Isle of Palms Shoal Management Project
Charleston County, South Carolina
Isle of Palms Shoal Management Project
Charleston County, South Carolina
J 01 NT
PUBLIC NOTI C E
CHARLESTON DISTRICT, CORPS OF ENGINEERS
G9A Hagood Ave nue
Charleston, South Carolina 29403-5107
and the
S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
OFFICE OF OCEAN AND COASTAL RESOURCE MANAGEMENT
1362 McMillan Avenue, Suite 400
Charleston, South Carolina 29405
REGULATORY DIVISION
Refer to: PIN #SAC-2010-1041-2IG-Modification
16 JANUARY 2013
Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) , Sections
401 and 404 of the Clean Water Act (33 U.S.C. 1344), and the South Carolina Coastal Zone
Management Act (48-39-10 et.seg .) an application has been submitted to the Department of the
Army and the S.C. Department of Health and Environmental Control by
THE CITY OF THE ISLE OF PALMS
CIO STEVEN B. TRAYNUM
COASTAL SCIENCE & ENGINEERING
POST OFFICE BOX 8056
COLUMBIA, SOUTH CAROLINA 29202
for a modification to an existing permit to allow two additional events to perform sand scraping and
transfer sand to eroded areas in the
ATLANTIC OC EAN
and on the beach at a location limited to the area between 53fd Avenue and an existing groin near
ttJ
the 17 tee of the links Course , on the northeastern end of the Isle of Palms, Charleston County ,
South Carolina (the project area begins at approximately Latitude 32.79861 °-Longitude
79.74670° and ends near Latitude 32.82000°- Longitude -79.72218°).
In order to give all interested parties an opportunity to express their views
NOTICE
is hereby given that written statements regarding the proposed work will be received by the Corps
until
15 Days from the Date of this Notice,
and SCDHEC will receive written statements regarding the proposed work until
30 Days from the Date of this Notice
from those interested in the activity and whose interests may be affected by the proposed work.
The proposed work consists of modification to the existing permit to allow the applicant to
increase the number of sand scraping events from two to four over the life of the permit and
change the expiration date of the S. C. Oepartment of Health and Environmental Control OCRM
permit to coincide with the Oepartment of the Army permit, which is 31 March , 2017 . The
REGULATORY DIVISION
Refer 10: PIN #SAC-201 0-1 041-2IG-Modificalion
16 JANUARY 2013
applicant would still be limited to the total volume of sand that can be scraped and transferred
under the existing permit, which is a maximum of 500,000 cubic yards. The applicant would also
still be limited to the currently allowable volume of sand scraped during one event, which is
250,000 cubic yards. The applicant has proposed that the special conditions of the current permit
be required for the two additional sand scraping events jf the modification is granted. The
applicant has stated that the modification is necessary since the 100 ft "trigger line ~ has been
reached along a portion of the project area in the vicinity of the Ocean Club building and the 18th
hole of the links Course.
The existing state and federal permits allow the applicant to perform sand
redistribution along the northeast end of Isle of Palms to mitigate recent erosion and in
anticipation of future erosion associated with shoal-bypass events and inlet delta dynamics.
Conditions of the permit limit the number of redistribution events to two , each of which can
involve moving up to 250,000 cy of sand from the beach in stable or accretional areas to
eroded areas. The permit stipulates that sand can only be borrowed from areas of the beach
with at least 400 ft of width seaward of structures (defined by a ~ buffer linen in the permit
drawings) . No excavations are allowed landward of the buffer line . Also , a 100 ft Utrigger
linen is established which provides a threshold minimum beach condition before a project is
justified (ie, the +5 ft NAVD contour needs to be less than 100ft from a building before a
project is done).
The applicant has stated that the permit modification is being requested due to the
following :
"1) The 100 ft trigger has been met along a portion of the project area (Sheet 2 of 5).
Erosion has led to loss of dune area and is impacting walkovers and infrastructure. CSE
expects erosion in the area to continue , and perhaps worsen over the next year due to the
ongoing shoal-bypass event. Some type of erosion mitigation will be required to ensure that
the ocean does not encroach on buildings.
2) The ongoing shoal bypass event is much larger than typical bypassing events at lOP and
is thereby taking more time to progress. Based on the July 2012 condition , the oncoming
shoal and sandbars on the landward (southwestern) side of the Dewees Inlet main channel
contain -2 million cy of sand above local closure depth. This compares to typical events
contain less than 500,000 cy (Gaudiano 1998). This shoal will have major impacts on the
lOP shoreline for several years , but it is not close enough yet to use as a borrow source.
Managing shoal-induced erosion will require more flexible mitigation options.
3) The City of the Isle of Palms (applicant) wishes to minimize the number of scraping events
by doing fewer but larger projects but must coordinate work with the timing of shoal bypass
events . The current condition requires something be done; however, a large project is
unfeasible at the present time due to the shoal configuration .
4) A permit modification is the applicant's preferred alternative compared to additional small
scale additions of upland sand. If the City uses the remaining permitted event this winter
(without a modification), they will not have a mechanism to mitigate potentially severe
erosion , which is expected to occur as the offshore shoal gets closer to the shoreline . If
nothing is done, continued erosion will pressure property owners to place emergency
sandbags ." The purpose of the proposed work is to protect properties on the Isle of Palms
and "ensure that the beach will be preserved over the next several years in response to what
is currently being observed in the delta ."
REGULATORY DIVISION
Refer to: PIN #SAC-2010-1 041-2IG-Modification
16 JANUARY 2013
NOTE: Plans depict ing the work described in th is notice are avai lable and w ill be
provided, upon rece ipt of a written request, to anyone that is interested in obtaining a copy
of the plans for the specific project. The request must identify the project of interest by
public noti ce number and a self-addressed stamped envelope must also be provided fo r
mailing the drawings to you . Your request for drawings should be addressed to the
U.S. Army Corps of Engineers
ATTN : REGULATORY DIVISION
69A Hagood Avenue
Charleston, South Carolina 29403·5107
The District Engineer has concluded that the discharges associated with this project, both
direct and indirect, should be reviewed by the South Carolina Department of Health and
Environmental Control in accordance with provisions of Section 401 of the Clean Water Act. As
such , this notice constitutes a request, on behalf of the applicant, for certification that this project
will comply with applicable effluent limitations and water quality standards. The work shown on
this application must also be certified as consistent with applicable provisions the Coastal Zone
Management Program (15 CFR 930). The District Engineer will not process this application to a
conclusion until such certifications are received .
The applicant is hereby advised that
supplemental information may be required by the State to facilitate the review.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act.
Implementation of the
proposed project would impact (23.2) acres of estuarine substrates and emergent wetlands
utilized by various life stages of species comprising the red drum , shrimp , and snapper-grouper
management complexes . Our initial determination is that the proposed action would not have a
substantial individual or cumulative adverse impact on EFH or fisheries managed by the South
Atlantic Fishery Management Council and the National Marine Fisheries Service (NMFS). Our
final determination relative to project impacts and the need for mitigation measures is subject to
review by and coordination with the NMFS.
Pursuant to Section 7(c) of the Endangered Species Act of 1973 (as amended) , the
District Engineer has consulted the most recently avai lable information and has determined that
the project is not likely to adversely affect any Federally endangered , threatened , or proposed
species or result in the destruction or adverse modification of designated or proposed critical
habitat. This public notice serves as a request for written concurrence from the U.S. Fish and
Wildlife Service and/or the National Marine Fisheries Service on this determination.
Pursuant to Section 106 of the National Historic Preservation Act (NHPA), this public
notice also constitutes a request to Indian Tribes to notify the District Eng ineer of any historic
properties of religious and cultural significance to them that may be affected by the proposed
undertaking.
In accordance with the NHPA, the District Engineer has also consu lted the latest
published version of the National Register of Historic Places for the presence or absence of
registered properties, or properties listed as being eligible for inclusion therein , and this worksite
is not included as a registered property or property listed as being eligible for inclusion in the
Register. To insure that other cultural resources that the District Engineer is not aware of are
not overlooked , this public notice also serves as a request to the State Historic Preservation
Office to provide any information it may have with regard to historic and cultural resources .
Any person may request, in writing , within the comment period speCified in this notice, that
a public hearing be held to consider this application. Requests for a public hearing shall state,
REGULATORY DIVISION
Refer 10: PI N #SAC-201 0-1041-2IG-Modificalion
16 JANUARY 2013
with particularity, the reasons for holding a public hearing.
The decision whether to issue a permit will be based on an evaluation of the probable
impact including cumulative impacts of the activity on the public interest and will include
application of the guidelines promulgated by the Administrator, Environmental Protection Agency
(EPA), under authority of Section 404 (b) of the Clean Water Act and , as appropriate, the criteria
established under authority of Section 102 of the Marine Protection, Research and Sanctuaries
Act of 1972, as amended . That decision will reflect the national concern for both protection and
utilization of important resources . The benefit which reasonably may be expected to accrue from
the project must be balanced against its reasonably foreseeable detriments. All factors which
may be relevant to the project will be considered including the cumulative effects thereof; among
those are conservation , economics , aesthetics , general environmental concerns , wetlands,
historic properties , fish and wildlife values, flood hazards, flood plain values , land use, navigation,
shoreline erosion and accretion , recreation , water supply and conservation, water quality, energy
needs, safety, food and fiber production and , in general, the needs and welfare of the people . A
permit will be granted unless the District Engineer determines that it would be contrary to the
public interest. In cases of conflicting property rights , the Corps of Engineers cannot undertake to
adjudicate rival claims.
The Corps of Engineers is soliciting comments from the public; Federal , state , and local
agencies and officials ; Indian Tribes; and other interested parties in order to consider and
evaluate the impacts of this activity. Any comments received will be considered by the Corps of
Engineers to determine whether to issue, modify, condition or deny a permit for this project. To
make this decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects , and the other public interest factors listed
above . Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments
are also used to determine the need for a public hearing and to determine the overall public
interest of the activity.
If there are any questions concerning this public notice, please contact Mary Hope Green
al 843-329-8044 or loll free al 1-866-329-8187.
""""..
OF PALMS,
CHARLESTON
COUNTY
o
1.700 n
3.400 FT
PROJECT AREA
OIRECTION S:
FROM CHARLESTON , TAKE US·17 NORTH. TURN RIGHT ONTO
517 (ISLE OF PALMS CONNECTOR). TURN LEFT ONTO PALM BLVD
SITE IS NORTHEAST OF 47TH AVE EXTENDING ALONG TO DEWEES INLET ON THE NORTHEAST END OF ISLE Of PALMS.
se
17
--
SAC-201 0- 1041 -2IG- MODIFICAT ION
XMlp®45
DRAWING nnE:
APPtiCANr:
CITY OF ISLE OF PALMS
PO DRAWER 508
ISlE OF PALMS SC 29451
AGENT
COASTAL SCIENCE & ENGINEERING
POBOX 8056
COLUMBIA,
29202
se
VICINITY MAP
"""
'Me
~.,
PROJECT.
~~
~l'O1)
l'OU·RI
,~
" ..."
..
~
...@]
,\ \ \ I \ 11/""
.....................
~
f /
\\'\
"
=;;;!
::
~;;
=.-:::..\
('~"I
,::'..:··~ I,
~',-;.
COASTAl
SCIENce
& ENGINEERINC
NoCOl i50
'!.....,0%.::=
\..
;
lAq; ~
\J-.-,";'{r..:.
.. ....···········~
./ ;;;,~
"
":'''-0
"," I.,,,FIII1~,,\ \ "","
.
N
1 MILE
~<'"
'v
o,,\)
~
v
"'
C"
'"'
V;;Q
cQ
":>
'" '">,
':>",.1
~
~
,
.)
".
~ j
~ ,0
"',..r '-'
"'"
0
-
1"
I
" , . .. -
'"" "
··
0
....,,'"
_
o __ ,
'
"".
'-...:::,
---='--.:
[;:
'. ._c" " '"
'0..Q:::)
'<0
'"":'"'"
" ElI l I l . ,
Dr ,
(
o=.~~
_ _ _, _
.....
...,~
'
Building Une'-..
,-
C)
c"
..,..
!I
~~ t OJ)
I
POTENTIAL BORROW AREA B
Under Dec 2012 Conditions
STA 328+00 to 335+00
Up to 40,000 f;'f
..-v 4.0
Q,c.,.
;'
-------c"....,)
" ,, ,
r_/
'_,_
I
,
,
.-'-'
NOTE: No excavation will be done
within 400' of the building line,
®
'"
POTENTIAL BORROW AREA A
Under Dec 2012 Conditions
STA 286 to 302
Up to 70,000 f;'f
'" 'l.' etC
o
A tlantic Ocean
shown based on data collected by
Coastal SCIence & Engineering, Inc via RTK GPS Dec 2012.
SAC-2010-1D41-2IG-MODIFICATION
APPUCAffT'
AGENT
CITY OF ISLE OF PAlMS
COASTAL SCIENCE & ENGINEERING
PO BOX 8056
COlUMBLA, SC 29202
~
PROPOSED FILL AREA
Under Dec 2012 Conditions
STA 308+00 to 322+00
Up to 110,000 cy
~JI.(."
Contou~
POST OFFICE BOX 508
ISLE OF PALMS, SC 29451
\\
0
ljl
Excnation.1Id Ii. limb and volume. may
DATUM:
HorIzontal, SPeS NAO '83 (Feet) SC Zone 3900
VMicaI: NAVO '88 (Feet)
II, I
,
\~.,;;;
r.JiF,,;' ~.I.e
NOTE:
change baHd on conditions .1 11M! lime 01
conslruction, but will remain within permitt~
boundaries Ind Iblde by Ili specl.1 conditions
ollhe permit.
II
0!! '[J.
@@:
._. ,
rj
,...,
Dewees Inlel
C"1;® \ \
r.....J ()
Lo ::w
§
_
.
'
_
v
~
,_
, ,_
_,
c- ,-
':J
~ ",.:'' 1
~,_ ,
,
--s_'-!J, ""
,-p-".::!vvV'
::; \ L.l ~ U
r-"
,
- I I~,
b
~
' , "'
'"",
'.
0
Jt
..
· C":,,,)\
'" , - ?
U
"ov
1'0 _
0" ' "
'-
" Ol
(~ c~co
'.
~
~J~'" "'cO:" I.l
~
<;..""
>
-- , ~~
",-,,,.~.,---,, ,
r
~
')
4
,,,. "
Of ",'''"0
.,) eO
oJ
<
'"
"""
Unu
\)0"
~ 1.1"tf;,
"'"'--1, ~ {'~J':l::c.U '(,.'~o,~(f ~o~o
0"0
V>=c:,
':i
il,:;>
>
r:>"",.,{/
a, [
0
.:> '"
"
"... YO"0.,)
o""~",.'. ~
~
"""'i;;:;' c" '" ~
..... O~c. )
' .C
e
,,;>"
b
C
l'
c.c ce
"
"J,
"('v
ov "",.,,,
)
0
1>;;
""
0
v
"'<'
"e,
J iRe'.-
<:- '" C'
0
()
V,,"
"
~
P222Z'I ,_""""
I
A~
I Proposed Fil Area
->5' NAVD (Dec 2012)
800
Scale (Feet)
" r DRAWING Tm.E:
EXISTING CONDITION (December 2012)
PROPOSED SCRAPING & FilL PLAN
- , _ . - MHHW·241'NAVD (Dec2012)
-
- . ""'" ....
""
... ""@J
-- - - MLLW -3.0' NA'IO (Dee 2012)
, 1._ .. .
~~,
REV-Sf[)
~.
101:1-111
Station: 292+00 (Shipwatch)
15
i
i
:
:
:
:
:
:
:
:
10
I
C
~
:::
5
i
::
:,
c:
i
:
,i
o
';::;
o
Q)
I
~..---..-------.-~--------- ..
~
'">
400 It
.,ff" U" I
t
1
I
-----+----.----------..- 1___________________1_______________________
:
'~
I
:,
.::
.:i
i
i,
:.
,i
:
:
I
I
:
:
NOTE:
:
1
fJ:CJYation and fill limits .nd volumes may change based on
eonditiOM II tM time of construction, but will remain within permitted!
i
bound.rin and l bide by.n special condition, 01 tIM permit.
-10
Excavation Limit
,
I
·
-----------------i------------------T'·--------------··..
,j----,-------..---
W
-5
Oec-12
r --··-..-------- ·-~-- ---····..·------+-----------------t-------------
~
z
-
!
1
:
t
1
.i:
1
:
!:
,,
"
.,
200
400
·
~.---------------- ------,
.
'"
,
+- --------------.-~-- ---------.-.------+------------.------I--------------------t-----------------------,
j
t
j
i
o
:
:,
i
:
:,
,,
:
:
:,
,
600
800
,
1000
DATUM:
Distance from Baseline (tt)
I-kmon!al SPCS NAD'83 (Feet) SC Zone 39Xl
Venica! NAVO '88 (Feet)
COntours shoWn based on data coHected by
Coastal Soer.ce& Engneenng, Inc I'ICI RTK GPS Dec 2012
SAC-2010-1041-2IG-MODIFICATION
APPUCANT
AGENT
CITY OF ISLE OF PALMS
COASTAl SCIENCE & ENGINEERING
PO BOX 8056
COLUMBIA, SC 29202
POST OFFICE BOX 508
ISLE OF PALMS. SC 29451
I
rDRA=-:c
"''''NG=n:::'': ::£------------, rSCllE
EXISTING CONDITION (December 2012)
PROPOSED SCRAPING SECTION
o\$SHOWN
'"
"
....
2C!3-II:l
PROJEC'I.
2~
."
IStEET
*~,
~,
~
1
Station: 330+00 (18th Hole)
!
!,
10
400 It Suffer Une
is
~
----------1
5
~
-~
<:
0
,
1
:i
:
\
:
W
-5
-10
,·-··------·-------------1----------,
Jul-12
-
Excavation limit
~-
- - - - - -·-·- - -·- f\" - ---·---·------l~
-------------------\--------------------1-------------.
.
Z
.;:
.2
.--It
-
:
-+:
:
:
,
!
:
:
:
!
:
:
i
:
i
,--.-------------.-.-.-.l-----------...........-..-.-~------_.... --..-------L._---..------------------l----------------____
I,
i,
i,
.;;
:,
!,
:
.··
.
.
..
··
.i
1
·!
..
o
400
200
600
800
A __
1000
Distance from Baseline (It)
DATUM:
Horizontal SPCS NAO '83 (FeeQ SC Zone 1900
Vertical. NAVO '88 (Feel)
Conlourl shoovn based OIl data collected by
Coastal ScIence & Eng~. Inc VIa RTK GPS Dec 2012.
APPlIUl.N,
CITY OF ISLE OF PALMS
POST OFFICE BOX 508
ISLE OF PALMS, SC 29451
AGENT
SAC.201()... 1041-2IG-MODIF1CATION
\ r DRAWING nnE;
COASTAl SCIENCE & ENGINEERING
PO BOX 8056
COLUMBIA, SC 29202
NOTE:
fatlYlllon .nd fililimu .nd '1oly,"" rNy change
based on conditions ~t the lime of construction, but will
rem.ln within permitted boundaries .nd .bide by all
IIIKI' Icondition. of the permit.
EXISTING CONDITION (December 2012)
PROPOSED SCRAPING SECTION
, r....,~
.o.s SItC/W'I 1&lEfT
.""
"""'" "',,,
~.-
~Cl .
2*
""
~
Station: 314+00 (Ocean Club)
15
,,
,,
i
1
i
10
~
o
~
z
!I
-.. --...... -..--+-...----,
i
i
1
,
:
.
,
.
,
-t---------t-·~-·-·-- ·-····t_
, ·--------·t-·····---·----I
,
:
5
!
,:
!
:
1
."l!
.i: Ma.i mum
.:
Fill Section
"
,,
i
:
!
-1 0
200
300
1
f
: : :
,
,
:
.
·----------r-··-·-····-r-·--·······--r--------
:i
l
- ...-;--..-
!"
1
,,"
!
!
,
-.-----------~-.-
.
,
----:--------.---r....------.-
'
!
f
"
.
,
"
!!
i
1
' ----r-·-·-·-····--I------------
: :
:
:l
i
!
!
500
!
"
: :
400
!
: :
.
,
.I
:
:
,
,
--:--------1----
i
i '
,.
'"
w
·5
0. __ _
:,
,
:
:
:,
.
--!--- ..---o .--------r---.-.....
~
Fill
.-------------j.......-.-...-. -i---....---~---..L...-..-..-------1-.-----------J-------.....-..1--------------
~
.o
DeC-12 -
1
:,
,
:
=c:
-
:
600
700
.~rvi'~------
800
1000
900
Distance from Baseline
DATUM:
HoRzontal: SPeS NAD '83 (Feet) SC Zone 39CXl
NOTE:
Veltical; NAVO '88 (Feet)
Contour1 shown based on data collected by
Coastal Science & Erogmeeting, Inc Vla RrK GPS Dec 2012
APPU~,
SAC-201 0-1 04t -2IG-MODIFICATION
'r'A~G~'Nr~----------------------~
CITY OF ISLE OF PALMS
COASTAl SCIENCE & ENGINEERING
POST OFFICE BOX 508
PO BOX 8056
ISLE OF PALMS, SC 29451
COLUMBIA, SC 29202
EIc.lnt.ion.M fili limitland .,oluns may change
buld on conditions at ttl. time of COllStruction , but will
remain within pennittld boundaries .nd
by III
IpiClal conditions oHhI penni!.
DRAWING nnE:
EXISTING CONDITION (December 2012)
PROPOSED Fill SECTION
.bid,
""'
.. " .....
.
~
.. .-""
~
I StEff
200·111
""'" ""
""
~