You can copy from here when filling out the rest of the page.
Blacks Camp Pier Project (Berkeley County)
Blacks Camp Pier Project (Berkeley County)
JOINT
PUBLIC NOTICE
CHARLESTON DISTRICT, CORPS OF ENGINEERS
69A Hagood Avenue
Charleston, South Carolina 29403-5107
and
THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
Office of Environmental Quality Control
Water Quality Certification and Wetlands Programs Section
2600 Bull Street
Columbia, South Carolina 29201
REGULATORY DIVISION
Refer to: P/N # 1996-11054-2IX (FKA: 96-1W-466)
January 24, 2013
Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), the South Carolina Coastal Zone
Management Act (48-39-10 et.seq.) and the S.C. Construction in Navigable Waters Permit Program (R. 19-450,
et. seq., 1976 S.C. Code of Laws, as amended), an application has been submitted to the Department of the
Army and the S.C. Department of Health and Environmental Control by
ALAN WEISS
1370 BLACKS CAMP ROAD
CROSS, SOUTH CAROLINA 29436
for a permit to construct two fixed piers and six floating piers in
LAKE MOULTRIE
at 1370 Blacks Camp Road, Cross, Berkeley County, South Carolina. Latitude 33.348773 N;
Longitude -80.116512W.
In order to give all interested parties an opportunity to express their views
NOTICE
is hereby given that written statements regarding the proposed work will be received by the Corps until
15 Days from the Date of this Notice
and SCDHEC will receive written statements regarding the proposed work until
30 Days from the Date of this Notice
from those interested in the activity and whose interests may be affected by the proposed work.
The proposed work involves the construction of six floating piers and two fixed piers. Pier "A" is a fixed pier that
is to be located on the north end of the property and will provide lake access and mooring for the rental units on
that end. It consists of a 4' x 92' walkway leading out to a perpendicularly attached 4' x 24' walkway. A proposed
9' x 8' shed with a metal roof is being constructed at the junction of the two walkways.
Pier "B" is a fixed pier that is to be located south and adjacent to the on-site existing piers and will be used
primarily as a staging facility for fishing tournaments. It consists of two 30' x 30' hexagon-shaped gazebos
connected by a covered 8' x 38' walkway.
REGULATORY DIVISION
Refer to: P/N # 1996-11054-2IX (FKA: 96-1W-466)
January 24, 2013
Page 2 of 3
Piers "C", "D", "E", "F", "G", and "H" are all floating dock structures and are to be located at the south end of the
property. They are to provide lake access and mooring for the campground and will all consist of a 4' x 10' fixed
pier leading to a 6' x 20' floating dock. A 4' x 10' ramp with handrails will connect the fixed pier and floating dock.
NOTE: Plans depicting the work described in this notice are available and will be provided, upon receipt of a
written request, to anyone that is interested in obtaining a copy of the plans for the specific project. The request
must identify the project of interest by public notice number and a self-addressed stamped envelope must also be
provided for mailing the drawings to you. Your request for drawings should be addressed to the
U.S. Army Corps of Engineers
ATTN: REGULATORY DIVISION
69A Hagood Avenue
Charleston, South Carolina 29403-5107
The work shown on this application must be certified as consistent with applicable provisions of the
Coastal Zone Management Program (15 CFR 930). The District Engineer will not process this application to a
conclusion until such certification is received. This activity may also require evaluation for compliance with the
S.C. Construction in Navigable Waters Permit Program. State review, permitting and certification is conducted
by the S.C. Department of Health and Environmental Control. The applicant is hereby advised that supplemental
information may be required by the State to facilitate the review. Persons wishing to comment or object to State
certification or the navigable waters permit must submit all comments in writing to the S.C. Department of Health
and Environmental Control at the above address within thirty (30) days of the date of this notice.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. Implementation of the proposed project would result in
0.06 acres of shading impact to estuarine substrates and emergent wetlands utilized by various life stages of
species comprising the red drum, shrimp, and snapper-grouper management complexes. Our initial
determination is that the proposed action would not have a substantial individual or cumulative adverse impact
on EFH or fisheries managed by the South Atlantic Fishery Management Council and the National Marine
Fisheries Service (NMFS). Our final determination relative to project impacts and the need for mitigation
measures is subject to review by and coordination with the NMFS.
The District Engineer has consulted the most recently available information and has determined that the
project will have no effect on any Federally endangered, threatened, or proposed species and will not result in the
destruction or adverse modification of designated or proposed critical habitat. This public notice serves as a
request to the U.S. Fish and Wildlife Service and the National Marine Fisheries Service for any additional
information they may have on whether any listed or proposed endangered or threatened species or designated or
proposed critical habitat may be present in the area which would be affected by the activity, pursuant to Section
7(c) of the Endangered Species Act of 1973 (as amended).
In accordance with the NHPA, the District Engineer has also consulted the latest published version of
the National Register of Historic Places for the presence or absence of registered properties, or properties
listed as being eligible for inclusion therein, and this worksite is not included as a registered property or
property listed as being eligible for inclusion in the Register. To insure that other cultural resources that the
District Engineer is not aware of are not overlooked, this public notice also serves as a request to the State
Historic Preservation Office to provide any information it may have with regard to historic and cultural
resources.
Any person may request, in writing, within the comment period specified in this notice, that a public
hearing be held to consider this application. Requests for a public hearing shall state, with particularity, the
reasons for holding a public hearing.
REGULATORY DIVISION
Refer to: P/N # 1996-11054-2IX (FKA: 96-1W-466)
January 24, 2013
Page 3 of 3
The decision whether to issue a permit will be based on an evaluation of the probable impact including
cumulative impacts of the activity on the public interest. That decision will reflect the national concern for both
protection and utilization of important resources. The benefit which reasonably may be expected to accrue
from the project must be balanced against its reasonably foreseeable detriments. All factors which may be
relevant to the project will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and
wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production and,
in general, the needs and welfare of the people. A permit will be granted unless the District Engineer
determines that it would be contrary to the public interest. In cases of conflicting property rights, the Corps of
Engineers cannot undertake to adjudicate rival claims.
The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and
officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this
activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue,
modify, condition or deny a permit for this project. To make this decision, comments are used to assess
impacts on endangered species, historic properties, water quality, general environmental effects, and the
other public interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act.
Comments are also used to determine the need for a public hearing and to determine the overall public
interest of the activity.
If there are any questions concerning this public notice, please contact Richard Chong at 843-329-8044
or toll free at 1-866-329-8187.
L
,"i
h f
Vsite Location
[]
)
-
f
}J~
~
f~.....,........................<
M 0
{
l' I.
T
H
l
.l
-o·o
( .)
':> ·
l-N(J
- · _..
::!..~~~
tv-,
. .:_ 0
0
.!:. ('1
~
1
~=§oo
~ ~ r~ N
~)j;
-
Alan Weiss
Blacks Camp Pier Project
BERKELEY COUNTY
SOUTH CA.ROLINA
. . . . ........ ,..
..
:!lltfk'l\l::
..
...
..· \ . t...t:I'H
Berkeley County, Lake Moultrie
~ ;Ut AIM;tt
- ·· - ~ -.,.v--
· J · -· · ..,.,.,., 4 .4
""
t
t·
~t(,· ..... f)'t
UN.1) t
-~-::" ""':~ :-'
f.)
:r:
~ :::t '.)
(.) ()
~
A"'
~
.0
~
,:;) -
>
f.)
t5 :; g
::c<~.a:::z(/)
Gl:NE.f!AL. HIQH'WAY' MAP
~· J.t l
V"J
~~U;:-(...
"...) ~ >. :> 0
.. ·:.'l"fC.~~{:!:~~=·
Nov. 28, 2012
1 of 5
Black's Camp Pier Project (Plan View)
Not to Scale
Lake Moultrie
High Water Mark
Campground
Blacl\s Camp F10r Pro.J0CI
S.\C# 1996-11 05 ~-2 1 X
l~:~
; ':
~[:£)
H0rl\d0y County. SC
:.Jov0m bo.;!r 28. 20 I 2
Sh00t 2
or 5
Applicant Name:
Alan Weiss
Project Name: Black's Camp Pier
Project
--------------------
Location:
Berkeley County, Lake Moultrie
Date:
Nov. 28, 2012
-Sheet No.
--
2 of 5
-~
Not to Scale
Side View Pier "A"
Proposed Shed on Pier
WI Metal Roof
~
81
-.J
I
High Water Mark
(75.5)
10
1
_j_
·;· .;.,.,.,.tl······=
·..:il=· = · = ·:e · =f .! j: -: . :. : . : -:fl. ····;.·! · ! · t ·:r :~ ......x. ...l
:
Highland Ground
~
~
:l
I
6" Pilings
I
I
I~
I'"'
/
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
92
1
1
I
I
I
I
I
I
I
~ ~
I
I
I
I
I
I
51
Lake BQtlQm
t
I
I
I
----------------~
IJiachs Lam p 1'11.:r l"I'O.J0CI
S,\C!f 1 996- 11 05~-2 1:\
B~rl\ ~ky Counly. SC
Ncm::m b0r 28. 20 12
Sltc:c:! 3 or 5
Plan View Pier "A"
Side P/L
Extended
:+-- 63
I
I
I
HWM
IJI I ~
··I·
E!l]~
!
-
;t
.
:
I
· ' 1"'1'" ' -- · . . . · - · . · - ·
Alan Weiss
Project Name:
Black's camp Pier Project
1
9'X8 Shed
Location:
92'
Berkeley County, Lake Moultrie
Date:
Nov. 28 2012
1
I
Sheet No.
3 of 5
Not to Scale
Lake Moultrie
...J
1
Plan View Pier "B"
r
30'
High Water Mark
38'
I Boat Ramp
Retaining Wall
I
125'
30
1
Side View Pier "8"
l l!l li !!lillil lil111.. · 1ill}illlll!!jjll!lliJ!II:!l:::m:,,
11 1
1;:,1
· ,;
11
I~A'. ,
!!
'I'
:
~
!;
:~~~
3o· : ~
·:
I·
I
I
I
;:
I
I
:
I
I
t
I
I
I
I
t
I
I
·
Highland Ground
I
I
I
I
:'
High Water Mark {75.5')
1:1 1 Project Name:
;~
Location:
. J---j
I
1
1:!1
I
I
::
I
I
::
I
.
.
t
Black's Camp Pter ProJec
Berkley County, Lake Moultrie
~
U lacK.s Camp i'tcr Fro.JcCI
I
::
Lake Bottom
: : [_
I
I
~
SAC!/ 1996-11 054-2IX
lkrk~ky County. SC
N ovcmh~r 28. 20 12
S lt~~t 4 of 5
r-=
~r~f
l~l
--------..41
High Water Mark (75.5')
Handrail
Typical Side View for
Piers- C, 0, E, F, G, H
Not to Scale
6" Piling
Walk Ramp (Proposed)
~ atBf8D::::::;··q;:Ji:THHH!\-hHYiH!i'.iiH!i:n;HIU1
I
I
I
Proposed Fixed Section
water Line
I
I
Proposed Floating Section
With Encapsulated Styrofoam
Billets
Typical Plan View for Piers C, 0, E, F, G, H
I
I
I
-
I
I
I
lake Bottom
I
B lacl\:s Camp P10r ProJect
St\C# 1996- I 1054-2L\'
-+I
1
6'
Lake Moultrie
1+---
ccBo
Floating Section
B~:!rk dcy
[Z)]
·~
~.
.,.._
~
'I
.
·~
~
~
County. SC
NOVI:!m b0r 28. 20 12
Sheet 5 of 5
.
. :
Applicant Name:
Alan Weiss
: :.i~J~--
_
Walk Ramp (10')
I
Project Name·
Blacks Camp Pier Project
Location:
Berkeley County, Lake Moultrie
High Water Mark
Date:
Nov. 28, 2012
Highland Ground
Sheet No.
5 of 5