You can copy from here when filling out the rest of the page.
Cooper River Partners Bulkhead & Wharf (Berkeley County)
Cooper River Partners Bulkhead & Wharf (Berkeley County)
J 01 NT
PUBLIC NOTICE
CHARLESTON DISTRICT, CORPS OF ENGINEERS
69A Hagood Avenue
Charleston, South Carolina 29403-5107
and
THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
Office of Environmental Quality Control
Water Quality Certification and Wetlands Programs Section
2600 Bull Street
Columbia, South Carolina 29201
REGULATORY DIVISION
Refer to: P/N #2012-00170-21R (Revised)
18 October 2012
Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), Section 401 of the Clean Water
Act (33 U.S.C. 1344), the South Carolina Coastal Zone Management Act (48-39-1 0 et.seq.), and the S.C.
Construction in Navigable Waters Permit Program (R. 19-450, et. seq., 1976 S.C. Code of Laws, as amended),
an application has been submitted to the Department of the Army and the S.C. Department of Health and
Environmental Control by
COOPER RIVER PARTNERS, LLC
C/0 LARRY ARRINGTON
1588 BUSHY PARK ROAD
GOOSE CREEK, SOUTH CAROLINA 29445
for a permit to dredge, construct a marine bulkhead, wharf, and mooring dolphins, and fill freshwater wetlands
along the
COOPER RIVER
at a site on the east side of Bushy Park Road approximately 1.9 miles north of the intersection with Red Bank
Road in Berkeley County, South Carolina. Latitude: 32.98574 N; Longitude: -79.92546 W .
In order to give all interested parties an opportunity to express their views
NOTICE
is hereby given that written statements regarding the proposed work will be received by the Corps until
15 Days from the Date of this Notice
and SCDHEC will receive written statements regarding the proposed work until
30 Days from the Date of this Notice
from those interested in the activity and whose interests may be affected by the proposed work.
NOTE: This project was advertised previously on June 25, 2012, as a dock. However, objections from
marine transportation experts regarding navigational safety resulted in the initial project being revised.
The applicant has considered several alternatives and has submitted the current project as described
below. Only comments received in regard to this current public notice will be included in the analysis
for determining permit authorization.
October 18, 2012
Page 2 of 3
REGULATORY DIVISION
Refer to: PIN #2012-00170-21R
The proposed work consists of constructing a bulkhead, wharf, and mooring dolphins in the Cooper River,
filling a wetland behind the bulkhead , and dredging in front of the wharf. In detail, a120' long marine bulkhead ,
and a 100' long x 30' wide concrete, pile supported wharf will be constructed immediately in front of the bulkhead.
The wharf will be complete with bull rails and fender system. Power and water utilities will be provided. Two
mooring dolphins will be installed in association with the wharf. Just behind the bulkhead , -750 cubic yards of fill
will be placed in a 0.232 acre freshwater wetland to provide access to the waterfront. In addition , -10 ,000 cubic
yards of material will be dredged from a 0.44 area in front of the wharf to provide depths needed to access the
wharf. The area will be dredged to -0.12 feet MLLW. The material will be dredged with an excavator (clam shell
or similar) with the dredged material hauled by truck to an on-site disposal area. The disposal area (SP2) is a 16
acre former settling pond at the Bushy Park Industrial Complex. Material has been removed from the pond per
SCDHEC Bureau of Land and Waste Management which has also provided approval for placing fill back in the
former pond. The former pond has no discharge point so there will be no runback from the disposal site into the
Cooper River or other waters or wetlands of the U.S. Mitigation for filling the 0.232 acre freshwater wetland will
be provided through purchase of mitigation credits from the Congaree Carton Mitigation Bank and the Francis
Beidler Forest In-Lieu Fee Program. The purpose of the project, according to the applicant, is to serve as an
import/export terminal to support the manufacturing operations at the Bushy Park Industrial Complex.
NOTE: Plans depicting the w o rk described in this notice are available and will be provided, upon receipt
of a written request, to anyone that is interested in obtaining a copy of the plans for the specific project.
The request must identify the project of interest by publ ic notice number and a self-addressed stamped
envelope must also be provided for mailing the drawings to you. Your request for drawings should be
addressed to the
U.S. Army Corps of Engineers
ATTN: REGULATORY DIVISION
69A Hagood Avenue
Charleston, South Carolina 29403-5107
The District Engineer has concluded that the discharges associated with this project, both direct and
indirect, should be reviewed by the South Carolina Department of Health and Environmental Control in
accordance with provisions of Section 401 of the Clean Water Act. As such, this notice constitutes a request, on
behalf of the applicant, for certification that this project will comply with applicable effluent limitations and water
quality standards. The work shown on this application must also be certified as consistent with applicable
provisions of the Coastal Zone Management Program (15 CFR 930). The District Engineer will not process this
application to a conclusion until such certifications are received . This activity may also require evaluation for
compliance with the S.C. Construction in Navigable Waters Permit Program. State review, permitting and
certification is conducted by the S.C. Department of Health and Environmental Control. The applicant is hereby
advised that supplemental information may be required by the State to facilitate the review. Persons wishing to
comment or object to State certification or the navigable waters permit must submit all comments in writing to the
S.C. Department of Health and Environmental Control at the above address within thirty (30) days of the date of
this notice.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson
Stevens Fishery Conservation and Management Act. Implementation of the proposed project would result in
0.232 acre filling , 0.44 acres dredging, and 0.07 acre shading for a total of 0.742 acres of impact of Waters of
the U.S. upstream of estuarine substrates and emergent wetlands utilized by various life stages of species
comprising the red drum, shrimp, and snapper-grouper management complexes. Our initial determination is
that the proposed action would not have a substantial individual or cumulative adverse impact on EFH or
fisheries managed by the South Atlantic Fishery Management Council and the National Marine Fisheries
Service (NMFS). Our final determination relative to project impacts and the need for mitigation measures is
subject to review by and coordination with the NMFS.
REGULATORY DIVISION
Refer to: P/N #2012-00170-21R (Revised)
October 18, 2012
Page 3 of 3
Pursuant to Section 7(c) of the Endangered Species Act of 1973 (as amended), the District Engineer
has consulted the most recently available information and has determined that the project is not likely to
adversely affect any Federally endangered, threatened , or proposed species or result in the destruction or
adverse modification of designated or proposed critical habitat. This public notice serves as a request for
written concurrence from the U.S. Fish and Wildlife Service and/or the National Marine Fisheries Service on
this determination.
Pursuant to Section 106 of the National Historic Preservation Act (NHPA), this public notice also
constitutes a request to Indian Tribes to notify the District Engineer of any historic properties of religious and
cultural significance to them that may be affected by the proposed undertaking.
In accordance with the NHPA, the District Engineer has also consulted the latest published version of
the National Register of Historic Places for the presence or absence of registered properties, or properties
listed as being eligible for inclusion therein, and this worksite is not included as a registered property or
property listed as being eligible for inclusion in the Register. To insure that other cultural resources that the
District Engineer is not aware of are not overlooked , this public notice also serves as a request to the State
Historic Preservation Office to provide any information it may have with regard to historic and cultural
resources.
Any person may request, in writing, within the comment period specified in this notice, that a public
hearing be held to consider this application. Requests for a public hearing shall state, with particularity, the
reasons for holding a public hearing.
The decision whether to issue a permit will be based on an evaluation of the probable impact including
cumulative impacts of the activity on the public interest and will include application of the guidelines promulgated
by the Administrator, Environmental Protection Agency (EPA), under authority of Section 404(b) of the Clean
Water Act and, as appropriate, the criteria established under authority of Section 102 of the Marine Protection,
Research and Sanctuaries Act of 1972, as amended. That decision will reflect the national concern for both
protection and utilization of important resources. The benefit which reasonably may be expected to accrue from
the project must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to
the project will be considered including the cumulative effects thereof; among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
flood plain values, land use, navigation, shoreline erosion and accretion, recreation , water supply and
conservation , water quality, energy needs, safety, food and fiber production and, in general, the needs and
welfare of the people. A permit will be granted unless the District Engineer determines that it would be contrary
to the public interest. In cases of conflicting property rights, the Corps of Engineers cannot undertake to
adjudicate rival claims.
The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and
officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this activity.
Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify,
condition or deny a permit for this project. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the activity.
If there are any questions concerning this public notice, please contact Robin Coller-Socha at
843-329-8044 or toll free at 1-866-329-8187.
1'
1.,·
.. >
--
~
..............
/
!
(
8 1 Istand
.""'II Sot
A V Al,
R~
f
)
,.
l
t.
,.
f~
6
,.}J r> IV
i5
,
~
·
/ I '-· ...............
'\ -J..Rcb
!1:
·~'
I
--.
'~/-"\
f
.._/~r,P.,..
'-- ~\
1.
II
,
L
. ..-~~ . \_ (
}
DRAWING FOR PERMITIING PURPOSES ONLy NOT FOR
CONSTRUCTION
f' r<
I-PH (,V. 1
J..All!J.&l:.
u~~
\;
USTR A
IT[
of(
P·.·[','
OOPfl> fiiV R PJ.RT', ['3. ·:_g' 0 64"N
·c·c s 3l
·n ,.,
l ' ··
1"
J 'J
NIY
F BER"'f.L[
5 UTH
crps0081 1
~
JN'
AR'
·A
J
,.
I
\ NEXANS HIGH
VOLTAGE USA,
1
\
I
\
I
\
I
L_~
COOPER RIVER
PARTNERS, LLC
PROPOSED
BULKHEAD
AND DOCK
PROJECT
AREA
0
a::
:..:
~
Q.
>
05
:::>
ID
~
:
T
'
sI.'
DISPOSAL AREA
{SETTLING POND #2)
~
t
;
·
~
!
SAC#2012-00170-2R
October 18, 2012
DRAWING FOR PERMITIING PURPOSES ONLY. NOT FOR
CONSTRUCTION
"URPOSE NClU.:.TR1A SIIE DEVELOPM(Nl
..PPUCANT
C' )P(W R vtR PART);['IS. LC
~
SITE MAP
.£
_QNG · DE
S RHv OAT M
F CURE. 2
~.
·· =
so·
PROPQSr ):
tlU KriEAO ,\NO WHARF CONSTRUCTION
'·
COOPER
'"01..<"1''
· 8£RKE £Y COUN-v,
SO
COOPER R Ei? FAR'NERS. I L~
BUSHY PAR· FACI TY
13l>su J'l·
CMltJA
SH£1 2
R,(R
or
6
1
H CAPOL NA
2460000019
~ NEXANS HIGH
VOLTAGE USA, INC.
o
(').J
0
0
0
0
0
~
24'70000004
Goose
COOPER RIVER
PARTNERS, LLC
PROPERTY
c{]
~reek
25~0000001
2460000004
\
!
~
~
WAi'E-R
:
i
;
~
~
t
~
!
2550000006
;
£
·t
J
~
SAC#2012-00170-2R
October 18, 2012
:f..
u
-'Pf'
ANT
COCPrP Rvt=> PART'.[Ir Gu=>· .3
F ;..·. VEl·
-'..M!....!.lii.l...
~,QNGI!UPE
52'59'10 64 ..N
79'55 ' 32 9.l'·,o,
ts SHY PAR> FACiliTY
COQP(R RIVER
C[PK fY
IH :.P
SO
NlV
'!.0.
EXCAVATON TO
-12' MLLW
(APPROX. 0.44 ACRES)
_,...
_,.
COOPER R I R
-~~
.P.'
...,~,
-~,
·!!fta
_,..,
-~.
·."16.1
-t~'
. "16-'
'·
-~~)
.'12-o
...
.'12-1
...\1..
_,
-~'
_,....
..-"~'~
...,...,
-'~
.,..,, '1
--'~~
_,3..
t::.
.
1
_,).\
12.5
~7
A 3.2
.
Al~. 4
12.8
PROPOSED
MOORING DOLPHIN
~
.... ~.~
.3"
-·-+3.-7·
PROPOSED WHARF
(100' X 30')
- ---· t4.2
PROPOSED
MOORING DOLPHIN
PROPOSED BULKHEAD
(114.7')
,-- -----
1
PROPOSED FILL
BEHIND PROPOSED
BULKHEAD
(0.232 ACRES)
I
~
~
~
BLOCK 0 12
BLOC~ D 11
\
~
~
J;
l
J
i:
'
~
SAC#2012-00170-2R
October 18, 201 2
~
u
EV(L PVE ll
P
.!..8.l!lWli.
31
~9
·~:,
1n, .1·t,
12 ' v.
R ~AR'tE~S .
4
A\
R R /ER
Y C
A=
t.Tf.
NA
( SEE DETAIL
FIGURE FOR
3 FOMOORING DOLPHIN
R DOLPHIN LOCATIONS)
48" DIAMETER
5 TEEL DOLPHI N
(rtPICAL)
--T----~OJ
DRAWING FOR
PENDING. NOT FOR CONSTRUCTION.
FINAL STRucnfi!MI~~~PURPOS£5,
'"'"'"
APP
N
.. -
"'
')TRIA
co " '
0
LW~lllllf. ;~
V"J..IlL
sf£
> ·· " '
-
'5 12'>w
,.,,
,, "
o ""'
PARlN P5
l
r
'
A
SAC#2012-0017
c tober 18, 20120-2R
l
r
:::.
' A' , >£C1
·"-">>
',
'AI" "
IN
t.O' IO SCALE
S R
v
OA~
I'
N..,VD oz
BER<(
..
NTY
or'
E·RK£
S
' lC·/>PCO"N
·t· y