Poplar Grove Mitigation Bank
Dorchester County, South Carolina
Poplar Grove Mitigation Bank
Dorchester County, South Carolina
PUBLIC NOTICE
CHARLESTON DISTRICT, CORPS OF ENGINEERS
69A Hagood Avenue
Charleston , South Carolina 29403-5107
December 5, 2012
REGULATORY DIVISION
Refer to: PI N # SAC-201 1-00847
Pursuant to Sections 401 and 404 of the Clean Water Act (33 U.S.C. 1341) and the South Carolina
Coastal Zone Management Act (48-39-10 et.seg .) a Prospectus has been submitted to the Department of the
Army and the South Carolina Interagency Review Team by
POPLAR GROVE LLC
ATTN: MR. VIC MtLLS
2743 PERIMETER PARKWAY
BUILDING 100, SUITE 370
AUGUSTA, GEORGIA 30909
for a proposal to establish and operate a wetland mitigation bank that is adjacent to tributaries of
RANTOWLES CREEK
at a location near the intersection of Tannenbaum Road and Delemar Highway (South Carolina Highway 165) in
Dorchester Cou nty, South Carolina (Latitude 32.845339 N, Longitude -80 .221677 W).
In order to give all interested parties an opportunity to express their views
NOTICE
is hereby given that written statements regarding the proposed work will be received by the Corps of Engineers
until
12 O'CLOCK NOON, FRIDAY, JANUARY 4, 2013
from those interested in the activity and whose interests may be affected by the proposed work.
The proposed project consists of establishing a freshwater wetland mitigation bank that is located within
the Stono River watershed (USGS 8-digit Hydrologic Unit Codes 3050202) . The 250-acre project site is a portion
of a 3,OOO-acre tract that is currently protected by a conservation easement. The proposed mitigation bank site
includes approximately 204.7 acres of jurisdictional wetlands , 40.5 acres of uplands, and 4.8 acres of other
aquatic resources (ditches , streams , and canals).
According to the bank sponsor, the proposed mitigation bank will preserve the existing streams
(approximately 1,600 linear feet) on the project site and will enhance the vegetation and hydrology within the
existing wetland systems. The mitigation work plan consists of removing planted loblolly pine , planting native
hardwood species, and plugg ing the existing ditches to restore natural flows within the project site . Groundwater
and surface water monitoring wells will be installed on the mitigation bank site to document existing hydrology
cond itions and to evaluate the restoration of natural hydrology on the project site. The bank sponsor is proposing
to use the Reg ional Guidebook for Applying the Hydrogeomorphic Approach to Assessing the Functions of
Headwater slope Wetlands on the South Carolina Coast to document the functional lift on the project site.
REGULATORY DIVISION
Refer 10: PIN # SAC-2011-00847
December 5, 2012
The proposed mitigation bank will provide in-kind compensatory mitigation for authorized impacts to
aquatic resource functions and services associated with future development activities within the Middle Atlantic
Coastal Plain and Sea Islands Coastal Marsh ecoregions, as shown on the attached Service Area Map. The work
required to complete the restoration and enhancement of aquatic resources located on the mitigation site may be
authorized under Nationwide Permit #27 after review by the Corps , the South Carolina Department of Health and
Environmental Control , and the Interagency Review Team . According to the bank sponsor, the mitigation bank
site will be further protected by granting additional rights through a conservation easement or transferring fee title
to an appropriate land trust.
The Prospectus for the proposed mitigation bank is available for review by appointment between the
hours of 9:00 am and 4:00 pm Monday through Friday at the address listed above . Please note if information
about the location of Federally listed Threatened or Endangered species or the location of cultural resources is
included in this Prospectus , this portion of the document may be withheld in accordance with the appropriate
statutes for the protection of this information. If there any questions concerning the proposed mitigation bank
or the information included in this public notice please contact Mr. Nat Ball bye-mail at
nathaniel.i.ball@usace.army.mil or by telephone at 843-329-8044 .
~i~~~l~~~ *
Site Location
FIGURE 1, LOCATION MAP, SOUTH CAROLINA GAZETIEER
FIGURE 4, 2006 CIR PHOTOGRAPH, RAVENEL QUADRANGLE
B.onk Boundary . 250
-
.0.:,..
Strum . <-1- 1.6001;"'0' fHUO.2 K'I
. _ ·· CiI<:II & Co nal . 10.100 Iin. ar fvt\l4.6 fer. .
-
Roads . 15.300 in .., fvetl7.0.cr ...
Plant'" Pin.
Up~ncI ·
33.S I"K
_
i-tara.vood W.~. ncI , 44,S."...
_
Plant'" Pin. Wootllnd · 160.2 ocr..
F~~t
O
:· .......oc=======oo......
' ,OCO
'. '.OCO
MAP SCALE : 1 INCH : 2000 FEET
FIGURE 3, EXISTING HABITATS, 2006 CIR PHOTOGRAPH, RAVENEL QUADRANGLE
03050106
03050109
03050110
03050203
03050 204
_
*
D
PRIMARY SERVICE AREA
SECONDARY SERVICE AREA
SITE LOCATION
'i.c':'·i'O..c
O 12:''i.OOiiiO
.....'5iii0 ·OOO Feet
o
MAP SCALE: 1 INCH = 125,000 FEET
FIGURE 9. POPLAR G ROVE MITIGATION BAN K SERVICE AREA MAP