Cooper River Partners Bulkhead & Wharf (Berkeley County)

Cooper River Partners Bulkhead & Wharf (Berkeley County)

J 01 NT PUBLIC NOTICE CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A Hagood Avenue Charleston, South Carolina 29403-5107 and THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Office of Environmental Quality Control Water Quality Certification and Wetlands Programs Section 2600 Bull Street Columbia, South Carolina 29201 REGULATORY DIVISION Refer to: P/N #2012-00170-21R (Revised)

18 October 2012

Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), Section 401 of the Clean Water Act (33 U.S.C. 1344), the South Carolina Coastal Zone Management Act (48-39-1 0 et.seq.), and the S.C. Construction in Navigable Waters Permit Program (R. 19-450, et. seq., 1976 S.C. Code of Laws, as amended), an application has been submitted to the Department of the Army and the S.C. Department of Health and Environmental Control by COOPER RIVER PARTNERS, LLC C/0 LARRY ARRINGTON 1588 BUSHY PARK ROAD GOOSE CREEK, SOUTH CAROLINA 29445 for a permit to dredge, construct a marine bulkhead, wharf, and mooring dolphins, and fill freshwater wetlands along the COOPER RIVER at a site on the east side of Bushy Park Road approximately 1.9 miles north of the intersection with Red Bank Road in Berkeley County, South Carolina. Latitude: 32.98574 N; Longitude: -79.92546 W . In order to give all interested parties an opportunity to express their views NOTICE is hereby given that written statements regarding the proposed work will be received by the Corps until 15 Days from the Date of this Notice and SCDHEC will receive written statements regarding the proposed work until 30 Days from the Date of this Notice from those interested in the activity and whose interests may be affected by the proposed work. NOTE: This project was advertised previously on June 25, 2012, as a dock. However, objections from marine transportation experts regarding navigational safety resulted in the initial project being revised. The applicant has considered several alternatives and has submitted the current project as described below. Only comments received in regard to this current public notice will be included in the analysis for determining permit authorization.

October 18, 2012 Page 2 of 3

REGULATORY DIVISION Refer to: PIN #2012-00170-21R

The proposed work consists of constructing a bulkhead, wharf, and mooring dolphins in the Cooper River, filling a wetland behind the bulkhead , and dredging in front of the wharf. In detail, a120' long marine bulkhead , and a 100' long x 30' wide concrete, pile supported wharf will be constructed immediately in front of the bulkhead. The wharf will be complete with bull rails and fender system. Power and water utilities will be provided. Two mooring dolphins will be installed in association with the wharf. Just behind the bulkhead , -750 cubic yards of fill will be placed in a 0.232 acre freshwater wetland to provide access to the waterfront. In addition , -10 ,000 cubic yards of material will be dredged from a 0.44 area in front of the wharf to provide depths needed to access the wharf. The area will be dredged to -0.12 feet MLLW. The material will be dredged with an excavator (clam shell or similar) with the dredged material hauled by truck to an on-site disposal area. The disposal area (SP2) is a 16 acre former settling pond at the Bushy Park Industrial Complex. Material has been removed from the pond per SCDHEC Bureau of Land and Waste Management which has also provided approval for placing fill back in the former pond. The former pond has no discharge point so there will be no runback from the disposal site into the Cooper River or other waters or wetlands of the U.S. Mitigation for filling the 0.232 acre freshwater wetland will be provided through purchase of mitigation credits from the Congaree Carton Mitigation Bank and the Francis Beidler Forest In-Lieu Fee Program. The purpose of the project, according to the applicant, is to serve as an import/export terminal to support the manufacturing operations at the Bushy Park Industrial Complex.

NOTE: Plans depicting the w o rk described in this notice are available and will be provided, upon receipt of a written request, to anyone that is interested in obtaining a copy of the plans for the specific project. The request must identify the project of interest by publ ic notice number and a self-addressed stamped envelope must also be provided for mailing the drawings to you. Your request for drawings should be addressed to the U.S. Army Corps of Engineers ATTN: REGULATORY DIVISION 69A Hagood Avenue Charleston, South Carolina 29403-5107 The District Engineer has concluded that the discharges associated with this project, both direct and indirect, should be reviewed by the South Carolina Department of Health and Environmental Control in accordance with provisions of Section 401 of the Clean Water Act. As such, this notice constitutes a request, on behalf of the applicant, for certification that this project will comply with applicable effluent limitations and water quality standards. The work shown on this application must also be certified as consistent with applicable provisions of the Coastal Zone Management Program (15 CFR 930). The District Engineer will not process this application to a conclusion until such certifications are received . This activity may also require evaluation for compliance with the S.C. Construction in Navigable Waters Permit Program. State review, permitting and certification is conducted by the S.C. Department of Health and Environmental Control. The applicant is hereby advised that supplemental information may be required by the State to facilitate the review. Persons wishing to comment or object to State certification or the navigable waters permit must submit all comments in writing to the S.C. Department of Health and Environmental Control at the above address within thirty (30) days of the date of this notice. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson Stevens Fishery Conservation and Management Act. Implementation of the proposed project would result in 0.232 acre filling , 0.44 acres dredging, and 0.07 acre shading for a total of 0.742 acres of impact of Waters of the U.S. upstream of estuarine substrates and emergent wetlands utilized by various life stages of species comprising the red drum, shrimp, and snapper-grouper management complexes. Our initial determination is that the proposed action would not have a substantial individual or cumulative adverse impact on EFH or fisheries managed by the South Atlantic Fishery Management Council and the National Marine Fisheries Service (NMFS). Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the NMFS.

REGULATORY DIVISION Refer to: P/N #2012-00170-21R (Revised)

October 18, 2012 Page 3 of 3

Pursuant to Section 7(c) of the Endangered Species Act of 1973 (as amended), the District Engineer has consulted the most recently available information and has determined that the project is not likely to adversely affect any Federally endangered, threatened , or proposed species or result in the destruction or adverse modification of designated or proposed critical habitat. This public notice serves as a request for written concurrence from the U.S. Fish and Wildlife Service and/or the National Marine Fisheries Service on this determination. Pursuant to Section 106 of the National Historic Preservation Act (NHPA), this public notice also constitutes a request to Indian Tribes to notify the District Engineer of any historic properties of religious and cultural significance to them that may be affected by the proposed undertaking. In accordance with the NHPA, the District Engineer has also consulted the latest published version of the National Register of Historic Places for the presence or absence of registered properties, or properties listed as being eligible for inclusion therein, and this worksite is not included as a registered property or property listed as being eligible for inclusion in the Register. To insure that other cultural resources that the District Engineer is not aware of are not overlooked , this public notice also serves as a request to the State Historic Preservation Office to provide any information it may have with regard to historic and cultural resources. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for a public hearing shall state, with particularity, the reasons for holding a public hearing. The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the activity on the public interest and will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency (EPA), under authority of Section 404(b) of the Clean Water Act and, as appropriate, the criteria established under authority of Section 102 of the Marine Protection, Research and Sanctuaries Act of 1972, as amended. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the project must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the project will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation , water supply and conservation , water quality, energy needs, safety, food and fiber production and, in general, the needs and welfare of the people. A permit will be granted unless the District Engineer determines that it would be contrary to the public interest. In cases of conflicting property rights, the Corps of Engineers cannot undertake to adjudicate rival claims. The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this project. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the activity. If there are any questions concerning this public notice, please contact Robin Coller-Socha at 843-329-8044 or toll free at 1-866-329-8187.

1'

1.,· .. >

--

~

.............. /

!

(

8 1 Istand

.""'II Sot

A V Al,

R~

f

)

,. l

t.

,.

f~

6

,.}J r> IV

i5

,

~

·

/ I '-· ............... '\ -J..Rcb

!1:

·~'

I

--. '~/-"\ f .._/~r,P.,.. '-- ~\ 1.

II

,

L

. ..-~~ . \_ (

}

DRAWING FOR PERMITIING PURPOSES ONLy NOT FOR CONSTRUCTION

f' r<

I-PH (,V. 1

J..All!J.&l:. u~~

\;

USTR A IT[ of( P·.·[',' OOPfl> fiiV R PJ.RT', ['

3. ·:_g' 0 64"N ·c·c s 3l

·n ,.,

l ' ··

1"

J 'J NIY

F BER"'f.L[ 5 UTH

crps0081 1

~

JN'

AR'

·A

J

,.

I

\ NEXANS HIGH VOLTAGE USA, 1

\ I

\ I

\ I

L_~ COOPER RIVER PARTNERS, LLC

PROPOSED BULKHEAD AND DOCK

PROJECT AREA

0

a:: :..:

~

Q.

>

05

:::>

ID

~

:

T

'

sI.'

DISPOSAL AREA {SETTLING POND #2)

~

t

;

·

~

!

SAC#2012-00170-2R October 18, 2012

DRAWING FOR PERMITIING PURPOSES ONLY. NOT FOR CONSTRUCTION

"URPOSE NClU.:.TR1A SIIE DEVELOPM(Nl ..PPUCANT C' )P(W R vtR PART);['IS. LC

~

SITE MAP

.£

_QNG · DE S RHv OAT M

F CURE. 2

~.

·· =

so·

PROPQSr ):

tlU KriEAO ,\NO WHARF CONSTRUCTION

'·

COOPER

'"01..<"1''

· 8£RKE £Y COUN-v,

SO

COOPER R Ei? FAR'NERS. I L~ BUSHY PAR· FACI TY

13l>

su J'l·

CM

ltJA

SH£1 2

R,(R

or

6

1

H CAPOL NA

2460000019

~ NEXANS HIGH

VOLTAGE USA, INC.

o

(').J

0 0 0 0 0

~ 24'70000004

Goose

COOPER RIVER PARTNERS, LLC PROPERTY c{]

~reek

25~0000001

2460000004

\ ! ~ ~

WAi'E-R

: i ; ~

~

t ~

!

2550000006

;

£ ·t J ~

SAC#2012-00170-2R October 18, 2012

:f.. u

-'Pf'

ANT

COCPrP Rvt=> PART'.[I

r Gu=>· .3 F ;..·. VEl·

-'

..M!....!.lii.l... ~,QNGI!UPE

52'59'10 64 ..N 79'55 ' 32 9.l'·,o,

ts SHY PAR> FACiliTY COQP(R RIVER C[PK fY IH :.P

SO

NlV '!.0.

EXCAVATON TO -12' MLLW (APPROX. 0.44 ACRES)

_,... _,.

COOPER R I R

-~~

.P.'

...,~,

-~,

·!!fta _,..,

-~. ·."16.1

-t~'

. "16-'

'·

-~~)

.'12-o

...

.'12-1

...\1..

_,

-~'

_,....

..-"~'~

...,...,

-'~

.,..,, '1

--'~~

_,3..

t::. .

1

_,).\

12.5

~7

A 3.2

.

Al~. 4

12.8

PROPOSED MOORING DOLPHIN

~

.... ~.~

.3"

-·-+3.-7·

PROPOSED WHARF (100' X 30')

- ---· t4.2

PROPOSED MOORING DOLPHIN

PROPOSED BULKHEAD (114.7')

,-- -----

1

PROPOSED FILL BEHIND PROPOSED BULKHEAD (0.232 ACRES)

I

~ ~ ~

BLOCK 0 12

BLOC~ D 11

\

~

~

J;

l

J

i: '

~

SAC#2012-00170-2R October 18, 201 2

~

u

EV(L PVE ll P

.!..8.l!lWli.

31

~9 ·~:,

1n, .1·t, 12 ' v.

R ~AR'tE~S .

4

A\

R R /ER

Y C A=

t.Tf. NA

( SEE DETAIL FIGURE FOR 3 FOMOORING DOLPHIN R DOLPHIN LOCATIONS) 48" DIAMETER 5 TEEL DOLPHI N (rtPICAL)

--T----~OJ

DRAWING FOR PENDING. NOT FOR CONSTRUCTION. FINAL STRucnfi!MI~~~PURPOS£5, '"'"'" APP

N

.. -

"'

')TRIA

co " '

0

LW~lllllf. ;~

V"J..IlL

sf£ > ·· " ' -

'5 12'>w ,.,, ,, "

o ""'

PARlN P5

l

r

'

A

SAC#2012-0017 c tober 18, 20120-2R l

r

:::.

' A' , >£C1 ·"-">>

',

'AI" " IN

t.O' IO SCALE

S R

v

OA~

I'

N..,VD oz

BER<(

..

NTY

or'

E·RK£ S ' lC·/>PCO"N ·t· y

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas