You can copy from here when filling out the rest of the page.
Harbourloft Bank Stabilization
Horry County, South Carolina
Harbourloft Bank Stabilization
Horry County, South Carolina
aJ O I N T
PUBLIC NOTICE
CHARLESTON DISTRICT, CORPS OF ENGINEERS
1949 Industrial Park Rd, Room 140
Conway, South Carolina 29526
and
S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
OFFICE OF OCEAN AND COASTAL RESOURCE MANAGEMENT
1362 McMillan Avenue, Suite 400
Charleston, South Carolina 29405
REGULATORY DIVISION
Refer to: P/N #2010-01366-3IY
May 2, 2013
Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), Sections 401 and 404 of the
Clean Water Act (33 U.S.C. 1344), and the South Carolina Coastal Zone Management Act (48-39-10 et.seq.) an
application has been submitted to the Department of the Army and the S.C. Department of Health and
Environmental Control by
Harborloft POA / Omni Management Services
c/o Jon Guerry Taylor & Associates, Inc
Craig Pawlyk
PO Box 1082
Mt. Pleasant, SC 29465
for a permit to perform bank stabilization and bulkhead replacement in the
Atlantic Intracoastal Waterway
Located on the AIWW within the Tidewater Subdivision adjacent to Harbor Drive, Little River, Horry County,
South Carolina (Latitude: 33.860847; Longitude: -78.625626).
In order to give all interested parties an opportunity to express their views
NOTICE
is hereby given that written statements regarding the proposed work will be received by the Corps until
15 Days from the Date of this Notice,
and SCDHEC will receive written statements regarding the proposed work until
30 Days from the Date of this Notice
from those interested in the activity and whose interests may be affected by the proposed work.
The proposed work consists of constructing approximately 1,000 linear feet (0.05 acres of backfill) of bulkhead
directly in front of an existing bulkhead along with the installation of 0.18 acres (592 cubic yards) of rip rap
along its toe for additional erosion protection. Additionally, the applicant proposes approximately 0.40 acres
(1,605 cubic yards) of rip rap rock sill constructed waterward of the existing bulkhead to provide protection
from erosion associated with wave action against the newly installed bulkhead. The applicant proposed no
mitigation for the project.
REGULATORY DIVISION
Refer to: P/N #201001366-3IY
May 2, 2013
Avoidance and Minimization measures as stated by the applicant: "Rock sill will be placed on (the)
channelward side of existing / remaining vegetation. Purpose of the installation is to prevent further destruction of
the existing marsh vegetation and undermining of bulkhead (and) erosion caused by wind and vessel created
wave action.
NOTE: Plans depicting the work described in this notice are available and will be provided, upon receipt
of a written request, to anyone that is interested in obtaining a copy of the plans for the specific project.
The request must identify the project of interest by public notice number and a self-addressed stamped
envelope must also be provided for mailing the drawings to you. Your request for drawings should be
addressed to the
U.S. Army Corps of Engineers
ATTN: REGULATORY DIVISION
1949 Industrial Park Road, Room 140
Conway, South Carolina 29526
The District Engineer has concluded that the discharges associated with this project, both direct and
indirect, should be reviewed by the South Carolina Department of Health and Environmental Control in
accordance with provisions of Section 401 of the Clean Water Act. As such, this notice constitutes a request, on
behalf of the applicant, for certification that this project will comply with applicable effluent limitations and water
quality standards. The work shown on this application must also be certified as consistent with applicable
provisions of the Coastal Zone Management Program (15 CFR 930). The District Engineer will not process this
application to a conclusion until such certifications are received. This activity may also require evaluation for
compliance with the S.C. Construction in Navigable Waters Permit Program. State review, permitting and
certification is conducted by the S.C. Department of Health and Environmental Control. The applicant is hereby
advised that supplemental information may be required by the State to facilitate the review. Persons wishing to
comment or object to State certification or the navigable waters permit must submit all comments in writing to the
S.C. Department of Health and Environmental Control at the above address within thirty (30) days of the date of
this notice.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. Implementation of the proposed project would impact
(0.63) acres of estuarine substrates and emergent wetlands utilized by various life stages of species
comprising the red drum, shrimp, and snapper-grouper management complexes. Our initial determination is
that the proposed action would not have a substantial individual or cumulative adverse impact on EFH or
fisheries managed by the South Atlantic Fishery Management Council and the National Marine Fisheries
Service (NMFS). Our final determination relative to project impacts and the need for mitigation measures is
subject to review by and coordination with the NMFS.
The District Engineer has consulted the most recently available information and has determined that
the project is not likely to adversely affect any Federally endangered, threatened, or proposed species and will
not result in the destruction or adverse modification of designated or proposed critical habitat. This public
notice serves as a request to the U.S. Fish and Wildlife Service and the National Marine Fisheries Service for
any additional information they may have on whether any listed or proposed endangered or threatened
species or designated or proposed critical habitat may be present in the area which would be affected by the
activity, pursuant to Section 7(c) of the Endangered Species Act of 1973 (as amended).
Pursuant to Section 106 of the National Historic Preservation Act (NHPA), this public notice also
constitutes a request to Indian Tribes to notify the District Engineer of any historic properties of religious and
cultural significance to them that may be affected by the proposed undertaking.
In accordance with the NHPA, the District Engineer has also consulted the latest published version of
the National Register of Historic Places for the presence or absence of registered properties, or properties
listed as being eligible for inclusion therein, and this worksite is not included as a registered property or
REGULATORY DIVISION
Refer to: P/N #201001366-3IY
May 2, 2013
property listed as being eligible for inclusion in the Register. To insure that other cultural resources that the
District Engineer is not aware of are not overlooked, this public notice also serves as a request to the State
Historic Preservation Office to provide any information it may have with regard to historic and cultural
resources.
Any person may request, in writing, within the comment period specified in this notice, that a public
hearing be held to consider this application. Requests for a public hearing shall state, with particularity, the
reasons for holding a public hearing.
The decision whether to issue a permit will be based on an evaluation of the probable impact including
cumulative impacts of the activity on the public interest and will include application of the guidelines promulgated
by the Administrator, Environmental Protection Agency (EPA), under authority of Section 404(b) of the Clean
Water Act and, as appropriate, the criteria established under authority of Section 102 of the Marine Protection,
Research and Sanctuaries Act of 1972, as amended. That decision will reflect the national concern for both
protection and utilization of important resources. The benefit which reasonably may be expected to accrue from
the project must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to
the project will be considered including the cumulative effects thereof; among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production and, in general, the needs and
welfare of the people. A permit will be granted unless the District Engineer determines that it would be contrary
to the public interest. In cases of conflicting property rights, the Corps of Engineers cannot undertake to
adjudicate rival claims.
The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and
officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this activity.
Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify,
condition or deny a permit for this project. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the activity.
If there are any questions concerning this public notice, please contact T. Brian Hardee at
843-365-0848.
Permit Purposes Only
Not For Construction
QUAD MAP
, .. = 2000'
AUTI-IORIZED AGENT:
JON GUERRY TAYLOR & ASSOCIATES, INC.
P.O. BOX 1082
MT. PLEASANT, SC 29465
c/o CRAIG PAWLYK
HARBOR LOFT BULKHEAD
REPLACEMENT AND ROCK
SILL INSTALLAllON
TIDEWATER DEVELOPMENT
NORTH MYRTLE BEACH,
HORRY COUNTY. SC
PROPOSED:
CONSTRUCTI ON OF REPLACEMENT
BULKHEAD AND NEW ROCK SILL FOR
EROSION CONTROL
IN: N. MYRTLE BEACH ON: A.I.W.W.
COUNTY: HORRY
STATE: SOUTI-1 CAROUNA
DATE: 3/18/2013
REVISED DATE:4/24/2013 SHEET: 1 OF 7
JON GUERRY TAYLOR & ASSOCIATES, INC.
-,
"t·
?;"
~
'5;.
"i
----...-.,
~
.....
-t!±j--
'
·"'i
· X. ..
\
:,;""
·"~"q.
'
L!J
..;r
~
~
-I
CEJ
~~
~
11.
.·
.
,
PROJECT Sit E
·q..
\\
·
~·
...
·l'"
l-
B-e-ach
.......
Permit Purposes Only
Not For Construction
LOCATION MAP
NOT TO SCALE
AUTHORIZED AGENT:
JON GUERRY TAYLOR & ASSOCIATES, INC.
P.O. BOX 1082
MT. PLEASANT, SC 29465
c/o CRAIG PAWLYK
HARBOR LOFT BULKHEAD
REPLACEMENT AND ROCK
SILL INSTALLAllON
llDEWATER DEVELOPMENT
NORTH MYRRE BEACH,
HORRY COUNTY, SC
PROPOSED:
CONSTRUCTION OF REPLACEMENT
BULKHEAD AND NEW ROCK SILL FOR
EROSION CONTROL
IN: N. MYRTLE BEACH ON: A. I. W. W.
COUNTY: HORRY
STATE: SOUTH CAROLINA
DATE: 3/18/2013
REVISED DATE: 4/24/2013 SHEET: 2 OF 7
JON GUERRY TAYLOR & ASSOCIATES. INC.
X-4JH
~
APPROX. 386 ' FROM
MARSHGRASS TO MARSHGRASS
BULKHEAD IS EXISTING CRITICAL
LINE. VERIFIED BY OCRM
(TANITRA MARSH ALL) 4 -20 -2011
ELEVATIONS SHOWN ARE REFERENCED
TO MEAN LOW WATER DATUM
X
~~~~·
-~,44
~
-0.60
. -~4
'Pl.
· -4.1
Permit Purposes Only
Not For Construction
x-4.64
...
...
...
...
...
...
...
...
9.59"
Harbor Drive
~
AUTHORIZED AGENT:
HARBOR LOFT BULKHEAD
REPLACEMENT AND ROCK
SILL INSTALLAliON
TIDEWATER DEVELOPMENT
NORTH MYRTLE BEACH,
HORRY COUNTY, SC
~
0
60
GRAPHIC SCALE 1" = 60'
PROPOSED:
CONSTRUCTION OF REPLACEMENT
BULKHEAD AND NEW ROCK SILL FOR
EROSION CONTROL
lli;_ N. MYRllE BEACH
.ott. A.I. W.W.
COUNTY: HORRY
STAlE: SOUTH CAROUNA
DAlE;_ 3/18/2013
REVISED DAlE: 4/2 4/2013 .s.tiE.E.T:.. 3 OF 7
JON GUERRY TAYLOR & ASSOCIATES, INC.
t:I..QIES.;
Permit Purposes Only
Not For Constructior
APPROX. 386' FROM
MARSHGRASS TO MARSHGRASS
BULKHEAD IS EXISTING CRITICAL
LINE. VERIFIED BY OCRM
(TANilRA MARSHALL) 4-20-2011
~
" -3.04
ELEVATIONS SHOWN ARE REFERENCED
TO MEAN LOW WATER DATUM
~~~~·
X·17'J
o< · 3M
Permit Purposes Only
Not For Construction
)( - 4.G4
X
·0.59
X -4.44
x~:H
X-o.o-4
EX. HOME
(TYP.)
EX. HOME
(TYP.)
~
0
60
GRAPHIC SCALE 1" =60'
,,,,,,Ill\
HARBOR LOFT BULKHEAD
REPLACEMENT AND ROCK
SILL INSTALLAllON
llDEWATER DEVELOPMENT
NORTH MYRTLE BEACH.
HORRY COUNTY. SC
PROPOSED:
CONSTRUCTION OF REPLACEMENT
BULKHEAD AND NEW ROCK SILL FOR
EROSION CONlROL
IN: N. MYRTLE BEACH
ill:!;_ A.I.W.W.
COUNTY: HORRY
~
~ 3/18/2013
SOUTH CAROUNA
REVISED DATE: 4/24/2013
~ 4 OF 7
JON GUERRY TA'tt.OR & ASSOOATES, INC.
NOTES:
APPROX. 386' FROM
MARSHGRASS TO MARSHGRASS
BULKHEAD IS EXISTING CRITICAL
LINE. VERIFIED BY OCRM
(TANITRA MARSHALL) 4-20-2011
~~ ·
~J· . APPROX.
N: 745967.33
N: 745931.42
X~\
2o·
\
E: 2720 380.27
115'
X
20'
~
APPROx.l\\ \\ ~
E: 2720293.50
E: 2720239.22 l
APPRO
115' x
SILL
N: 7 45 992.25
ELEVATIONS SHOWN ARE REFERENCED
TO MEAN LOW WATER DATUM
N: 745906.75
E: 2720176.70
N: 746027.83
E: 2720557.37
IW
~
0
PROPOSED IMPROVEMENTS PLAN VIEW
AUTHORIZED AGE~··... No. 3671 /~~
JON GUERRY TAYLO~~OObttlES::~,,,"'
P.O. BOX 1082
,,,,, OF ~'J \,,.
1
MT. PLEASANT, SC 29465 11iltll ll:t>11:
cfo CRAIG PAWLYK
HARBOR LOFT BULKHEAD
REPLACEMENT AND ROCK
SILL INSTALLATION
~DEWATER DEVELOPMENT
NORTH MYRTLE BEACH,
HORRY COUNTY, SC
60
GRAPHIC SCALE 1"
=60'
PROPOSED:
CONSTRUCTION OF REPLACEMENT
BULKHEAD AND NEW ROCK SILL FOR
EROSION CONTROL
1M;_ N. MYRTLE BEACH
.Qtf;_ A.I.W.W.
COUNTY: HORRY
illJI;_ SOUTH CAROUNA
DATE: 3/18/2013
REVISED DATE: 4/24/2013
.s.tiEEI;_ 5 OF 7
JON GUERRY TAYLOR & ASSOCIATES, INC.
~
N: 746151.4.3
E: 2721 07.3. 92
APPROX. .386' FROM
MARSHGRASS TO MARSHGRASS
BULKHEAD IS EXISTING CRITICAL
LINE. VERIFIED BY OCRM
(TANITRA MARSHALL) 4-20-2011
N: 746146.42
E: 2721 014.79
Permit Purposes Only
Not For Constructior.
ELEVATIONS SHOWN ARE REFERENCED
TO MEAN LOW WATER DATUM
W~\.'i'J
N: 74612.3.6.3
E: 2720924.69
....t~· N: 746107.91
~~~, .
E: 2720860.12
APPROX.
1.30' X 20'
SILL
PROPOSED ROCK
SILL (TYP.)
N: 7460.39.64
E: 2720620.06
E:
~oo~o~o.n
NEW BULKHEAD
~
0
,,; ALAN \'\'
PROPOSED IMPROVEMENTS'P~~N VIEW
JON
P.O. BOX 1
MT. PLEASANT,
c/o CRAIG PAWLYK
N: 746149.4.3
E: 2721120..3.3
HARBOR LOFT BULKHEAD
REPLACEMENT AND ROCK
SILL INSTALLAllON
~DEWATER DEVELOPMENT
NORTH MYRTLE BEACH,
HORRY COUNTY, SC
60
GRAPHIC SCALE 1" = 60'
PROPOSED:
CONSTRUCTION OF REPLACEMENT
BULKHEAD AND NEW ROCK SILL FOR
EROSION CONTROL
IN: N. MYRTLE BEACH
.Qt:t. A.I.W.W.
COUNTY: HORRY
STAlE: SOUlH CAROUNA
DAlE: 3/18/2013
REVISED DAlE: 'V24/2013 .sJ:lEU. 6 OF 7
BULKHEAD IS EXISTING CRITICAL
LINE. VERIFIED BY OCRM
(TANITRA MARSHALL) 4-20-2011
t--------------n·'"' ""'·' ut./-..\.!./.<..'VARIES
------------1
TOP ELEY, VARIES:
APPROX.
+8.0 FT. MLW
PROPOSED ROCK SILL
PROPOSED NEW BULKHEAD
/~~~~~~~~~~~IT----------TO
BE BUILT APPROXIMATELY TWO
FEET IN FRONT OF EXISTING WALL
_., .
,
/.lll:=l"9oc:
MHW (HIGH TlDE)
LINE~4.1'
~
-~
MLW
r
--- +5.0'2MLW_ z
.. ..--....~
11
VARIES
EXISTING VINYL
SHEET PIUNG
Permit Purposes Only
Not For Construction
SECTION A-A
N.T.S.
AUTHORIZED AGENT:
JON GUERRY TAYLOR & ASSOCIATES. INC.
P.O. BOX 1082
MI. PLEASANT, SC 29465
c/o CRAIG PAWLYK
HARBOR LOFT BULKHEAD
REPLACEMENT AND ROCK
SILL INSTALLAllON
nDEWATER DEVELOPMENT
NORTH MYRTLE BEACH,
HORRY COUNTY, SC
PROPOSED:
CONSTRUCTION OF REPLACEMENT
BULKHEAD AND NEW ROCK SILL FOR
EROSION CONTIROL
IN: N. MYRTLE BEACH
.Q!:t. A.I.W.W.
COUNTY: HORRY
STATE: SOUTH CAROUNA
.MIE;_ 3/18/2013
REVISED DATE: 4/24/2013
JON GUERRY TAYLOR & ASSOCIATES, INC.
SHEET: 7 OF 7