Congaree River Remediation
Richland County, South Carolina
Congaree River Remediation
Richland County, South Carolina
JOINT
PUBLIC NOTICE
CHARLESTON DISTRICT, CORPS OF ENGINEERS
1835 Assembly Street
Strom Thurmond Federal Building
Room 865 B-1
Columbia, South Carolina 29201
and
THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
Office of Environmental Quality Control
Water Quality Certification and Wetlands Programs Section
2600 Bull Street
Columbia, South Carolina 29201
REGULATORY DIVISION
Refer to: P/N # 2011-1356-6IO
August 23, 2013
Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), Sections
401 and 404 of the Clean Water Act (33 U.S.C. 1344) an application has been submitted to the
Department of the Army and the S.C. Department of Health and Environmental Control by
Mr. Don Harris
C/o South Carolina Electric and Gas Company
220 Operation Way
Cayce, South Carolina 29033
for a permit to construct a cofferdam and remove a Tar-Like Material that is comingled with
sediment in the
Congaree River
Located just south of the Gervais Street Bridge, in the City of Columbia, Richland County, South
Carolina (Latitude 33.995127 Longitude -81.049628)
In order to give all interested parties an opportunity to express their views
NOTICE
is hereby given that written statements regarding the proposed work will be received by Corps
until
15 DAYS FROM THE DATE OF THIS NOTICE
And SCDHEC will receive written statements regarding the proposed work until
30 DAYS FROM THE DATE OF THIS NOTICE
The proposed work consists of the construction of a temporary cofferdam to facilitate the removal
of a Tar-Like Material (TLM) comingled with sediment in the Congaree River. In detail, the
applicant proposes to construct a 60' X 3990' temporary cofferdam in the Congaree River in three
separate phases over three construction seasons (3 years). The applicant proposes to dewater
the area and remove 27,000 cubic yards of TLM comingled with sediment by using a combination
of physical methods which include excavation, dredging, vacuuming, and hand shoveling. The
excavated material will be transported by truck to an on-site processing building where large
objects that may be encountered in the sediment will be removed. The TLM entrained sediment
will then be mixed with cement kiln dust or other readily available drying agents and transported
REGULATORY DIVISION
Refer to: 2011-1356-6IO
August 23, 2013
to Waste Management's Richland County Landfill located at 1047 Highway Church Road, Elgin,
S.C. Upon completion of each phase, the rock material used to construct the temporary
cofferdam will be left in place and used to construct the next phase of the cofferdam and/or used
to re-establish the shoreline slope of the disturbed area. The project area is approximately 23.0
acres with 10.5 acres consisting of the Congaree River and the other 12.5 acres consisting of
st
st
uplands. All construction will begin on May 1 and cease by October 31 to minimize potential
impacts to spawning fish and endangered species. The project purpose, as stated by the
applicant, is to address the occurrence of TLM that is comingled with sediment along the eastern
shoreline of the Congaree River, just south of the Gervais Street Bridge in the City of Columbia,
South Carolina. The South Carolina Department of Environmental Control (SCDHEC) has
entered into a Voluntary Cleanup Contract (VCC) with South Carolina Electric and Gas Company
(SCE&G) to assess and remediate the TLM that originated from the Huger Street former
Manufactured Gas Plant. The work will be performed by SCE&G at the direction of SCDHEC. No
mitigation is proposed for the impacts due to the remedial nature of the project.
The work shown on this application must be determined consistent with applicable
provisions of the South Carolina Construction in Navigable Waters Permit Program. The
applicant is hereby advised that supplemental information may be required by the State to
facilitate the review. Persons wishing to comment or object to State navigable waters permit must
submit all comments in writing to the S.C. Department of Health and Environmental Control at the
above address within thirty (30) days of the date of this notice.
Preliminary review of the scope of work sought by this application indicates that State and
Federal permits should be processed concurrently. If the Federal permit is issued in advance of
the State's a special provision will be included in the Federal permit expressing the endorsement
of the District Engineer to any revisions or conditions subsequently imposed by the State permit.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. Implementation of the
proposed project would impact freshwater habitat well inland of estuarine substrates and
emergent wetlands utilized by various life stages of species comprising the red drum, shrimp,
and snapper-grouper management complexes. Our initial determination is that the proposed
action would not have a substantial individual or cumulative adverse impact on EFH or fisheries
managed by the South Atlantic Fishery Management Council and the National Marine Fisheries
Service (NMFS). Our final determination relative to project impacts and the need for mitigation
measures is subject to review by and coordination with the NMFS.
Pursuant to Section 7(c) of the Endangered Species Act of 1973 (as amended), the
District Engineer has consulted the most recently available information and has determined that
the project is not likely to adversely affect any Federally endangered, threatened, or proposed
species or result in the destruction or adverse modification of designated or proposed critical
habitat. This public notice serves as a request for written concurrence from the U.S. Fish and
Wildlife Service and/or the National Marine Fisheries Service on this determination.
Pursuant to Section 106 of the National Historic Preservation Act (NHPA), this public
notice also constitutes a request to Indian Tribes to notify the District Engineer of any historic
properties of religious and cultural significance to them that may be affected by the proposed
undertaking.
In accordance with the NHPA, the District Engineer has also consulted the latest
published version of the National Register of Historic Places for the presence or absence of
REGULATORY DIVISION
Refer to: P/N # 2011-1356-6IO
August 23, 2013
registered properties, or properties listed as being eligible for inclusion therein, and this worksite
is not included as a registered property or property listed as being eligible for inclusion in the
Register. To insure that other cultural resources that the District Engineer is not aware of are
not overlooked, this public notice also serves as a request to the State Historic Preservation
Office to provide any information it may have with regard to historic and cultural resources.
Any person may request, in writing, within the comment period specified in this notice, that
a public hearing be held to consider this application. Requests for a public hearing shall state,
with particularity, the reasons for holding a public hearing.
The decision whether to issue a permit will be based on an evaluation of the probable
impact including cumulative impacts of the activity on the public interest. That decision will reflect
the national concern for both protection and utilization of important resources. The benefit which
reasonably may be expected to accrue from the project must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the project will be considered
including the cumulative effects thereof; among those are conservation, economics, aesthetics,
general environmental concerns, wetlands, historic properties, fish and wildlife values, flood
hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation,
water supply and conservation, water quality, energy needs, safety, food and fiber production and,
in general, the needs and welfare of the people. A permit will be granted unless the District
Engineer determines that it would be contrary to the public interest. In cases of conflicting
property rights, the Corps of Engineers cannot undertake to adjudicate rival claims.
The Corps of Engineers is soliciting comments from the public; Federal, state, and local
agencies and officials; Indian Tribes; and other interested parties in order to consider and
evaluate the impacts of this activity. Any comments received will be considered by the Corps of
Engineers to determine whether to issue, modify, condition or deny a permit for this project. To
make this decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments
are also used to determine the need for a public hearing and to determine the overall public
interest of the activity.
If there are any questions concerning this public notice, please contact Chip Ridgeway at
803-253-3906.
2011-1356-610
Cogaree River Remediation Project
South Carolina Electric and Gas Company
Richland County
August 23, 2013
TABLE 1
AREA CALCULATIONS BY PHASE
Congaree River Sediments
Columbia, South Carolina
Phase
II
II
Total
II
(linear-feet)
{feet)
(square feet)
Acres
(square feet)
Acres
(square feet)
1,443
60
86,580
2.0
122,843
2.8
209,423
4.8
1,302
60
78,120
1.8
148,292
3.4
226,412
5.2
1,245
60
74,700
1.7
134,265
3.1
208,965
4.8
239,400
5.5
405,400
9.3
644.800
14.8
458,000
10.5
3,990
4
Total Project Footprint Within River (All Phases)' l
Acre
Notes:
1
( )
(Z)
31
t
4
( )
The elevation of the river bottom within the project area varies, which directly impacts the final footprint width of the cofferdam. An average width of 60 feet wide at
the base of the cofferdam (submerged in the bottom of the river) is shown on the attached figures and was used in the various area calculations. The 60-foot widtr
is based on a 1.5 to 1 slope on both sides of the cofferdam with a 10-foot wide crest at elevation 123.5 (NGVD '29) and an assumed river bottom elevation of 107
(NGVD '29), which is conservative. The actual footprint of the temporary cofferdam and starter berm will vary.
The total "isolated" area for each phase includes only the area inside the cofferdam.
Total in-river footprint per phase (cofferdam +isolated area). The sum of the total area per phase overstates the overall project footprint because Phases 2 and 3
contain overlap areas as shown on the attached figures.
This area represents the cumulative project footprint. It is smaller than the sum of the phase-specific areas due to the overlap of areas.
2011-1356-610
Cogaree River Remediation Project
South Carolina Electric and Gas Company
Richland County
August 23, 2013
Page 2 of 13
8/21/2013
Feet
2011-1356-610
Cogaree River Remediation Project
South Carolina Electric and Gas Company
Richland County
August 23, 2013
Page 3 of 13
LEGEND
PROJECT SITE · APPRQXIMATE ACRES
v' -
M11iYMETR!C LINE (FEET NAVO '88)
- APPROXIMATE COI'FERDAM/DIKE
I..OCA'TION
- UIIIIT OF PERIIff 1\CTM'!Y
\
- APPROXIMATE EOOE OF RIIIER
PROJECT SITE
23.0ACRES
UPLAND
12.5ACRES
RIVER
1D.5ACRES
PHASE 1 COFFERDAM FOOTPRINT 2.0 ACRES
PHASE 1 EXCAVATION AREA
\\
2.8 ACRES
PHASE 2 COFFERDAM FOOTPRINT 1.8 ACRES
3.4ACRES
PHASE 2 EXCAVATION AREA
PHASE 3 COFFERDAM FOOTPRINT 1.1 ACRES
3.1 ACRES
PHASE 3 EXCAVATION AREA
NOTE:
PHASE AREA ESTIMATES INCLUDE
OVERLAP BETWEEN PHASES.
\_
NOTES:
1) SIZE AND LOCATIONS FOR SITE OPERATIONS ARE
TENTATJVF.. ANO WiLl BE CONFiRMED WITH CONTACTOR
PERSONNEL
2} THE ELEVATION OF THE RIVER BOITOM W!TH!N THE PROJECT
AREA VARIES. WHICH DIRECTLY IMPACTS THE FINAl WIDTH
OF THE TEMPORARY COFFERDAM, AN AVERAGE WIDTI< OF 60 FEET
WIDE AT THE BASE Oi= THE. COFFERDAM (SUBMERGED IN THE
BOTTOM OF THE RIVER) IS SHOWN ON TiiE ATTACHED FIGURES
AND WAS USED IN TilE VARIOUS AREA CAlCUlATIONS, THE
OO.FOOT WIDTH IS BASED ON A 1.5 TO 1 SLOPE ON BOTH
SlOES OF THE COFFERDAM WITii A 16-FOOT WIDE CREST AT
ELEVATION 123.5 {NOVO '29} AND AN ASSUMED RIVER BOTTOM
ELEVATION OF 107 (NGVC '29), WHICH IS CONSERVATIVE. THE
ACTUAL FOOTPRINT OF THE TEMPORARY COFFERDAM AND STAATE.R
BERM Wltl VARY.
3) FORADOmONAl DETAILS ASSOCIATEO WITH THE TEMPORARY
COFFERDAM, PLEASE REFER TO THE RIZZO TRANSMITTAL FINAL DRAWINGS··
COFFERDAM DESIGN. DATED SEPTEMBER 20. 2012.
FIGURE3
SOUTH CAROLINA
ELECTRIC & GAS COMPANY
o·
150'
'"""''Scale}
APPROXIMATE LIMIT OF PERMIT ACTIVITY
CONGAREE RM::R SEDIMENTS
COLUMBIA, SOUTH CAROUNA
DATE: 8/7/13
Fll.E NAME: CONG0-45
MANAGEMEI'<'T AND TECHNICAL RFSOURCES, INC.
2011-1356-610
Cogaree River Remediation Project
South Carolina Electric and Gas Company
Richland County
Auaust 23. 2013
P::vtP 4 nf
1~
300'
---n:
. --nr
~
00-
-/ll&01'
B;Sl- ~ AII£A Of' -
FIGURE 7 PHASE 2 TYPICAL
CROSS SECTION
fr
30'
60'
90'
.120'
(Feet Scale)
liall!!h
1. FOOIPAINT
0 1 ' - I S - USING 4
eo~-Wl£1£ at.SE.
ltCR.W.. DIMEICUONS WHJ.. ·
i.£SS.
z. 1VFAI. I.HrNI FOC1lME .. PIWii 1 - · - !J'
NJ MltASUREl) BV Clll'll1DE TOE OF SIJlP£.
FIGURE4
SOUTH CAROLINA
ELECTRIC & GAS C()J~I"&I\I.Y__
_j
2011-1356-610
Cogaree River Remediation Project
South Carolina Electric and Gas Company
Richland County
August 23,2013
Paae 5 of 1~
Pl.iiCEioiOO
West-Line 7
East-Line 7
2011-1356-610
Cogaree River Remediation Project
South Carolina Electric and Gas Company
Richland County
August 23, 2013
Page 6 of 13
,,. ..f.......
············--
-----......... .............................
................................
............·-··----
congaree .111.\la~lll(~
Congaree River
...........
..,.._~~~
~~19ft:.
tfGI:l>IO
Coo~~e: Rl¥$! ear:~ t'!t!p¢:!'Hl~ ·
o~po~I'UQ~f &..'Wir<>nrMilt :s
oomovtn but rna~ b$ 'mf!~d ffl!.,.<>rli:tl
to ~~*f
:t;ht.tnarma
ttran$wes.Weftegr'-ls:t:We
sll?.qUena:~};. ~ ltt'toto~ ritrt>:;!:~~ fto~
..
[~
. . '!,'~:·:
Cl
~~
~
~
('..fa~. t~ stu., to ;h'ie- to frf.!HihH':1
';U!II1!.1s- or t."((ffltlin'*tlr:n'S. th~r*M
an11s. !.::JY$red
ConjJafl8'fl, R:Wtl:f
Sed!m~rrt5 Qf
Reo.TtMmt&:¥ flt1e {;.1 coar»e
~ani!
.
fln· ta r.:o:.:use Qtavets. !XI-btJf91s,
tl-OOf.fje.rS:, -a:r...Jl In j;'~3C0-S CS"ll h2'1e
varrtnc ametltw.t of 5#1.
C<)<'I{W6·1Um SMt'Oii!lt 01
R~mnanl.s·
oray to blade:, sfft
cta):. i-Oct\1-ertfl~e tttfintfl sane :;'II
tts!$\nalk~ l"lEmH~f. ~-n
miat.O&WS
!19
w
D
NotGS
Granite Sectro~ ar:t:V:Jr t--oult!:e-ts
· aasumetj
,\,pp-ro.(l~~~t~ *)::QirH,.,f'tt
targeM1. The surface water level was deterrnmed by us·n·~ the av·>rage ('f the
maximum river geugos MHghts recordE>d during the S&ptember-October 20'10
investigations, accounting for river slope {2.10 feet/rnii. USi\CE (:ongaree
River Bas;n Navigability Study 1977) and ref~Brencing to the ·olevation ('112 25
fe~t, NAVD '8B) cf USGS gauge 02'!69500. Congaroet River at Colt-~rnb!a. SC.
2. Tile coringiboring locations are constructed along a fence !ina, and
bathymetry ;;nd topography are from the "7" -strike fine.
3. Western extent of sediment targeted for removal
r
PHASE 1
.n........
I
FIGURES
SOUTH CAROLINA ELECUUC AND GAS CO.
PH'A.S£'.1 TYPlCA.L CROSS SfCTIOH
-----······················--
CONGAREE RIVER SEDtMENTS
COLUMBf.A, SOUTH CAROliNA
.!.61.E. 0$.105/2013
__.......EJU; NAME; F'Hft.SEjJXE~&....
MANAGEMENT J~"D TECH!Ii1CAL RESOll!tCES,!NC.
0'
30'
80'
90'
120'
- 01'-
1. FOalPAINr
IS SIIOWN USIIiO A
00'-'MD£ - . """"""- DIIIU4SIONS ..... liE 1.£11$,
2.. TarAL f.BrtE'M FOC:J1"I« fH PHitiiE a - 1302 LF
M; IAl'IIIJIIEl) B< OIIISICE: TOE Of" SWPE.
FIGURES
SOUTH CAROLINA
ELECTRIC & GAS COMPANY
2011-135&-610
Cogaree River Remediation Project
South Carolina Electric and Gas Company
Richland County
August 23, 2013
Page 7 of 13
West-Line 11
East·Line 11
2011-1356-610
Cogaree River Remediation Project
South Carolina Electric and Gas Company
Richland County
August 23, 2013
Page 8 of 13
'"'
~~
Cofferdam
(location and
'" .:j_
dimensions
approximate)
-~
Approximate Area of
Riprap Placement
$
~
Congaree River
*j ..,.l-
j
'""'"':5~~
i~
r._
a~~\i :r_·-c·rrr.+tt~rr----~~
)~
;,<.
X
~
~
:~
)C
Y.
~
:o<.x:;:::x~XWl!~X
llf.
)<'.
A
)(
X
X
'I<
:.-;
y.
<<
X
X
XXX:XXl:w-·
>1
lD.
X
X
X
~
X
X
X
X
X
X
<
" X"
" X X"X'
.
X
X
.' ..
X
Y.
X
X
X
X
"
X
X
:·
~
X
X
X
X
X
"
X
X
X
X.
.
¥
X
X
:'1,
X
X
X
X
" "- " ::..;X ·' XX X
"
~
,.
X
X
..
~
' .x
~
X
X
"
X
~
..
" " X X "X
X
X
X
';<.
X
X
X
X
X
X
X
X
X
~
X.
X
X
X
X
X
X
X
X
..
.
X
X
X
X
:;;
X
X
"
:-<.:
X
X
X
'/(
X
X
v.
X
X
' "
X
-~(~·
Notes:
I.£G£110
Ccm..:taret< RNa-r B.aol>: D2p~alt$.
0>!3:PMi'fi¢'fm! ~rMtonmV~tis
-~.Jn!YloiV/'1 trut m&y ~ \l'f.lti~d (ftU">t-o !1it~r ~S-Il~ra m~riAa
{'traMgt9£SW'tWre:gr&-es..!'~
s~t~«:~e-nc~a-n. :!...lfhQ!:~w
rangeHs trom
days, t!)sm:, tufmt-t~ rn&dium
sa!His .or com~lnationto l.h&reor
i~l'ld !S faYt-£8<1.
Rt..rer Se~mM~t.$ !:lr
Re~nnante- fine to ooaree sanG.
tiM to Ci:RlC9'e l;lf6'4Gi.$. r;obcOio:m,
Co-ngar~e
b~IIOOr5.
var{!ng
>lnd fn
pt~c~s.
c;ln l"ia>~~
amcunte ~.JJ »tit
Ccmg~r9f< RN~r Sh:.)~in~ or
Rfjrt1nants- grar to bla.t!r.. tilt,
cl.iy, 3~dvnry flnt ill fin~.: iiat'1d
wmr:.~nab>:"Jn tt~r&nf. Car: b~
mh::actous.
(H
D
'
"
"
D
Grarn~e:
Sedf{J:<:J. an&..;a:ss:nrrfllcl:
Af.:$1®~ffiM'7 ~J.iru-.t: ~1 :1:@>$.~'\I'H';t
tarQ"et~:i
tor f:e:mo·... ~!
1 The surface water !evei was ;jetermmc·d t·Y using the average of the
maximum river gf;uge heights recorded during th<; Sopternb&r·O(:tober 2010
inv8stigations. accounting for river slope 12.10 feet/milE·, USA.CE Conga reo
River Basin NllVr(Jab!lity Study 1977) and referencing to the elevation (112.25
feet, NAVD 'B8} of USGS gau9e 02159500, Congaree
Riv~?r >3t
I u---PHASE 2 · I
Columbia, SC
2. The coring/bonng locatwns are constructed along a fence lme. and
bathyrneuy and topo(Jraptrv are from the "11" -strike line.
3. Th>9 C:e>ngaree River bank slope likely differs from that shOwn.
4. Since no corings/borings ware coli acted west of 011. lithology was
int$rpreted fn:)tn existing corjngs/borings along Une 11
? This geoloc~ical cross-sectron was preparwi t>y evaluaung exrstrng
coring/toring logs and inferrE)d site conditions hetw&en data points. r\s such,
ir.terprE!tation betv..Jeer. data points was base::.1 on best. professional judgeml9nt.
Actual s1te conditions '.j0pictod bc-tt\~een O.JFIGURE 1
SOUTH CAROLINA ElECTRIC AND GAS CO.
PHASE 2 TYPJCAL CROSS SECTION
CONGARE£ RIVER SEDtMENTS
COLUMBIA. SOUTH CAR.OUNA
..£JLE NAMl;~.P.f:!?.,~-~PI~
MA>."lAGE.MENT 1\.."'-"D TECW><1C·.\l RESOURCES, INC.
~ATE: OM:l§/2013
\_-·-·-::-·-,
~
\
\
I~
\\
[ I~'-~
_____!
I 1I
'"-....,j
/\~J
f
\\
~
0"
\ \
30'
fiO'
\
90'
"""""
1. fOOll'RINf 01' COI'1'Ba»ool 1$ USIII(I A
10'-WIIl£ ElliE. - . WIU. liE LESll
:!. WTAL UNEM FOOTAGE Ill I'KtiSE ;J · 1246 IF
AS III&SUR£D 8't OUfSIOE "TO£ 01' SI.CP£.
FIGURES
SOUTH CAROLINA
ELECTRIC & GAS COMPANY
2011-1356-610
Cogaree River Remediation Project
South Carolina Electric and Gas Company
Richland County
August 23, 2013
Paae 9 of 13
West-Line 16
..,._.
~:$
East-Line 16
2011-1356-610
Cogaree River Remediation Project
South Carolina Electric and Gas Company
Richland County
August 23, 2013
Page 10 of 13
..·
Congaree River Bank
fl
i,..,,.j..._
~
I
Approximate Area of
Riprap Placement
Congaree River
.
~~ i.::2.~=~2i wl~-~~i.:.~:.:. :~::a·~-~--~~r~_>"'-=~-::M.:.: . :~~-~~~:::;~A'X;(
XX X
y~~ *-2..:.~-~-::.:.2·:;xK-~ )(
X)( "'.X.,..
.f
~---~~:2..:.;~~~~=-=--~.:.~.:;~2:~
~;.e~~
l£Glilffi
112
C.¢f~l}m$Q- Rw~r f!.M~ D~PQtHs.~
Ot:po.sibon:at :&:l'tYiro-nrnent lts
l.:!t'l!..l"K~wtl but rh'*Y" t;~ 'l>'WiiSd ~fh.:..-hll
I¢ r;~.:t~ JStmrt! m~uin~
lfransgressW.Jr-.egreuJWJ
fH~Qt-1$-tl~.S}f. l...itt!DIOQYrartlj)E:$11r(lm
d;a~.
tc Sin, tO tiM kc medium
san09 ::J:r c:orru~·il1af!M$1f19t~Qt
ano It t:arereR-lv~r S!~men~
ey.r
Renlrl:ilf'IW· ftn>i! tl:l CC>M&G Bal'~d .
!JI)~ t(} CC3r$~ 1;ll'W111!.i, CI){!!)JI(IS.
l>t!IJJ®rs, antttn ptaef'S. tanh~
var~h113 -a:n10Unt3
F/3
~J
at silt
C!1 ~!llr.eiJf Caf! h&
iY!Icaetau-s
or
D
D
Crantie B~atoct<: ~;..rt-atJ::i· !)m~~~:rs:
- &s:sumt:~d
~P~~Kim~6!' ~>:N:nt
t~rget~d
m:sMlm~;r.t
rer remcr-(3:1
Notes·
1. Tt1e surface water level was .j'.lterminod by using the average of thE>
maximum river gauge hoigiliS rt,Jcorded during tt1e Septembor-Octobor 2010
investigations. accountin9 for rivsr siooo (2:10 feotlrmle. l.I:O·ACE Congaree
f l!ne
:l. The Congarea River bank Slope likely differs frorn that shown
4. Since M corings!Mnngs were collected west of 01r'>. lrtMiogy was
interpreted from existing conngs/borings along Line 1f;.
5. Tnis geological cross-section was prepared by evaluating ,,..,stinfJ
coring/boring k\JS and inferred site conditions betwe6ln data points. As such,
Interpretation tJJttw$en d rJepr(:ted between exi>ting corings/borings may vary.
L!HASE3J
FtGURE9
SOUTH CAROUNA ELECTRIC AND GAS CO.
PHASE 3 TYPICAL CROSS SECTION
CONC'..AAEE RNER SEDtMENTS
COUJMBIA.
SOUTH
------....-....-..............
--- CAAOt.JNA
An;;: OWQ5/Z:QJJ. .........._£tLE. !>JAME: PH&§.J;:...~.IYPfl.
ncHJ..'IC.AL P.:ESOORas, me
1
C; f·IOKE FL'SO rni! TEXTURED·····
r··1'[)Pr=
-·'· ....... L.. INf::·p
·-··, nr:)
·--~ \ ""'~
1
0
lJIGO!:\R D
/\F)PR0\;'[0
:;;IDE
AASHTO
EQU 1\//\LE~~T
. JQs
"
.J..
j_2_,3 ~ ~5
i'~O.
57
STO!'JE
N.G..(:!.!~\R_C;~_
::2JDE
i
SCDOT
ROCI< RIVER
8'±
BOTTOf\/1
V;\R ,ES)
1
---
STEEL
FOR
F~'l
........,..,.~
PE
Gf~OLJTif'~G
(OPTiON.AL)
//..::/
/··' '·-., '---- ,./·./,:·//'Z/
. ' ',__ _ ,' '·-., ' /'/0.~)/0://-{_/
'-.. "'\. .,/ '-- '< // '··. ·-.,_ /'
f
·
S CAL E
ST/\RTEF< BER~v4 TO BE
COMPLETED PRIOI~ TO
6
0
6 FEET
SHEET 71 SHEET 8
PU\CEiv1ENT CW HDPE
L..ll\JER OR SH()TF~OCK
LEGEND:
FIGURE 10
~DETAIL NO.
SEE DETAIL
~
(Sheet 7 of 13 from Rizzo Cofferdam Design)
TYPICAL COFFERDAM SECTION
? ?
SHEET WHERE _ / . . "".__SHEET WHERE
DETAIL IS
DETAIL
CALLED OUT
IS SHOWN
2011-1356-610
Cogaree River Remediation Project
South Carolina Electric and Gas Company
Richland County
August 23, 2013
Page 11 of 13
114708A8
PREPARED FOR
SOUTH CAROLINA ELECTRIC & GAS
CONGAREE RIVER REMEDIATION
COLUMBIA, SOUTH CAROLINA
f""V""'"V"'
~
<._
Rul C. Rizzo Associates, Inc.
ENGINEERS &
CONSULTANTS
AV_~~GE
_ _y_..____
RIVI;R ElEVATION
RIPRAP MOUND HEIGHT=
APPROXIMATE DESIRED
SHORELINE (VARIES)----
GEOTEXTILE OR
GRANULAR FILTER
RIPRAP MOUND THICKNESS =
APPROXIMATELY 2X LAYER
THICKNESS
2011-1356-610
Cogaree River Remediation Project
South Carolina Electric and Gas Company
Richland County
August 23, 2013
Page 12 of 13
FIGURE 11
SOUTH CAROLINA
ELECTRIC & GAS COMPANY
TYPICAL R!PRAP RIVER BANK
STABIUZATION
CONGAREE RIVER SEDIMENTS
COLUMBIA, SOUTH CAROLINA
NOT TO SCALE
DATE: 8121/1.3
FILE NAME: CONG057
MANAGEMENT Ai~D TECHNICAL RESOURCES, INC.
2011-1356-610
Cogaree River Remediation Project
South Carolina Electric and Gas Company
Richland County
August 23, 2013
TRUCK ROUTE TO LANDFILL
FIGURE 12
SOUTH CAROLINA
& GAS COMPANY
1) FROM THE SITE ENTRANCE GATE TRUCKS WILL MAKE. A LEfT ONTO GIST STREET.
2) AT THE STOP SIGN AT THE END OF GIST STREET TRUCKS WILL MAKE A RIGHT TURN ONTO GERVAIS STREET.
3) AT THE NEXT INTERSECTION TRUCKS WILL MAKE A LEFT ONTO HUGER STREET.
4) TRUCKS WILL FOLLOW HUGER STREET FOR APPROXIMATELY 0.8 MILES AND MERGE ONTO i-126 W/US-76 W TOWARD GREENVILLEISPARIANBURG.
5) TRUCKS WILL MERGE ONTO 1..2QE AND CONTINUE FOR APPROXIMATELY 17.5 MILES TO EXIT 82 ·SPEARS CREEK CHURCH ROAD.
S) TRUCKS WILL MAKE A RIGHT ONTO SPEARS CREEK CHURCH ROAD {SC-53) AND THEN TURN LEFT ONTO PERCIVAL ROAD (SC-12).
7) TRUGKS WILL BARE RIGHT ONTO SCREAMING EAGLE ROAD (SC-268) AND TURN LEFT !NTO THE LANDFILL ENTRANCE.
ROUTE TO LANDFILL
CONGAREE RIVER SEDIMENTS
COLUMB~. SOUTH CAROUNA