You can copy from here when filling out the rest of the page.
Long Brow Plantation Cross-Embankment Project
Colleton County, South Carolina
Long Brow Plantation Cross-Embankment Project
Colleton County, South Carolina
JOINT
PUBLIC NOTICE
CHARLESTON DISTRICT, CORPS OF ENGINEERS
69A Hagood Avenue
Charleston, South Carolina 29403-5107
and the
S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
OFFICE OF OCEAN AND COASTAL RESOURCE MANAGEMENT
1362 McMillan Avenue, Suite 400
Charleston, South Carolina 29405
REGULATORY DIVISION
Refer to: P/N # 2013-00421-1T
April 22, 2013
Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), Sections
401 and 404 of the Clean Water Act (33 U.S.C. 1344), and the South Carolina Coastal Zone
Management Act (48-39-10 et.seq.) an application has been submitted to the Department of the
Army and the S.C. Department of Health and Environmental Control by
LONG BROW PLANTATION
C/O FOLK LAND MANAGEMENT, INC.
TRAVIS FOLK
3515 WHITE HALL ROAD
GREEN POND, SOUTH CAROLINA 29446
for a permit to excavate and place fill material in wetlands and waters of the
COMBAHEE RIVER
within existing managed tidal impoundments (historic rice fields) of Long Brow Plantation located
at 2898 Wiggins Road in Green Pond, Colleton County, South Carolina (32.628948 Latitude /
-80.649112 Longitude)
NOTICE
is hereby given that written statements regarding the proposed work will be received by the Corps
until
15 Days from the Date of this Notice,
and SCDHEC will receive written statements regarding the proposed work until
30 Days from the Date of this Notice
from those interested in the activity and whose interests may be affected by the proposed work.
The proposed work consists of the renovation of a former cross-embankment and canal within an
existing managed tidal impoundment and the installation of a new wooden spillway box within the
new cross-embankment and a new wooden trunk within an existing perimeter embankment. In
detail, the work consists of the excavation of 6,852 cubic yards from 0.77 acres of tidal wetlands
REGULATORY DIVISION
Refer to: P/N # 2013-00421-1T
April 22, 2013
and waters to obtain fill material and to construct a new canal. The excavated material will be
used as fill to renovate a former cross-embankment. The excavated material will be placed in
0.68 acres of tidal wetlands and waters adjacent to the newly excavated canal to construct the
new cross-embankment. The canal will be 2,300' in length with a top width of 14.5', a bottom
width of 10.25', and a depth of 6.5'. The new cross-embankment will be 2,470' in length with a top
width of 12', a bottom width of 18', and a height of 5'. The new spillway box that will be installed in
the cross-embankment will be 5' wide X 25' long and will have an inside height of 18", an outside
height of 2' and a 6' tall flashboard riser. Wooden bulkheads, approximately 8-10' in length, will
be constructed on either side of the spillway box to provide stability. The new wooden rice field
trunk will be a typical Combahee style trunk that will be installed within the existing perimeter
embankment located within the same large managed tidal impoundment field where the crossembankment and canal are being proposed. The proposed work will divide the existing
approximate 139.5 acre managed tidal impoundment field into an 87.3 acre field and a 52.2 acre
field.
The purpose of the proposed project is to create two management units of more consistent bed
topography. Currently, the southern portion of the impoundment is slightly higher than the
northern portion. This is a common morphology in rice fields with the areas closer to tidal
waterways being higher and elevation dropping farther away from the river. Historically, this field
was compartmentalized to allow for a more consistent bed level, which was done during
th
th
commercial rice production in the 18 through the early 20 centuries. This field was managed
primarily for widgeon grass (Ruppia maritime) and a consistent water level will aid in this
management strategy. A trunk and spillway are included with the project to allow for efficient
water circulation once the cross-embankment is constructed.
The excavation of the new canal and construction of the new cross-embankment will occur
simultaneously. To complete the project, the managed tidal impoundment field will be drained
and dried during the summer months. The proposed work will be completed with a long-reach
excavator on tracks using wooden mats for stability. As the excavator proceeds down the length
of the proposed cross-embankment and canal, the operator will simultaneously excavate the new
canal and place the excavated material in the location of the cross-embankment. The new
wooden spillway box will be installed as the cross-embankment is being constructed. Bulkheads
will be constructed on either side of the newly installed spillway box. The bulkheads will be 8-10'
in length and sufficient enough to provide stability for the portion of the embankment that crosses
the spillway box. By conducting the work simultaneously, it will minimize the amount of traffic
across the bed of the impoundment. The proposed trunk in the perimeter embankment will also
be installed while the impoundment is drained and dry.
According to the applicant, impacts associated with the proposed project were minimized in
several ways. First, the work will be constructed in the dry. This will ease access by heavy
machinery and also minimize damage to wetlands. The proposed work will be completed during
summer months. Second, all material will be obtained from within the managed tidal
impoundment field. Were material required from outside of the project area, it would have to travel
across existing embankments. This travel would require remediation of the existing embankment
due to excessive travel by heavy machinery. In addition, spill from this transport could fall into the
field and represent additional concerns. Third, the proposed embankment is of sufficient
dimensions to allow for water control and travel by agricultural machinery, which are both
necessary for the management of the managed tidal impoundment fields. Fourth, the applicant
has minimized impacts by locating the proposed cross-embankment on top of the remnants of a
former embankment. While the former embankment has subsided to the point where it does not
control water, the impoundment field bed topography in this area is variable whereas elsewhere
REGULATORY DIVISION
Refer to: P/N # 2013-00421-1T
April 22, 2013
throughout the field, the bed is at level topography.
The applicant states that a compensatory mitigation plan has not been developed for the
proposed project for several reasons. First, the proposed project aids in the management of the
managed tidal impoundment by creating two management units with more consistent field bed
topography. This will in turn enable each unit to be managed more effectively. Construction of
the new cross-embankment is the only practical way to allow the achievement of the goal of
increased water circulation capability and enhanced wildlife habitat quality. Second, the proposed
activity is in line with traditional activities within managed tidal impoundment fields in the ACE
Basin. The proposed cross-embankment is in the footprint of a former historic embankment that
has subsided. Third, this project will be funded by a NAWCA grant administered through Ducks
Unlimited. The proposed proposal was reviewed at multiple levels of the US Fish and Wildlife
Service and the Flyway Councils. The project was deemed to have a positive contribution for
management of avian habitat and thus was funded. Fourth, compensatory mitigation has not
been required for similar projects in the area.
NOTE: Plans depicting the work described in this notice are available and will be
provided, upon receipt of a written request, to anyone that is interested in obtaining a
copy of the plans for the specific project. The request must identify the project of interest
by public notice number and a self-addressed stamped envelope must also be provided for
mailing the drawings to you. Your request for drawings should be addressed to the
U.S. Army Corps of Engineers
ATTN: REGULATORY DIVISION
69A Hagood Avenue
Charleston, South Carolina 29403-5107
The District Engineer has concluded that the discharges associated with this project, both
direct and indirect, should be reviewed by the South Carolina Department of Health and
Environmental Control in accordance with provisions of Section 401 of the Clean Water Act. As
such, this notice constitutes a request, on behalf of the applicant, for certification that this project
will comply with applicable effluent limitations and water quality standards. The work shown on
this application must also be certified as consistent with applicable provisions the Coastal Zone
Management Program (15 CFR 930). The District Engineer will not process this application to a
conclusion until such certifications are received. The applicant is hereby advised that
supplemental information may be required by the State to facilitate the review.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. Implementation of the
proposed project would impact 1.45 acres of estuarine substrates and emergent wetlands
utilized by various life stages of species comprising the red drum, shrimp, and snapper-grouper
management complexes. Our initial determination is that the proposed action would not have a
substantial individual or cumulative adverse impact on EFH or fisheries managed by the South
Atlantic Fishery Management Council and the National Marine Fisheries Service (NMFS). Our
final determination relative to project impacts and the need for mitigation measures is subject to
review by and coordination with the NMFS.
The District Engineer has consulted the most recently available information and has
determined that the project will have no effect on any Federally endangered, threatened, or
proposed species and will not result in the destruction or adverse modification of designated or
proposed critical habitat. This public notice serves as a request to the U.S. Fish and Wildlife
REGULATORY DIVISION
Refer to: P/N # 2013-00421-1T
April 22, 2013
Service and the National Marine Fisheries Service for any additional information they may have
on whether any listed or proposed endangered or threatened species or designated or
proposed critical habitat may be present in the area which would be affected by the activity,
pursuant to Section 7(c) of the Endangered Species Act of 1973 (as amended).
Pursuant to Section 106 of the National Historic Preservation Act (NHPA), this public
notice also constitutes a request to Indian Tribes to notify the District Engineer of any historic
properties of religious and cultural significance to them that may be affected by the proposed
undertaking.
In accordance with the NHPA, the District Engineer has also consulted the latest
published version of the National Register of Historic Places for the presence or absence of
registered properties, or properties listed as being eligible for inclusion therein, and this worksite
is not included as a registered property or property listed as being eligible for inclusion in the
Register. To insure that other cultural resources that the District Engineer is not aware of are
not overlooked, this public notice also serves as a request to the State Historic Preservation
Office to provide any information it may have with regard to historic and cultural resources.
Any person may request, in writing, within the comment period specified in this notice, that
a public hearing be held to consider this application. Requests for a public hearing shall state,
with particularity, the reasons for holding a public hearing.
The decision whether to issue a permit will be based on an evaluation of the probable
impact including cumulative impacts of the activity on the public interest and will include
application of the guidelines promulgated by the Administrator, Environmental Protection Agency
(EPA), under authority of Section 404(b) of the Clean Water Act and, as appropriate, the criteria
established under authority of Section 102 of the Marine Protection, Research and Sanctuaries
Act of 1972, as amended. That decision will reflect the national concern for both protection and
utilization of important resources. The benefit which reasonably may be expected to accrue from
the project must be balanced against its reasonably foreseeable detriments. All factors which
may be relevant to the project will be considered including the cumulative effects thereof; among
those are conservation, economics, aesthetics, general environmental concerns, wetlands,
historic properties, fish and wildlife values, flood hazards, flood plain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy
needs, safety, food and fiber production and, in general, the needs and welfare of the people. A
permit will be granted unless the District Engineer determines that it would be contrary to the
public interest. In cases of conflicting property rights, the Corps of Engineers cannot undertake to
adjudicate rival claims.
The Corps of Engineers is soliciting comments from the public; Federal, state, and local
agencies and officials; Indian Tribes; and other interested parties in order to consider and
evaluate the impacts of this activity. Any comments received will be considered by the Corps of
Engineers to determine whether to issue, modify, condition or deny a permit for this project. To
make this decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments
are also used to determine the need for a public hearing and to determine the overall public
interest of the activity.
If there are any questions concerning this public notice, please contact (Tracy Dotolo
Sanders) at 843-329-8044 or toll free at 1-866-329-8187.