You can copy from here when filling out the rest of the page.
Jack's Creek Impoundment Field DikeCharleston County, South Carolina
Jack's Creek Impoundment Field Dike
Charleston County, South Carolina
J 01 NT
PUBLIC NOTICE
CHARLESTON DISTRICT, CORPS OF ENGINEERS
69A Hagood Avenue
Charleston, South Carolina 29403-5107
and the
S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
OFFICE OF OCEAN AND COASTAL RESOURCE MANAGEMENT
1362 McMillan Avenue, Suite 400
Charleston, South Carolina 29405
REGULATORY DIVISION
Refer to : P/N #SAC-2013-00574-21G
18 JUNE 2013
Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) , Sections
401 and 404 of the Clean Water Act (33 U.S.C. 1344), and the South Carolina Coastal Zone
Management Act (48-39-10 et.seq .) an application has been submitted to the Department of the
Army and the S.C. Department of Health and Environmental Control by
THE U. S. FISH AND WILDLIFE SERVICE (USFWS)
C/0 MS. SARAH DAWSEY, REFUGE MANAGER
5801 HIGHWAY 17 NORTH
AWENDAW, SOUTH CAROLINA 29429
for a permit to perform excavation , place fill material and install water control structures in waters
of the existing Jack's Creek impoundment adjacent to the
ATLANTIC OCEAN
at locations , within the existing Jack's Creek impoundment on Bull 's Island , in the USFWS Cape
Romain National Wildlife Refuge , near Awendaw , Charleston County , South Carolina .
(Latitude 32 .91751 o- Longitude -79 .5847r)
In order to give all interested parties an opportunity to express their views
NOTICE
is hereby given that written statements regarding the proposed work will be received by the Corps
until
15 Days from the Date of this Notice,
and SCDHEC will receive written statements regarding the proposed work until
30 Days from the Date of this Notice
from those interested in the activity and whose interests may be affected by the proposed work .
The proposed work consists of performing excavation by long reach excavator to construct
borrow ditches in approximately 8.1 acres of wetlands in the existing impoundment and placing
the excavated fill material in approximately 8.1 acres of wetlands in the existing impoundment to
construct a 5,348 long earthen cross field dike and construct a 955 ' earthen cross field dike . Each
cross field dike will have a bottom width of approximately 56.66 ' and a top width of 20 '.
Approximately 16 .3 acres of brackish water wetlands within the existing impoundment will be
REGULATORY DIVISION
Refer to : P/N #SAC-2013-00574-218
18 JUNE 2013
impacted by the proposed work . In addition , the applicant will install two rice trunks and one
double flashboard riser in the constructed cross dikes for water control capability . Due to the
nature of the proposed work and beneficial impacts including beneficial impacts to water quality ,
the applicant has not proposed compensatory mitigation for the proposed work . The purpose of
the proposed work is for protection of the freshwater interior fields in the event of salt water
encroachment from ocean side dike failure ; for water quality improvements including the reduction
of fecal coliform levels in surrounding estuarine waters during draw downs by allowing the refuge
more control of water levels for timed water releases ; and to allow more efficient and more options
for management capabilities .
NOTE: Plans depicting the work described in this notice are available and will be
provided, upon receipt of a written request, to anyone that is interested in obtaining a copy
of the plans for the specific project. The request must identify the project of interest by
public notice number and a self-addressed stamped envelope must also be provided for
mailing the drawings to you. Your request for drawings should be addressed to the
U.S. Army Corps of Engineers
ATTN: REGULATORY DIVISION
69A Hagood Avenue
Charleston, South Carolina 29403-5107
The District Engineer has concluded that the discharges associated with this project , both
direct and indirect, should be reviewed by the South Carolina Department of Health and
Environmental Control in accordance with provisions of Section 401 of the Clean Water Act. As
such , this notice constitutes a request , on behalf of the applicant, for certification that this project
will comply with applicable effluent limitations and water quality standards . The work shown on
this application must also be certified as consistent with applicable provisions the Coastal Zone
Management Program (15 CFR 930). The District Engineer will not process this application to a
conclusion until such certifications are received . The applicant is hereby advised that
supplemental information may be required by the State to facilitate the review.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. Implementation of the
proposed project would impact (16 .3) acres of brackish substrates adjacent to estuarine
substrates and emergent wetlands utilized by various life stages of species comprising the red
drum , shrimp , and snapper-grouper management complexes . Our initial determination is that
the proposed action would not have a substantial individual or cumulative adverse impact on
EFH or fisheries managed by the South Atlantic Fishery Management Council and the National
Marine Fisheries Service (NMFS) . Our final determination relative to project impacts and the
need for mitigation measures is subject to review by and coordination with the NMFS .
The District Engineer has consulted the most recently available information and has
determined that the project will have no effect on any federally endangered , threatened , or
proposed species and will not result in the destruction or adverse modification of designated or
proposed critical habitat. This public notice serves as a request to the U.S. Fish and Wildlife
Service and the National Marine Fisheries Service for any additional information they may have
on whether any listed or proposed endangered or threatened species or designated or
proposed critical habitat may be present in the area which would be affected by the activity ,
pursuant to Section 7(c) of the Endangered Species Act of 1973 (as amended) .
Pursuant to Section 106 of the National Historic Preservation Act (NHPA) , this public
notice also constitutes a request to Indian Tribes to notify the District Engineer of any historic
REGULATORY DIVISION
Refer to : P/N #SAC-2013-00574-21G
18 JUNE 2013
properties of religious and cultural significance to them that may be affected by the proposed
undertaking .
In accordance with the NHPA, the District Engineer has also consulted the latest
published version of the National Register of Historic Places for the presence or absence of
registered properties , or properties listed as being eligible for inclusion therein , and this worksite
is not included as a registered property or property listed as being eligible for inclusion in the
Register. To insure that other cultural resources that the District Engineer is not aware of are
not overlooked , this public notice also serves as a request to the State Historic Preservation
Office to provide any information it may have with regard to historic and cultural resources .
Any person may request, in writing , within the comment period specified in this notice , that
a public hearing be held to consider this application . Requests for a public hearing shall state ,
with particularity, the reasons for holding a public hearing.
The decision whether to issue a permit will be based on an evaluation of the probable
impact including cumulative impacts of the activity on the public interest and will include
application of the guidelines promulgated by the Administrator, Environmental Protection Agency
(EPA) , under authority of Section 404(b) of the Clean Water Act and , as appropriate , the criteria
established under authority of Section 102 of the Marine Protection , Research and Sanctuaries
Act of 1972, as amended . That decision will reflect the national concern for both protection and
utilization of important resources. The benefit which reasonably may be expected to accrue from
the project must be balanced against its reasonably foreseeable detriments . All factors which
may be relevant to the project will be considered including the cumulative effects thereof; among
those are conservation , economics , aesthetics , general environmental concerns , wetlands ,
historic properties , fish and wildlife values , flood hazards , flood plain values , land use , navigation ,
shoreline erosion and accretion , recreation , water supply and conservation , water quality, energy
needs , safety, food and fiber production and , in general , the needs and welfare of the people . A
permit will be granted unless the District Engineer determines that it would be contrary to the
public interest. In cases of conflicting property rights , the Corps of Engineers cannot undertake to
adjudicate rival claims .
The Corps of Engineers is soliciting comments from the public; Federal , state , and local
agencies and officials; Indian Tribes ; and other interested parties in order to consider and
evaluate the impacts of this activity. Any comments received will be considered by the Corps of
Engineers to determine whether to issue , modify, condition or deny a permit for this project. To
make this decision , comments are used to assess impacts on endangered species , historic
properties , water quality, general environmental effects , and the other public interest factors listed
above . Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments
are also used to determine the need for a public hearing and to determine the overall public
interest of the activity.
If there are any questions concerning this public notice , please contact Mary Hope Green
at 843-329-8044 or toll free at 1-866-329-8187.
~--
~,_
· --· j,.~J~·
_.,u.__
-
~ ~ ~-~~
__u~,
-"!!;
·'
DaleS-/(,.
Sbee1
2
-13
of -~'J.
Dale
Sbeei
AG -
S-(6 - (
S
of
"2o 10- 5?1-- 2.""1:6
r
Jf4'
WPOUNOWOO BUI...KHOO
WINGW"'-1. ('I'll' .)
<="i~/
/
INTRUNK
.A
('I'll'.)
a·
y:
TYP.
(IU~T
<=~~~)
x 6· STOP L0CS
2'"
~ · K 18"' OPENINC
CAHN.. BUlKHEAD
WINGW"'-1. ('I'll'.)
w.. s.s. c.BlE
<~~/
(lrm:RIOR) S l /
---,-------------------
2"' · 6"' STOP LOGS
TONGUE AND GROOYE . 4 · (TYP.)
TONGUE AND GROeNE.
4'
___.J....
_________________ _
~
~
s·
(,frot?OUN(»-e~T
fOP AND BOTTOM 90AROS SHAll BE
TONCUE AND CROO'w!: JXt2' e
(loCT\.W. OIWEN90N)
(INTERIOR) S /
/·PDUNOU~/
(_(~)S/
-- ;-)
i
1
1
STOPLOC RISER
WAX. TOP OF L.OC EL
6· BElOW TOP CE' DtKE El...
i' I
1
~~- Lit ~I.... .-~
\ §·
~\
---J ilFI
1cl~ l
~~
MI +'! .-EL
>c
·c·
80~ OF BOX
TYPICAL
I
TYI'ICAl
1 - - - - 2 4' - - - - l
I
T7J .l
~
EI..EYMlQt!
~
DOUBLE SPILLWAY BOX DETAILS
c.
!'
I
~
NOT TO SCAU:
SPILLWAY BOX DETAILS
STRUC!IJRE
:
PROPOSED DOUet.£ SPU.LWAY BOX #1
~
(t'
U\
II'"
S
ll/
lloiPOUNOUOITl£/
1 - - - - - - - 2 4'-o' - - - - -- -1
f - - - - - - - J 0'-0 ' - -- - -- -j
PUNCH-IN BOARDS SHALL BE
t:r L.ONC, JX 12 Sl.OPPY-V
1.
/)._
I~ "
~·J
PUNCH-IN BOAADS SI-W..L BE
12' LONG, JX12 SLOPP'Y-V
$£X. ('I'll'.)
.. ~ ·
,_
0
lN
.
/
( (:xm..,..)
/IWPOUNOUOITIE /
C.. (::.ro,IORJ
TOP AND BOTTotr.t 90AAOS SHAll. BE
TONGUE ANO GROOvE .3X12's
(ACTU>l OIWEHSION)
!I
~ I f ~ ~ J. ~ ~ k~&:ii,r·~fM:?~~ti~tt~'~
·
su/
c.BlE
o4· · 6· MUD
1
U\1
STOPUlC RIS[R
MAX...TOPOFt.OGEL
BELOW TOP OF DIKE EL
f
·f
/',
J'
'''f
.
"t'
CONTROL STtlCT'l.R:S SHALL 8£ BY A <:::ONPMV SPECWJZIHG
ICTS WITH NOT lESS TtWol FIVE YEARS OF DOCUMENTED
tt Of WOOOEJol WATER CONlROL S1'RUCTUR£S. APfiROIIN.. OF
B'Y THE ENCIHEER SHN..1. BE WANDATORY PRIOR TO
3.
4.
17,
(\'
THE CONTRACTOR IS RESPOHSJBI.£ FtiR n£ RENOVN... OF ALL MATERIAL WHICH WAY BE
PRESENT THA.T NAY INHBT THE ORMNG OF THE TIMBER Pll.£5 NID VERT1CAl 3 lC 12
""""""'·
THE CONlllAC1'0R SHAlL FEl.D VERifY "'-1. t.lfASUREWENTS
W.TERIAI.S.
~
·~--,.;,
.....
--·---~-· ,
...
~------~-----·~-
...............
--·
~
OROERINC
TliE CONTRACTOR IS RESPONS191.£ fOR 1l£ RENOVAL OF THE EXISTlNC AUJNINUW
,.St:R.
~
]fJ
~
2.
-2..
'
z:,
COFFER CAWS ~D RESHN'E 'THE CROUND NolO CANAL TO THE PRECONSTRUOTON
El£VAT10NS AND SHAPE.
~
f
THE CONTRACTOR IS RESPONSIBlE FOR DEWAl'ERINC AND CONSTRUcnNC COFFER
DANS AS NECES:SARY TO Al.lOW FOR THE INSTAU.AllON OF THE STRUClUR£. AFTER
COWPt£TlON Of n£ STRUCTURE IHSTAU.ATlON , 'THE CONTRACTOR SHALL REWC1JE NfY
l1!lliJI:a
TBIIIIOCiliiiiNJ'JBIIJil.BAalD- 'lBBPUIU'OBB
<.-JNlaiiiii.BYIBW~ 'DIBAl111IOBITYOP
MIOIBW.~P.&HIII.I,ONN0-2.2111L
JrJBNOJ''JOBB~-~
IIIDDINO, ORI'DIIrrP1l111'081111.
~~~~~TEo ~~-..
---- .. .. --·· --· · =--=:,.:::ex-~
1="' ~~
~fin
~ :.t e:a.;.o:sota 42. .tt U£4l!LJib?t.l2 ILJS&Qi!#Zl.Ul.U
WALL
A
3/4" DIA. S.S. CABLE (TYP.)
---1-------------------
5' x 18" OPENING
IN TRUNK
4'
____L___________
I
-tl[[
I
~DMENT
lR
1' nP.
15'-0"
J
~l
§·
2" X 6" ST OP LOGS
PNGUE
AND GROOVE.
~
-.
.
~t t?1f t-{
\-1
b- - ~ ,_i (. i
!'
>
§·
5'
!
~
>
~ .
~
Cfo
\
Jl-.
'
0
<.n
'-.\ (
+ \1\
~~
....
0
~
~
r
PLAN VIEW
f 't,.
·f ~
~
, ')
~
t::l
·15'
"T
V)
I
l7'
I
........
w
4'
____L__________________
~ ·~
V\
C)
---l-------------------
.f.
~
2::..
~
]f)
~
l7,
~
1"\nl
"~"'
niC'C'D
~
~
I
I
O..C
A\llbcwiuld 01\e"'eel.!
\
.;: . ""'
·..s~
6 -(
L
#=::SAc':'.""ZOI ;3 ~ ooSi1- ~2fu
-
existing Roads and Dikes
..6.
P(oposed Ftashboard Riser
·
Proposed Rice Trunk
f1G£gl Proposed Cross Dike
*Each cross-dike has
a 20' crown and
-56.66' base.
Ao\ JrhOV\ ~ I
h-#vMcCfu'YVL
·--t-i-/t~AC
-Z0{3 -Ot£7
32. Description of the Overall Project and of Each Activity in or Affecting U.S. Waters or State
Critical Areas
The project entails the construction of an earthen cross-dike approximately 5,348 feet long
running in a straight south-southeast trajectory from 32°55'31.57" N 79°35'09.79" W to
32°54'42.37" N 79°34'52.47", which would bisect the Jacks Creek impoundment on Bulls Island
at Cape Romain National Wildlife Refuge. The project would also include the construction of an
earthen cross-dike approximately 955' connecting an upland peninsula at Jacks Creek at
32°54'59.71" N 79°35'09.87 W to the larger proposed 5,348' long cross-dike at 32°55'03.74" N
79°34'59.67" W(see attached maps).
The cross-dikes would have 20' crowns with 20' 2.5:1 side slopes and 56.66' bases. Together,
the cross-dikes would account for a footprint of approximately 355 ,867 square feet. Their
construction would necessitate the excavation borrow ditches impacting 355,867 square feet of
waters immediately adjacent to the proposed cross-dikes and would require approximately
71 ,5 83 yd3 of sediment to construct, with 29, 181 yd 3 affecting waters there from filling
(assuming an average impoundment depth of2.5'). Additionally, the project would entail the
installation of a double-flashboard riser on the 955' dike at 32°55'06.74" N 79°35'00.77 Wand
two rice trunks on the 5,348' dike at approximately 32°54 ' 52.38" N 79°34'55.49" Wand
32°55'06.68" N 79°33'01.64" W.
/>
33. Overall Project Purpose and the Basic Purpose of Each Activity in or Affecting U.S. Waters
Construction of a Cross-Dike in Jacks Creek Impoundment
Jacks Creek impoundment is managed for a variety of migratory birds, including waterfowl,
shorebirds, and wading birds . At approximately 485 acres, it is the largest impoundment on
Bulls Island and supports the majority of waterfowl use there. It is impounded on its Atlantic
side by a one-mile stretch of dike which is separated from the ocean by roughly 200 feet of beach
at the narrowest point; this section of beach erodes at a rate of25-30 feet per year, which will
lead to a breach within the next 6-8 years, barring no tropical storm activity (which would
expedite this). As climate continues to change, sea levels are expected to rise and storms are
expected to become more severe. This poses an ongoing threat to the aforementioned dike ,
which has been systematically breached in the past due to its parallel juxtaposition with the
ocean. Breaching of this dike would convert the entire 485-acre impoundment to a tidally
influenced saltwater system that is unproductive for growing waterfowl foods or for wildlife
dependent on its brackish waters .
Taking no action on the ocean-facing dike will ultimately require additional patchwork to repair
the impoundment from saltwater inundation. However, the creation of a cross-dike running
perpendicular to the ocean-facing dike (see attached maps) would ensure that 254.5 acres of
Jacks Creek west of the proposed dike would remain manageable to the benefit of migratory
birds as well as wildlife dependent on fresh to brackish waters, whereas the 230.3 acres of Jacks
Creek east of the proposed dike would revert back to natural tidal salt marsh. The transformation
- -z:rc
of230 acres ofwetlands from brackish to salt marsh would benefit wildlife species dependent on
salt water marshes such as rails, marsh sparrows, and diamondback terrapins.
Salinity levels in the remaining 255 acres of brackish water (which would be subdivided into two
impoundments, 142 and 113 acres in size) would more easily react to rainfall events as opposed
to the current 485-acre impoundment, which, due to its size, does not react quickly or in great
magnitude to normal rainfall events. In addition, this project would aid the management of fecal
coliforms that build up in impoundments by allowing the refuge to execute timed releases of
water. This would benefit surrounding estuarine and marine waters by reducing fecal coliform
concentration when drawn downs occur and impounded water is released.
The addition of the 955' cross-dike connecting an upland peninsula to the 5,348' cross-dike as
well as its proposed double-flashboard riser would create two brackish impoundments that could
be managed for different migratory bird species simultaneously, if desired. For example, the
northern 113-acre impoundment could be managed for growing waterfowl food plants while at
the same time the refuge could manage the southern 142-acre impoundment for shorebirds or
wading birds. Furthermore, the two impoundments created by the cross-dikes would serve as a
buffer for interior freshwater impoundments on the island, such as Pools 1, 2, and 3 and Big
Pond. These freshwater bodies are impounded by dikes that are 2' lower in elevation than the
dikes that surround the outside of Jacks Creek. Therefore, if Jacks Creek were to be breached in
its current state, a surge of salt water would inundate interior impoundments. This would create
dire consequences for the birds, reptiles, amphibians and mammals on Bulls Island who rely on
fresh waters.
The proposed rice trunks to be installed on the 5,348' cross-dike would be strategically located
where the historic Jacks Creek used to flow (see map). When the ocean-facing dike does breach
and the area east of the cross-dike reverts back to tidal salt marsh, the creek is likely to assume
the path of least resistance, i.e., its historic bed. Thus, the location of the rice trunks at the
aforementioned coordinates would allow the refuge to easily and consistently drain/draw water
to/from this tidal salt water creek.
The borrow ditches to be excavated for construction of each dike would later be used as
conveyance channels which would allow for the flooding and draining of the two managed
impoundments.
39. Describe measures taken to avoid and minimize impacts to Waters of the United States:
Where possible, the refuge would utilize preexisting topographical features to reduce the impacts
to waters in Jacks Creek impoundment. The 5,348 ' cross-dike would tie into high marsh
hammocks such as the 2.7-acre hammock located at 32 °54'58 .79" N 79°34'59.22" W. The 955 '
cross-dike would be situated off of an upland peninsula so as to reduce the need to construct a
longer cross-dike elsewhere. In addition, the refuge would install turbidity barriers at all points
of discharge to control floating silt. This project would be completed entirely inside a managed
impoundment that is isolated from surrounding U.S. waters by a series of dikes.
40. Provide a brief description of the proposed mitigation plan to compensate for impacts to
aquatic resources or provide justification as to why mitigation should not be required.
Mitigation should not be required for this project because the benefits to wildlife and
environmental health outweigh the impacts to the waters of Jacks Creek. Construction of the
described cross-dikes would benefit wildlife species dependent on brackish/fresh waters by
ensuring the existence of two brackish water impoundments which would total255 acres. The
reduced impoundment sizes would allow salinity levels to respond quicker to rainfall events; this
in tum would lead to the continued promotion of waterfowl food plants. The two brackish water
impoundments would serve as a buffer against salt water surges, which in tum would protect
freshwater interior impoundments on Bulls Island.
In addition, the reversion of 230 acres of brackish marsh to salt marsh would benefit salt marsh
dependent species. The project would also encourage greater aquatic/environmental health by
allowing the refuge to better manage water releases and fecal coliform concentrations in the
impoundment. Lastly, the reversion of230 acres ofhabitat to its natural state would be a service
to the public on the mainland as it would serve as a better buffer against storm events.
42. List all Corps Permit Authorizations and other Federal, State, or Local Certifications,
Approvals, Denials received for work described in this application.
The most recent permitted work at the proposed projected site was in November 2008 , when the
rice trunk situated at 32°55'28.34" N 79 °35'14.33" W blew out, requiring emergency repair work.