NOV 10
HAILE GOLD PROJECT
GENERAL
ENVIRONMENTAL
PARTIAL SITE PLAN
Environmental Assessment
for the Haile Cold Mine Project in Kershaw, SC
Draft- December 3, 2010
A hydraulically operated rock breaker will be provided for breaking oversize rock delivered to the jaw
crusher. The primary crushing facility will be equipped with an air compressor to provide high pressure
air requirements for maintenance equipment such as air tools and air lances.
The primary crusher discharge conveyor will feed crushed ore to the coarse ore stockpile feed
conveyor. The coarse ore stockpile feed conveyor will transport the ore to a conical coarse ore
stockpile. The crushing production rate will be monitored by a belt scale mounted on the coarse ore
stockpile feed conveyor. A tramp iron magnet will be installed at the discharge of the primary crusher
discharge conveyor to remove any unwanted metal from the crusher discharge stream. A metal
detector will be installed over the coarse ore stockpile feed conveyor to insure that any tramp metal has
been removed.
A water spray system will be installed to suppress dust in ore feed streams, transfer points between
conveyors and chutes, and the crusher dump pocket.
The coarse ore stockpile will have approximately one day of full throughput live storage capacity. Dead
storage may be recovered by bulldozer and/or a frond end loader when needed.
Any ore spillage will be returned to the nearest belt conveyor for processing. Precipitation falling on the
crusher will be collected in a sump in the lowest level of the crusher structure and will be pumped to
the process plant for use in the process.
Crushed Ore Reclaim
Two draw points under the crushed ore stockpile will provide ore to two reclaim apron feeders located
in a tunnel under the stockpile. The reclaim feeders will discharge onto the SAG mill feed conveyor.
Each feeder will be capable of feeding up to 400 tons per hour of ore to the SAC mill feed conveyor.
The feeders will be variable speed and controlled to maintain the ore feed rate to the grinding circuit.
Either or both feeders may be operated at any time. The speed of the feeders will be controlled by a
control signal that will be provided by a belt scale mounted on the conveyor down stream of the
feeders. A magnet will be installed over the SAC mill feed conveyor to make sure any tramp metal is
removed.
In addition to water sprays at ore transfer points, cartridge type dust collectors will be installed to
capture and control dust from the reclaim feeders within the reclaim tunnel.
Precipitation that lands on the ore stockpile or that is collected in the reclaim tunnel area will be
collected in a sump in the lowest corner of the tunnel and will be pumped to the process plant for use
in the process.
Grinding
The crushed ore from the reclaim tunnel is conveyed to the grinding circuit. The grinding circuit will
process an average of 7,000 tons of ore per day on a 365 days per year basis. At 92% plant availability,
this equates to a design throughput of 7,609 ton per day. Ore will be ground to a final product size of
80% passing 200 mesh (74 microns) in a semi-autogenous (SAC) primary mill and secondary ball mill
grinding circuit.
SAC #1992-24122-4
Haile Gold Mine
Sheet 35 of 58
Page 40 of 120
Dated 21 Jan 2011
Environmental Assessment
for the Haile Gold Mine Project in Kershaw, SC
Draft- December 3, 2010
Primal)' grinding will be performed in a SAC mill. The ore from the SAC mill feed conveyor is deposited
into the SAC mill and is mixed with water to make a solid and liquid mixture referred to as slurry. The
SAC mill will operate in closed circuit with a SAC mill discharge screen. Closed circuit implies that the
slurl)' discharge from the mill is screened with the coarse material that does not pass the screen
openings returning to the feed of the SAC mill and the finer material progressing to the second stage of
grinding in the ball mill circuit.
SAC mill discharge screen oversize material will report to a series of two belt conveyors that will
transport the oversize back to the SAC mill feed conveyor.
Secondary grinding will be performed in a ball mill operated in closed circuit with hydrocyclones. The
hydrocyclones segregate the ore particles by size with the fine material reporting to the hydrocyclone
overflow and the coarse product reporting to the cyclone underflow. The underflow returns to the ball
mill for additional grinding. The ball mill product will discharge over a trommel screen prior to being
pumped to the hydrocyclones. The trommel screen will separate ball chips and tramp material from the
process stream and deliver that material to tote bin for removal.
The ball mill discharge slurl)' will fall through the trommel where it will be combined with SAG mill
discharge screen undersize slurl)' in the hydrocyclone feed pump box. This combined slurry will be
pumped, using variable speed slurl)' pumps, to the hydrocyclones for sizing. Hydrocyclone underflow
will flow by gravity back to the ball mill for additional grinding.
A portion of the combined SAC mill and ball mill slurl)' will be pumped to a flash flotation cell The flash
flotation cell separates the gold bearing sulfide minerals from the gangue material into a concentrate
stream containing the gold containing sulfides and a tail stream containing the gangue. The flash
flotation concentrate will flow by gravity to the regrind circuit while the tail is returned to the
hydrocyclone feed sump.
Hydrocyclone overflow (final grinding circuit product) will flow by gravity to a vibrating trash screen for
removal oftramp material. Trash screen oversize will discharge into a tote bin for removal. Trash screen
undersize will flow by gravity to the rougher flotation conditioning tank.
An overhead crane will be provided for maintenance purposes. The area will be equipped with a sump
and pump for clean-up purposes.
The grinding and flotation circuit is an open air plant covered with a roof only. The floor will be concrete
with containment walls to contain process upsets within the grinding and flotation area. The floor will be
sloped to floor sumps that collect the contained solution and solids, which are then pumped back to
the hydrocyclone feed pump box. The "Process Containment and Events Pond" section discusses
containment sizing.
Rotation
As discussed previously, a portion of the combined SAC mill and ball mill discharge will be pumped to a
flash flotation cell. Tail from the flash flotation cell will flow by gravity back to the hydrocyclone feed
sump. Concentrate from the flash flotation cell will flow by gravity to the regrind hydrocyclone feed
pump box.
SAC #1992-24122-4
Haile Gold Mine
Sheet 36 of 58
Page 41 of 120
Dated 21 Jan 2011
Environmental Assessment
for the Haile Gold Mine Project in Kershaw, SC
Draft- December 3, 2010
Hydrocyclone overflow will flow by gravity to a flotation feed trash screen for removal of tramp material
ahead of the rougher flotation conditioning tank. Trash screen undersize will flow by gravity to the
rougher flotation conditioning tank.
Flotation concentrate from both the flash flotation cell and the rougher flotation cells will be pumped to
a regrind circuit. The concentrate regrind circuit grinds the material to approximately 15 microns..
Various flotation reagents will be added to the SAG mill feed, to the cyclone feed sump, to the rougher
flotation conditioning tank and stage added to the rougher flotation cells as needed to achieve efficient
flotation recovery. The "Reagent Storage and Mixing" section discusses these reagents in more detail
along with associated addition points.
Concentrate Treatment
Regrind
Combined flotation concentrate from the flash flotation cell and the rougher flotation cells will be
pumped using a variable speed pump to the regrind hydrocyclone cluster. The underflow stream from
the regrind hydrocyclone cluster will flow by gravity to the regrind mill for additional grinding. Overflow
from the regrind hydrocyclone cluster will flow by gravity to the regrind mill discharge pump box.
Product from the regrind mill will be combined with the regrind cyclone overflow in the regrind mill
discharge pump box, where it will be pumped using a variable speed pump to the pre-aeration
thickener feed box. Regrind hydrocyclone underflow may be bypassed to an agitated surge tank ahead
of the regrind mill for storage when the regrind mill is down for maintenance.
Pre-aeration
Reground concentrate will be pumped to a thickener. Flocculant and dilution water will be added to the
thickener feed to aid in settling. In addition, milk of lime {MOL) may be added to the thickener feed.
The withdrawal rate of thickened solids will be controlled by a variable speed thickener underflow pump
to maintain the proper slurry characteristics. Underflow from the pre-aeration thickener will be pumped
at approximately 60% solids to an agitated pre-aeration tank where it will be diluted to approximately
45% solids with internal reclaim water ahead of a series of eight agitated carbon-in-leach (CIL) tanks.
The thickener overflow will be pumped using a fixed speed pump to the internal reclaim water tank for
reuse in the grinding and flotation process circuits.
The pre-aeration circuit will consist of one agitated tank. Process air will be piped to the tank and
bubbled through the slurry to oxidize the ore. Aeration enhances gold recovery and reduces the amount
of reagents required for leaching. Also, lead nitrate will be added to the pre-aeration tank to promote
better gold recovery.
Slurry from the pre-aeration tank will be pumped to CIL tank #1 where it will be leached with cyanide in
the presence of activated carbon.
.
L
The pre-aeration thickener will be mounted on steel legs on foundations. A concrete containment area
with slab on grade and cast-in-place walls will contain precipitation and process spills within the
regrind, pre-aeration and thickening areas. A sump pump will transfer the contained material back to the
pre-aeration thickener for processing.
SAC #1992-24122-4
----------~~---
--
Page42 ofl20
---- -·-····-·-- ·---·--·-
~-~ --~"·--- ---··~-·-
·---~-----·--
---------
Haile Gold Mine
Sheet 37 of 58
Dated 21 Jan 2011
EnvironmentalAssessment
for the Haile Gold Mine Project in Kershaw, SC
Draft- December 3, 2010
Flotation Tailing Treatment
The rougher flotation tailing will still contain enough gold to justify further processing. This section
describes the process that will be used to recover the additional gold from the flotation tailing.
Flotation Tail Thickener
The rougher flotation tailings will flow by gravity to a thickener. Flocculant, milk of lime and dilution
water (internal reclaim) will be added to the thickener feed to aid in settling.
The withdrawal rate of settled solids from the thickener will be controlled by a variable speed thickener
underflow pump to maintain the proper slurry characteristics. Underflow from the flotation tailing
thickener will be pumped using a variable speed slurry pump, at approximately 60% solids, to the Cll
tank #2 feed box where it is combined with the discharge from Cll tank #1. The combined slurry will
be diluted to approximately 45% solids with reclaim water ahead of the remaining seven Cll tanks
where it will be leached with cyanide in the presence of activated carbon.
The thickener overflow will be pumped using a fixed speed pump to the internal reclaim water tank.
The flotation tail thickener will be mounted on steel legs on foundations. A concrete containment area
with slab on grade and cast-in-place walls will contain precipitation and process spills. A sump pump
will transfer the contained water back to the flotation tail thickener.
Carbon-In leach (CIL)
The CIL circuit will consist of eight agitated tanks. The gold is leached from the ore and adsorbed onto
activated carbon that is mixed within the slurry. The first CIL tank will be used to leach reground
flotation concentrate only and will provide approximately 20 hours of retention time. The remaining
seven CIL tanks (i.e. tanks #2 through #8) will be used to leach the combined flotation tailing and
discharge from tank # 1. The seven tanks will provide approximately 20 hours of total retention time at
45% solids. Cyanide solution may be added to the first and second CIL tanks. Process air will be piped
to all tanks. Milk of lime may be added to the CIL circuit to adjust pH if required.
Slurry will advance by gravity from tank to tank, exiting the last tank and reporting by gravity to the CIL
carbon safety screen.
The CIL tanks will nominally contain 1 0 g/L of 6 x 12 mesh granular activated carbon to adsorb the
dissolved precious metals from the slurry.
Carbon, which has a larger particle size than the ground slurry, will be retained in each CIL tank by an
inter-stage screen that will allow only the ore slurry to flow from tank to tank. The carbon will be
advanced to the next tank in series (counter-current to the slurry flow) on a batch basis using vertical
recessed impeller pumps located in each tank. Loaded carbon (i.e. carbon with precious metals
adsorbed onto it) from either the first tank, the second tank, or the third tank will be pumped to the
loaded carbon screen. The carbon (screen oversize) will be water washed on the screen and then
discharged by gravity into the acid wash vessel while the screen undersize will be returned to the
appropriate CIL tank.
Page 43 of 120
SAC #1992-24122-4
Haile Gold Mine
Sheet 38 of 58
Dated 21 Jan 2011
EnvironmentalAssessment
for the Haile Cold Mine Project in Kershaw, SC
Draft- December 3, 2010
A concrete containment slab on grade and containment walls will contain precipitation and process
spills in the CIL area. A sump pump will transfer the material back to the process.
Cll Carbon Safety Screen
Slurry discharging from the last Cll tank will flow by gravity to a Cll carbon safety screen fitted with 28
mesh screen panels. The purpose of this screen is to prevent accidental losses of activated carbon.
The oversize (carbon) from the safety screen will be collected and returned to the CIL circuit. Slurry
that passes through the screen will be pumped using a fixed speed pump to the cyanide recovery
thickener.
A concrete containment slab on grade and containment walls will contain precipitation and process
spills. A sump pump will transfer this material back to the process.
Tailing Systems
Cyanide Recovery Thickener and Tailing Detoxification
The CIL carbon safety screen undersize stream will report to the cyanide recovery thickener feed box.
Dilution water (reclaim water), flocculant, and milk of lime are added to the slurry which is then
thickened to approximately 55% solids. Overflow solution containing cyanide from the cyanide recovery
thickener is routed to the reclaim water tank for reuse in the process. Within process operating limits, a
maximum amount of dilution water will be used at all times to minimize the cyanide remaining in the
slurry. Under normal operating conditions, the cyanide recovery thickener underflow will be pumped to
the tailing storage facility. The withdrawal rate of settled solids will be controlled by a variable speed
thickener underflow pump to maintain proper slurry characteristics.
As stated above, cyanide recovery thickener underflow will be pumped to the tailing storage facility
under normal conditions. If the cyanide level is high enough (i.e. greater than or equal to 50 ppm weak
acid dissociable (WAD) cyanide), the flow can be directed to the cyanide destruction tanks, where
cyanide is destroyed using the S02/Air process.
In the cyanide detoxification tanks, residual free and WAD cyanide will be oxidized to the relatively non
toxic form of cyanate by the S02/Air process using ammonium bisulfite and oxygen, with copper
sulfate as a catalyst as needed. Milk of lime will also be added as needed to maintain a slurry pH in the
range of 8.0 to 8.5. The more stable iron cyanides are removed from solution as an insoluble
ferrocyanide precipitate. The cyanide levels are thereby reduced to an environmentally acceptable level.
The detoxification is accomplished in two agitated tanks operating in parallel. Each tank will provide a
residence time of approximately 30 minutes.
Discharge from the cyanide detoxification tanks will be final plant tailing and will be pumped to the
tailing storage facility.
A concrete containment slab on grade and containment walls will contain precipitation and process
upsets in the cyanide recovery thickener and cyanide detoxification area. A sump pump will transfer the
material back to the cyanide recovery thickener.
SAC #1992-24122-4
Haile Gold Mine
Page 44 of 120
~---------------
-----------------------------------
Sheet 39 of 58
Dated 21 Jan 2011
EnvironmentalAssessment
for the Haile Gold Mine Project in Kershaw, SC
Draft- December 3, 2010
Carbon Handling and Refinery
Carbon Acid Wash
Loaded carbon from the CIL circuit will flow by gravity to a carbon acid wash vessel. The carbon wiJI be
acid washed to remove inorganic contaminants (mainly calcium carbonate) by circulating dilute
hydrochloric acid from the acid wash recirculation tank upwards through the bed of carbon. Residual
acid in the acid wash vessel will be neutralized with caustic before transferring the carbon to the strip
vessel. The carbon is transferred with water using a horizontal recessed impeller pump. Carbon transfer
water comes from the closed circuit carbon transfer water system.
A concrete containment slab independent of the carbon strip area containment slab on grade and
containment walls will contain precipitation and process spills in the acid wash area. A sump pump will
transfer the material back to the process.
Carbon Stripping
Cold will be removed from the carbon utilizing a pressure Zadra circuit. The pressure Zadra circuit
comprises circulating a 280°F caustic cyanide solution upward through the partially fluidized. bed of
loaded carbon. This process is also known as carbon stripping. A more thorough description of the
process is as follows:
The loaded carbon from the acid wash circuit will be pumped into the top of the strip column and the
excess water will be drained to the floor sump and returned to the process using a sump pump. After
the complete batch of carbon has been transferred, the strip cycle will be initiated by pumping. hot
caustic cyanide solution from the barren solution tank into the bottom of the strip vessel. The solution
will discharge through a screened outlet at the top of the vessel before passing through the heat
recovery exchanger to the pregnant (strip solution that contains the concentrated gold) solution tank.
The hot side of the final heat exchanger is piped to a thermal fluid heater. Approximately 1 0 Bed
Volumes (BV's) at a rate of 2 to 3 BVjhr will be passed through the carbon to remove all the precious
metals. A Bed Volume is the volume of soluti6n that occupies the space in the vessel that is occupied
by the carbon. A final 3 BV of hot water will be used to wash the carbon at the end of the stripping
cycle. After the stripping circuit has been cooled down, the carbon will be transferred with water to the
reactivation circuit using a horizontal recessed impeller pump.
A concrete containment slab on grade and containment walls, independent of the acid wash area, will
contain precipitation and process spills in the carbon strip area. A sump pump will transfer the water
back to the process.
Refinery
The pregnant strip solution produced in the carbon strip circuit is collected in the pregnant solution
tank, where it is pumped to electrowinning cells to recover the precious metals. Electrowinning is used
to recover the precious metals from the pregnant solution, and it is an electrolytic process where the
precious metals are recovered from the solution by passing direct electrical current between electrodes
(anodes and cathodes) immersed in the solution. As the current passes from the anode to the cathode,
the precious metals loosely plate onto the cathode as a sludge.
Electrowinning is accomplished in two electrowinning cells in series. Each cell contains anodes (304
stainles-stell punched plate) and cathodes (stainless steel mesh held in place by 304-steel bayonets
Page 45 of 120
SAC #1992-24122-4
Haile Gold Mine
Sheet 40 of 58
Dated 21 Jan 2011
Environmental Assessment
for the Haile Gold Mine Project in Kershaw, SC
Draft- December 3, 2010
and wire frames, and suspended in cross linked polyethylene baskets). Each cell has a DC rectifier
capable of delivering a current of 0 to 2000 amps at a voltage of 0 to 9 volts.
The flow rate of pregnant solution through each cell is approximately 50-70 gallons per minute (gpm).
During electrowinning the solution flows by gravity to the electrowinning (EW) pump box. From there,
the EW barren solution pump delivers the solution to the barren strip solution tank. The sludge will be
periodically washed off the cathodes and recovered as a damp cake in a plate and frame filter press.
The filter cake will be dried in a drying oven prior to smelting.
The dried filter cake (gold sludge) will be processed, along with pre-mixed flux, in an electric induction
melting furnace. When the sludge and flux mixture becomes fully molten, the components separate into
two distinct layers: slag (on the top) and metal (on the bottom). The slag layer, containing most of the
impurities, is poured off first into a conical slag pot. The remaining molten metal, containing the
precious metals and minor impurities, is then poured off into bar molds.
After cooling and solidifying, the metal bar (dore) will be dumped from the mold and slag will be
knocked off by hand. The resulting dore bar will be further cleaned of residual slag using a shot cleaning
machine and finished as required with a needle gun. The cleaned bars are then weighed and stamped
with an 1.0. number and weight. Dore bars, each weighing a total of approximately 50 to 80 pounds, will
be the final product of the operation and will be stored in a vault awaiting shipment.
Slag will be collected and returned to the process.
Exhaust from the barren solution tank, the pregnant solution tank, and the electrowinning cells will be
collected through ductwork and passed through an exhaust control system before discharging to
atmosphere. Fumes from the drying oven and the melting furnace will be collected through ductwork
and cleaned in a bag house before discharging through an exhaust control system to atmosphere.
The refining building will be enclosed by concrete block walls with a steel framed roof and metal
roofing. Water used for cleanup and any spills will be collected and pumped back into the process.
Carbon Reactivation
Following stripping, the carbon will be thermally regenerated before being returned to the CIL circuit.
Carbon used in the Cl L circuit can be fouled by various organic compounds such as flocculant and
flotation reagents. The organics on the surface and in the pores of the carbon blind the adsorption sites
available for gold/silver recovery. Thus, organics are removed from the carbon by volatilizing them at
high temperatures. The process of restoring the active sites on the surface of the carbon and removing
the organics is called carbon reactivation.
Stripped carbon will be pumped from the bottom of the strip vessel to a dewatering screen ahead of a
rotary tube reactivation kiln. The coarse carbon particles in the screen oversize will go into the
reactivation kiln feed bin. The fine carbon particles and the transfer solution will pass through the
screen and flow to a carbon fines settling tank. The feed bin has two wedge wire screens sitting in
discharge pipes in the bottom of the bin, and any remaining solution may be drained through these
screens and pipes to the floor sump where it is returned to the process.
SAC #1992-24122-4
Page 46 of 120
L----------------------------------------
Haile Gold Mine
Sheet 41 of 58
Dated 21 Jan 2011
EnvironmentalAssessment
for the Haile Cold Mine Project in Kershaw, SC
Draft- December 3, 2010
Well drained damp carbon will be fed from the feed bin into the feed end of the rotary tube reactivation
kiln using a variable speed screw conveyor. The reactivation kiln will be heated to temperatures as high
as 1400 oF. After entering the feed end of the tube, the carbon will travel down the sloping tube and
discharge into a quench tank, where it is quickly cooled. As the hot carbon contacts the fresh water in
the quench tank steam is generated, which will provide the desired moisture in the atmosphere above
the carbon inside the kiln tube.
Exhaust gases from the reactivation kiln will pass through a wet scrubber and exhaust control system
which discharges to atmosphere.
Quenched carbon will be pumped by the quench tank carbon transfer pump to a carbon sizing screen.
The coarse carbon particles in the screen oversize will go into the regenerated carbon holding tank. The
fine carbon particles and the bulk of the fresh water will pass through the screen and flow to the carbon
fines settling tank. The feed bin will have two wedge wire screens sitting in discharge pipes in the
bottom of the bin allowing excess water to be drained to the floor sump and pumped back to the
process. Reactivated carbon will be pumped, using carbon transport water, from the regenerated
carbon holding tank back to CIL tank #8 for reuse.
Periodically, new activated carbon must be added to the system to make up for fine carbon losses. A
bulk bag containing approximately 1500 lb of carbon will be suspended above the carbon quench tank.
The tank is filled with water, which will be mixed by an agitator. The bottom of the bag will be opened
and carbon allowed to flow gradually into the tank. The agitating action quickly wets the surfaces of the
carbon and attrits the carbon particles to break up any lumps.
Screen underflow containing carbon fines from the kiln feed dewatering screen and the carbon sizing
screen will flow to the carbon fines settling tank. Carbon fines will be recovered using a plate and frame
filter and sold or disposed of. A concrete containment slab on grade and containment walls wiU contain
precipitation and process spills. The regeneration area sump pump will return the solutions and spills to
the process.
Reagent Storage and Mixing
Reagents requiring handling, mixing, and distribution systems include:
·
·
·
·
·
·
·
·
·
·
·
·
·
Sodium cyanide (NaCN)
Quicklime (Pebble Lime) (CaO)
Aero 404
Potassium Amyl Xanthate (PAX)
Caustic (sodium hydroxide) (NaOH)
Ammonium Bisulfite (ABS)
Copper Sulfate (CuS04)
Hydrochloric Acid (HCI)
Sulfuric Acid (H2S04)
Lead Nitrate (PbN03)
Flocculant
Antiscalant
UNR 811A
Page 47 of120
SAC #1992-24122-4
Haile Gold Mine
Sheet 42 of 58
Dated 21 Jan 2011
EnvironmentalAssessment
for the Haile Cold Mine Project in Kershaw, SC
Draft- December 3, 2010
The dry reagents will be stored under cover, then mixed in reagent tanks and transferred to distribution
tanks for process use.
The reagent building will be a steel framed structure with metal roofing. In general, the building is open,
but metal siding will be installed where necessary to keep reagents dry. The floors will be slab on grade
concrete with concrete containment walls to capture spills and any precipitation that enters the sides
of the structure.
Reagents which are not compatible to be stored together will be kept in separate containment areas
within the reagent storage area. Sump pumps in the different containment areas will return these
materials to the appropriate process stream.
Sodium Cyanide (NaCN)
Sodium cyanide solution will be added to the ore in the leach circuit to recover gold and silver. Also,
sodium cyanide solution will be used to promote the removal of gold and silver from the carbon in the
carbon stripping circuit.
Dry sodium cyanide will be delivered in bulk quantity by 20 ton trucks. Sodium cyanide solution will be
prepared by adding water to a sodium cyanide mix tank and circulating the solution between the mix
tank and the bulk truck until all the dry cyanide has been dissolved. The tanker truck will then be
emptied and thoroughly rinsed before leaving site. Throughout the mixing process, the bulk tanker is
parked on containment that drains to the main cyanide area containment inside the reagent building.
Sodium cyanide solution will be distributed to the GIL circuit and barren strip solution tank using
individual metering pumps.
Quicklime (Pebble Lime) (GaO)
Milk of lime slurry will be produced by hydrating pebble quick lime in a lime slaker. Milk of lime slurry
will be used to control pH in various parts of the process. Milk of lime slurry will be distributed to the
GIL circuit, cyanide detoxification tanks and thickeners using timer controlled on-off valves in a
circulating loop.
Dry pebble quicklime will be delivered to the site in bulk quantity by 20 ton trucks and will be
pneumatically off loaded to a cone bottom lime silo storage bin. The bin will be equipped with a bin vent
type dust collector.
AER0404
AERO 404 promoter will be added to the SAC mill and rougher flotation circuit to enhance flotation of
gold and gold-bearing sulfide minerals.
AERO 404 will be delivered as an aqueous solution in bulk tanker trucks. AERO 404 may be added
directly or may be diluted for ease of metering. AERO 404 will be added to the SAC mill prior to flash
flotation and to the rougher flotation conditioning tank using individual metering pumps.
Potassium Amyl Xanthate (PAX)
PAX (collector) will be added to the SAC mill and rougher flotation circuit to enhance the flotation of
gold and gold-bearing sulfide minerals. Dry PAX will be delivered to the site in flo-bins or supersacs.
The PAX mix system will include a conical bottom, agitated mix tank and a sloped bottom distribution
SAC #1992-24122-4
I
Page 48 of 120
Haile Gold Mine
Sheet 43 of 58
Environmental Assessment
for the Haile Cold Mine Project in Kershaw, SC
Draft- December 3, 2010
tank. PAX will be added to the SAC mill prior to flash flotation and to the rougher flotation conditioning
tank using individual metering pumps.
Caustic (NaOH)
Caustic soda solution will be used in the carbon strip circuit to neutralize acidic solutions after acid
washing the carbon and as a reagent in the carbon stripping process. In addition, caustic can be added,
if needed, to the cyanide mixing system to maintain the proper pH of the cyanide solution.
Liquid caustic soda (50% solution) will be delivered in bulk tanker trucks. Caustic will be off loaded to a
heated and insulated storage tank. Caustic will be distributed to the appropriate location on an as
needed basis using individual delivery pumps.
Ammonium Bisulfite
Ammonium bisulfite will be added to the tailing detoxification circuit as the primary source of sulfur
dioxide (S02} to oxidize free cyanide and weak acid dissociable (WAD) metal cyanide complexes
(INCOTM process).
Liquid ammonium bisulfite will be delivered in 20 ton bulk tanker trucks and offloaded into a storage
tank. The ammonium bisulfite solution will be pumped directly from the storage tank to the cyanide
detoxification tanks using a metering pump.
Copper Sulfate
Copper sulfate will be added to the cyanide detoxification tanks to provide copper ions as a catalyst for
the cyanide detoxification process. Dry copper sulfate will be delivered in supersacs and stored in a dry
area. The copper sulfate system will comprise an agitated mixing tank and a holding tank.
Hydrochloric Acid
Hydrochloric acid will be used in the carbon strip circuit to acid wash carbon. Hydrochloric acid (30%)
will be delivered in 20 ton bulk tanker trucks. Acid will be off loaded from the bulk truck to a storage
tank. A dilute acid solution will be prepared by pumping acid directly from the storage tank to the acid
wash circulating tank as needed.
Sulfuric Acid
Sulfuric acid will be used in the grinding and rougher flotation circuits to maintain pH. Sulfuric acid
(93%) will be delivered in 20 ton bulk tanker trucks. Acid will be off loaded from the bulk truck to a
storage tank. Metering pumps will be used to deliver sulfuric acid to the SAC mill and to the rougher
flotation conditioning tank.
Lead Nitrate
Lead nitrate will be added to the pre-aeration tank to enhance leaching. Dry lead nitrate wiJI be delivered
in 25 kg pails and stored in a dry area. The lead nitrate system will comprise an agitated mixing tank and
a holding tank. A metering pump will be used to deliver lead nitrate solution to the pre-aeration tank
feed box.
Page 49 of 120
SAC #1992-24122-4
Haile Gold Mine
Sheet 44 of 58
Dated 21 Jan 2011
EnvironmentalAssessment
for the Haile Cold Mine Project in Kershaw, SC
Draft- December 3, 2010
Flocculant
Flocculant will be added to the pre-aeration thickener, to the flotation tailing thickener and to the
cyanide recovery thickener to enhance solids settling. Pre-engineered flocculant mixing systems will be
used to mix and distribute dry flocculant. The dry flocculant will be delivered in supersacs.
Antiscalant
Antiscalant will be added to the reclaim water and internal reclaim water tanks to prevent scaling in
pipelines, tanks, etc. The antiscalant will be delivered in bulk tanker trucks and will be added to the
process using metering pumps directly coupled to vendor supplied tanks.
UNR 811A
If needed, UNR 811A may be added to the reclaim water tank and the internal reclaim water tank using
metering pumps directly coupled to vendor supplied tanks. UNR 811A is used to abate mercury
production by complexing mercury to form a stable organic sulfide precipitate. Although mercury
production is expected to be negligible, the system is being installed to ensure mercury can be
addressed if ever needed.
Flux
Flux will be added during the smelting stage to remove contaminants from the electrowinning sludge.
Dry pre-mixed flux will be delivered in 1 0 lb pre-packaged bags that come in drums on pallets. Flux will
be manually added to the melting furnace.
Water Systems
Water for the Haile Project will be supplied from a variety of sources over the life of the mine. Fresh
water (non-potable) will be supplied from pit depressurization wells. Water from the wells will be
pumped to a fresh water tank. The fresh water tank will supply the requirements for reagents, crushing
area dust suppression, and for use as makeup water in ore processing. In addition, fresh water will be
available at the truck shop and the truck wash.
Water will be recovered from the pre-aeration thickener, from the flotation tail thickener, and from the
cyanide recovery thickener for reuse in the process. The recovered water from the 'non-cyanide' unit
operations of the process (i.e., flotation tail thickener overflow and pre-aeration thickener overflow) will
be directed to an Internal Reclaim water tank. Recovered water from the cyanide recovery thickener will
be directed to the Reclaim water tank. Make-up water from the fresh and/or reclaim water tanks will be
added to the internal reclaim water tank as required.
Water will be reclaimed from the tail pond using reclaim water pumps mounted on floats. Reclaimed
water will be pumped to the reclaim water tank, located near the process plant, for subsequent use as
make-up water in ore processing.
Compressed Air Systems
An air compressor and air receiver will be installed for operation and maintenance at the primary
crushing area.
SAC #1992-24122-4
Page 50 of 120
Haile Gold Mine
Sheet 45 of 58
Dated 21 Jan 2011
EnvironmentalAssessment
for the Haile Cold Mine Project in Kershaw, SC
Draft- December 3, 2010
Plant air compressors will provide service and instrument air for grinding through cyanide detoxification
unit operations. An air dryer will remove moisture in instrument air. Plant air and instrument air receivers
will be provided.
Individual low pressure blowers will be located in the flotation area to provide air to the flash flotation
cell and to the rougher flotation cells.
A low pressure blower will provide air to the bottom of the pre-aeration tank and to the CIL tanks.
A low pressure blower will provide air to the cyanide detoxification tanks.
Tank mounted reciprocating air compressors will be installed for operation and maintenance at the
truck shop and at the mill maintenance building.
Process Containment and Events Pond
To ensure all process upset conditions do not impact the environment, the process facility has been
designed with the following safe guards:
Process Containment
The process facilities will be designed to contain any spills caused by an upset in process. Each area,
as described previously in this document, will be designed such that it is built on a concrete floor that
has cast in place concrete walls. The floor area and wall heights will be designed to capture any
process spills and the floors will be sloped toward a collection sump for cleanup and the return of
process solutions or slurries back to the process streams for which it is best suited. Table IV-1
summarizes the main containment areas.
Page 51 of 120
SAC #1992-24122-4
Haile Gold Mine
Sheet 46 of 58
Dated 21 Jan 2011
EnvironmentalAssessment
for the Haile Gold Mine Project in Kershaw, SC
Draft- December 3, 2010
TABLE IV-1. Process Containment Philosophy
Indoor/
Outdoor
Containment
System
Containment Volume
Sump Pumps to
Covered
Concrete Pad
with stem walls
11 0% of Largest Vessel
Cyclone feed
pump box
Covered
Concrete Pad
with stem walls
11 0% of Largest Vessel
First flotation cell
Outdoor
Concrete Pad
with stem walls
11 0% of Largest Vessel
First flotation cell
Outdoor
Concrete Pad
with stem walls
11 0% of Largest Vessel
+ 100 Year/ 24 hour
storm event
First Leach Tank
Final Tailing
Thickener
Outdoor
Concrete Pad
with stem walls
Reagent Area
Covered
Concrete Pad
with stem walls
Containment Area
Grinding Building
Rotation and
Regrind
Pre-Aeration
Thickener
Leach Area
11 0% of Largest Vessel
+ 100 Year/ 24 hour
storm event
11 0% of Largest Vessel
in each containment
area
Tailing Thickener
Pump Truck
11 0% of Largest Vessel
Fresh and Reclaim
Water Pad
Outdoor
Concrete Pad
with stem walls
Tailing Line
Outdoor
Lined Trench and
Pond
Truck Shop Tank
Farm
Outdoor
Concrete Pad
with stem walls
Refinery
Indoor
Fuel Tanks
Outdoor
+ 100 Year/ 24 hour
storm event
11 0% of the entire
pipeline volume + 100
year/ 24 hour storm
event
Reclaim Water
Tank
Tailing Thickener
11 0% of Largest Vessel
I
Concrete Pad
with stem walls
Local concrete
slab and sumps
for minor spills.
Double walled
tanks on concrete
Page 52 of 120
+ 100 Year/ 24 hour
storm event
Pump Truck
11 0% of Largest Vessel
Pum_pTruck
SAC #1992-24122-4
Haile Gold Mine
Sheet 4 7 of 58
Dated 21 Jan 2011
EnvironmentalAssessment
for the Haile Cold Mine Project in Kershaw, SC
Draft- December3, 2010
Events Pond
The Events Pond will be designed to capture any solutions or slurries that escape the main process
containment facilities, tailing slurl)' pipeline or reclaim water line. Each containment area has been
designed to capture spills in accordance with Table IV-1. Should multiple events occur, any material
that would not fit within the containment area will report to the events pond. The additional solution or
slurry from the failure would exit the containment area through a pipeline and would flow by gravity to
the lined pond.
The tailing and reclaim pipelines are designed to have double containment involving either a pipeline
within a pipeline or a pipeline within a lined containment structure or trench. Should a failure of the
tailing pipeline occur or should an unanticipated power failure occur, the material from the pipeline
would drain to the Events Pond for contained collection of the pipeline material.
Once the event materials have been collected and the failures have been repaired, the material that
reported to the events pond will be removed and returned to the process area for which it is best
suited.
C.
Hazardous Waste and Storage Tanks
Currently, Haile Cold Mine is a conditionally exempt small quantity generator of hazardous waste.
During the new mining activities, this will likely be increased to a small or large quantity generator of
hazardous waste pursuant to the Resource Conservation and Recovel)' Act ("RCRA") regulations
administered by the South Carolina Department of Health and Environmental Control ("DHEC"). There
will be no on-site treatment storage or disposal ("TSD") of hazardous waste from the facility. Thus, it is
anticipated that any hazardous waste generated will remain on site for no greater than 90 days before
being shipped to an off-site TSD facility.
The waste streams that are anticipated to be generated from the tailing facility are conditionally exempt
from hazardous waste regulations under the "Bevell Amendment" to RCRA.
Other minor sources of hazardous waste may also be generated. Employees who handle such waste
materials will be properly trained in the waste management in a manner consistent with DHEC
regulations. Haile will develop a Solid and Hazardous Waste Management Plan that will identify and
characterize all waste streams at Haile to ensure proper storage, handling, and disposal.
Multiple above ground storage tanks containing petroleum products will be located at the project site.
Each of these tanks will be either double-wall or equipped with secondary containment, as required by
40 CFR Part 112, and are associated with fueling and maintenance activities for the construction and
operation activities located on the mine property.
D.
Site Wide Water Management
Across the project site a detention structure, diversion channels, culverts, conveyance pipes, sediment
collection channels, and sediment detention basins are proposed to control site-wide surface water
runoff due to stormwater.
Page 53 of 120
SAC #1992-24122-4
Haile Gold Mine
Sheet 48 of 58
Dated 21 Jan 2011
EnvironmentalAssessment
for the Haile Cold Mine Project in Kershaw, SC
Draft- December 3, 2010
The site wide water balance is a key operational consideration for Haile Gold Mine. At all times,
adequate storage must be available in the TSF for both mill process and meteorological water. Project
storage and treatment facilities must be adequately sized for the volume of contact water that is
anticipated to be generated. The purpose of the site wide water balance is to estimate:
·
·
·
·
·
Process solution storage at the Duckwood Tailing Storage Facility (TSF);
Rates and volumes of surface water runoff generated from various areas on site;
Available water supply verses demands for mill and mine operations;
Amount ofTSF reclaim, contact water and non-contact water used in mill and mine operations;
Amount of contact water requiring treatment.
The water balance model was developed as a tool to aid in the design of TSF and water management
facilities and assist with future water management planning. It is intended to be a tool that allows Haile
to better understand water management decisions for safe operations of the facility.
The water balance was developed to analyze in a probabilistic manner accurate estimates of how wet
and dl)' periods will impact water management. Multiple possible scenarios are modeled covering a
range of potential occurrences. Results from these multiple realizations provide a range of potential
outcomes allowing risk-based decision making.
The general design criteria have been developed considering the following: The site wide water balance
was developed to include all major facilities that are expected to add water to the system, facilities that
store water, facilities that use water and water treatment that removes water from the system. A
schematic of the overall system is provided on Figure IV-4.
Water that is added to the system is grouped into two categories: contact water that requires
treatment before it can be released and non-contact water that does not require treatment Non
contact water may require detention for sediment, but is not expected to be run through the water
treatment plant.
Contact Water
·
·
·
Free water in the TSF
Runoff and underdrain from PAC Overburden and Low Grade Ore Stockpile
Direct precipitation and runoff accumulating in the active and inactive pits
Non Contact Water
·
·
·
·
·
·
·
Runoff from Topsoil Stockpiles
Runoff from Overburden Storage Areas
Groundwater from Pit Depressurization
Runoff from Undisturbed Ground
Run-on from Upgradient Areas
Runoff from TSF Outer Perimeter
Runoff from the Plant Site
SAC #1992-24122-4
Page 54 of 120
------------------··-- ----·---·-··--------·
Haile Gold Mine
Sheet 49 of 58
Dated 21 Jan 2011
EnvironmentalAssessment
for the Haile Gold Mine Project in Kershaw, SC
Draft- December 3, 2010
The site wide balance used annual, end of year mine facility areas in conjunction with runoff coefficients
to estimate runoff, seepage, or pumping rates on a monthly basis.
~,.,.,...~.-.,.,..,..,.,...,-
1
TSFStored
I Uru!L~draioj,...,..,.....,...._---l,___~ree :·er
\
\~
~
Figure IV-4. Schematic of the Overall System
SAC #1992-24122-4
Haile Gold Mine
Sheet 50 of 58
Page 55 of 120
Dated 21 Jan 2011
EnvironmentalAssessment
for the Haile Cold Mine Project in Kershaw, SC
Draft- December 3, 2010
Duckwood Tailing Storage Facility
The TSF will be the primary storage vessel for operational water used to meet mill water demands. Free
water from tailing slurry and precipitation add water to the TSF. Geometric data for the TSF modeled in
the water balance includes total surface area of the impoundment, exposed liner areas and tailing
surface areas throughout time. For safety purposes, it was assumed that freeboard is required in the
TSF for the Probable Maximum Precipitation (PMP). The General PMP event produces 47.96 inches of
rainfall; therefore a minimum of four feet of freeboard is required to store the runoff volume associated
with the storm.
Overburden Storage Areas
There will be 8 overburden storage facilities on the mine site. Seven of the overburden storage facilities
will contain non-acid generating (NAG) material. Runoff from these storage areas will be detained in
sediment ponds, then be released without treatment. This water is considered non contact water.
One overburden storage facility will contain potentially acid generating (PAC) material. This storage area
will be constructed with a geomembrane-lined basin and collection underdrains. Runoff and underdrain
flow from this facility will be considered contact water.
A low grade ore stockpile is located adjacent to the PAC overburden storage area. It will be
constructed as part of the PAC OSA Runoff and underdrain flow from the low grade ore stockpile will
be considered contact water and require treatment prior to release.
Pit Development
Seven open pits will be in operation at various times throughout the life of the mine. Direct precipitation
on and runoff collected in the pits will be considered contact water and will require treatment prior to
release. It is assumed that runoff will be pumped out of the pits to a pre-treatment storage area.
A system of pumping wells will be used to depressurize groundwater surrounding the open pits.
Depressurization of the pits is expected to be a significant, consistent source of water throughout the
project It is anticipated that this water will be of good quality and can be used as the fresh water
source for mill makeup, for dust suppression or released.
Water Treatment and Pre-treatment Storage
Treatment will be required before any contact water can be released from the system. A water
treatment facility with a capacity of 1,200 gpm was used for the water balance model. Monthly contact
water runoff rates may peak at rates significantly higher than 1,200 gpm. A pre-treatment storage pond
was added to the system to reduce the need to treat water at a high peak rate. During wet periods
contact water can be stored for treatment at a later time so that the treatment rate can be significantly
less than the peak runoff rate. During dry periods the treatment rate will exceed the runoff rate and
water stored in the pond will be treated.
SAC #1992-24122-4
Page 56 of 120
Haile Gold Mine
Sheet 51 of 58
Dated 21 Jan 2011
Environmental Assessment
for the Haile Cold Mine Project in Kershaw, SC
Draft- December 3, 2010
Haile Cold Mine Creek Detention Structure
A large portion of runoff from the mine will originate from miscellaneous undisturbed areas within the
mine and the Haile Creek basin upstream of the mine site. This water will not come in contact with the
mine facilities and is considered non contact. This water will be diverted with a diversion channel and
discharged downstream of the mine. If required, it may be captured and used to meet fresh water
demand at the mine.
Dust Suppression and Miscellaneous Water
Additional fresh water demands for dust suppression and miscellaneous use was added to the model.
These additional water demands are assumed to be met using runoff from non-contact water
generated on site or groundwater pit depressurization.
Plant Site
Runoff from the plant site is considered non contact water as all process water internal to the system
will be captured internally and not allowed to comingle with meteoric water. Plant site runoff will be ·'·
captured and contained for sediment removal and then released with other non-contact water or used
to meet mill fresh water demands.
The model was run using a monthly time step. The model has an assumed start of Month Qand
includes the first year of preproduction and 16 years of operations for a total of 204 months (17 years).
Water Balance Results
Water balance results indicate that sufficient storage will be maintained in the TSF to contain all slurry
water. Free water reclaimed from the TSF, contact water and non contact water will be used to meet
mill and mine water demands. All free water from the TSF will either remain in the TSF of be used in the
milling process. Contact water that is generated on site that is not used for mine related purposes will
need to be treated prior to being released to the environment. Non contact water that is not used is
anticipated to be collected for sediment control, as needed, and released.
Contact Water Storage and Treatment Requirements
Water treatment capacity is designed for a rate of 1,200 gpm. During average precipitation conditions,
contact water will be generated at average monthly rates of up to approximately 850 gpm. During
potential wet years, contact water will be generated at average rates that exceed the treatment plant
design capacity. The pre-treatment water storage facility will be used to temporarily store water in
these instances and regulate treatment rates.
Water treatment is highly dependent on precipitation that will occur at the mine with all contact water
requiring treatment derived from rainfall and runoff. Generally water requiring treatment is expected to
grow as the mine develops, reaching a maximum in Years 5-8 of operations. During these years it is
anticipated that the water treatment plant could be run at its maximum design rate if wet months or
years occur. In this event approximately 18 million gallons of water would need to be stored in the pre
treatment facility to regulate treatment at 1,200 gpm. During extreme drought conditions, little to no
Page 57 of 120
SAC #1992-24122-4
Haile Gold Mine
Sheet 52 of 58
Dated 21 Jan 2011
EnvironmentalAssessment
for the Haile Cold Mine Project in Kershaw, SC
Draft- December 3, 2010
water treatment may be required. On an annual basis, water treatment requirements were predicted to
range from none for drought conditions to an average annual rate of nearly 1,200 gpm for wet months
or years.
Non Contact Water Release
Non contact water that is not used in the mill process will be released from the system. A majority of
contact water is generated from rainfall and therefore the amount of non contact water to be released
from the system is dependent on precipitation patterns. Given drought conditions, non contact water is
expected to be released at average annual rates ranging from approximately 150 gpm to 900 gpm.
Given average precipitation, non contact water is predicted to be released at average annual rates in the
2,000 gpm to 2,600 gpm rates.
Water generated from pit depressurization pumping is anticipated to be one of the significant sources
of non contact water, and one that is not directly related to current precipitation patterns. As a result of
this water supply, water is expected to be released from site at most times during the planned mine life.
Makeup Water Requirements
The site wide water balance predicts that given typical meteorological conditions, makeup water from
outside sources is not expected to be required to meet mine water demands. In Year 2 through Year 8
of operations, water from pit depressurization is anticipated to be high enough that no outside makeup
water would be required. During initial startup and later operations, pit depressurization pumping is not
expected to be as great. During these periods the water balance is predicting that makeup water could
be required if an extreme drought occurred. During the initial months of startup peak makeup of
approximately 800 gpm could be required. During later operations the peak anticipated makeup water
rate is 400 gpm for a drought where no precipitation occurs.
Conclusions
Precipitation values and design storms were developed for frequencies up to the 500-year, 24-hour
storm event, as well as the Probable Maximum Precipitation values. The peak flows and resulting
discharge volumes were evaluated for sizing each of the water management structures including the
diversion channels, culverts, runoff collection channels, and Haile Creek detention structure. Watershed
delineation was based upon topographic maps with 5-foot contour intervals and took into consideration
the dynamic design life of the facility by evaluating each water management structure at the most
critical design phase with the greatest peak discharge.
A site wide water balance was completed for the Haile Gold Mine to ensure that adequate storage is
available in the Duckwood TSF for both mill process and meteorological water. Project water storage
and water treatment facilities were adequately sized for the volume of contact water that is anticipated
to be generated and take into account the influence of how dry and wet periods impact the overall site
wide water management.
Page 58 of 120
SAC #1992-24122-4
Haile Gold Mine
Sheet 53 of 58
Dated 21 Jan 2011
EnvironmentalAssessment
for the Haile Cold Mine Project in Kershaw, SC
Draft- December 3, 2010
E.
Reclamation Plan Overview
Overview
Provided below is an overview of the reclamation plan proposed to address the requirements of the
South Carolina Department of Health and Environmental Control Bureau of Land and Waste
Management - Division of Mining and Solid Waste Permitting -Application for a Mine Operating
Permit Form MR-500. Specifically, this planned work will address Section 48-20-90 - "An operator
shall submit with his application for an operating permit a proposed reclamation plan".
Haile Cold Mine Reclamation Plan Summary
The Haile Cold Mine Reclamation and Closure Plan is designed to reclaim land disturbed by mining,
overburden disposal, ore processing operations, and associated support facilities to a stabilized
condition that will provide for the long-term protection of land and water resources, minimize the
adverse impacts of mining, and support the intended post-mining land use. The plan will meet all
applicable regulatory requirements. All surface water controls will be designed to withstand the peak
flow from the 100-yr, 24-hr storm event.
The plan describes the general reclamation procedures and methods for achieving the final closure
requirements and objectives. In addition, the plan serves as a basis for calculating reclamation costs,
long-term post-reclamation maintenance and the required financial assurance.
During operations, Haile will take the opportunity to perform aspects of the final reclamation activities
concurrent with operations. Concurrent reclamation will be performed on disturbed areas once all
planned mining activities in the area are completed and no future mining activity is expected. Final
reclamation will commence immediately upon cessation of mining and milling operations. Final
reclamation will be completed as soon as practicable after mining activities cease at the facility.
Due to continued exploration success there are unknowns associated with the final configuration of the
mine site over 1 5 years in the future. For this reason, the reclamation and closure plan presented is
more conceptual than detailed. As mining activities at the Haile Gold Mine progress, the reclamation
and closure plan will be continuously refined and expanded, while adhering to the concepts outlined in
this document. Financial assurance will be provided for proposed reclamation and closure activities to
ensure that reclamation and closure will not become a financial responsibility of the State of South
Carolina.
Overburden Classification
The overburden that will be generated during the development of the Haile Gold Mine will be classified
into three categories based on the potential for acid generation. Red overburden contains strongly acid
generating material and has the potential to generate low pH and very high metals and sulfate content
in contact water. Yellow overburden contains moderately acid generating material and has the potential
to generate low pH but low to moderate metals content in contact water. Green overburden is inert to
alkaline and could generate moderately low pH with low to non-detectable metals content in contact
water, but is expected to meet stormwater requirements.
SAC #1992-24122-4
Page 59 of 120
Haile Gold Mine
Sheet 54 of 58
Dated 21 Jan 2011
EnvironmentalAssessment
for the Haile Gold Mine Project in Kershaw, SC
Draft- December 3, 2010
Reclamation Activities
The reclamation plan will provide stable slopes, manage discharge water quality and establish
vegetation over all portions of the mine site except those areas designated as post-closure pit lakes, pit
highwalls adjacent to the post-closure pit lakes, and any roads and access areas necessary for post
closure activities and land use(s ).
Haile Cold Mine already has good experience and understanding of what vegetation will grow at the site
from its historical reclamation successes. However, during the mine operating period Haile Cold Mine
will establish vegetation test plots and perform other studies to establish and refine appropriate
vegetation species and seeding rates, soil and fertilizer requirements, and overall vegetation procedures
to ensure sustainable vegetation post-closure.
The proposed facilities at the Haile Cold Mine fall into seven general facilities types. (1) backfilled pits,
(2) unfilled pits {future pit lakes), (3) red/yellow overburden areas, {4) green overburden areas, (5) Haile
Cold Mine Creek, (6) tailings storage facility (TSF), and (7) plant site, roads, powerlines, pipelines, and
other ancillary facilities. Following is a description of the proposed reclamation activities planned for
each type of facility:
Backfilled Pits
Of the seven pits included in the mine plan, four pits, Mill, Haile, Red Hill, and Chase Hill, will be
completely backfilled with overburden and a fifth, Snake Pit, will be partially backfilled with overburden.
The pits will be backfilled as part of overburden placement during operations after completion of pit
development.
Yellow overburden will be placed in the pits up to a level that will ensure this material is permanently
inundated with water following the cessation of depressurization pumping, limiting the ability of the
material to generate acid rock drainage (ARD). Additional precautions will be taken during fill placement
to limit ARD generation prior to inundation. The measures include lime amendment, placement of
overburden in lifts, and placement of a saprolite layer on top of yellow overburden. Lime, or other
suitable pH buffering material, will be placed concurrently with the backfill. The backfill will be placed in
lifts not more than 50 feet thick and the final lift will be capped with a 5 ft layer of saprolite to limit
oxygen transport into the overburden pile. Lime addition and saprolite layer construction will be
performed as part of normal mine operations.
Green overburden will be placed above the yellow overburden {and above the long term inundation
surface) to complete backfilling and promote positive drainage off the pit backfills. During reclamation,
the green overburden will be vegetated using established procedures.
Snake Pit will be partially backfilled. As with the other overburden backfill, yellow overburden will be
placed below the level that will ensure permanent inundation, amended with lime and sealed with a
minimum 5 ft thick saprolite cover layer. Additionally, a minimum 20 foot thick saprolite cover will be
placed on the exposed yellow overburden slope of the Snake Pit backfill. This will occur on final backfill
slopes below the post mining inundation level. Rnal slopes will be constructed with alternating benches
and angle of repose slopes to have an overall slope of 3H:1V or flatter.
Page 60 of 120
SAC #1992-24122-4
Haile Gold Mine
Sheet 55 of 58
Dated 21 Jan 2011
Environmental Assessment
for the Haile Cold Mine Project in Kershaw, SC
Draft- December 3, 2010
Green overburden will be placed in Snake Pit above the yellow overburden (and above the long term
inundation surface). Final slopes will be constructed to have an overall slope of 3H:1V or flatter.
Concurrent with placement of the green overburden, the angle of repose slopes will be pushed down to
develop inter-bench slopes of 2.5H:1 V slopes with surface water controls to limit erosion. During
reclamation, the green overburden will be vegetated using established procedures.
Unfilled Pits
Two of the pits, Ledbetter and Small, will not be backfilled during mining or reclamation and will remain
as pit lakes. At least one year prior to mine closure, a pit lake study will be performed to predict final
water levels and water quality within the pit lake. During reclamation, a security fence and safety berm
will be established around the remaining pit highwall. All surface water inlets or outlets to the pit lakes
will be improved to limit erosion and control flow into and out of the pit Jakes.
Red/Yellow Overburden Areas
One overburden area, Johnny's Overburden Area, will be designated to receive all red overburden and
any yellow overburden not needed for the pit backfills. Overburden in this area will be placed on a
geomembrane liner and any seepage generated during operations will be collected for treatment The
overburden will be placed in lifts not more than 50 ft high with a minimum 20 foot thick saprolite layer
at the outside perimeter. The final lift will be covered with a 5 foot thick layer of saprolite. The final
slopes will be constructed with alternating benches and angle of repose slopes to have an overall slope
of 3H:1V or flatter. Concurrent with placement of the overburden, the angle of repose slopes will be
pushed down to develop inter-bench slopes of 2.5H:1V slopes with surface water controls to limit
erosion.
During reclamation, the entire Johnny's Overburden Area will be covered with a geosynthetic liner and a
minimum of 2 feet of growth media material. The growth media will be vegetated using established
procedures.
Seepage will continue to be collected and treated in the same manner as that used during the operating
period. As inflows to the overburden have been effectively eliminated, the seepage from the overburden
is expected to decrease significantly over time. Once seepage has been reduced sufficiently, passive
treatment cells, utilizing an anaerobic treatment, will be constructed in the lined seepage collection
ponds. This passive treatment cell will provide discharge q·uality water from the overburden area with
minimal maintenance requirements. Haile already has good experience and understanding of the use of
passive treatment systems at the existing mine.
Green Overburden Areas
An additional seven overburden areas at the Haile are designated to receive only green overburden
(James Overburden Area, Hayworth Overburden Area, Hilltop Overburden Area, Red Hill Overburden
Area, Haile Overburden Area, 601 Overburden Area, and Ramona's Overburden Area). Overburden in
these areas will be placed on a prepared subgrade. All final slopes of the overburden area will be
constructed with alternating benches and angle of repose slopes to have an overall slope of 3H:1Vor
flatter. Concurrent with placement of the overburden, the angle of repose slopes will be pushed down
to develop inter-bench slopes of 2.5H:1V slopes with surface water controls to limit erosion. During
reclamation, the green overburden will be vegetated using established procedures.
SAC #1992-24122-4
Page 61 of 120
Haile Gold Mine
Sheet 56 of 58
Dated 21 Jan 2011
EnvironmentalAssessment
for the Haile Gold Mine Project in Kershaw, SC
Draft- December 3, 2010
Haile Cold Mine Creek
During mining activities, portions of Haile Cold Mine Creek will be impacted by Ledbetter Pit and Haile
Pit development.
Ledbetter Pit will be reclaimed as a pit lake. The creek will be redirected in an engineered channel
during operations. After mining ceases, low flows in the creek will continue to flow in the engineered
channel and high flows will be diverted into the pit lake. The pit lake will rise to a level that will discharge
into Haile Cold Mine Creek downstream of the pit. Once the pit lake reaches its final elevation, Haile
Gold Mine Creek will be directed into the lake and will flow through the pit lake. Engineered structures
will control creek flow into and out of the lake and the engineered channel will be abandoned at this
time.
During mining operations in Haile Pit, Haile Cold Mine Creek and the North Fork Creek will be
redirected into engineered channels in a similar manner to that used for the Ledbetter Pit. However,
during mining operations the Haile Pit will be backfilled to restore near original topography in the vicinity
of these two original drainages such that Haile Cold Mine and the North Fork Creek will be re
established on top of the backfilled pit.
Tailings Storage Facility
The Tailing Storage Facility (TSF) will consist of an above grade lined impoundment, filled with tailing
material. A drainage collection system above the lined facility will collect seepage water from the
tailings and return it to the impoundment. As the outboard slopes of the TSF achieve final configuration,
they will be vegetated using established procedures.
At the cessation of milling, the TSF will be reclaimed using a dry closure approach. In order to dewater
the tailing facility, the water treatment plant will be reconfigured to treat the tailings pool and drainage
water. Water collected from the underdrains and any remaining free water in the impoundment will be
treated in the reconfigured water treatment plant and discharged though the same outfall used during
operations.
The upper surface of the tailings will be stabilized using soil fill placed by low ground pressure
equipment where necessary. As the surface of the tailings is stabilized and shaped for positive drainage
of stormwater, a geosynthetic liner will be placed over the tailings in stages. A minimum of two feet of
growth media will be placed over the geosynthetic and the entire area will be vegetated using
established procedures.
Once the surface of the TSF has been successfully reclaimed, the perimeter of the tailings facility berm
will be opened to allow storm water to freely drain off the covered and reclaimed tailings surface
without disturbing the tailings. Surface water controls will be established at the spillway outlet location
to prevent the erosion of the embankment during periods of high flow.
Seepage will continue to be collected and treated in the same manner as that used during the closure
activities. Once inflows to the tailings have been effectively eliminated, the seepage from the tailings
facility is expected to decrease significantly over time as the tailings approach ultimate consolidation.
Once seepage has been reduced sufficiently, a passive treatment cell, utilizing an anaerobic treatment,
will be constructed in the lined underdrain collection pond. This passive treatment cell will provide
discharge quality water from the TSF with minimal maintenance requirements.
SAC #1992-24122-4
Haile Gold Mine
Sheet 57 of 58
Page 62 of 120
- - - - Dated 21 Jan 2011
-----~-------------
EnvironmentalAssessment
for the Haile Cold Mine Project in Kershaw, SC
Draft- December 3, 2010
Plant Site, Roads, Powerlines, Pipelines, and other Facilities
Other facilities at the mine, including the plant site, growth media stockpiles, sediment and settling
ponds, disturbed land, roads, powerlines, pipelines and surface water controls, that are not required for
post-closure monitoring or maintenance will be regraded, demolished, salvaged andfor removed as
appropriate. All areas will be graded to promote drainage and growth media placed if needed to support
vegetation. All disturbed areas will be vegetated using established procedures.
Post-Closure Monitoring
The Haile Cold Mine will require post closure maintenance and monitoring. In addition to general site
monitoring and maintenance, passive treatment cells will require replacement approximately every 25
years or as necessary. Ground water and surface water samples will be collected and analyzed. It is
anticipated that surface and ground water will be monitored for a period of 1 0 years following mine
closure. The passive treatment cells will require periodic maintenance.
Page 63 of 120
SAC #1992-24122-4
Haile Gold Mine
Sheet 58 of 58
Dated 21 Jan 2011
Hail(; Gold Mine Com:eptual Mitigation Plan
Mitigation Pian Overview
1.4 Site Selection and Site Overview
HGM is proposing to utilize four separate mitigation areas to address the mitigation obligation under the
404 permit. The selection rationale, and a summary of each area, is shown below. The detailed
conceptual mitigation plan for each area is provided in the subsequent section of the plan.
Flat Creek Headwaters Mitigation Area (See Section 2, 2A, and 2B for details)
;~ .. ~.'
\
;_t.
'
,'f
A core conservation strategy is to focus efforts on the Flat Creek watershed, which is located in HUC
03040202-Lynches River and within the Lynches River TMDL area. In the Flat Creek watershed HGM
proposes to restore and enhance 14,565 linear feet of stream, and place conservation easements on over
250 acres of riparian buffer protecting approximately 47,150 linear feet of stream,.
The mitigation area proposed is ideal for several reasons. First, it is in the same 8-digit watershed as is the
Haile Gold Mine site, which satisfies the USACE requirement for mitigation to be in the same watershed
as the impacts. Second, the watershed is small enough, approximately 32,000 acres in size, that the
mitigation will have a meaningful uplift on water quality through the efforts under this mitigation plan.
Third, Flat Creek is 303 (d) listed and within the Lynches River TMDL area. Finally, the Flat Creek area
has been a primary focus area in the Midlands for conservation efforts by The Nature Conservancy
(TNC), US Fish and Wildlife Service (FWS) and SC Department of Natural Resources (DNR).
3 '
REVISED
JOINT
PUBLIC NOTICE
CHARLESTON DISTRICT, CORPS OF ENGINEERS
69-A Hagood Avenue
Charleston, South Carolina 29403
and
THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
Office of Environmental Quality Control
Water Quality Certification and Wetlands Programs Section
2600 Bull Street Columbia, South Carolina 29201
REGULATORY DIVISION
Refer to: PIN # SAC 1992-24122-4IA
April 9, 2013
Pursuant to Sections 401 and 404 of the Clean W ater Act (33 U.S.C. 1341), a revised application has
been submitted to the Department of the Army and the South Carolina Department of Health and
Environmental Control by
HAILE GOLD MINE, INC.
ATTN: DAVID THOMAS
7283 HAILE GOLD MINE ROAD
KERSHAW, SC 29067
for a permit to construct and operate a gold mine in order to extract and process gold from the Haile ore body in
HAILE GOLD MINE CREEK and CAMP BRANCH, both tributaries to the Little Lynches River
at a location approximately 3 miles north of the Town of Kershaw near the intersection of US Highway 601 and
Haile Gold Mine Road, Lancaster County, South Carolina (Latitude: 34.579810°N; Longitude -80.539554°W).
In order to give all interested parties an opportunity to express their views
NOTICE
is hereby given that written statements regarding the proposed work will be received by both of the above mentioned
offices until
noon on May 7, 2013,
from those interested in the activity and whose interests may be affected by the proposed work.
PLEASE NOTE: A public notice was originally advertised for the proposed work on January 28, 2011. The
proposed project has been revised. Haile Gold Mine, Inc. has obtained additional properties that have allowed a
reconfiguration of project components to reduce permanent losses to wetlands and other waters of the U.S. This
revised notice constitutes an advertisement of the revised proposed work. The original public notice issued January
28, 2011, is also available at http://www.HaileGoldMineEIS.com. The Corps of Engineers initiated preparation of an
Environmental Impact Statement (EIS) on July 1, 2011. A Draft EIS is currently being prepared in compliance with
the National Environmental Policy Act (NEPA) and Corps of Engineers regulations in cooperation with the U.S.
Environmental Protection Agency (EPA), Catawba Indian Nation, and South Carolina Department of Health and
Environmental Control (SC DHEC).
Please be advised that comments submitted in response to this revised notice will be combined with the
comments received in response to the original public notice and considered during the permit review
process. Please address comments to the revised elements of the proposed project.
The revised proposed work consists of the excavation and fill of 120.46 acres of wetlands and 26,460.54
REGULATORY DIVISION
Refer to: PIN # SAC 1992-24122-4IA
April 9, 2013
linear feet of streams. The applicant has explored numerous site plan alternatives to demonstrate avoidance and
minimization of aquatic resources impacts. The revised application reflects a twenty-five percent (25%) reduction in
wetland impacts and a thirty-two percent (32%) reduction in stream impacts relative to the original application
submitted in January 2011 which proposed a total of 161.81 acres of wetland impacts and 38,775 linear feet of
stream impacts.
Consistent with the original public notice issued on January 28, 2011, the proposed work consists of the
mechanized land clearing, grubbing, temporary stockpiling, filling, and excavation of 120.46 acres of jurisdictional,
freshwater wetlands and 26,460.54 linear feet of streams. Mining will be phased over a 12-year period. Eight open
mine pits will be excavated, ranging in depth from 110 to 840 feet. In each pit the surface layer, consisting of the
existing seed bank and growth media, will be removed and stockpiled for use during reclamation activities. Next,
overburden (waste rock) will be excavated and stockpiled for future backfilling of some pits. Once the overburden is
removed, ore will be mined using 6-inch diameter bore holes, explosives and wheeled loading equipment to load
100-ton capacity off-road mining trucks. Following ore removal, some pits will be backfilled with overburden; others
will be left to fill with water to become lakes. Ore will be milled and processed at a plant on site. Once the gold has
been extracted, the remaining material, or tailings, will be pumped to a Tailing Storage Facility (TSF). Cyanide levels
in the tailings will be maintained at 50 ppm or less of weak acid dissociable [W AD] cyanide, and the flow of tailings
will be directed to cyanide destruction tanks, as necessary to maintain this level in the tailings. Once mining ceases,
the TSF will be encapsulated with geosynthetic material and a minimum of 2' of growth media. Reclamation of
mining area units will take place as mining progresses and reclamation will meet with then-current standards
established in the South Carolina Mining Regulations. Any water leaching from the TSF will be monitored and
treated prior to discharge into the Little Lynches River. Mining activities will take place seven days per week, 365
days per year.
Note that the plan drawings attached to this notice depict direct impacts to wetlands and other waters of the
United States. The Corps of Engineers, with the applicant's cooperation, has been working to characterize the
groundwater hydrology of the proposed mine site in order to define the extent of indirect impacts that may result from
groundwater depressurization (drawdown) as mine pits are excavated. Since August 15, 2012, additional
groundwater pumping and groundwater level observation wells have been installed for this purpose. Groundwater
modeling using these new data is currently underway to predict any hydrologic impacts to surface water features,
including wetlands and streams.
According to the applicant, the project purpose is to produce gold for sale from the mineralized gold bearing
zones on the Haile property. The Corps of Engineers has determined that the overall project purpose is to open and
operate an economically viable gold mining operation using gold-bearing mineral reserves in the Carolina slate belt
region.
According to the applicant, extensive geological investigations, sampling and drilling have confirmed that
the Haile Gold Mine has economically recoverable mineral resources located on its site. From these investigations,
the owner has determined that the proposed facilities and operations cannot be moved to another site due to
resource location, project economics and land ownership/availability. Four on-site alternatives have been
investigated in development of the Least Environmentally Damaging Practicable Alternative including: 1) No-action
alternative, 2) Twenty-one alternative site plans, 3) the preferred alternative, and 4) No-pit backfill alternative plan.
Mitigation is being proposed in the form of a permittee-responsible mitigation plan that includes restoration
and enhancement of 64,486 linear feet of streams, preservation of 32,585 linear feet of streams, restoration and
enhancement of 190.11 acres of wetlands and preservation of 17.6 acres of wetlands. Additionally, out-of-kind
mitigation is being proposed in the form of preservation by transferring fee simple ownership of 642 acres (Parcel
A - 590 acres and Parcel B - 52 acres) of conservation land adjacent to the Forty Acre Rock Heritage Preserve
and Wildlife Management Area, designated as a National Natural Landmark. All proposed mitigation will take
place in four areas within the same watershed as the impact site. The four subject areas are identified as Flat
Creek Headwaters Mitigation Area, Little Lynches River Mitigation Area, Lynches River Headwaters Mitigation
Area and Flat Creek Heritage Preserve Expansion Area. The Applicant has not changed its compensatory
mitigation plan since the original public notice.
NOTE: Plans depicting the work described in this notice are available and will be provided, upon receipt of
a written request, to anyone that is interested in obtaining a copy of the plans for the specific project. The
REGULATORY DIVISION
Refer to: PIN # SAC 1992-24122-4IA
April 9, 2013
request must identify the project of interest by public notice number and a self-addressed stamped
envelope must also be provided for mailing the drawings to you. Your request for drawings should be
addressed to the
U.S. Army Corps of Engineers
ATTN: REGULATORY DIVISION
69-A Hagood Avenue
Charleston, South Carolina 29403
The District Engineer has concluded that the discharges associated with this project, both direct and
indirect, should be reviewed by the South Carolina Department of Health and Environmental Control in
accordance with provisions of Section 401 of the Clean Water Act. As such, this notice constitutes a request, on
behalf of the applicant, for certification that this project will comply with applicable effluent limitations and water
quality standards. The District Engineer will not process this application to a conclusion until such certification is
received. The applicant is hereby advised that supplemental information may be required by the State to facilitate
the review. Persons wishing to comment or object to W ater Quality Certification must submit all comments in
writing to the S.C. Department of Health and Environmental Control at the above address within thirty (30) days of
the date of this notice.
This notice maintains the Essential Fish Habitat (EFH) consultation requirements of the Magnuson Stevens
Fishery Conservation and Management Act. Implementation of the proposed project would impact approximately
120.46 acres of freshwater wetland habitat and 26,460.54 linear feet of stream habitat and would be considered
"non-fishing related activities that may adversely affect EFH" under the Magnuson-Stevens Act provisions. Our initial
determination is that the proposed action would not have a substantial individual or cumulative adverse impact on
EFH or fisheries managed by the South Atlantic Fishery Management Council and the National Marine Fisheries
Service (NMFS). Our final determination relative to project impacts and the need for mitigation measures is subject
to review by and coordination with the NMFS.
Pursuant to Section 7(c) of the Endangered Species Act of 1973 (as amended), the applicant has provided
protected species surveys for the property associated with the activity described above. Based upon this report, the
District Engineer has determined that the project is not likely to adversely affect any federally endangered,
threatened, or proposed species or result in the destruction or adverse modification of designated or proposed critical
habitat. This notice maintains consultation requirements with the U.S. Fish and Wildlife Service and the National
Marine Fisheries Service regarding federally protected species.
Pursuant to Section 106 of the National Historic Preservation Act (NHPA), this public notice also constitutes
a request to Indian Tribes to notify the District Engineer of any historic properties of religious and cultural significance
to them that may be affected by the proposed undertaking.
In accordance with the NHPA, the District Engineer has also consulted the latest published version of the
National Register of Historic Places for the presence or absence of registered properties, or properties listed as being
eligible for inclusion therein, and this worksite includes one historic structure, Site 0946, which is eligible for listing as
well as several others that are either not eligible or require evaluation. Additionally, several sites labeled as Historic
Areas are scattered throughout the site. The applicant has coordinated closely with the State Historic Preservation
Office throughout site preparation work. To insure that other cultural resources that the District Engineer is not aware
of are not overlooked, this public notice also serves as a request to the State Historic Preservation Office to provide
any information it may have with regard to historic and cultural resources.
Any person may request, in writing, within the comment period specified in this notice, that a public hearing
be held to consider this application. Requests for a public hearing shall state, with particularity, the reasons for
holding a public hearing.
The decision whether to issue a permit will be based on an evaluation of the probable impact including
cumulative impacts of the activity on the public interest and will include application of the guidelines promulgated by
the Administrator, Environmental Protection Agency (EPA), under authority of Section 404(b) of the Clean Water Act
and, as appropriate, the criteria established under authority of Section 102 of the Marine Protection, Research and
Sanctuaries Act of 1972, as amended. That decision will reflect the national concern for both protection and
REGULATORY DIVISION
Refer to: PIN # SAC 1992-24122-4IA
April 9, 2013
utilization of important resources. The benefit which reasonably may be expected to accrue from the project must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to the project will be
considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, flood plain values, land
use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy
needs, safety, food and fiber production and, in general, the needs and welfare of the people. A permit will be
granted unless the District Engineer determines that it would be contrary to the public interest. In cases of conflicting
property rights, the Corps of Engineers cannot undertake to adjudicate rival claims.
The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and
officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this activity. Any
comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or
deny a permit for this project. To make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and the other public interest factors listed above.
Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement
pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public
hearing and to determine the overall public interest of the activity.
If there are any questions concerning this public notice, please contact Richard Darden at 843-329-8043.
NOTES:
1. NOTES apply to all Sheets.
2. The Haile Modified Alternative General Layout presents an updated modification to the 2011 Mine Plan
submitted as part of the Permit Application (Revised January 11 , 2011 ). The Modified Alternative General
Layout (2012 Modified Plan), developed by AMEC dated May 2012 , represents a mine plan that has
addressed specific concerns received during the Permit Application review process to maximize avoid
ance and minimization measures associated with disturbance to waters of the US .
3. Maps herein depict the proposed mine facilities, major existing roadways for orientation and aquatic
resources.
4 . Property Boundary now includes approximately 4,552 .25 acres of land. Exclusion Areas shown within
the Property Boundary are not currently owned by Haile and therefore are not included in the total Prop
erty Boundary acreage.
5. Jurisdictional waters of the US , depicted as Aquatic Resources , are per the Ecological Resource
Consultants , Inc. Jurisdictional Determination Request Wetland Delineation Report, Haile Gold Mine
Project (SAC 1992-24122-41A), Lancaster County, South Carolina, Revised -August 2012 (ERC 2012).
The waters of the US mapping herein and that of ERC 2012 reflects the final field verification by the
USACE Conway Office on July 24-25 , 2012 . All Aquatic Resource mapping , both wetlands and streams ,
is pending final USACE verification and subject to change .
6 . All jurisdictional Aquatic Resources are depicted on the maps herein, however only identification label
ing has been provided for those Aquatic Resources that are associated with direct impacts. Refer to ERC
2012 for complete Aquatic Resource identification . On this Detailed Plan, the Stream Reach ID does not
designate the starting point of the direct stream impact; it only denotes the starting point of the entire
stream reach as delineated in ERC 2012 .
7. Direct impacts are assumed to be those activities which may result from excavation, fill, or physical loss
of waters of the US. Potential indirect impacts to waters of the US are not considered as part of this
analysis.
8 . All direct impacts for this analysis have assumed an additional 50 foot disturbance area around all
facilities beyond the planned "footprint" of the activity. The additional 50 foot disturbance area extends
from the outermost edge of the activity or facility (i.e., daylight or last grade line). While this additional
disturbance area may not be directly impacted as part of an activity (i.e., fill or excavation), it has been
assumed as part of this analysis as a direct impact associated with potential incidental access , potential
variation or modifications upon final construction design , construction implementation needs and/or BMP
control measures that may be needed . A 450 foot direct disturbance area has been assumed around the
outer edge of the proposed Champion Pit activity anticipated pit shell to allow for operational flexibility
plus an additional 50 foot disturbance area extending 50 feet from the outermost edge of the activity has
been assumed , for a total disturbance area of 500 feet around the outer edge of the proposed Champion
Pit.
SHEET TITLE (1 of 2)
Plan Sheet 1 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Draw n by:
ERC
I
_A ugust 15, 2012 1
Date.
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Note. Refer to 2012 Revised Permit
Application.
Haile Gold Mine Inc.
~,...;:;~ 7283 Haile Gold Mine Road
~~ P.O. Box128
Kershaw, SC 29067
NOTES (continued):
9. A 50' wetland buffer area is maintained around all non-impacted wetlands and streams within the
Project Boundary. This buffer area is intended as a "no-disturbance" area and will not be altered from the
existing condition .
10. Table 1 -Aquatic Resource Direct Impact Summary provides a detailed analysis of determined direct
impacts grouped within each Impact Area of the 2012 Modified Plan . Impact Areas have been designated
based on each primary facility footprint and include the determined direct impacts of each Aquatic
Resource . The Impact ID refers to a discrete impact within each Aquatic Resource and Reach corre
sponding to ERC 2012 . Coward in Classification refers to US Classification of Wetlands and Deep Water
Habitats of the US (Cowardin et. al 1979) as determined in ERC 2012. Total Impact (acres) refers to the
area of wetland and reservoir/open water calculated within each Impact ID area . Total Impact (linear feet)
refers to the linear length of non-vegetated channel or stream calculated within each Impact ID area .
Stream area has been excluded from total wetland area.
11 . Schematic cross-sections are only intended as approximate visual representations .
Detailed Plan Includes:
· SHEET TITLE (1 of 2)
· SHEET TITLE (2 of 2)
· SHEET OVERALL SITE LAYOUT
· SHEET OVERVIEW (1 OF 3)
· SHEET OVERVIEW (2 OF 3)
· SHEET OVERVIEW (3 OF 3)
· SHEET TABLE 1 (PAGE 1 OF 4)
· SHEET TABLE 1 (PAGE 2 OF 4)
· SHEET TABLE 1 (PAGE 3 OF 4)
· SHEET TABLE 1 (PAGE 4 OF 4)
· SHEET KEY
· SHEET KEY (A)
· SHEET KEY (B)
· SHEET 1-15 (PLAN VIEWS)
· SHEET 16-30 (SCHEMATIC CROSS SECTIONS)
SHEET TITLE (2 of 2)
Plan Sheet 2 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by :
ERC
I
_A ugust 15, 2012 1
Date.
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Note. Refer to 2012 Revised Permit
Application.
Haile Gold Mine Inc.
~~~ 7283 Haile Gold Mine Road
~~ P.O . Box128
Kershaw, SC 29067
r
OVERVI
SHEET OVERALL SITE LAYOUT
Plan Sheet 3 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by:
ERC
Date
August 15, 2012
~
-
Property Boundary
Stream Impact
Wetland Impact
~
Exclusion Area
1
Wetland/Stream No Impact
1,500
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Note. Refer to 2012 Revised Permit
Application.
Legend
D
1I
3,000
Feet
. Overview Sheet
...1J1 Match Line
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
Plan Sheet 4 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by:
ERC
Date
August 15, 2012
Note. Refer to 2012 Revised Permit
Application.
Legend
D
~
-
1
Property Boundary
Stream Impact
Wetland Impact
Wetland/Stream No Impact
0
800
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
1,600
Feet
.
Overview Sheet
....!J1 Match Line
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
000
000
HAYWORTH
GROWTH MEDIA
STORAGE AREA
SNAKE
GROWTH MEDIA
STORAGE AREA
Plan Sheet 5 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by:
ERC
Date
August 15, 2012
Note. Refer to 2012 Revised Permit
Application.
Legend
D
~
1
Property Boundary
Stream Impact
Wetland/Stream No Impact
0
-
Wetland Impact
800
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
1,600
Feet
.
Overview Sheet
....!.J1 Match Line
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
03-HOCK TSF
BORROW AREA
HAUL ROAD
Plan Sheet 6 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by:
ERC
Date
August 15, 2012
Note. Refer to 2012 Revised Permit
Application.
Legend
D
~
-
1
Property Boundary
Stream Impact
Wetland Impact
Wetland/Stream No Impact
0
800
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
1,600
Feet
.
Overview Sheet
....!.J1 Match Line
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O. Box 128
Kershaw, SC 29067
TABLE 1. AQUATIC RESOURCE DIRECT IMPACT SUMMARY.
Impact Area
Impact ID
Total Impact
Coward in
Aquatic Resource
(Acres)
Classification
AAA1
-
Reach AAA
R4SB4C
AAA2
1.91
Wetland AAA
PSS1/POWHb
1.05
Wetland AAA
PEM1/POWHb
0.44
-
Wetland AAA
Reach AAA
PF01C
R4SB4C
2.06
Wetland AAA
PF01B
AAA3
AAA4
AAA5
AAA6
-
AAA7
4 .91
AAA
Reach AAA
R4SB4C
Wetland AAA
PF01B
AAA7
-
Reach AAA
R4SB4C
AAA8
1.26
Wetland AAA
PF01B
AAA9
0 .28
Wetland AAA
PF01B
AAA10
0.96
Wetland AAA
PF01C
AAA11
0 .77
4.2
Wetland AAA
Wetland BBB
PF01C
PF01B
BBB1
1.25
Wetland BBB
PF01C
Reach BBB
Wetland DDD
R4SB4C
PF01B
Wetland DDD
PF01C
Reach DDD
Wetland EEE
R4SB4C
PEM1C
Wetland EEE
PF01B
Wetland EEE
PF01C
Wetland EEE
PSS1C
BBB
2.34
DDD1
3.41
DDD
0.17
1.86
EEE1
20 .32
EEE
5.28
2.28
QQQ1
QQQ
01-DUCKWOOD TSF
2nd Order
167.89
2nd Order
707.91
2nd Order
1,548.69
1st Order
450.67
1st Order
348 .52
2,419 .18
6,214.15
-
000
R4SB4C
Reach 000
TOTAL WETLAND IMPACT (acres)=
TOTAL STREAM IMPACT (linear feet)=
2nd Order
0
277 .96
277.96
SS1
-
ss
R4SB4C
Reach SS
TOTAL WETLAND IMPACT (acres)=
TOTAL STREAM IMPACT (linear feet}=
3rd Order
0
203 .58
203.58
-
-
03-HOCK TSF BORROW AREA HAUL ROAD
04-PLANT SITE
TOTAL WETLAND IMPACT (acres)=
TOTAL STREAM IMPACT (linear feet)=
SHEET TABLE 1 (PAGE 1 OF 4) Plan Sheet 7 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Date August
571.29
0001
02-HOLLYTSF BORROW AREA HAUL ROAD
I
Total Impact
{Linear Feet)
2nd Order
Reach EEE
R4SB4C
1st Order
PF01B
Wetland QQQ
TOTAL WETLAND IMPACT (acres)=
54.75
TOTAL STREAM IMPACT (linear feet)=
Drawn by : ERC
Stream Order
15 , 20121
0
0
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Note. Refer to 2012 Revised Permit
Application.
~
0
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
TABLE 1. AQUATIC RESOURCE DIRECT IMPACT SUMMARY.
Impact Area
Impact ID
51
Total Impact
1.02
-
5
Rl
0
R
D2
Fl
0.51
D
OS-PLANT SITE HAUL ROAD
F2
-
Reach F
R2UB2H
2
F4
1.07
Wetland F
PFOlB
F5
0.42
Wetland F
PSSlHh
0.48
Wetland F
PEMlC
0.36
Wetland F
PSSlC
3.13
Wetland F
PEMlHh
F7
PFOlHh
Wetland F
PEMlH
1.06
Wetland F
PFOlB
5.39
Wetland F
PFOlB
Reach F
R2UB2H
0.74
Wetland F
PFOlB
0.96
Wetland F
PFOlC
Fll
6.48
Wetland F
PFOlB
F12
0.05
Wetland F
PFOlC
0.28
Wetland F
PEMlC
0.6
Wetland F
PFOlC
1.21
0.33
Wetland F
Wetland J
PSSlC
PFOlC
Wetland J
PSSlC
F8
F9
F
FlO
F18
J1
0.28
J2
L1
Ml
Nl
0.95
0.31
0.65
-
0.16
-
J
L
M
N
06-PIT RELATED ACTIVITIES
SHEET TABLE 1 (PAGE 2 OF 4)
Plan Sheet 8 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Date August
15 , 20121
471.51
1,361.85
Reach J
R4SB4C
Wetland J
PFOlC
PFOlC
Wetland L
Reach L
Wetland M
Reach M
Wetland N
3rd Order
1,090.46
3rd Order
1,506 .23
POWHh
Wetland F
0.08
0.61
Total Impact
(Linear Feet)
PFOlB
Wetland F
F6
Stream Order
PFOlB
Wetland 5
R4SB4C
Reach 5
1st Order
Wetland R
PFOlB
TOTAL WETLAND IMPACT (acres)=
1.02
471 .51
TOTAL STREAM IMPACT (linear feet)=
Wetland D
PFOlC
Reach F
R2UB2H
3rd Order
Wetland F
0.76
-
I
Classification
9.51
F3
Drawn by: ERC
Coward in
Aquatic Resource
(Acres)
2nd Order
1,564.74
R4SB4C
PFOlC
1st Order
547.29
R4SB4C
PFOlC
1st Order
1,608.36
1st Order
241.59
Reach N
R4SB4C
TOTAL WETLAND IMPACT (acres)=
TOTAL STREAM IMPACT (linear feet)=
36.38
7,920.52
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Note. Refer to 201 2 Revised Permit
Application.
~
0
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O. Box 128
Kershaw, SC 29067
TABLE 1. AQUATIC RESOURCE DIRECT IMPACT SUMMARY.
Impact Area
Impact ID
F17
Total Impact
2.77
-
F
07-DETENTION STRUCTURE
Q1
1.45
-
Q
08-JAMES OSA HAUL ROAD
P1
1.13
p
-
09-ROBERT OSA HAUL ROAD
F13
F14
F15
F16
N2
0.03
1.38
0 .54
3.09
5.66
1.27
1.03
F
N
10-JOHNNY'S OSA
C1
D1
0 .07
0.4
-
c
D
0.27
E1
1.48
E
-
11-RAMONA'S OSA
L2
3.27
0
L
12-601 OSA
SHEET TABLE 1 (PAGE 3 OF 4) Plan Sheet 9 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by: ERC
I
Date August
15 , 20121
Coward in
Aquatic Resource
(Acres)
Classification
Stream Order
PF01B
Wetland F
R2UB2H
3rd Order
Reach F
TOTAL WETLAND IMPACT (acres)=
2.77
427.13
TOTAL STREAM IMPACT (linear feet)=
PF01B
Wetland Q
Reach Q
R4SB4C
1st Order
TOTAL WETLAND IMPACT (acres)=
1.45
TOTAL STREAM IMPACT (linear feet)=
269 .17
Wetland P
PF01B
R4SB4C
1st Order
Reach P
TOTAL WETLAND IMPACT (acres)=
1.13
TOTAL STREAM IMPACT (linear feet)=
261.01
Wetland F
PF01C
Wetland F
PF01B
PF01C
Wetland F
PF01B
Wetland F
Wetland F
PF01C
Wetland N
PF01C
Wetland N
PF01B
R4SB4C
1st Order
Reach N
TOTAL WETLAND IMPACT (acres)=
13.00
TOTAL STREAM IMPACT (linear feet)=
1,011.80
PF01B
Wetland C
R4SB4C
1st Order
Reach C
Wetland D
PF01C
R4SB4C
1st Order
Reach D
Wetland E
PF01C
Total Impact
(Linear Feet)
427.13
269 .17
261.01
1,011.80
1,576.84
3,532.55
2
Wetland E
POWHh
R4SB4C
Reach E
TOTAL WETLAND IMPACT (acres)=
TOTAL STREAM IMPACT (linear feet)=
Wetland L
PF01C
R4SB4C
Reach L
TOTAL WETLAND IMPACT (acres)=
TOTAL STREAM IMPACT (linear feet)=
1st Order
2.22
7,111.22
2,001.83
1st Order
3.27
877.40
877.40
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Note. Refer to 2012 Revised Permit
Application.
~
0
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
TABLE 1. AQUATIC RESOURCE DIRECT IMPACT SUMMARY.
Impact Area
Impact ID
BBl
CCl
EEl
HHl
JJl
KKl
Total Impact
0.34
0.33
0.51
0.09
0.12
0.25
0.42
0.17
-
BB
cc
EE
HH
JJ
KK
13-CHAMPION PIT
T1
T2
1.13
1.11
0
Coward in
Aquatic Resource
(Acres)
T
14-TSF HAUL ROAD
Classification
PSSlC
Wetland BB
PFOlB
Wetland CC
Wetland CC
PFOlC
Wetland CC
PFOlH
R4SB4C
Reach CC
PSSlC
Wetland EE
Wetland HH
PFOlC
Wetland JJ
PSSlC
Reach JJ
R4SB4C
PSSlC
Wetland KK
R4SB4C
Reach KK
TOTAL WETLAND IMPACT (acres)=
TOTAL STREAM IMPACT (linear feet}=
NA
PFOlB*
Wetland T
PFOlB
Reach T
R4SB4C
TOTAL WETLAND IMPACT (acres)=
TOTAL STREAM IMPACT (linear feet)=
Stream Order
Total Impact
(Linear Feet)
1st Order
320.71
1st Order
260.48
1st Order
2.23
800.45
219.26
1st Order
2.24
614.64
614.64
TOTAL WATERS OF THE US DIRECT IMPACT DIRECT IMPACT:
TOTAL WETLAND IMPACT (acres)=
120.46
Subtotal Wetland =
Subtotal Reservoir/Open Water=
109.47
10.99
TOTAL STREAM IMPACT {linear feet)=
26,460.54
Notes:
1
Coward in Classification based on : Classification of Wetlands and Deepwater Habitats of the United States (Cowardin et. al1979}. Refer to the Jurisdictional Determination Request
Wetland Delineation Report (REVISED- August 2012) for a detailed description of wetland habitat types.
2
Coward in Classification POWHh designates reservoir/open water habitat type.
*
= Approximate wetland area.
SHEET TABLE 1 (PAGE 4 OF 4) Plan Sheet 10 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by:
ERC
I
Date
August 15 , 20121
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Note. Refer to 2012 Revised Permit
Application.
~
0
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
--------------
-- ~:--g~
'
---
SHEET KE
'
-----
(
- ) -
SHEET K
Y(A)
+
SHEET KEY
Plan Sheet 11 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by :
ERC
Legend
Date
August 15, 2012
§§
~
Note. Refer to 2012 Re vised Permit
Application.
Exclusion Area
D
Property Boundary
~
Stream Impact
B
Existing Culvert
Wetland Impact
Sheet Match Line
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Wetland/Stream No Impact
:. _..1! Sheet Key
H
0
Schematic Cross-Section
1,500
3, 000
Feet
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O. Box 128
Kershaw, SC 29067
--
SHEET KEY (B)
SHEE
---
-
Plan Sheet 12 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by:
ERC
Legend
Date
August 15, 2012
§§
~
D
Property Boundary
~
Stream Impact
B
Wetland Impact
Exclusion Area
Note. Refer to 2012 Revised Permit
Application.
:. _..1! Sheet Key
0
Sheet Match Line
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
1,500
Feet
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
1
I
1----------------- ~:
)5~
I
I
---Plan Sheet 13 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by:
ERC
Legend
Date
August 15, 2012
§§
~
D
Property Boundary
~
Stream Impact
B
Wetland Impact
Note. Refer to 2012 Re vised Permit
Application.
Exclusion Area
0
Sheet Match Line
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O. Box 128
Kershaw, SC 29067
Aquatic
E
(Impact El)
Plan Sheet 14 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by:
ERC
Date
Legend
~
D
Property Boundary
~
Stream Impact
Wetland Impact
Exclusion Area
Wetland/Stream No
Impact
-
August 15, 2012
'\4.
~
Existing Culvert
Note. Refer to 2012 Revised Permit
Application.
..ft._
H
0
Sheet Match Line
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Stream Reach 10
Schematic Cross-Section
200
400
Feet
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O. Box 128
Kershaw, SC 29067
SHEET 2 of 30
Plan Sheet 15 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by :
ERC
Date
Legend
~
D
Property Boundary
~
Stream Impact
Wetland Impact
Exclusion Area
Wetland/Stream No
Impact
-
August 15, 2012
'\4.
~
Existing Culvert
Note. Refer to 2012 Revised Permit
Application.
_1t_
H
0
Sheet Match Line
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Stream Reach 10
Schematic Cross-Section
200
400
Feet
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O. Box 128
Kershaw, SC 29067
Aquatic Resource
H H {Impact HH1}
13-CHAMPION
PIT
Plan Sheet 16 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by :
ERC
1S
' 2012
§§
§ § Exclusion Area
Legend
D
.A
t
0 ate. ugus
Property Boundary -
~ Stream Impact
~
~ Wetland Impact
Wetland/Stream No
Impact
'.
~
ill
1
Existing Culvert
Sh
ee
t M t h L"
ac
me
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Note. Refer to 2012 Revised Permit
Application.
..ft._
H
0
Stream Reach 10
Schematic Cross-Section
200
400
Feet
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
(Impact J2}
ACTIVIT!
(Impact D2}
2
Plan Sheet 17 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by :
ERC
Date
Legend
~
D
Property Boundary
~
Stream Impact
Wetland Impact
Exclusion Area
Wetland/Stream No
Impact
-
August 15, 2012
'\4.
13
Existing Culvert
Note. Refer to 2012 Revised Permit
Application.
..ft._
H
0
Sheet Match Line
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Stream Reach 10
Schematic Cross-Section
200
400
Feet
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
6
Plan Sheet 18 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by:
ERC
Date
Legend
~
D
Property Boundary
~
Stream Impact
Wetland Impact
Exclusion Area
Wetland/Stream No
Impact
-
August 15, 2012
'\4.
13
Existing Culvert
Note. Refer to 2012 Revised Permit
Application.
_1t_
H
0
Sheet Match Line
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Stream Reach 10
Schematic Cross-Section
200
400
Feet
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
SHEET 6 of 30
Plan Sheet 19 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by :
ERC
Date
Legend
~
D
Property Boundary
~
Stream Impact
Wetland Impact
Exclusion Area
Wetland/Stream No
Impact
-
August 15, 2012
'\4.
~
Existing Culvert
Note. Refer to 2012 Revised Permit
Application.
_1t_
H
0
Sheet Match Line
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Stream Reach 10
Schematic Cross-Section
200
400
Feet
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O. Box 128
Kershaw, SC 29067
8
quatic Resource
(Impact Ml} M
Plan Sheet 20 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by :
ERC
Date
Legend
~
D
Property Boundary
~
Stream Impact
Wetland Impact
Exclusion Area
Wetland/Stream No
Impact
-
August 15, 2012
'\4.
13
Existing Culvert
Note. Refer to 2012 Revised Permit
Application.
_1t_
H
0
Sheet Match Line
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Stream Reach 10
Schematic Cross-Section
200
400
Feet
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O. Box 128
Kershaw, SC 29067
Plan Sheet 21 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by :
ERC
Date
Legend
~
D
Property Boundary
~
Stream Impact
Wetland Impact
Exclusion Area
Wetland/Stream No
Impact
-
August 15, 2012
'\4.
13
Existing Culvert
Note. Refer to 2012 Revised Permit
Application.
_1t_
H
0
Sheet Match Line
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Stream Reach 10
Schematic Cross-Section
200
400
Feet
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
OSA
Resource
Q
ROBERT OSA
Plan Sheet 22 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by :
ERC
Date
Legend
~
D
Property Boundary
~
Stream Impact
Wetland Impact
Exclusion Area
Wetland/Stream No
Impact
-
August 15, 2012
'\4.
13
Existing Culvert
Note. Refer to 2012 Revised Permit
Application.
..ft._
H
0
Sheet Match Line
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Stream Reach 10
Schematic Cross-Section
200
400
Feet
Haile Gold Mine Inc .
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
Resource
T
Plan Sheet 23 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by :
ERC
Date
Legend
~
D
Property Boundary
~
Stream Impact
Wetland Impact
Exclusion Area
Wetland/Stream No
Impact
-
August 15, 2012
'\4.
13
Existing Culvert
Note. Refer to 2012 Revised Permit
Application.
..ft._
H
0
Sheet Match Line
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Stream Reach 10
Schematic Cross-Section
200
400
Feet
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
tAAAB
~
uatic Resource
ss
(Impact SS1)
Plan Sheet 24 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by:
ERC
Date
Legend
~
D
Property Boundary
~
Stream Impact
Wetland Impact
Exclusion Area
Wetland/Stream No
Impact
-
August 15, 2012
'\4.
13
Existing Culvert
Note. Refer to 2012 Revised Permit
Application.
..ft._
H
0
Sheet Match Line
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Stream Reach 10
Schematic Cross-Section
200
400
Feet
Haile Gold Mine Inc .
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
A q u a t i c R = ''"'""'' '""' "
B
(Impact BBB1)8
Plan Sheet 25 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by :
ERC
Date
Legend
~
D
Property Boundary
~
Stream Impact
Wetland Impact
Exclusion Area
Wetland/Stream No
Impact
-
August 15, 2012
'\4.
13
Existing Culvert
Note. Refer to 2012 Revised Permit
Application.
..ft._
H
0
Sheet Match Line
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Stream Reach 10
Schematic Cross-Section
200
400
Feet
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
0
0
0
0
Aquatic Resourc
E E E (Impact
Resource
DD
(Impact DDD1)
Plan Sheet 26 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by:
ERC
Date
Legend
~
D
Property Boundary
~
Stream Impact
Wetland Impact
Exclusion Area
Wetland/Stream No
Impact
-
August 15, 2012
'\4.
13
Existing Culvert
Note. Refer to 2012 Revised Permit
Application.
..ft._
H
0
Sheet Match Line
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Stream Reach 10
Schematic Cross-Section
200
400
Feet
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
lN
(Jl
13
0
0
0
~
0
0
Aquatic Resource
(Impact QQQ1)
Q Q Q
TSF
Plan Sheet 27 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by :
ERC
Date
Legend
~
D
Property Boundary
~
Stream Impact
Wetland Impact
Exclusion Area
Wetland/Stream No
Impact
-
August 15, 2012
'\4.
13
Existing Culvert
Note. Refer to 2012 Revised Permit
Application.
..ft._
H
0
Sheet Match Line
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Stream Reach 10
Schematic Cross-Section
200
400
Feet
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O. Box 128
Kershaw, SC 29067
N
~
0
0
HOLLY TSF
BORROW AREA
TSF
AREA
Plan Sheet 28 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by :
ERC
Date
Legend
~
D
Property Boundary
~
Stream Impact
Wetland Impact
Exclusion Area
Wetland/Stream No
Impact
-
August 15, 2012
'\4.
13
Existing Culvert
Note. Refer to 2012 Revised Permit
Application.
..ft._
H
0
Sheet Match Line
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Stream Reach 10
Schematic Cross-Section
200
400
Feet
Haile Gold Mine Inc .
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
800
800
700
700
RAMONA'S OSA
..........
.......
~
600
600
500
500
z
0
~
Gj
.....J
w
L
400
\
~ IMPACTED AQUATIC \
~ ~ RESOURCE
E:ISTING-:ROUN;
~
-
-
--------
~
400
---------
UNIMPACTED AQUATIC RESOURCE
300 +-------+-------r-----~~----~------~-------+-------+300
0+000
0+500
1+000
1+500
2+000
2+500
3+000
3+500
STATION, (ft)
A
~
d
T
100 FT
I
HORIZONTAL
SHEET 16 of 30
Plan Sheet 29 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by:
ERC
A'
_A
Date .
t
ugus 15 , 2012
SECTION A
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Note. Refer to 2012 Revised Permit
Application.
Schematic Cross-Section
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
EXISTING GROUND
f\f
500
RESOURCE
\__~-~
500
/
~
~
400
I
\,/"V
__./
400
-
,--._
+'
..._.,
z
0
!;;(
Gj
HAILE
PIT
MILL ZONE
PIT
300
300
_j
w
200
200
100
100
50 +----+------+----+----+-----+---~ 50
0+000
0+500
1+000
1+500
2+000
2+500
3+000
STATION, (ft)
B
~
d
T
100 FT
I
HORIZONTAL
SHEET 17 of 30
Plan Sheet 30 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by:
ERC
B'
_A
Date.
t
ugus 15 , 2012
SECTION B
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Note. Refer to 2012 Revised Permit
Application.
Schematic Cross-Section
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
500
___/
500
AQUATIC
400
~
~
GROUND
--
~
~
400
_/
-
~IMPACTED
RESOURCE
300
300
LEDBETTER PIT
r--.
....
.....
200
SNAKE PIT
200
"--'
z
0
i=
~
__J
w
100
100
0
0
-100
-100
-200
-200
-275 +-----+----+---+-----+----+---+-----+~--+ -275
0+000
0+500
1+000
1+500
2+000
2+500
3+000
3+500 3+839
c
STATIONr''-->.,;.f..:..<.t_ _ _ _ _ _ _ _ _ _ _ _c_·_
_,
SECTION C
SHEET 18 of 30
Plan Sheet 31 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by:
ERC
Date
August 15 , 2012
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Note. Refer to 2012 Revised Permit
Application.
Schematic Cross-Section
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
800
+-------~------~------4-------~------~------~-----+
700
800
700
JOHNNY'S PAG OSA
,-.._
-::
........,
- 600
601 OSA
z
L
0
!;{
Gj
600
PIT RELATED
DISTURBANCE
EXISTING GROUND
.....J
w
500
500
IMPACTED AQUATIC
RESOURCE
400
IMPACTED AQUATIC
RESOURCE
400
350 +-------+-------+-------~------~------~------~-----+ 350
0+000
0+500
1+000
1+500
2+000
2+500
3+000 3+400
D
STATION,
(tt)
D'
100 FT
I
SHEET 19 of 30
Plan Sheet 32 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by :
ERC
_A
Date .
t
ugus 15 , 2012
SECTION D
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Note. Refer to 2012 Revised Permit
Application.
Schematic Cross-Section
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
ELEVATION, (ft)
rrJ
0
0
0(]1
+0
0
0
0
0
0
0
n
0
+
0
0
0
)>
0
+
(]1
:::0
0
0
(/)
~
()
0
rr
rrJ
-uo
g""''
rrJ
(/)
-1-1
c
rrJ
1\)
+
(/)
~
-1
0
=I
z
__....
....,
..-+
rrJ
~~
Ui
Z-i
Orr!
~
0
0
0
c:::o
:::orr!
()
00
rrJO
X
::::!
z
G)
I
G)
~
:::0
0
c
z
1\)
0
-1
I
:::0
0
+
(]1
0
0
0
(/)
)>
..........
(Jj
UJI
-1)>
::u
cr
()rrJ
+
0
0
0
-lo
:s::::
C::;o
-u
::urrJ
)>
l'lrrJ
()
-1
UJA
rrJ
J:!o :::00
rrJ
F~ (/))>
:ErrJ 0 0
)>Z cc
-<-I :::0~
0 ()_
z rrJ()
(Jj
+
(]1
0
0
~
+
0
0
0
rr1
~
0
z
+
(]1
0
0
-1
:s::::
rrJI
Q)>
l>-<
I
(/):E
-10
o::u
::;o-1
)>I
~
(/)
()
0
0
C1>
(]1
:::0
g
-..J
0
0
UJ-<
l>Cfi
~
0
0
~
CXl
0
0
c a::!
zo
~ oz
0
=I
8
0
0
c....
:s::::
-u
)>
()
-1
rrJ
~ §
§
-..J
C1>
0
0
0
I
z
oz
0
+
(]1
"0
(]1
0
0
~
(Jj
G) G)
rrJ::u
)>0
;g~
)>I
rr1
(]1
+
rrJ_ 0
o(Jj
0(]1
0
~
0
0
(]1
0
0
SHEET 20 of 30
Plan Sheet 33 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by:
ERC
Date
August 15 , 2012
C1>
0
0
CXl
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Note. Refer to 2012 Revised Permit
Application.
Schematic Cross-Section
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
..
0
0
~
~ §
§
ELEVATION, (ft)
~
~8
s
'I
0
~
~
0
0
0
0
0
0
0
c:_
0
I
zz
+
()1
-...J
0
0
O'l
0
0
G')f'Tl
:;oX
OVl
c--1
0
s
()1
~
UJ
OG')
z
z
-<
(/).
0
0
(/)
00
~
~
~
0
z
.,_......
""'0
I
+
0
(/)0>
~~~
0
0
()f'Tl()
--+.
-IZ::;o
..-+
'-"
+
()1
0
0
>
G')
0
(/)
>
:E
0
:::0
-I
0
f'TIZA
f'TIOS::::
:!<
I
c-lf'Tl
:::OOfTl
:::0}>
I
(/)
Vlc""''
)>
0}>)>
c~n
--I
:::O()f'Tl
()
0
fTl
N
'!.
+
0
OUJ
00
0
~
0
0
()1
0
0
O'l
0
0
-...J
0
0
(/)
fTl
~
0
z
'I
SHEET 21 of 30
Plan Sheet 34 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by:
ERC
Date
August 15, 2012
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Note. Refer to 2012 Revised Permit
Application.
Schematic Cross-Section
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
700
+-----+----+----~
700
ROBERT OSA
HAYWORTH OSA
-::;?
..,__
600
IMPACTED
AQUATIC
RESOURCE
~
z
0
~
(;j
d 500
600
500
CULVERT
REPLACEMENT
EXISTING GROUND
400 +-----+----+----~ 400
0+000
0+500
1+000
1+500
G'
G
STATION, (ft)
100 FT
I
SHEET 22 of 30
Plan Sheet 35 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by :
ERC
.A
t
0 ate . ugus
15 ' 2012
SECTION G
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Note. Refer to 2012 Revised Permit
Application.
Schematic Cross-Section
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
700
700
JAMES OSA
ROBERT OSA
?'+ 600
.._,
600
z
0
!:;(
Gj
.....J
w 500
500
CULVERT
EXISTING GROUND
400
0+000
H
~
d
T
0+500
1+000
STATION, (ft)
ERC
H'
100 FT
I
HORIZONTAL
SHEET 23 of 30
Plan Sheet 36 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by :
400
1+500
.A
t
0 ate . ugus
15 ' 2012
SECTION H
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Note. Refer to 2012 Revised Permit
Application.
Schematic Cross-Section
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O. Box 128
Kershaw, SC 29067
+----+---+ 700
700
HAUL ROAD
600
600
EXISTING
GROUND
,-...
+-'
..,__
..........,
z
0
~
Gj
-
~~
500
500
~
_J
w
CULVERT
IMPACTED
AQUATIC
RESOURCE
400
400
300 +----i-------+ 300
0+000
0+500
1+000
I
~
d
T
100 FT
I
eo
L;;;;;;j
o
5f'
;;;;;l
HORIZONTAL
1
STATION, (ft)
100 FT
I
VERTICAL
SHEET 24 of 30
Plan Sheet 37 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by :
ERC
I
.A
t 1S
,1
0 ate . ugus
' 2012.·
I'
SECTION I
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Note: Refer to 2012 Revised Permit
App/JcatJon.
Schematic Cross-Section
Haile Gold Mine Inc.
~~ 7283 Haile Gold Mine Road
~~ P.O . Box128
'·co"o"'"
Kershaw, SC 29067
700 + - - - - - + - - - 4 700
-
?
rr
HAUL ROAD AT
PLANT SITE
600
'-"
z
\_
0
~
>
w
.....J
w 500
600
IMPACTED
AQUATIC
RESOURCE
~
'=CULVERT
500
EXISTING
GROUND
400
0+000
J
3f. d
400
0+500
1+000
STATION, (ft)
J'
100 FT
390
I
HORIZONTAL
SHEET 25 of 30
Plan Sheet 38 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by :
ERC
I
.A
t
0 ate . ugus
1S
,1
' 2012.·
SECTION J
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Note: Refer to 2012 Revised Permit
App/JcatJon.
Schematic Cross-Section
Haile Gold Mine Inc.
~~ 7283 Haile Gold Mine Road
~~ P.O . Box128
'·co"o"'"
Kershaw, SC 29067
ELEVATION, (ft)
.J:o.
00
+0
A
0
0
0
U1
0>
0
0
0
0
"
0
0
+---------~~~----_.--------~
0
+
U1
0
0
+
0
0
0
..
+
U1
0
0
N
(j)
~
-I
0
z
r--.
~
'--"
+
0
0
0
N
+
U1
0
0
UJ
+
0
\
0
0
\\
UJ
+
U1
0
0
I
z
ITl
::u
.J:o.
(j)
+
0
ITl
~
0
z
0
0
.J:o.
A
A
+
.J:o.
+---------~------~-+--------~
0-J:o.
0>
U1
00
0
0
0
0
0
0
0
"
SHEET 26 of 30
Plan Sheet 39 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by :
ERC
Date
August 15 , 2012
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Note. Refer to 2012 Revised Permit
Application.
Schematic Cross-Section
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O. Box 128
Kershaw, SC 29067
I
700 +-----~------~------+-----~------~------+------+ 700
EXISTING GROUND
DUCKWOOD TSF
EMBANKMENT
?..... 600
..........
z
600
T
0
LINER
\_ UNIMPACTED AQUATIC RESOURCE
!<
Gj
G:l 500
500
IMPACTED AQUATIC RESOURCE
IMPACTED AQUATIC RESOURCE
400 +-------+-------~----~~----~-------+-------+-------+ 400
0+000
0+500
1+000
1+500
2+000
2+500
3+000
3+500
STATION, (ft)
L
3C(.L
d
100 FT
390
I
HORIZONTAL
SHEET 27 of 30
Plan Sheet 40 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by:
ERC
L'
_A
Date .
t
ugus 15 , 2012
SECTION L
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Note. Refer to 2012 Revised Permit
Application.
Schematic Cross-Section
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067
700
700
DUCKWOOD TSF ~
EMBANKMENT
HOLLY HAUL
?.._ 600
.._,
600
.,
z
0
GROUND
!;:(
/
>
w
~
....J
w 500
500
CULVERT
IMPACTED
AQUATIC
RESOURCE
400
0+000
M
~
d
T
100 FT
I
eo
L;;;;;;j
o
5f'
;;;;;l
HORIZONTAL
1
400
1+000
M'
STATION , (ft)
0+500
100 FT
I
VERTICAL
SHEET 28 of 30
Plan Sheet 41 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by :
ERC
I
.A
t 1S
,1
0 ate . ugus
' 2012.·
SECTION M
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Note: Refer to 2012 Revised Permit
App/JcatJon.
Schematic Cross-Section
Haile Gold Mine Inc.
~~ 7283 Haile Gold Mine Road
~~ P.O . Box128
'·co"o"'"
Kershaw, SC 29067
700
+----~-----+
1
700
DUCKWOOD TSF
EMBANKMENT
-
600
EXISTING
GROUND
"'"'
+J
'-"'
z-
HOCK
HAUL
ROAD
0
~ 500
>
w
.....J
w
;;;....
~
600
~
-;/
IMPACTED
AQUATIC
RESOURCE
400
500
400
CULVERT
350
0+000
N
~
d
0+500
STATION, (ft)
390
ERC
I
N'
SECTION N
HORIZONTAL
SHEET 29 of 30
Plan Sheet 42 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by:
350
1+000
.A
t 1S
,1
0 ate . ugus
' 2012.·
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Note: Refer to 2012 Revised Permit
App/JcatJon.
Schematic Cross-Section
Haile Gold Mine Inc.
~~ 7283 Haile Gold Mine Road
~~ P.O . Box128
'·co"o"'"
Kershaw, SC 29067
600
EXISTING GROUND
,------
500
l
600
500
I
_....,_
.....
'+
.........
z-
0
400
f-
CHAMPION PIT
IMPACTED
AQUATIC
RESOURCE
~
w
.....J
w
300
400
300
200 +-------1----+---+-------11-----+ 200
0+000
0+500
1+000
1+500
2+000
2+500
0
STATION, (ft)
0'
~
d
T
100 FT
I
eo
L;;;;;;j
HORIZONTAL
o
5f'
;;;;;l
1
100 FT
I
VERTICAL
SHEET 30 of 30
Plan Sheet 43 of 43
Haile Modified Alternative General Layout
Waters of the US Direct Impact Analysis Detailed Plan
Drawn by :
ERC
_A
Date .
t
ugus 15 , 2012
SECTION 0
HAILE GOLD MINE PROJECT
(SAC 1992-24122-41A)
Note. Refer to 2012 Revised Permit
Application.
Schematic Cross-Section
Haile Gold Mine Inc.
7283 Haile Gold Mine Road
P.O . Box 128
Kershaw, SC 29067