You can copy from here when filling out the rest of the page.
General Permit- Lake Marion and Lake Moultrie
Berkeley, Clarendon, Orangeburg, Sumter and Calhoun Counties in South Carolina
General Permit- Lake Marion and Lake Moultrie
Berkeley, Clarendon, Orangeburg, Sumter and Calhoun Counties in South Carolina
J 0 I NT
PUBLIC NOTICE
CHARLESTON DISTRICT, CORPS OF ENGINEERS
69A Hagood Avenue
Charleston, South Carolina 29403-5107
and
THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
Office of Environmental Quality Control
Water Quality Certification and Wetlands Programs Section
2600 Bull Street
Columbia, South Carolina 29201
REGULATORY DIVISION
Refer to: General Permit #SAC- 2007-02505-GG
12 JUNE 2013
Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) , Sections 401 and 404 of
the Clean Water Act (33 U.S.C. 1341 ), the South Carolina Coastal Zone Management Act (48-39-1 0 et.seq.)
and the S.C. Construction in Navigable Waters Permit Program (R. 19-450, et. seq ., 1976 S.C . Code of Laws,
as amended) , a General Permit to perform work in or affecting navigable waters of the United States has been
proposed by the
District Commander
U.S. Army Corps of Engineers
Charleston District
69A Hagood Avenue
Charleston , South Carolina 29403
to authorize , where such authorizations are required , the construction , repair and maintenance of private , non
commercial piers , docks , boat lifts , moorings , boat houses , boat ramps , marine railways for dry storage ,
retaining walls , bulkheads , rip-rap and groins for erosion control , minor maintenance , minor discharges , and
removal of vessels by the adjacent property owners within the boundaries of
LAKE MARION AND LAKE MOULTRIE
in Berkeley, Clarendon, Orangeburg, Sumter
and Calhoun Counties, South Carolina
Anyone wishing to conduct work within the above referenced lakes in accordance with the terms and
conditions of Corps ' General Permit must also obtain authorization from Santee Cooper. For additional
information regarding Santee Cooper's Shoreline Management Plan , please contact their Property Management
Office at 843-761-4028.
In order to give all interested parties an opportunity to express their views
NOTICE
is hereby given that written statements regarding the proposed work will be received by the Corps and the
South Carolina Department of Health and Environmental Control until
JUNE 27, 2013,
from those interested in the activity and whose interests may be affected by the proposed work .
The District Engineer has concluded that the discharges associated with th is project, both direct and
REGULATORY DIVISION
Refer to: General Permit #SAC- 2007 -02505-GG
12 JUNE 2013
indirect, should be reviewed by the South Carolina Department of Health and Environmental Control in
accordance with provisions of Section 401 of the Clean Water Act. As such , this notice constitutes a request, on
behalf of the applicant , for certification that this project will comply with applicable effluent limitations and water
quality standards. The District Engineer will not process this application to a conclusion until such certification is
received . The applicant is hereby advised that supplemental information may be required by the State to facilitate
the review . Persons wishing to comment or object to Water Quality Certification must submit all comments in
writing to the S.C. Department of Health and Environmental Control at the above address within fifteen (15) days
of the date of this notice.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson
Stevens Fishery Conservation and Management Act. Implementation of the General Permit would impact
freshwater habitat upstream of estuarine substrates and emergent wetlands utilized by various life stages of
species comprising the red drum , shrimp , and snapper-grouper management complexes . Our initial
determination is that the General Permit would not have a substantial individual or cumulative adverse impact
on EFH or fisheries managed by the South Atlantic Fishery Management Council and the National Marine
Fisheries Service (NMFS). Our final determination relative to project impacts and the need for mitigation
measures is subject to review by and coordination with the NMFS.
The District Engineer has consulted the most recently available information and has determined that the
General Permit will have no effect on any federally endangered , threatened , or proposed species and will not
result in the destruction or adverse modification of designated or proposed critical habitat. Provisions have been
made in the form of general conditions to the General Permit, which should prevent any effect to federally
endangered, threatened, proposed species , or their critical habitat that the District Engineer is not aware of or may
have overlooked. This public notice serves as a request to the U.S. Fish and Wildlife Service and the National
Marine Fisheries Service for any additional information they may have on whether any listed or proposed
endangered or threatened species or designated or proposed critical habitat may be present in the area which
would be affected by the activity, pursuant to Section 7(c) of the Endangered Species Act of 1973 (as amended).
Pursuant to Section 106 of the National Historic Preservation Act (NHPA) , this public notice also
constitutes a request to Indian Tribes to notify the District Engineer of any historic properties of religious and
cultural significance to them that may be affected by the proposed undertaking .
In accordance with the NHPA, the District Engineer has evaluated the proposed General Permit
regarding its potential to affect cultural resources including registered properties or properties listed as being
eligible for inclusion in the National Register. Provisions have been made in the form of general conditions to
the General Permit , which should prevent any adverse effect to cultural resources that the District Engineer is
not aware of are not overlooked ; this public notice also serves as request to the State Historic Preservation
Officer to provide any information it may have with regard to impacts this General Permit may have in historic
and cultural resources .
Any person may request, in writing , within the comment period specified in this notice, that a public hearing
be held to consider this General Permit. Requests for a public hearing shall state , with particularity, the reasons
for holding a public hearing .
The decision whether to issue this General Permit will be based on an evaluation of the probable impact
including cumulative impacts of the activity on the public interest and will include application of the guidelines
promulgated by the Administrator, Environmental Protection Agency (EPA) , under authority of Section 404(b) of
the Clean Water Act and , as appropriate , the criteria established under authority of Section 102 of the Marine
Protection , Research and Sanctuaries Act of 1972, as amended . That decision will reflect the national concern for
both protection and utilization of important resources . The benefit which reasonably may be expected to accrue
from the project must be balanced against its reasonably foreseeable detriments . All factors which may be
relevant to the project will be considered including the cumulative effects thereof; among those are conservation ,
REGULATORY DIVISION
Refer to: General Permit #SAC-2007 -02505-GG
12 JUNE 2013
economics , aesthetics , general environmental concerns , wetlands, historic properties , fish and wildlife values ,
flood hazards, flood plain values , land use, navigation , shoreline erosion and accretion, recreation , water supply
and conservation , water quality, energy needs, safety, food and fiber production and , in general , the needs and
welfare of the people . A permit will be granted unless the District Engineer determines that it would be contrary to
the public interest. In cases of conflicting property rights , the Corps of Engineers cannot undertake to adjudicate
rival claims .
The Corps of Engineers is soliciting comments from the public; Federal , state, and local agencies and
officials; Indian Tribes ; and other interested parties in order to consider and evaluate the impacts of this activity.
Any comments received will be considered by the Corps of Engineers to determine whether to issue , modify,
condition or deny a permit for this project. To make this decision , comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects , and the other public interest
factors listed above . Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the activity.
If there are any questions concerning this public notice, please contact Mary Hope Green at
843-329-8044.
General Permit No .
SAC-2007-02505-GG
Name of Applicant:
General Public
Effective Date :
Expiration Date:
DEPARTMENT OF THE ARMY
GENERAL PERMIT
A general permit to perform work in or affecting waters of the United States , both navigable and non
navigable , upon the recommendation of the Chief of Engineers, pursuant to Section 10 of the Rivers
and Harbors Act of March 3, 1899 (33 U.S .C. 403) and Section 404 of the Clean Water Act (33 U.S.C.
1344), is hereby issued by authority of the Secretary of the Army by the
District Commander
U. S. Army Corps of Engineers
Charleston District
69A Hagood Avenue
Charleston , South Carolina 29403
to authorize , where such authorizations are required, the construction , repair and maintenance of
private, non-commercial piers , docks , boat lifts , moorings , boat houses, boat ramps , marine railways for
dry storage , retaining walls , bulkheads , rip-rap and groins for erosion control , minor maintenance , minor
discharges , and removal of vessels by the adjacent property owners within the boundaries of
LAKE MARION AND LAKE MOULTRIE
in Berkeley, Clarendon , Orangeburg , Sumter
and Calhoun Counties , South Carolina
I. Authorized Activities and Special Conditions
1. Residential Piers and Docks
a) Piers and docks shall not exceed six (6) feet in width . The size and extension of a
dock or pier must be limited to that which is reasonable for the intended use . In some
locations such as narrow coves , docks may not be permitted at all .
b) Piers and docks will be located a minimum of ten (1 0) feet from adjacent property
lines and should not encroach across the imaginary lake ward extension of said property
lines.
1
c) Piers and docks may have a 'T ' or "L" shaped terminal having dimensions not greater
than 16 feet in length by 24 feet in width .
d) Hand railings are permissible provided that the sides of the docks are not enclosed
so as to obscure cross-vision and they do not exceed three feet (3) in height.
e) Piers , docks , floats and moorings in regard to single-family use are limited to 1 pier.
f) No sinks , toilets , showers , etc ., or any type of equipment or construction which will
create or cause any liquid or solid waste to be discharged into the waters of the lakes
will be permitted .
g) All fixed docks must be built at an elevation where the decking is a minimum of two
(2) feet above the maximum high water line of the lake .
h) Flotation devices on floating docks shall be encased or encapsulated . Styrofoam
billets , barrels or similar devices are not permitted .
i) Roofs may be gabled or hip . Roofs may be constructed with any modern type of
residential/commercial covering. Gable roofs are not to exceed ten (13) feet in height
from the top of pitch to the decking of the pier or twelve ( 15) feet in height from top of
pitch to the water surface . Flat roofs are not allowed .
2. Moorings
a) Mooring structures , such as dolphins , pilings , or buoys, shall not be located beyond
the distance prescribed in Paragraph II. a. (1) nor shall they be located greater than 20 '
laterally from the side of the associated pier or dock when associated with the pier or
dock . The number of such structures shall not exceed two per property . A variance in
the location and number of buoys may be cons idered on a case by case basis by Santee
Cooper provided their location does not extend beyond the distances prescribed in
paragraph II. a. (1) and they do not interfere with navigation or aesthetic values .
b) Vessels secured to mooring structures must be moored in a manner which will not
create any hazards to navigation .
3. Boat lifts and Covered Boat Lifts
a) Roofs may be gabled or hip . Gable or hip roofs are not to exceed ten (13) feet in
height from the top of pitch to the decking of the pier or twelve (15) feet in height from
top of pitch to the water surface .
b) Boat lifts will be located a minimum of ten (10) feet from adjacent property lines and
should not encroach across the imaginary lake ward extension of said property lines . A
variance in the distance from the adjacent property lines may be granted in instances
where conformity with existing structures would be practical and in cases where
exceptions would be desirable due to the curvature of the shoreline .
c) Boat lift dimensions will not exceed sixteen (16) feet by th irty (30 ) feet.
2
d) Uncovered boat lifts will be considered for all areas of Lake Marion and Lake Moultrie
provided that when fully raised , the bottom of the boat may not exceed the height of the
decking of the pier or dock . The total height of any portion of the lift will not exceed ten
(13) feet above the maximum high water line of the lake . Uncovered lifts for personal
watercraft such as jet skis will also be considered , however, no more than two (2) per
waterfront lot will be allowed .
e) No sinks , toilets , showers , etc ., or any type of equipment or construction which will
create or cause any liquid or solid waste to be discharged into the waters of the lakes
will be permitted .
4 . Boat Ramps
a) Boat ramps will be constructed of reinforced concrete . Uses of asphalt compounds
or petroleum products are not authorized under this General permit. Boat ramps may be
up to sixteen (16) feet wide and the minimum length required to be functional.
b) Boat ramps will be located a minimum of ten (1 0) feet from adjacent property lines
and should not encroach across the imaginary lake ward extension of said property
lines . A variance in the distance from the adjacent property lines may be granted in
instances where conformity with existing structures would be practical and in cases
where exceptions would be desirable due to the curvature of the shoreline.
c) Vegetated wetlands must be avoided to the maximum extent practicable . If a
proposed boat ramp would affect more than 500 square feet of vegetated wetlands ,
review and concurrence of the U. S. Fish and Wildlife Service and the South Carolina
Department of Natural Resources are required .
5. Marine Railways
a) Marine railways extending from onshore boat houses must not interfere with
navigation .
b) Marine railways will be located a minimum of ten (1 0) feet from adjacent property
lines and should not encroach across the imaginary lake ward extension of said property
lines . A variance in the distance from the adjacent property lines may be granted in
instances where conformity with existing structures would be practical and in cases
where exceptions would be desirable due to the curvature of the shoreline.
6 . Erosion Control
6.1 Retaining Walls/Bulkheads and Groins . Bank stabilization activities necessary for
erosion prevention , provided the activity meets all of the following criteria :
a) No material is placed in excess of the minimum needed for erosion protection .
b) The activity is no more than 500 feet in length along the bank .
3
c) The activity does not exceed an average of one cubic yard per funning foot
placed along the bank below the plane of the ordinary high water mark , unless this
criterion is waived in writing by the U. S. Army Corps of Engineers District Engineer
concluding that the discharge will result in minimal adverse effects .
d) The activity does not involve discharges or dredged or fill material into special
aquatic sites, unless this criterion is waived in writing by the U. S . Army Corps of
Engineers District Engineer.
e) No material is of the type , or is placed in any location, or in any manner, to impair
surface water flow into or out of any waters of the United States .
f) No material is placed in a manner that will be eroded by normal or expected high
flows .
g) Retaining walls/bulkheads and riprap must be placed against the existing
erosional scarp, and landward of any wetland vegetation to prevent the loss of
wetlands . The recapturing of land by earthen fill will not be permitted .
h) Only clean earthen fill free of all potential sources of pollution may be used as
backfill material. The backfilled area must be stabilized with vegetative cover after
construction to minimize erosion.
i) Riprap must consist of clean stone or masonry material free of all potential
sources of pollution . Riprap materials must have received prior approval by Santee
Cooper.
Groins and retaining walls for erosion control will be permitted provided that they
are constructed of treated wood , concrete , vinyl sheeting, or some other suitable
material that has received prior approval by Santee Cooper.
j)
k) Groin walls must be a minimum of two (2) feet above the maximum high water
mark of the lake and must not be excessive in length . Groins walls must be clearly
marked and lighted by U. S. Coast Guard standards so as not to be a hazard to safe
navigation .
7. Minor Maintenance
a) This authorizes the removal of accumulated sediments and debris in the vicinity of
and within existing structures (e .g., bridges , culvert road crossings, water intake
structures, etc .) and the placement of new or additional riprap to protect the structure.
The removal of sediment is limited to the minimum necessary to restore the waterway in
the immediate vicinity of the structure to the approximate dimensions that existed when
the structure was built , but cannot extend further than 200 feet in any direction from the
structure. This 200 foot limit will also apply to maintenance dredging to remove
accumulated sediments from canals associated with outfall and intake structures . All
dredged or excavated materials must be deposited and retained in an upland area
unless otherwise specifically approved by the district engineer under separate
authorization. The placement of riprap must be the minimum necessary to protect the
4
structure or to ensure the safety of the structure. Any bank stabilization measures not
directly associated with the structure will require a separate authorization from the Army
Corps of Engineers district engineer.
b) This also authorizes temporary structures , fills, and work necessary to conduct the
maintenance activity . Appropriate measures must be taken to maintain normal
downstream flows and minimize flooding to the maximum extent practicable, when
temporary structures , work , and discharges, including cofferdams , are necessary for
construction activities , access fills , or dewatering of construction sites . Temporary fills
must consist of materials, and be placed in a manner, that will not be eroded by
expected high flows. Temporary fills must be removed in their entirety and the affected
areas returned to pre-construction elevations . The areas affected by temporary fills
must be re-vegetated , as appropriate .
c) The permittee must submit a pre-construction notification to Santee Cooper prior to
commencing the activity . Where maintenance dredging is proposed, the pre-construction
notification must include information regarding the original design capacities and
configurations of the outfalls, intakes, small impoundment, and canals.
d) This authorizes the repair, rehabilitation or replacement of any previously authorized
structure or fill that does not qualify for the Clean Water Act Section 404(f) exemption for
maintenance.
8. Minor Discharges
a) Minor discharges of dredged or fill material into waters of Santee Cooper system .
i. The quantity of discharged material and the volume of area excavated does
not exceed 25 cubic yards below the plane of the ordinary high water mark.
ii. The discharge will not cause the loss of more than acre of waters of the
Santee Cooper system.
9. Removal of Vessels
a) Temporary structures or minor discharges of dredged or fill material required for the
removal of wrecked , abandoned , or disabled vessels , or the removal of man-made
obstructions to navigation.
II. GENERAL CONDITIONS:
a) That all activities identified and authorized herein shall be consistent with the terms and conditions
of this permit; and that any variance or activity not specifically identified and authorized herein shall
constitute a violation of the terms and conditions of this permit which may result in the modification ,
suspension , or revocation of this permit , as set forth more specifically in General Condition ~below
and in the institution of such legal proceedings as the United States Government may consider
appropriate .
b) That the permittee agrees to make every reasonable effort to perform the work authorized herein in
a manner so as to minimize and adverse impact on fish , wildlife , and environmental resources .
5
c) That the permittee must perform the work authorized herein in a manner so as to minimize and
degradation of water quality .
d) That the permittee shall allow the District Commander or his authorized representative to make
periodic inspections at any time deemed necessary in order to assure that the activity being performed
under authority of this permit is in accordance with the terms and conditions prescribed herein .
e) That the permittee shall maintain the work or structure authorized herein in good condition.
f) That this general permit does not convey any property rights , either in real estate or material , or any
exclusive privileges ; and it does not authorize any injury to property or invasion of rights or any
infringement of Federal , State or local laws or regulations or Federal Energy Regulatory Commission
regulations , nor does it obviate the requirement to obtain other Federal , State , local , or South Carolina
Public Service Authority (SCPSA or Santee Cooper) assent or to comply with any applicable standards
required by ordinance for the construction of activities authorized herein . Other Federal , State , or local
agencies and/or Santee Cooper are not limited by this document and may impose more stringent
requirements than those identified in this document.
g) That structures authorized by this General Permit shall be designed , located , and/or operated to
allow the full and free use by the public of all navigable waters adjacent to the work authorized by this
permit.
h) That authorization of a specific work or structure authorized herein may be summarily suspended in
whole or in part upon a finding by the District Commander that immediate suspension would be in the
general public interest or there has been a violation of any terms and conditions of this permit. Such
suspension shall be effective upon receipt by the permittee of a written notice thereof which shall
indicate (1) the extent of the suspension , (2) the reasons for this action , and (3) any corrective or
preventative measures to be taken by a permittee which are deemed necessary by the District
Commander to abate imminent hazards to the general publ ic interest. A permittee shall take immediate
action to comply with the provisions of this notice . Within ten (1 0) days following the receipt of this
notice of suspens ion, the permittee may request a meeting with the District Commander or a public
hearing to present information relevant to a decision whether his/her permit should be reinstated ,
modified , or revoked. If a public hearing is requested it shall be conducted pursuant to procedures
prescribed by the Chief of Engineers . After completion of the public hearing or within a reasonable time
after issuance of the suspension notice to the permittee if no hearing is requested , the authorization of
the specific work or structure will be reinstated , modified , or revoked . Any modification , suspension , or
revocation of authorization under this Genera l Permit shall not be the basis for any claim for damages
against the United States .
i) That if the display of lights and signals on any structure authorized herein is not otherwise provided
for by law, such lights and signals as may be prescribed by the United States Coast Guard shall be
installed and maintained by and at the expense of the permittee .
j) That if and when a permittee desires to abandon an authorized work, unless such abandonment is
part of a transfer procedure by which the individual is transferring ownership of the structure , the
permittee may be required to remove the structure.
k) That the permittee recognizes the possibility that wo rks or structures authorized herein may be
subject to damage by wave wash from passing vessels . The issuance of th is General Permit does not
relieve the permittee from taking all proper steps to ensure the integrity of works pe rmitted herein and
the safety of boats moored thereto from damage by wave wash and the perm ittee shall not hold the
United States liable for any such damage .
6
I) That a structure owner upon receipt of a notice from the District Engineer for failure to comply with the
terms , conditions , or standards of this General Permit shall , within 60 days without expense to the
United States and in such manner as the Secretary of the Army or his authorized representative(s) may
direct , effect compliance with terms , conditions , and standards or remove the structure .
m) That if the permittee , prior to or during the performance of the work authorized herein , encounters
previously unidentified archeological remains or cultural resources within the area subject to
Department of the Army authorization , the applicant agrees to cease work and contact the District
Commander, so that coordination with the South Carolina Institute of Archaeology and Anthropology ,
the South Carolina Department of Archives and History, and the Tribal Historic Preservation Office may
be conducted .
n) That the permittee must notify the District Commander if the activity authorized by this General
Permit may affect any historic properties listed , or which may be eligible for listing on the National
Register of Historic Places. The activity is not authorized until the procedures for the protection of
cultural resources (Appendix C to 33 CFR 325) have been completed on the eligible property or
structure .
o) That this General Permit does not authorize work or structures within areas designated as
"environmentally sensitive areas" by Santee Cooper.
p) That the term "permittee" means the individual authorized by the District Commander to accomplish
work under this General Permit. The majority of activities authorized under this General Permit are
limited to private, non-commercial use and limited commercial uses . However, subaqueous utility lines
and overhead power lines are typically constructed and/or maintained by corporations or other
commercial entities .
q) That if the District Commander determines federal listed threatened or endangered species and/or
designated critical habitat are known to exist in the project area and that such species may be
adversely affected by the proposed work , then that specific work is not authorized by this General
Permit.
r) That a variance in the dimensions or locations of the activities authorized herein may be granted in
instances where conformity with existing structures would be practical and in cases where exemptions
would be desirable due to curvature and/or slop of the shoreline . This variance will be considered
authorized upon approval by Santee Cooper. However, the District Commander reserves the right to
deny such variance if effects on navigation and the aesthetic values of the surrounding area are
determined to be contrary to the public interest.
s) This general permit relates only to activities authorized herein and does not convey the right to place
any cover, closed structure , or structures for any nonwater-related use on or adjacent to the pier, dock,
boat lifts , moorings, boat houses , boat ramps , marine railways for dry storage , seawalls , retainer walls ,
and riprap without the prior written approval of the Corps of Engineers .
t) The permittee must implement best management practices during and after all construction to
minimize erosion and migration of sediments off site . These practices may include use of devices
capable of preventing erosion and migration of sediments in waters of the U.S., including wetlands.
These devices must be maintained in a functioning capacity until the area is permanently stabilized
upon project completion .
u) The permittee understands and agrees that , if future operations by the United States require the
removal , relocation , or other alteration , of the structure or work herein authorized , or if, in the opinion of
the Secretary of the Army or his authorized representative, said structure or work shall cause
7
unreasonable obstruction to the free navigation of the navigable waters , the permittee will be required ,
upon due notice from the Corps of Engineers , to remove , relocate , or alter the structural wok or
obstructions caused thereby , without expense to the United States. No claim shall be made against the
United States on account of any such removal or alteration .
Ill. PROHIBITED ACTIVITIES :
All work that exceeds the terms and conditions specified herein is prohibited unless an
Individual or Nationwide Department of the Army Permit has been obtained from the Corps of
Engineers . All work for purposes other than those specified herein is expressly not authorized by this
document.
IV. REQUIRED AUTHORIZATIONS:
a. Prior to performing any of the work authorized herein within the prescribed geographical limits
of this General Permit, the permittee must also obtain authorization from Santee Cooper.
b. Santee Cooper has agreed to furnish the Corps of Engineers and the South Carolina
Department of Health and Environmental Control Bureau of Water with a monthly tabulation and
pertinent information on all work or activities authorized under this General Permit.
V. PENALTIES FOR VIOLATIONS :
Authorization obtained under this General Permit limits the size , length and use of any work
or structures. Any deviation from the specifications , or other terms or conditions of the General
Permit shall constitute a violation of the River and Harbors Act of 1899 and/or Section 404 of the
Clean Water Act, and may result in the District Commander seeking judicial relief to have the
permittee remove structures and/or restore the project area to its former condition as well as the
imposition of penalties as provided by law .
VI. REVOCATION OF THE GENERAL PERMIT:
This permit may be revoked by issuance of a public notice at any time the District
Commander determines that the cumulative effects of the activities authorized herein have an
adverse effect on the public interest. Following such revocation , any future activities in areas
covered by this General Permit will be processed as Individual or Nationwide Permits .
VII. DURATION OF THE GENERAL PERMIT.
This General Permit will cover activities started within five (5) years and completed within six
(6) years after the date of issuance unless this permit is revoked in the interim. Revoking the
General Permit will not affect work performed in accordance with the conditions stated herein . At
the end of the first year and every succeeding year , the Corps of Engineers and the Federal and
State regulatory and resource agencies will jointly review activities authorized by this General
8
Permit to determine if significant cumulative impacts have resulted . If the District Commander
determines revocation of this permit , in whole or in part , may be in order due to cumulative impacts ,
a public notice of the intention will be issued and after a review of all additional data submitted ,
action will be taken to amend , modify or revoke this permit as appropriate .
This permit shall become effective on the date of the District Commander's signature .
BY AUTHORITY OF THE SECRETARY OF THE ARMY:
Edward P. Chamberlayne , P.E.
Date
Lieutenant Colonel , EN
Commander, U.S. Army Engineer District, Charleston
or his Designee
Tina B. Hadden
Chief, Regulatory Division
9