You can copy from here when filling out the rest of the page.
City of Beaufort Downtown Marina Modification
Beaufort County, South Carolina
City of Beaufort Downtown Marina Modification
Beaufort County, South Carolina
JO I NT
PUBLIC NOTICE
For Permit Modification
CHARLESTON DISTRICT, CORPS OF ENGINEERS
69A Hagood Avenue
Charleston, South Carolina 29403-5107
and the
S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
OFFICE OF OCEAN AND COASTAL RESOURCE MANAGEMENT
1362 McMillan Avenue, Suite 400
Charleston, So uth Carolina 29405
REGULATORY DIVISION
Refer to: PIN #2012-0498-1W
5 SEPTE MBER 2012
Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), Section
401 of the Clean Water Act (33 U.S.C. 1344), and the South Carolina Coastal Zone Management
Act (48-39-10 et.seq.) an application has been submitted to the Department of the Army and the
S.C. Department of Health and Environmental Control by
CITY OF BEAUFORT
cl o SLIGH ENVIRONMENTAL CONSULTANTS, INC.
31 PARK OF COMMERCE WAY, SUITE 200B
SAVANNAH, GEORGIA 31405
for a permit to modify the existing Beaufort Downtown Marina by installing additional floating
docks and expanding the existing mooring field in waters of the
BEAUFORT RIVER
at locations within the existing marina, 1006 Bay Street, City of Beaufort, Beaufort County, South
Carolina (Latitude 32.42968', Longitude -80.67226')
In order to give all interested parties an opportunity to express their views
NOTICE
is hereby given that written statements regarding the proposed work will be received by the
Corps until
15 days from the date of this notice
and SCDHEC will receive written statements regarding the proposed work until
30 days from the date ofth is notice
from those interested in the activity and whose interests may be affected by the proposed work.
The proposed work consists of the addition of a floating dock to the main dock, the
expansion of the day dock located on the western side of the facility, the replacement and
reconfiguration of the easternmost dock structure and an expansion to the mooring field . In detail,
the proposed work includes the addition of a 10' x 20' float on the main dock that will have
REGULATORY DIVISION
Refer to: PIN #2012-0498-1W
5 SEPTEMBER 2012
a step-down transformer to serve transient vessels . T he proposed day dock expansion consists of
the installation of a new 8' x 180' floating dock channelward of the existing 6' x 100' floating dock.
A new 4' x 100' floating dock will be added adjacent to and landward of the 6' x 100' floating dock
on the opposite side of the pilings.
Six existing timber floats located on the smaller dock to the east of the main dock witl be
replaced with 11 ' x 24' drive on floats within the same footprint. The project also includes
expansion of the existing mooring field located to the west of the existing facility to an area
measuring 1,700' x 300' to provide 49 mooring envelopes that will measure 104' in diameter. Each
envelope will have a center mooring buoy anchored to the river bottom with a helical anchor
system . The proposed additions will provide additional space for local and transient boaters .
NOTE: Plans depicting the work described in this notice are available and will be
provided, upon receipt of a written request, to anyone that is interested in obtaining a copy
of the plans for the specific project. The request must identify the project of interest by
public notice number and a self-addressed stamped envelope must also be provided for
mailing the drawings to you. Your request for drawings should be addressed to the
U.S. Anny Corps of Engineers
AnN: REGULATORY DIVISION
69A Hagood Avenue
Charleston, South Carolina 29403-5107.
The District Engineer has concluded that the discharges associated with this project, both
direct and indirect, should be reviewed by the South Carolina Department of Hea lth and
Environmental Control in accordance with provisions of Section 401 of the Clean Water Act. As
such , this notice constitutes a request, on behalf of the applicant , for certification that this project
will comply with applicable effluent limitations and water quality standards . The work shown on
this application must also be certified as consistent with applicable provisions the Coastal Zone
Management Program (15 CFR 930). The District Engineer will not process this application to a
conclusion until such certifications are received. The applicant is hereby advised that
supplemental information may be required by the State to facilitate the review.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. Implementation of the
proposed project would impact 11 .8 acres of estuarine substrates and emergent wetlands
utilized by various life stages of species comprising the red drum, shrimp, and snapper-grouper
management complexes. Our initial determination is that the proposed action would not have a
substant ial individual or cumulative adverse impact on EFH or fisheries managed by the South
Atlantic Fishery Management Council and the National Marine Fisheries Service (NMFS). Our
final determination relative to project impacts and the need for mitigation measures is subject to
review by and coordination with the NMFS.
The District Engineer has consulted the most recently available information and has
determined that the project will have no effect on any Federally endangered , threatened , or
proposed species and will not result in the destruction or adverse modification of designated or
proposed critical habitat. This public notice serves as a request to the U .S . Fish and Wildlife
Service and the National Marine Fisheries Service for any additional information they may have
on whether any listed or proposed endangered or threatened species or designated or
REGULATORY OIVISION
Refer to: PIN #2012-0498-1W
5 SEPTEMBER 2012
proposed critical habitat may be present in the area which would be affected by the activity ,
pursuant to Section 7(c) of the Endangered Species Act of 1973 (as amended).
Pursuant to Section 106 of the National Historic Preservation Act (NHPA). this public
notice also constitutes a request to Indian Tribes to notify the District Engineer of any historic
properties of religious and cultural significance to them that may be affected by the proposed
undertaking.
In accordance with the NHPA, the District Engineer has also consulted the latest
published version of the National Register of Historic Places for the presence or absence of
registered properties, or properties listed as being eligible for inclusion therein, and this worksite
is not included as a registered property or property listed as being eligible for inclusion in the
Register. To insure that other cultural resources that the District Engineer is not aware of are
not overlooked , this public notice also serves as a request to the State Historic Preservation
Office to provide any information it may have with regard to historic and cultural resources .
Any person may request, in writing , within the comment period specified in this notice, that
a public hearing be held to consider this application. Requests for a public hearing shall state,
with particularity, the reasons for holding a public hearing.
The decision whether to issue a permit will be based on an evaluation of the probable
impact including cumulative impacts of the activity on the public interest. That decision will reflect
the national concern for both protection and utilization of important resources . The benefit which
reasonably may be expected to accrue from the project must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the project will be considered
including the cumulative effects thereof; among those are conservation , economics, aesthetics,
general environmental concerns, wetlands , historic properties , fish and wildlife values , flood
hazards, flood plain values , land use, navigation, shoreline erosion and accretion , recreation ,
water supply and conservation, water quality, energy needs, safety, food and fiber production and ,
in general, the needs and welfare of the people. A permit will be granted unless the District
Engineer determines that it would be contrary to the public interest. In cases of conflicting
property rights , the Corps of Engineers cannot undertake to adjudicate rival claims.
The Corps of Engineers is soliciting comments from the public; Federal , state, and local
agencies and officials ; Indian Tribes; and other interested parties in order to consider and
evaluate the impacts of this activity. Any comments received will be considered by the Corps of
Engineers to determine whether to issue, modify, condition or deny a permit for this project. To
make this decision, comments are used to assess impacts on endangered species , historic
properties, water quality, general environmental effects, and the other public interest factors listed
above . Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments
are also used to determine the need for a public hearing and to determine the overall public
interest of the activity.
If there are any questions concerning this public notice, please contact Debbie King at
843-329-8044 or toll free at 1-866-329-8187.
Proj ect Description
Beaufort Downtown Marina Improvements
Beaufort County, So uth Ca rolina
Apri l 4, 2012
Revised August 27, 2012
Introduction:
The City of Beaufort (applicant) is requesting a modification to the existing South Carolina Department of
1lealth aod Environmental Control - Office of Ocean and Coastal Resource Management (OCR M) permit
2005· 1E-1 40·P proposing improvements to the exist ing Oeaufort Downtown Marina. The project area is
located on the Beaufort River south of and adjacent to lJay Street, ap proximately 0.25 mi les west of US Hwy
2 1 Bus iness in Beaufort, Beaufort County, South Carolina.
Existing Facility:
The existing marina consists of three floating dock facilit ies, a boat ramp, and a mooring fie ld. The main dock
facility extends approximately 365 feet into the waterway and contains slips on both s ides of the main float.
The dock structure located east of the main dock extends approximately 145 fee t into the waterway and
contains seven finger float s. Other amenities at the Downtown Marina consist of a day dock and boat ramp
located approximately 250 feet west of the main dock facili ty and a mooring fi eld located further west.
Proposed Site Plan :
The ap pl icant is proposing to modify the existing permi t which authorized the expansion o f the day dock
located on the western side of the Downtown Marina facility. The perm it authorized a new S' x ISO' float and
a new 4 ' x 100' addition to the existing dock. In addition to these day dock improvements, the applicant is
proposing additional activities in order to accommodate local and transient boaters. Additional proposed
improvements include the installation ofa new 10' x 20' floal o n the main dock 10 accommodate a transformer
to serve transient vessels. Also, the applicant is proposing to remove six of the existing timber floats located
on the smaller dock to the east of tne main dock and install new drive-on floats. The drive on floats will
measure 24' x II' each. The applicant is also proposing the expansion of the existing mooring field located
west oftne faci lity. The new mooring field wil l be 1,700 feet long and 300 feet wide and wi ll provide 49
mooring envelopes. Each envelope wil l be 104 feet in diameter and wil l contain a mooring buoy securely
anchored to the river bollom with a helical anchor system. The proposed improvements will provide
additional space for local and transient boaters.
All act ivit ies will be pcrfonned in a manner to minimize turbidity in the Beaufort River. There will be no oils
or other pollutants released from the proposed activities, aod the proposed project should have no adverse
effect on water q uality. All work performed during constmction will be done in a manner \0 prevent
interference with legitimate water uses.
SAC#2-0I2.- 04,}S-IIN
Prepared
aligh
',000
Bv:
environmental con.ultont_, irH::.
31 Park '" Commen;
I r..,t
Beaufort Downtown Morino
Proiect location Mop
US Geological Survey - Beaufort Quod
Beaufort County, South Carolina
~
'
..
"'
......
.,
. REtIOi!i (, FI"'UJMliel:
,
A.IJAT~ ~NV II!'MU, .
HfN ~1'/5'OH flCATs
"
:r..
~'. '
\-fI." - (:
~1'7nN6! MA~JI'lA ~AYO!lT ..
:l: T,!;!2,MAS &
Ff
HUTTON
-.DOWNTowN fV\Ar<1NA.1Mir~OVF.MENT<7
I ~ I " " ' - I ~ I c-woIooo
682.Jo/'1nrMDoddJ&:deYOrd· S!AleIOD
1'O&crx1~
ML.f/eoJOI'It.SC29.o1&5-1522 · M)M9moo
www.ltIoritosanclhullon.com
_GotoI_OoI.I _ _ oet _ _ ""
....,.. . ~kdzoll
JO' ~_:
.
sl-eet 2<>f ~
SCA\!::
AS SHOwtoi
DATUM: HAVD9Ii
"
·
,
~'
WlOE ADDITK:H TO
..
)~----c
,
~ EXIST~
""-'" -
,
8
",
·
8
' I
NEW LIGHTED FLOATNGo DOCK
EXI&TlNGo CITY
-, -
DAY DOCK EXPANSION
,- , JM :
,iI
6 I tJ
'till
DOCKS
PROPOSED
IMFROVEMENTS
5CALE I' · 41Zl '
-
,
HA~
SAc. 2-012.- o4~8-1 VI!
CITY OF BEAUFORT
SOUTH CAROLINA
BEAUFORT COUNTY
TITLE:
DAY DOCK EXPANSION
5UatrTL£:
PROPOSED IMPROVEMENTS
COUNTY:
E£AVFORf
.o..PPLT.:
CITY
PAGE:
5 iF ·
cr
SEAurORT
:lAT[:
,
'
..
0,. ,
II
.
.~
'
~-
....
·
,
"';.:
i!i
n
THOMAS
&
HUTTON
~1_1-....a' 0t5 t~
682 .1ohnrOa Dodds 80lAevad · SlMte 100
POblS22
Ml.1'IeOfor1.SC29~1522
· 843M9.o2lX1
_.lhomcIoondhul!on.c:om
_GA.l_0.0. t _ _
IC
I _ _ OC
.
:5"."
C;I Ty OF BEAL!fOI\T
DO'NNTO'NN MARINA MOOI\INGr
AcZOI2-04'l8-IW '
j~~J~JI~!l.WJJ (V/~~ ·~L;I~~'~_
~I ew
.
~~ :=,WN
,
.. ". ;.
·
,
_
__
.
·
I