Paul & Dalton Plantation Field Renovation Project
Colleton County, South Carolina
Paul & Dalton Plantation Field Renovation Project
Colleton County, South Carolina
JOINT
PUBLIC NOTICE
CHARLESTON DISTRICT, CORPS OF ENGINEERS
69A Hagood Avenue
Charleston, South Carolina 29403-5107
and the
S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
OFFICE OF OCEAN AND COASTAL RESOURCE MANAGEMENT
1362 McMillan Avenue, Suite 400
Charleston, South Carolina 29405
REGULATORY DIVISION
Refer to: P/N # 2012-01069-11
November 1, 2012
Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), Sections
401 and 404 of the Clean Water Act (33 U.S.C. 1344), and the South Carolina Coastal Zone
Management Act (48-39-10 et.seq.) an application has been submitted to the Department of the
Army and the S.C. Department of Health and Environmental Control by
PAUL & DALTON PLANTATION
C/0 FOLK LAND MANAGEMENT, INC.
TRAVIS FOLK
3515 WHITE HALL ROAD
GREEN POND, SOUTH CAROLINA 29446
for a permit to excavate and place fill material in wetlands and waters of the
COMBAHEE RIVER
within existing managed tidal impoundments (historic rice fields) of Paul and Dalton Plantation
located at 3220 Wiggins Road in Green Pond, Colleton County, South Carolina (32.61392
Latitude/ -80.642816 Longitude)
NOTICE
is hereby given that written statements regarding the proposed work will be received by the Corps
until
15 Days from the Date of this Notice,
and SCDHEC will receive written statements regarding the proposed work until
30 Days from the Date of this Notice
from those interested in the activity and whose interests may be affected by the proposed work.
The proposed work consists of the excavation of 5.1 acres of wetlands and waters and the
placement of excavated (fill) material into 10.8 acres of wetlands and waters within the existing
managed tidal impoundment fields (historic rice fields) to construct new interior field-dikes and
canals. The proposed work also includes the installation of new spillway boxes with risers. In
REGULATORY DIVISION
Refer to: P/N # 2012-01069-1 T
November 1, 2012
detail, the work consists of the following :
Section 1: The construction of Section 1 of the interior field-dikes and canals involves the
excavation of a 2,606' long canal with a top width of 10', a bottom width of 8.25', and a depth of
10', and the construction of a 2,606' long field-dike with a top width of 12', a bottom width of 21 ',
and a height of 5.5'. Approximately 8,807 cubic yards of material will be excavated from the canal
and 8,759 cubic yards of that excavated material will be used to construct a new field-dike. The
new field-dike will be constructed approximately 30' from the canal to establish a 30' wide berm
that will be at the existing grade of the impoundment field. The construction of the Section 1
interior canal will impact 0.60 acres of wetlands and waters and the construction of the Section 1
field-dike will impact 1.26 acres of wetlands and waters.
Section 2: The construction of Section 2 of the interior field-dikes and canals involves excavation
of a 1,018' long canal with a top width of 10', a bottom width of 8.25', and a depth of 10', and the
construction of a 1,018' long field-dike with a top width of 12', a bottom width of 21 ', and a height
of 5.5'. Approximately 3,440 cubic yards of material will be excavated from the canal and 3,421
cubic yards of that excavated material will be used to construct the new field-dike. The new field
dike will be constructed approximately 30' from the canal to establish a 30' wide berm that will be
at the existing grade of the impoundment field . The construction of the Section 2 interior canal will
impact 0.23 acres of wetlands and waters and the construction of the Section 2 field-dike will
impact 0.49 acres of wetlands and waters.
Section 3: The construction of Section 3 of the interior field-dikes and canals involves excavation
of a 2,017' long canal with a top width of 10', a bottom width of 8.25', and a depth of 10', and the
construction of a 2,017' long field-dike with a top width of 12', a bottom width of 21', and a height
of 5.5'. Approximately 6,816 cubic yards of material will be excavated from the canal and 6,779
cubic yards of that excavated material will be used to construct the new field-dike. The new field
dike will be constructed approximately 30' from the canal to establish a 30' wide berm that will be
at the existing grade of the impoundment field . The construction of the Section 3 interior canal will
impact 0.46 acres of wetlands and waters and the construction of the Section 3 field-dike will
impact 0.97 acres of wetlands and waters.
Section 4: The construction of Section 4 of the interior field-dikes and canals involves excavation
of a 1,439' long canal with a top width of 10', a bottom width of 8.25', and a depth of 10', and the
construction of a 1,439' long field-dike with a top width of 12', a bottom width of 21 ', and a height
of 5.5'. Approximately 4,863 cubic yards of material will be excavated from the canal and 4,836
cubic yards of that excavated material will be used to construct the new field-dike. The new field
dike will be constructed approximately 30' from the canal to establish a 30' wide berm that will be
at the existing grade of the impoundment field . The construction of the Section 4 interior canal will
impact 0.33 acres of wetlands and waters and the construction of the Section 4 field-dike will
impact 0.69 acres of wetlands and waters.
Section 5: The construction of Section 5 of the interior field-dikes and canals involves excavation
of a 867' long canal with a top width of 10', a bottom width of 8.25', and a depth of 10', and the
construction of a 867' long field-dike with a top width of 12', a bottom width of 21 ', and a height of
5.5'. Approximately 2,930 cubic yards of material will be excavated from the canal and 2,914
cubic yards of that excavated material will be used to construct the new field-dike. The new field
dike will be constructed approximately 30' from the canal to establish a 30' wide berm that will be
at the existing grade of the impoundment field . The construction of the Section 5 interior canal will
impact 0.20 acres of wetlands and waters and the construction of the Section 5 field-dike will
impact 0.42 acres of wetlands and waters .
REGULATORY DIVISION
Refer to: P/N # 2012-01069-1T
November 1, 2012
Section 6: The construction of Section 6 of the interior field-dikes and canals involves excavation
of a 2,250' long central canal with a top width of 19.5', a bottom width of 17', and a depth of 10',
and the construction of a two (2) 2,250' long field-dikes with top widths of 12', bottom widths of
21 ', and heights of 5.5'. The central canal will be located between the two field-dikes.
Approximately 15,208 cubic yards of material will be excavated from the central canal and 15,125
cubic yards of that excavated material will be used to construct the two new field-dikes. The two
new field-dikes will be constructed approximately 18' from the central canal to establish two 18'
wide berms that will be at the existing grade of the impoundment field . The construction of the
Section 6 interior central canal will impact 1.01 acres of wetlands and waters and the construction
of the Section 6 field-dikes will impact 2.17 acres of wetlands and waters.
Section 7: The construction of Section 7 of the interior field-dikes and canals involves excavation
of a 968' long canal with a top width of 10', a bottom width of 8.25', and a depth of 10', and the
construction of a 968' long field-dike with a top width of 12', a bottom width of 21 ', and a height of
5.5'. Approximately 3,271 cubic yards of material will be excavated from the canal and 3,253
cubic yards of that excavated material will be used to construct the new field-dike. The new field
dike will be constructed approximately 30' from the canal to establish a 30' wide berm that will be
at the existing grade of the impoundment field . The construction of the Section 7 interior canal will
impact 0.22 acres of wetlands and waters and the construction of the Section 7 field-dike will
impact 0.47 acres of wetlands and waters.
Section 8: The construction of Section 8 of the interior field-dikes and canals involves excavation
of a 2,788' long central canal with a top width of 19.5', a bottom width of 17', and a depth of 10',
and the construction of a two (2) 2,788' long field-dikes with top widths of 12', bottom widths of
21 ', and heights of 5.5'. The central canal will be located between the two field-dikes .
Approximately 18,844 cubic yards of material will be excavated from the central canal and 18, 741
cubic yards of that excavated material will be used to construct the two new field-dikes. The two
new field-dikes will be constructed approximately 18' from the central canal to establish two 18'
wide berms that will be at the existing grade of the impoundment field. The construction of the
Section 8 interior central canal will impact 1.25 acres of wetlands and waters and the construction
of the Section 8 field-dikes will impact 2.69 acres of wetlands and waters.
Section 9: The construction of Section 9 of the interior field-dikes and canals involves excavation
of a 2,223' long canal with a top width of 10', a bottom width of 8.25', and a depth of 10', and the
construction of a 2,223' long field-dike with a top width of 12', a bottom width of 21 ', and a height
of 5.5'. Approximately 7,512 cubic yards of material will be excavated from the canal and 7,471
cubic yards of that excavated material will be used to construct the new field-dike. The new field
dike will be constructed approximately 30' from the canal to establish a 30' wide berm that will be
at the existing grade of the impoundment field. The construction of the Section 9 interior canal will
impact 0.51 acres of wetlands and waters and the construction of the Section 9 field-dike will
impact 1.07 acres of wetlands and waters.
Section 10: The construction of Section 10 of the interior field-dikes and canals involves
excavation of a 1,142' long canal with a top width of 10', a bottom width of 8.25', and a depth of
10', and the construction of a 1,142' long field-dike with a top width of 12', a bottom width of 21 ',
and a height of 5.5'. Approximately 3,859 cubic yards of material will be excavated from the canal
and 3,838 cubic yards of that excavated material will be used to construct the new field-dike. The
new field-dike will be constructed approximately 30' from the canal to establish a 30' wide berm
that will be at the existing grade of the impoundment field . The construction of the Section 10
interior canal will impact 0.26 acres of wetlands and waters and the construction of the Section 10
REGULATORY DIVISION
Refer to: P/N # 2012-01069-1 T
November 1, 2012
field-dike will impact 0.55 acres of wetlands and waters.
Spillway Boxes: Eight (8) new 28' long X 5' wide wooden spillway boxes with 6' tall flash board
risers will be installed in new and existing embankments. Bulkheads 8-1 0' wide on either side of
the spillway boxes will also be constructed .
Project Purpose
The overall project purposes include enhance water circulation capability, improve and diversify
habitats within the managed tidal impoundment for wildlife species , and minimize the potential
negative impact that would result if the perimeter river field-dike were to fail. The proposed new
embankments and water control structures will allow the larger managed tidal impoundment fields
to be managed as smaller fields with different habitat types and water depths. These habitats will
be enhanced by improved water circulation capability. The proposed project would also serve to
protect the majority of the rice field if one portion of the perimeter river field-dike were to fail.
Project Sections 1, 3, 4, 5, 6, 8, and 9 are proposed in order to restore two canals that ran from
the perimeter river field-dike to the bordering upland. Project Sections 1, 3, 4, and 5 will border
the existing field-dike but will restore the former canal that once ran between these two field-dikes .
Project Sections 6, 8, and 9 consist of constructing field-dikes on both sides of the former central
canal. These canals will serve the purpose of allowing better water flow in areas of the tidal
impoundment fields that are farthest from the river. Currently, new water that enters the field
through a trunk must travel across the tidal impoundment field for some distance before reaching
areas near the hill. Currently, the water can lose dissolved oxygen and contain filamentous algae
before it reaches areas close to the uplands. These canals will greatly improve the ability to
circulate water through the managed tidal impoundment fields, which will also create higher quality
wildlife habitat.
Project Sections 2, 7, and 10 will serve to compartmentalize the large managed tidal
impoundment fields. Project Section 2 will create two smaller impoundment fields of 68 acres and
93 acres. Project Section 7 will create two smaller impoundment fields of 48 acres and 71 acres.
Project Section 10 will create two smaller impoundment fields of 112 acres and 81 acres. These
cross field-dikes (Sections 2, 7, and 10) will serve two purposes. First, they will serve to minimize
impacts if a portion of the perimeter river field-dike were to fail. A Corps permit was issued
recently (SAC 2011-01131-1 T) to improve stability of the perimeter river field-dike, but the
additional insurance of the proposed cross-dikes will be helpful. Second, portions of the managed
tidal impoundment fields closer to the Combahee River are higher than portions of the fields
closer to the uplands. The proposed cross field-dikes will help compartmentalize areas of similar
elevation. This similarity in elevation across a management unit will better help manage for plants
valuable to wildlife and manage for migrating shorebirds in fall and spring .
The proposed project will create multiple different managed tidal impoundment fields where water
levels can be controlled independently, thus resulting in different water management regimes.
Consequently, a variety of management strategies will be used in the resulting water units. Some
tidal impoundment fields will be managed to promote nektonic species. Flooding during times of
peak availability of young fishes from the river is expected to result in a productive fishery within a
managed tidal impoundment field. This will provide excellent habitat for bald eagles and ospreys.
Some tidal impoundment fields will be managed as moist soil units. These managed tidal
impoundment fields have brackish water for some time and management for widgeongrass
(Ruppia maritime) is the management regime that will provide the greatest habitat value.
REGULATORY DIVISION
Refer to: P/N # 2012-01069-1T
November 1, 2012
Managing multiple managed tidal impoundment fields with a variety of water levels will also benefit
migrating shorebirds . During spring and fall migrations, numerous bi-polar shore bird species
pass through the ACE Basin. They obtain high-energy foods required for migration from recently
exposed mud flats in these managed tidal impoundment fields. By having multiple units,
managers are able to stagger mud flat exposure, and thereby access to food resources, over a
longer period of time. Once these managed tidal impoundment fields dry out after a period of
dewatering, their value to migrating shorebirds is minimal. The ability to dewater a different unit
once one has dried will be of great conservation utility for plantation managers.
Avoidance and Minimization
According to the applicant, avoidance strategies are few for the proposed work. Not performing
the proposed work would not meet the stated goal of improving water circulation capabi lity and
enhancing wildlife habitat value if no work were occurred. The applicant stated that purchasing a
property with fully functioning managed tidal impoundment fields is either cost prohibitive or does
not exist. Additional impacts to wetlands and waters were avoided by keeping the width of the
proposed field-dikes to dimensions that are sufficient for access with traditional agricultural
equipment and implements.
The applicant has minimized impacts by restoring the original layout of the managed tidal
impoundment fields. The proposed location of the new embankments (field-dike , berm , canal
complex) nearly replicates exactly the interior embankments that once occurred within the project
area. The managed tidal impoundments were initially constructed with the proposed layout and it
can be assumed that they functioned properly.
To further minimize impacts, all proposed work will occur in the dry after the managed tidal
impoundments have been drained in late winter and early spring . Also, all fill material needed for
the proposed work will be obtained from within the managed tidal impoundment fields . The
proposed field-dike construction and canal excavation activities will occur simultaneously. The
proposed work will be completed with a long-reach excavator on tracks using wooden mats for
stability if required . As the excavator proceeds down the length of the proposed field-dike and
canal , the operator will simultaneously excavate the new canal and use the excavated material
(fill) to construct the field-dike . The machinery will start at one end of a proposed field-dike/canal
and continue until one section is completed . The new wooden spillway boxes will be installed as
the proposed dikes are constructed . Also, bulkheads will be constructed on either side of the
newly installed spillway boxes to provide stability for the portion of the field-dike that crosses the
spillway box. By conducting all of the work simultaneously, the amount of traffic traveling across
the beds of the managed tidal impoundment fields will be minimized.
The newly constructed field-dikes will attempt to be revegetated by broadcast seeding of a fast
growing herbaceous species (e.g. browntop millet (Panicum ramosum). Based on past
experience, this area will also revegetate form native plant species already establ ished in the tida l
impoundment.
Compensatory Mitigation
The applicant has not developed a compensatory mitigation plan for the proposed project for
several reasons. They state that first, the proposed project aids in the management of a more
diverse set of habitats by allowing multiple water management regimes within a fully-functioning
tidal impoundment. Construction of new field-dikes is the only practical way to allow the property
owner to achieve his goal of increased water circulation capability and enhanced wildlife habitat
REGULATORY DIVISION
Refer to: P/N # 2012-01069-1T
November 1, 2012
quality. Second, the proposed activity also is in line with traditional activities within managed tidal
impoundments in the ACE Basin. Third, another motivation of this project is to protect the majority
of the managed tidal impoundment fields if one portion of the perimeter river field-dike were to fail.
Recent permitting history demonstrates that sections of the perimeter river field-dike are under
extreme erosion and correction of this will be a long-term project. A Corps permit was issued
recently (SAC 2011-01131-1 T) to improve stability of the perimeter river field-dike. Construction
of the proposed interior field-dikes will limit the impact of a perimeter river field-dike breach to a
minor portion of the managed tidal impoundment field rather than allowing it to impact the majority
of a field. Based on these reasons, the applicant believes that compensatory mitigation is not
required for the proposed project.
NOTE: Plans depicting the work described in this notice are available and will be
provided, upon receipt of a written request, to anyone that is interested in obtaining a
copy of the plans for the specific project. The request must identify the project of interest
by public notice number and a self-addressed stamped envelope must also be provided for
mailing the drawings to you. Your request for drawings should be addressed to the
U.S. Army Corps of Engineers
ATTN: REGULATORY DIVISION
69A Hagood Avenue
Charleston, South Carolina 29403-5107
The District Engineer has concluded that the discharges associated with this project, both
direct and indirect, should be reviewed by the South Carolina Department of Health and
Environmental Control in accordance with provisions of Section 401 of the Clean Water Act. As
such, this notice constitutes a request, on behalf of the applicant, for certification that this project
will comply with applicable effluent limitations and water quality standards. The work shown on
this application must also be certified as consistent with applicable provisions the Coastal Zone
Management Program (15 CFR 930). The District Engineer will not process this application to a
conclusion until such certifications are received . The applicant is hereby advised that
supplemental information may be required by the State to facilitate the review.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. Implementation of the
proposed project would impact 15.9 acres of estuarine substrates and emergent wetlands
utilized by various life stages of species comprising the red drum, shrimp, and snapper-grouper
management complexes. Our initial determination is that the proposed action would not have a
substantial individual or cumulative adverse impact on EFH or fisheries managed by the South
Atlantic Fishery Management Council and the National Marine Fisheries Service (NMFS). Our
final determination relative to project impacts and the need for mitigation measures is subject to
review by and coordination with the NMFS.
The District Engineer has consulted the most recently available information and has
determined that the project will have no effect on any Federally endangered , threatened , or
proposed species and will not result in the destruction or adverse modification of designated or
proposed critical habitat. This public notice serves as a request to the U.S. Fish and Wildlife
Service and the National Marine Fisheries Service for any additional information they may have
on whether any listed or proposed endangered or threatened species or designated or
REGULATORY DIVISION
Refer to: P/N # 2012-01069-1T
November 1, 2012
proposed critical habitat may be present in the area which would be affected by the activity,
pursuant to Section ?(c) of the Endangered Species Act of 1973 (as amended).
Pursuant to Section 106 of the National Historic Preservation Act (NHPA), this public
notice also constitutes a request to Indian Tribes to notify the District Engineer of any historic
properties of religious and cultural significance to them that may be affected by the proposed
undertaking.
In accordance with the NHPA, the District Engineer has also consulted the latest
published version of the National Register of Historic Places for the presence or absence of
registered properties, or properties listed as being eligible for inclusion therein , and this worksite
is not included as a registered property or property listed as being eligible for inclusion in the
Register. To insure that other cultural resources that the District Engineer is not aware of are
not overlooked , this public notice also serves as a request to the State Historic Preservation
Office to provide any information it may have with regard to historic and cultural resources.
Any person may request, in writing , within the comment period specified in this notice, that
a public hearing be held to consider this application. Requests for a public hearing shall state ,
with particularity, the reasons for holding a public hearing.
The decision whether to issue a permit will be based on an evaluation of the probable
impact including cumulative impacts of the activity on the public interest and will include
application of the guidelines promulgated by the Administrator, Environmental Protection Agency
(EPA), under authority of Section 404(b) of the Clean Water Act and, as appropriate, the criteria
established under authority of Section 102 of the Marine Protection, Research and Sanctuaries
Act of 1972, as amended. That decision will reflect the national concern for both protection and
utilization of important resources . The benefit which reasonably may be expected to accrue from
the project must be balanced against its reasonably foreseeable detriments. All factors which
may be relevant to the project will be considered including the cumulative effects thereof; among
those are conservation, economics, aesthetics, general environmental concerns, wetlands,
historic properties, fish and wildlife values, flood hazards, flood plain values, land use, navigation,
shoreline erosion and accretion , recreation, water supply and conservation, water quality, energy
needs, safety, food and fiber production and , in general, the needs and welfare of the people. A
permit will be granted unless the District Engineer determines that it would be contrary to the
public interest. In cases of conflicting property rights, the Corps of Engineers cannot undertake to
adjudicate rival claims.
The Corps of Engineers is soliciting comments from the public; Federal, state, and local
agencies and officials; Indian Tribes; and other interested parties in order to consider and
evaluate the impacts of this activity. Any comments received will be considered by the Corps of
Engineers to determine whether to issue, modify, condition or deny a permit for this project. To
make this decision, comments are used to assess impacts on endangered species , historic
properties, water quality, general environmental effects, and the other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments
are also used to determine the need for a public hearing and to determine the overall public
interest of the activity.
If there are any questions concerning this public notice, please contact (Tracy Dotolo
Sanders) at 843-329-8044 or toll free at 1-866-329-8187.
Project within Reg ion
0
5
10
_\
20 Miles
N
Project Tlle: Paul & Dalon rice field renovation
Project Location: 3220 Wiggins Road
Green Pond , SC Cd leton County
32° 36' 58.53" N. 80 ° 38 ' 33.45" W
Applicant: Tony Bakker
Agent: Travis Fok, Fdk Land Management
LLENDALE
I
Ora wing Scale
1": 42 ,000'
Date
Sheet
of
BERKELEY
DORCHESTER
BERKELEY
COLLETON
HAMPTON
CHARLESTON
Project Site
BEAUFORT
JASPER
BEAUFORT
BEAUFORT
BEAUFORT
BEAUFORT
BEAUFORT
BEAUFORT
BEAUFORT
BEAUFORT
Paul & Dalton Plantation fManaged Tidal
Impoundment Field Renovation
P/N: SAC-2012-01069-1T
November 1, 2012
Sheet 1 of 13
Project Tile: Paul & Dalen rice field renovation
Project Location: 3220 Wiggins Road
Green Pond , SC Col letonCounty
32 ° 36' 58.53 " N, 80 ° 38 ' 33 .45 " W
Applicant: Tony B akker
Agent : Travis Fol<, Folk Land Management
Project Area within Quad
0
1
2
Yemassee 7 .5' Quad
--------
~N
4 Miles
I
I
Drawing Scale
1": 7,500 '
Date
Sheet
of
Green Pond 7 .5' Quad
White Hall 7 .5' Quad
~-
1
I
I
I
I
I
I
I
I
I
I
\
-·
~.«.
~
Project Area (gray)
- ?..
~
'
I
I
I
I
I
I
I
I
I t
I~ .
I .l ,,·
I ,.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.
.I;
:'
I
I
\
"'
I_
Sheldon 7 .5' Quad
Paul & Dalton Plantation
boundary (black)
--!.
;,:
.
..
.,.
·..
~
'·
......
Wiggins 7.5' Quad
Dale 7 .5' Quad
!
'
""'
:.·
·.~;-
.~
......
.
-
/:·
...
c , 1 #ot~
"" ~~ ...
"·
.
'st.., ,..,._
t,..... ~
·lfA.,f:H
·.
Paul & Dalton Plantation rManaged Tidal
Impoundment Field Renovation
P/N: SAC-2012..Q1069-1T
.......
...
November 1, 2012
-t!·r
;_
··
.....
~-·.:
JtQr.t ..·
J
ISlA'WD
-
·· -
Sheet 2 of 13
··' '.,..,
/ /-4-
_..;·:.--
-·
-··
~"'
·
..,... -
I
--------~-- -- ------~~------~-- -- -----
Laurel Bay 7.5' Quad
1
Beaufort 7.5' Quad
1
Frogmore 7.5' Quad
Project Tlle: Pau l & Dalon rice field renovation
Project Location: 3220 Wigg ins Road
Vicinity Map
0
I
0.5
I
I
1
I
I
_\
2 Miles
I
I
I
I
Green Pond , SC Colleton County
32° 36' 58.53" N, 80 ° 38 ' 33 .45" W
Applicant: Tony Bakker
Agent: Travis Fol<, Folk Land Management
Drawing Scale
1": 6,500 '
_
Date
...
, .:;S~h:::ee
=-t--o_,.f-
N
~ }
9.
0
Q
ro
<}
Hickory Hill Road
~
\
-=: stocks Creek Road (dirt)
()
%
COUNTY
(1
RT
TY
~
~
t?.
L
~
.Z..
~
~ro
C}
%
Paul & Dalton Plantation I Managed Tidal
Impoundment Field Renovation
PIN: SAC-2012-01069-1T
November 1, 2012
Sheet 3 of 13
Paul & Dalton ~lantati~;_(black~l
Project Area within Paul & Dalton Plantation boundary
0
1 ,250
2,500
5,000 Feet
2009 aerial
~
N
Project Tlle: Paul & Dakon rice field reno vation
Project Location: 3220 Wiggins Road
Green Pond , SC Colleton County
32° 36' 58.53 " N, 80 ° 38' 33.45 " W
Ora wing Scale
1" : 1,750'
Date
Sheet
of
Paul & Dalton Plantation . Managed Tidal
Impoundment Field Renovation
PIN: SAC-2012-01069-1T
November 1, 2012
Sheet 4 of 13
Existing dikes, spillways, and trunks within Project Area
0
480
960
J
1,920 Feet
6',
..s/'~~
~
1"1)
Project Tlle: Paul & Dakon rice field renovation
Project Location: 3220 Wiggins Road
Green Pond , SC Colleton County
32° 36' 58.53" N , 80 ° 38 ' 33.45" W
Date
Sheet
\
z
L
I
'\
existing, spillway,
6
existing, trunk,
..
\
existing dikes
0
of
('
'
-
Ora wing Scale
1": 850'
t/
1171.4 acres !
~'
.I
'r'
/~<><9 ~
L[V££
-¥·
~
.......
I , ,
;
Paul & Dalton Plantation I Managed Tidal
Impoundment Field Renovation
P/N: SAC-2012-01069-1T
November 1, 2012
Sheet 5 of 13
Identification of proposed dike/canal sections (numbers)
and water control structures (letters) (cross sections also shown )
-==-=--=
I
Legend
0
J
(Proposed dike sections are to scale)
Project Tile: Pau l & Dalon rice field renovation
Project Location: 3220Wiggins Road
Green Pond, SC Colleton County
32° 36' 58.53"N , 80 ° 38 ' 33.45" W
Drawing Scale
1": 850'
=1
I
1 Date
J
orl
Sheet
proposed , spillway
=
0
existing dikes
500
1,000
2,000 Feet
. . proposed dike
. . proposed canal
1 project
--
area
.....
,
''
~
\
22.4 acres,
(existing im~oundment)
92.9 acres
68.1 acres
I
I
\
-"
\
I
\
\
\
'
\
I
\
I
I
I
111.5 acres
I
~
~L
project area boundary
81 .0 acres
~-
'!
~
/
/
/
-
-
L
Paul & Dalton Plantation . Managed Tidal
Impoundment Field Renovation
P/N: SAC-2012-01069-1T
November 1, 2012
I
Sheet 7 of 13
PrOJect Tl le: Paul & Dalon rice field re novation
Project Location: 3220 Wiggins Road
Proposed water flow plan
1
Legend
=n
0
500
1 ,000
wcs
Q
A
2,000 Feet
J
Drawing Scale
1": 850'
Green Pond , SC Colleton County
32° 36' 58.53 " N, 80 ° 38 ' 33.45" W
I Date
---f Sheet
of
existing, spillway
ex1shng, trunk
proposed, sp1llway J
=
North Canal w ill be used to move wate r
efficiently between Combahee River and
sections of rice field closest to the hill.
ex1st1ng d1kes
-
proposed dike
1-.:=
proposed canal
..::-1
project area
',
'\
\
I
22.4 acres 1
(existing i m~ound m ent)
'
.....
-' '
I
47.5 acres
\
\
81.8 acres
(existing impoundment)
\
'
\
\
I
I
\
\
I
)
I
111 .5 acres
81 .0 acres
[Pr$ct area bound~ry]
Paul & Dalton Plantation e Managed Tidal
Impoundment Field Renovation
P/N: SAC-2012~1069-1T
November 1, 2012
Sheet 8 of 13
South Canal will be used to move water
efficiently between Combahee River and
sections of rice field closest to the hill.
Cross Section A-A (typical )
proposed fill for cross dike & excavation fo r adjacen t canal
1 0.0 '
~
30 .0'
~ ._------------------------------~
proposed canal
proposed berm w1dth
top w1dth
5 .5'
ex1stmg grade nee f1eld bed
~
12.0'
proposed d1ke top
~
proposed
dike
he1gh t
21'
proposed
canal
depth
~
8.2 5'
prop osed
canal bottom
width
proposed dike base
I
10 .0 '
~
Paul & Dalton Plantation eManaged Tidal
Impoundment Field Renovation
P/N: SAC-2012-01069-1T
November 1, 2012
Sheet 9 of 13
Project Ttl/e. Paul & Dalton nee field renovat1on
Legend
IW'# ffiWAl
Excavat1on
I
Fill
.·1
Project Localton: 3220 W1gg1ns Road
Green Pond, SC Colleton County
32 36' 58.53" N, 80 38' 33.45" W
l
App!tcanl Tony Bakker
Dale
Agent. Trav1s Folk. Fo-lk_L
_a_n_d_ M-anagement
Sheet
Cross Section B-B (typical )
proposed fill for single dike & excavation fo r adjacent canal with exis ting dike to left of canal
f
extstmg features
20 '
·
6. 0'
average
existing dike
base
H---t
av~r:ge
exbls mg
erm
Width
35 '
average existing canal wid th
f
proposed features
8 .0 '
·
·
average
existing
berm
·d h
WI t
·
12. 0 '
proposed
dike top
30 .0'
·
·
proposed berm width
10 .0'
·
proposed canal
top width
·.:: :::: :: :: : :::::: : :
exist I
·
21'
proposed dike
base
e - rice f1eld bed
proposed
canal
depth
·
1 0 .0 '
8. 25'
·
·
proposed canal
bottom width
Paul & Dalton Plantation · Managed Tidal
Impoundment Field Renovation
~ : SAC-2012 -01069 -1T
November 1, 2012
Pro;ect Tttfe: Paul & Dalton rice f1eld renovat1on
Legend
tr.1"-00o/4 Excavation
<-:~~1
Sheet 10 of 13
Fill
Existing dike
Existing canal
Pro;ect Localion: 3220 W1ggins Road
Green Pond . SC Colleton Coun ty
32 36' 58 53" N , 80 ° 38 ' 33 45 " W
1"
Applicant. Tony Bakker
Date
Agent: Trav1s Folk, Folk Land Management
Sheet
--
--
Drawmg Scale
15'
--~
of
Cross Section C- C (typi cal)
proposed fi ll for single dike & excavation for adjacent canal with existing dike to right of can al
ex1s/mg features
proposed features
. .
.
10 .0 '
30 .0'
·
·~--------------~
proposed berm width
12 .0 '
proposed
dike top
prop osed canal
top width
·
8 .0'
35'
average
. .
eXISting
berm
·d h
WI t
average existing canal width
6 .0 '
20 '
~·
average
. . d"k
eXISting I e
base
average
. f
exbls lng
erm
width
rade - nee field bed
21,
10.0'
8.25 '
·
proposed dike
base
·
· ·
proposed canal
bottom width
Paul & Dalton Plantation ~ anaged Tidal
Impoundment Field Renovation
P/N: SAC-2012-01069-1T
November 1, 2012
1·.· .
. ·.· I
~
Project Tille : Paul & Dalton rice f1eld renovation
Legend
17/#//mYM
Sheet 11 of 13
Excavation
Fill
Existing dike
Existing canal
Project Locat1on: 3220 Wiggins Road
Green Pond, SC Collet on County
32o 36' 58 53" N, 80 ° 38' 33 .45" W
i orawmg Scale
I 1" : 15'
Applicant: Tony Bakker
Date
Agent: Trav;; Folk, Folk Land Management
Sheet
---i
7J
.
.
Cross Section 0 - 0 (typical )
Pro posed fill for double dike & exc avation for central cana l
12.0'
~
proposed
dike top
.
18 .0 '
18.0 '
proposed berm width
proposed berm wid th
12.0 '
~
proposed
dike top
19 .5 '
proposed
dike height
.. -:.; -:::.:. :::.::: : -:.: ..
proposed canal
top width
existing grade - nee field bed
21 '
21'
pro posed dike base
proposed
canal
depth
I
proposed dike base
1 0 .0 '
17 .0'
proposed canal
bottom wid th
Paul & Dalton Plantation . Managed Tidal
Impoundment Field Renovation
PIN: SAC-2012-01069-1T
November 1, 2012
r
Legend
W//###.M
Excavation
~~
Fill
Sheet 12 of 13
----ProJect Title: Paul & Da lton rice f1e ld renovation _ _
ProJect Loca!ton. 3220 W1gg1ns Road
Green Pond , SC Colleton County
32 36' 58 53" N, 80 38' 33 45'' W
L A,o,ol1cant: Tony Bakker
1
_
Drawmg Scale
1 " . 10 ·
_l Date
Agent. Trav1s Folk, Folk Land Management
j
Sheet
_
----1
~
.
Illustration of Typical Wooden Spillway Box and Flashboard Rizer
to be used in Various Locatio ns Throughout Rice Field
21,
Tidal Ri ce Field
.-
~
6.0'
Height of
Flash board
Riser
Tidal Rice Fi eld
dike width
~~
wetland fill for new dike
5 .5 '
...
f..
·
r---,
-
- --
L T
J
'
I-
~
- r-
· -,r,
·
'
I
I
~
I
'
I
I
·
I
f
~
a
Sti\BBIN(; t'
·
·
r
I
I
.
1
I
I
I
-
_!
··
·
I
!
r
.
t
I
I
S\DtBOAT ~
~
·
I
·
.
I
,....
Direction of water flow
L
Spt!lway box placed 6" below grade of wetland
Paul & Dalton Plantation f Managed Tidal
Impoundment Field Renovation
P/N: SAC-2012-01069-1T
November 1, 2012
Dimensions
Width of spillway box= 5'
Length of spillway box= 28 '
Outside height of spillway box = 2. 0'
Inside height of spil lway box = 18"
Height of flashboard rizer = 6.0'
I
Sheet 13 of 13
Pro1ect Ttf/e. Paul & Dalton nee field renovation
ProJect Location: 3220 W1QQ1ns Roa d
Green Pond . SC Colleton County
32 36' 58 53" N, 8Q u 38 ' 33 45" W
-
Drawmg Scale
1 " : 3 5·
--
Applicant ' Tony Bakker
Date
Agent: Trav1s Folk , Folk Land Man agem en t
Sheet
~
of
'