Town of HIlton Head - Ocean Point Beach
Beaufort County, South Carolina
Town of HIlton Head - Ocean Point Beach
Beaufort County, South Carolina
JOINT
PUBLIC NOTICE
CHARLESTON DISTRICT, CORPS OF ENGINEERS
69A Hagood Avenue
Charleston, South Carolina 29403-5107
and the
S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
OFFICE OF OCEAN AND COASTAL RESOURCE MANAGEMENT
1362 McMillan Avenue, Suite 400
Charleston, South Carolina 29405
REGULATORY DIVISION
Refer to: P/N #SAC-2013-00695-1W
10 JUNE 2013
Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) , Sections
401 and 404 of the Clean Water Act (33 U.S.C. 1344), and the South Carolina Coastal Zone
Management Act (48-39-10 et.seq.) an application has been submitted to the Department of the
Army and the S.C. Department of Health and Environmental Control by
THE TOWN OF HILTON HEAD ISLAND, SC
c/o OLSEN ASSOCIATES, INC.
ATTN.: MR. CHRISTOPHER CREED, P. E. (SC 23064)
2618HERSCHELSTREET
JACKSONVILLE, FLORIDA 32204
for a permit to place fill material along the shoreline of
PORT ROYAL SOUND
at a location along 2,000 linear feet of shoreline in an area of Port Royal Plantation known as
Ocean Point on Hilton Head Island in Beaufort County, South Carolina (Latitude 32 .22604°,
Longitude -80.67096°)
In order to give all interested parties an opportunity to express their views
NOTICE
is hereby given that written statements regarding the proposed work will be received by the Corps
until
15 days from the date of this notice
and SCDHEC will receive written statements regard ing the proposed work until
30 days from the date of this notice
from those interested in the activity and whose interests may be affected by the proposed work.
The proposed work consists of the placement of up to 35,000 cubic yards of beach
compatible sand obtained from an upland sand source, the Deerfield Mine in Hardeeville, SC, and
placing it on 2,000 linear feet of eroding shoreline at Ocean Point in Port Royal Plantation. Once
the material is trucked in, it will be moved into place and shaped using mechanical means.
REGULATORY DIVISION
Refer to: P/N #SAC-2013-00695-1W
10 JUNE 2013
According to the applicant, this project will be performed in an area of localized erosion to provide
protection for approximately two years and will take 2-3 weeks to accomplish.
NOTE : Plans depicting the work described in this notice are available and will be
provided, upon receipt of a written request, to anyone that is interested in obtaining a copy
of the plans for the specific project. The request must identify the project of interest by
public notice number and a self-addressed stamped envelope must also be provided for
mailing the drawings to you . Your request for drawings should be addressed to the
U.S. Army Corps of Engineers
ATTN: REGULATORY DIVISION
69A Hagood Avenue
Charleston, South Carolina 29403-5107.
This Public Notice, including plans, is available for revi ew on the Charleston District
Web Site www.sac.usace.army.mii/Missions/ Regulatory/PublicNotices. The subject
notice can be obtained by clicking the file with the subject project number.
The District Engineer has concluded that the discharges associated with this project, both
direct and indirect, should be reviewed by the South Carolina Department of Health and
Environmental Control in accordance with provisions of Section 401 of the Clean W ater Act. As
such , this notice constitutes a request, on behalf of the applicant, for certification that this project
will comply with applicable effluent limitations and water quality standards. The work shown on
this application must also be certified as consistent with applicable provisions the Coastal Zone
Management Program (15 CFR 930). The District Engineer will not process this application to a
conclusion until such certifications are received. The applicant is hereby advised that
supplemental information may be required by the State to facilitate the review.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. Implementation of the
proposed project would impact 4.5 acres of estuarine substrates and emergent wetlands
utilized by various life stages of species comprising the red drum, shrimp, and snapper-grouper
management complexes. Our initial determination is that the proposed action would not have a
substantial individual or cumulative adverse impact on EFH or fisheries managed by the South
Atlantic Fishery Management Council and the National Marine Fisheries Service (NMFS). Our
final determination relative to project impacts and the need for mitigation measures is subject to
review by and coordination with the NMFS.
The District Engineer has consulted the most recently available information and has
determined that the project is likely to adversely affect the loggerhead sea turtle (Caretta
carreta) and is not likely to adversely affect he piping plover (Charadrius melodus) and
designated critical habitat (USFWS SC Unit-15) for wintering piping plover (Ch aradrius
melodus). This public notice serves as a request to the U.S. Fish and Wildlife Service and/or
the National Marine Fisheries Service to initiate formal consultation on this these species and/or
critical habitat that may be present in the area which would be affected , pursuant to Section ?(c)
of the Endangered Species Act of 1973 (as amended). A biological assessment (or other
similar document) detailing our analysis of the effects of the action will be provided.
REGULATORY DIVISION
Refer to: P/N #SAC-2013-00695-1 W
10 JUNE 2013
Pursuant to Section 106 of the National Historic Preservation Act (NHPA), this public
notice also constitutes a request to Indian Tribes to notify the District Engineer of any historic
properties of religious and cultural significance to them that may be affected by the proposed
undertaking .
In accordance with the NHPA, the District Engineer has also consulted the latest
published version of the National Register of Historic Places for the presence or absence of
registered properties, or properties listed as being eligible for inclusion therein, and this worksite
is not included as a registered property or property listed as being eligible for inclusion in the
Register. To insure that other cultural resources that the District Engineer is not aware of are
not overlooked, this public notice also serves as a request to the State Historic Preservation
Office to provide any information it may have with regard to historic and cultural resources.
Any person may request, in writing , within the comment period specified in this notice, that
a public hearing be held to consider this application. Requests for a public hearing shall state,
with particularity, the reasons for holding a public hearing.
The decision whether to issue a permit will be based on an evaluation of the probable
impact including cumulative impacts of the activity on the public interest and will include
application of the guidelines promulgated by the Administrator, Environmental Protection Agency
(EPA), under authority of Section 404(b) of the Clean Water Act and, as appropriate, the criteria
established under authority of Section 102 of the Marine Protection, Research and Sanctuaries
Act of 1972, as amended . That decision will reflect the national concern for both protection and
utilization of important resources. The benefit which reasonably may be expected to accrue from
the project must be balanced against its reasonably foreseeable detriments. All factors which
may be relevant to the project will be considered including the cumulative effects thereof; among
those are conservation, economics, aesthetics, general environmental concerns, wetlands,
historic properties, fish and wildlife values, flood hazards, flood plain values, land use, navigation ,
shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy
needs, safety, food and fiber production and, in general , the needs and welfare of the people. A
perm it will be granted unless the District Engineer determines that it would be contrary to the
public interest. In cases of conflicting property rights, the Corps of Engineers cannot undertake to
adjudicate rival claims.
The Corps of Engineers is soliciting comments from the public; Federal, state, and local
agencies and officials; Indian Tribes; and other interested parties in order to consider and
evaluate the impacts of this activity. Any comments received will be considered by the Corps of
Engineers to determine whether to issue, modify, condition or deny a permit for this project. To
make this decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments
are also used to determine the need for a public hearing and to determine the overall public
interest of the activity.
If there are any questions concerning this public notice, please contact Debbie King at
843-329-8044 or toll free at 1-866-329-8187.
~000
N
'\
-
'"
0
+ +
il
APPLICANT:
TOWN OF
HILTON HEAD ISLAND, SC
SAC 2013-00695-1 W
TOWN OF HILTON HEAD ISLAND
OCEAN POINT INTERIM
BEACH FILL PROJECT
PROJECT VICINITY
w
l
/
0
() 0
0
<' S
- i>i
DATE:
A PPROVED
REVISION
OATE:
05/15/13
DRAWN BY:
PJS
SHEET
1
OF
5
1
+
31
+
1
E9
LANDWARD LIMIT OF BERM (typ.)
PORT ROYAL
PLANTATION
(+7.5ft contour or se award limit of establi shed veg etation line)
+.
SEAWARD EDGE OF BERM (typ.)
+
--TOE OF FILL (typ. , varies)
SAND BEACH FILL (typ.)- ·+
EXISTING
GROI ~ (typ. )
+
+
HILTON HEAD
ISLAND
...----sHOALS
29C e
PIPING PLOVER
/~ SAND L~ SIGHTINGS
+
/
~
'
DEC 2012TOMAR 2013
BEACI+
HOUSE
298ED
TOWN OF Hll TON HEAD ISLANDL
BEACH MONITOR!
JOINER
BANK
'
TATION (typ.)
PIPING PLOVER
CRITICAL HABITAT
(UNIT SC-15)
~
I§
PERMIT REVIEW ONLY
NOT FOR CONSTRUCTION
APPLI CANT:
TOWN OF
HILTON HEAD ISLAND, SC
SAC 2013-00695-1W
TOWN OF HILTON HEAD ISLAND
OCEAN POINT INTERIM
BEACH FILL PROJECT
PLAN
DATE:
APPROVED
REVISION
DATE:
05/15/13
DRAWN BY:
PJS
SHEET
3
OF
5
31
PORT ROYAL
PLANTATION
+
$
+
-1
SAND BEACH FILL (typ.)
.----- SHOALS
HILTON HEAD
ISLAND
29C
/ S A N D LOBE
+
BEACI+
HOUSE
298
HE~ISLANDL
TOWN OF HILTON
BEACH MONITOR!
TATION (typ.)
+
+
+
~
+
APPLICANT:
TOWN OF
HILTON HEAD ISLAND, SC
SAC 2013-00695-1W
TOWN OF HILTON HEAD ISLAND
OCEAN POINT INTERIM
BEACH FILL PROJECT
CROSS-SECTION LOCATIONS
DATE:
~
PERMIT REVIEW ONLY
NOT FOR CONSTRUCTION
APPROVED
REVISION
DATE:
05/15/13
DRAWN BY:
PJS
SHEET
4 OF 5
(/) I
-i
)>
)>
r= 0
'"0
'"0
1\)
Oz
z 0
0
(") -i ~
0
I,
....~o.m
r
)>
z
-i
Wl>
60
oU5
O)r
15
col>
U'lz
I
0
;;;
~~
>
(.!)
N
....Jo.
;o
0
(/)
(/)
I
(/)
m
()
-l
0
z
-
(/)
,......
'<
""0
....._...
-1
0
~
OJ0Z
mo 0
)>m
())>"'Tl
IZI
"'Tl-or=
j=0-1
r;zO
-o-lz
:::0-I
ozm
c:....-1)>
mmo
():::0
--~-(/)
S:r
)>
z
0
z
~
5 i
0
=n:s
0
>
C1)
w
-5
-10
I
I
I
I
I
I
I
50
0
I
100
I
I
I
I
-1
MHW
----.....:. ·· '· .... ar
'f MLW
~ll .l':11V I DISTORTION
I
150
200
250
300
350
400
SEAWARD EDGE OF BERM
10
5
=
MHHW'
-I
LANDWARD LIMIT OF BERM
[MHW
0
n:s
>
C1)
-5
w
-10
0
50
100
150
200
250
300
350
400
Distance from Monument (ttl
0
'<
:;~ o !':'
-a ~ ~
NOTE: HORIZONTAL(H) TO VERTICAL(V)
DISTORTION IS 20(H):1(V)
~
BATHYMETRIC SURVEY BY ARC SURVEYING
~
I
m V5 .
.,o m
(]1
IMHHW '
SLOPE
SAND BEACH FILL
N
~
~
(]1(1)
I
Ol
0
0
I
CO~~~~U::I:.~
15
s::
I
I
\
/
Distance from Monument (ttl
~
:\j
BEACH PROI=IL ~ __/
0
0
~
~ ~~,
4
>
(.!)
z
!')
r- SEAWARD EDGE OF BERM
10
0
s::
()
=1
SURVEY DATE: NOVEMBER 2012
*MHHW also refers to spring high tide line.
& MAPPING, INC.
PERMIT REVIEW ONLY
NOT FOR CONSTRUCTION
ATTACHMENT A
SAC 2013-00695-1 W
Additional information provided by
the applicant
Sheet 1 of 3
PROJ ECT DESCRIPTI ON
Ocean Point I nterim Beach Fill P r oject
Hilton Head Island, South Ca r olina
Applicant: Town of Hilton Head Island
Agent: Olsen Associates, Inc., Jacksonville, Florida
The proposed project will include the placement of up to 35,000 cy of sand along about 2,000 feet
of Port Roya l Sound shoreline in Port Royal Plantation on Hilton Head Island, SC. The proj ect
area is located a long a portion of the island 's shoreline known as Ocean Point. Sand for the project
wi ll be obtained from a beach-compatible upland sand source, trucked to the project site, an d
placed and shaped mechanically. The most probable sand source will be the Deerfie ld Mine in
Hardeevi lle, SC, a sou rce that has been used as beach fi ll on Hi lton Head Island in the past (PIN
2004-13583 - IIW, amended). Sediment conditions at the Deerfield mine area are very c lean and
uniform, and the sediments are highly compatible with nat urally occurring beach sediments on
H ilton Head Island.
The purpose of the project is to address a hig hly-localized beach erosion problem that is causing
extreme narrowing of beach widths between the shorefront upland development and the average
water line. Recent beach monitoring results ind icate that the project area shoreline is losing about
15,000 cubic yards of sand per year. As such, the proposed project wil l prov ide the equivalent of
as much as two years of protection to the subject shoreline. This project is intended to provide
temporary re lief from the localized high rate of erosion until the Town's next island-wide
comprehensive beach nourishment project planned for the fall /winter of 2015. l f the proposed
interim project is not constructed, recent shore line change data suggest that the erosion could cause
the upland bluff to retreat to the shorefront development line within the next 12 to 18 months.
The project shorel ine is located within the limits of the portion of the 2006/07 beach renourishment
project that was constructed along the Port Royal Plantation Port Royal Sound shoreline (PIN 2004
1W-319-P (revised)). It is also located about 2,800 feet no t1h of the low-crested terminal groin and
1,700 feet north ofthe northern limit of beach fill completed in May 2012 (P/N 2009-1056- 1IW-P).
T he project sho rel ine has been consistently erosional s ince completion of the 2006/07 island-wide
beach restoration project due to movement of adjacent sand shoals and migration of a smal l
intertidal channel seaward ofthis area.
It is proposed that sand placement on the beach will occur between April 1 and April 30, 2014.
G iven the planned fill volume and anticipated sand placement rate , it is expected that construction
wou ld occur over a 14 to 21 day period . Access to the beach will be from the upland through Port
Royal Plantation and shore-side common areas.
The sand will be placed in a typical beach fil l construction benn configuration with an upper
elevation genera lly equivalent to the adjacent ambient beach elevations and have an initial seaward
slope of 1V:10H.
ATTACHMENT B
SAC 2013-00695-1 W
Additional information provided by
the applicant
Sheet 2 of 3
AVOIDANCE AND MINIMIZATION STATEMENT
Ocean Point Interim Beach Fill Project
Hilton Head Island, South Carolina
Applicant: Town ofHilton Head Island
Agent: Olsen Associates, lnc., Jacksonville, Florida
The proposed project will include the placement of up to 35,000 cy of sand along about 2,000 feet of Port
Royal Sound shoreline in Port Royal Plantation on Hilton Head Island, SC. The no-action alternative is not
acceptable due to the localized high rate of erosion and potential threat to upland development prior to
construction of a larger renourishment project along this reach of shoreline. The location ofthe proposed fill
placement cannot be avoided due to the localize nature of the significant erosion problem.
The fill quantity has been minimized to provide the minimum volume necessary to offset the anticipated
erosion rate for a two-year period. It is expected a larger renourishment of this reach of shoreline will be
permitted within two years as part of the Town's island-wide comprehensive nourishment project.
During project development, the preferred alternative was identified as scraping the massive sand lobe that is
situated along the shoreline to the immediate south ofthe project. The sand lobe is the product of sand losses
from shorelines farther to the south and sand placed as part of the 2012 Port Royal Sound Shoreline
Restoration and Stabilization Project. lt is more than 900 feet wide (relative to the upland development line),
occupies more than 10 acres, and may contain more than 50,000 cy of sand in just the upper three feet of the
shoal. This shoal is located between 900 and 3,500 feet from the proposed fill limits, and due to its
proximity and highly compatible sand, it is the most cost effective sand source for the project. However, a
portion of the sand shoal is located within Designated Critical Habitat Unit SC-15 for wintering piping
plovers, and the ongoing foraging habitat study for the 2012 Port Royal Project has documented a relatively
high level of foraging activity in this area during the past two wintering seasons. T herefore, based on our
environmental impact review during the alternatives analysis, the sand lobe was eliminated from
consideration. It is noted that the proposed fill site is not located in Designated Critical Habitat Unit SC-15.
Based on elimination of the sand lobe alternative due to environmental concerns, the project will be
constructed with a beach-compatible, although significantly more expensive, sand from an upland source to
avoid potential impacts to preferred wintering piping plover foraging habitat and minimize impacts to the
overall effect of the project to the shoreline. The material will be delivered to the project site from an upland
beach access point adjacent to the project site. It is anticipated that work on the beach can be completed in 10
to 15 days.
Due the existing high rate of erosion and proximity of upland development to the existing shoreline, the
project needs to be constructed as soon as possible. To avoid sea turtle nesting season, however, it is
proposed that sand placement commence after November I, 2013 with project completion prior to April 30,
2014. The floating site for the piping plover foraging habitat study during the 2012 and 2013 wintering
seasons was located within the project area shoreline. The ideal window for project construction to avoid
impacts to the ongoing foraging habitat study during the 2013/2014 wintering season and potential impacts
to nesting sea turtles is between March 15 and April 30, 2014. The Town of Hilton Head will make every
effort to construct the project during this window as an avoidance and minimization measure. However, if
the erosion rate accelerates during the second half of 2013, and the risk of damage to upland development
and public safety increases, the project may need to be constructed as early as November 2013. Ifthe project
is not constructed during the optimal avoidance/minimization window of March 15 to April 30, 2014, the
Town of Hilton Head Island will coordinate with USFWS for potential revisions to the monitoring protocol
for the 20 I 3/2014 wintering piping plover surveys.
SAC 2013-00695-1 W
Additional information provided by
the applicant
Sheet 3 of 3
Town of Hilton Head Island
Ocean Point Adjacent Property Owners
February 2011 Aerial Pholog raphy
~--~~dilo--....;i!=::==::::::a;,--....,;;
"1...
l i.MI · 4 00 tee !
.. _ .,..,_,......... ..... . . ......
n. ~
.., .-
...... ·-·..
. ... .... --~..... ...... ,, _, ,.,~ _ ,. _ .., ·
- -~ · ··
....,...,,-
.,.
. ...... . . . . . . ., . . . , ......,,,..,... HI<.........