12, 2012
Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) , Sections 401
and 404 of the Clean Water Act (33 U.S.C. 1344), and the South Carolina Coastal Zone
Management Act (48-39-10 et.seq .) an application has been submitted to the Department of the
Army and the S.C. Department of Health and Environmental Control by
RUTH T. DAMOUR
162 BOX BRANCH DRIVE
BRANCHVILLE, SOUTH CAROLINA 29432
for a permit to excavate accumulated sediment from an existing canal outlet leading to the
EDISTO RIVER
at a location at the river frontage of the above address and river mile 96.4 on the north bank of the
Edisto River (at its confluence with Box Branch) , Town of Branchville, Dorchester County, South
Carolina .
(Latitude 33.17035 x Longitude -80.73770)
In order to give all interested parties an opportunity to express their views
NOTICE
is hereby given that written statements regarding the proposed work will be received by the Corps
until
15 DAYS FROM THE DATE OF THIS NOTICE
and SCDHEC will receive written statements regarding the proposed work until
30 DAYS FROM THE DATE OF THIS NOTICE
from those interested in the activity and whose interests may be affected by the proposed work.
The proposed work consists of the mechanical excavation of river sediments from the mouth
of an existing canal. Specifically, the work will involve the removal by a mechan ical excavator of
approximately 100 cubic yards of accumulated sand from an approximate 35-foot by 15-foot area to
an upland repository site on the owner's property about 250-feet from the river bank.
The purpose of the project, as described by the applicant, is to re-establish an off-river
space for boat storage and river access.
REGULATORY DIVISION
Refer to: PIN # SAC 2012-0328-1 Q
July 12, 2012
NOTE: Plans depicting the work described in this notice are available and will be provided,
upon receipt of a written request, to anyone that is interested in obtaining a copy of the
plans for the specific project. The request must identify the project of interest by public
notice number and a self-addressed stamped envelope must also be provided for mailing
the drawings to you. Your request for drawings should be addressed to the
U.S. Army Corps of Engineers
ATTN: REGULATORY DIVISION
69A Hagood Avenue
Charleston, South Carolina 29403-5107
The District Engineer has concluded that the discharges associated with this project, both
direct and indirect, should be reviewed by the South Carolina Department of Health and
Environmental Control in accordance with provisions of Section 401 of the Clean Water Act. As
such , this notice constitutes a request, on behalf of the applicant, for certification that this project will
comply with applicable effluent limitations and water quality standards. The work shown on this
application must also be certified as consistent with applicable provisions the Coastal Zone
Management Program (15 CFR 930). The District Engineer will not process this application to a
conclusion until such certifications are received . The applicant is hereby advised that supplemental
information may be required by the State to facilitate the review.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. Implementation of the proposed
project would impact 0.012 acres upstream of estuarine substrates and emergent wetlands
utilized by various life stages of species comprising the red drum , shrimp, and snapper-grouper
management complexes . Our initial determination is that the proposed action would not have a
substantial individual or cumulative adverse impact on EFH or fisheries managed by the South
Atlantic Fishery Management Council and the National Marine Fisheries Service (NMFS). Our
final determination relative to project impacts and the need for mitigation measures is subject to
review by and coordination with the NMFS.
The District Engineer has consulted the most recently available information and has
determined that the project will have no effect on any Federally endangered , threatened , or
proposed species and will not result in the destruction or adverse modification of designated or
proposed critical habitat. This public notice serves as a request to the U.S. Fish and Wildlife
Service and the National Marine Fisheries Service for any additional information they may have
on whether any listed or proposed endangered or threatened species or designated or proposed
critical habitat may be present in the area which would be affected by the activity , pursuant to
Section 7(c) of the Endangered Species Act of 1973 (as amended) .
Pursuant to Section 106 of the National Historic Preservation Act (NHPA) , this public
notice also constitutes a request to Indian Tribes to notify the District Engineer of any historic
properties of religious and cultural significance to them that may be affected by the proposed
undertaking .
REGULATORY DIVISION
Refer to: PIN # SAC 2012-0328-1 Q
July 12, 2012
In accordance with the NHPA, the District Engineer has also consulted the latest
published version of the National Register of Historic Places for the presence or absence of
registered properties , or properties listed as being eligible for inclusion therein , and this worksite
is not included as a registered property or property listed as being eligible for inclusion in the
Register. To insure that other cultural resources that the District Engineer is not aware of are not
overlooked , this public notice also serves as a request to the State Historic Preservation Office to
provide any information it may have with regard to historic and cultural resources .
Any person may request, in writing , within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for a public hearing shall state, with
particularity, the reasons for holding a public hearing .
The decision whether to issue a permit will be based on an evaluation of the probable impact
including cumulative impacts of the activity on the public interest. That decision will reflect the
national concern for both protection and utilization of important resources. The benefit which
reasonably may be expected to accrue from the project must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the project will be considered including
the cumulative effects thereof; among those are conservation , economics, aesthetics, general
environmental concerns, wetlands , historic properties, fish and wildlife values , flood hazards, flood
plain values, land use, navigation, shoreline erosion and accretion , recreation , water supply and
conservation , water quality, energy needs, safety, food and fiber production and , in general, the
needs and welfare of the people. A permit will be granted unless the District Engineer determines
that it would be contrary to the public interest. In cases of conflicting property rights, the Corps of
Engineers cannot undertake to adjudicate rival claims.
The Corps of Engineers is soliciting comments from the public; Federal, state, and local
agencies and officials ; Indian Tribes; and other interested parties in order to consider and evaluate
the impacts of this activity. Any comments received will be considered by the Corps of Engineers to
determine whether to issue, modify, condition or deny a permit for this project. To make this
decision, comments are used to assess impacts on endangered species , historic properties, water
quality, general environmental effects, and the other public interest factors listed above. Comments
are used in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the activity.
If there are any questions concerning this public notice, please contact Paul Hinchcliff at
843-329-8044 or toll free at 1-866-329-8187.
'""
DORt HESTER CO.
UTILITY LINE
R M. 90.~
UTILITY LINE
! R.M. 86.3
,
COLLETON
co
\~~
R.M. 81.1
.~.
·
:E
~
z
90
0
80
§
70
;=
S TREAM
~"
Da",o
SAC 2012-038
", C···, J;."c
'2 J"'nO
2"Q
er, Dorche a"'at,O"
I2
Ster CO""",
. --------~SC
""'sto
......-MEAN WATER SURl'ACE
am
80
sh~1 Of
90'(6.0')
50
'0
.8
OftHj() SIIIUCTUIIE
~75'--iIlRIl'CtIULCU:Ai....a:INItAIIICIWIID.
, , ' --
MEAN WAr£R SU_""_"'_'_,>,,-_-.-:===
STAUM
8l0~
M~·4
i' (e')
SIU'".' .-,'[1 MI.! lIXU1I)ro- / ' -
'l'unCIl a.,EllAICt TO SlllCn.£
1U~ II:'TM"IOHnC1
IUXMII ClPTH
(J" '"
.s
.0
as
81
RIVEII MilES
U.S. ARMY CORPS OF ENGINEERS
",,",S
::~:'
l , o.O'lIl1)1.11(13..1J'[lrM(AII " TOturj((I.A(ILl.SUCliU$l;STIJ'!DAfIIClW'SoIHIIMMRtf.CM.l
','[lHICJt. OIIOS/()IS I1HJl Slll£i14 II£l) ro O'lOt£.MJ !It\.(I\lIH lit( FIELD IUSUII(If)oTS
.un¥[ UXATIQH II" IVfrj u TIlI SUlfIoCl IS APPIIOXWIED filii! COIlCU MI.P'1, M[ASUl[O C1tD.SS S£.tll!lo~
»0 'o'D.0011[$ . STRUM flO' ''~ TIl: ~ (awOl IoIIJ fllUl OIS(hlTlOtb sa SlIIWI'f ADUI
~CIt COFlEl[ W\Jf.;AllON
~101S.
CHARlESTON DISTRICT
Char leston. South Carolina
fOOT Ia: OWMl
1T1EA/jn.0t
,'"
Iii
ST..... f'l c:.oNSUlTAHTS
Pl...N AND PROFILE
EDISTO RIVER
Edisto River Are a
COLLETON -OORCHESTER
co.. S.C
NAVIGABILITY STUDY
Miles81.0-98.0
Plate 03-10
~
. ~~
-
~ i? ?"'(? '.
,
h~ '"
1;'1 I.'/~~"' -"
II~~'"
11';1
//1
II
1/
.' 1/
14'
I,. /1
- ~, 1/
~"-...
.
7.
',"
,
I·
i
.....
/f~,
. //
~
I
",,,,"'-
\_-
-
,-
......
'\
,
""
.0'
'i
IIJ'
...
.. . If '
\.
,
'._
/
\.
,
"
3 :-/B2 C
',, .- J.rU
I
i
. ·l1
. . ,. ."u,"2:./2
1 ..
· 1/ !
r
// o'
- -........ --~-9 I.
SAC 2012-0328
Project Area
river mile 96.4
- Sec. 10 waters
~~"
~
,
II
~~
\',
n
u
\
\
~~ "
~~
"'~
,J
jj'
H
Charleston District
U.S. Army Corps of Engineers
I~
U'
Ii
II,
_,.,r;;,
~:/-/J
SAC 201 2-0382- 1Q
12 July 2012
Damour Canal Excavation
Edisto River, Dorchester County SC
sheet 2 of 4
//
/
Application #SAC 2012-0328-1~Q
Location of the material revmoved from the end of the canal
is the shaded area.
Also see shaded area in photo.
~____----------------_J5~/------------------~
~:V(,f
0. ?y()~ A.fl.!!.A,.
C ~J?a.. I
'WE T
LAAl05
-
Pr~ft.,..1j
/.,',.(;
Charleston District
U.S. Army Corps of Engineers
SAC 2012-0382-1Q
12 July 2012
Damour Canal Excavation
Edisto River, Dorchester County SC
sheet 3 of 4
Application #SAC 2012-0328-1~Q
The shaded area is the material to be removed
2JIJ'
""'0 P
~
I
V,'~ v./
o'
...<
f\ ,~
A~ . .1.00YO'"
\
. ::."<
~.
S ,~).4_" _ l" ~'-r
I
'
_(' )
Gro vn '!
oS ,'J.
2~
I
;.. ... 1
~
I/ .... IAJ
The floor of the canal is sloped towards the river.
The area where the material is removed will follow the same slope.
Charleston District
U.S. Army Corps of Engineers
SAC 2012-0382-1Q
12 July 2012
Damour Canal Excavation
Edisto River, Dorchester County SC
sheet 4 of 4
I