Congaree River Remediation

Richland County, South Carolina

Congaree River Remediation Richland County, South Carolina

JOINT PUBLIC NOTICE CHARLESTON DISTRICT, CORPS OF ENGINEERS 1835 Assembly Street Strom Thurmond Federal Building Room 865 B-1 Columbia, South Carolina 29201 and THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Office of Environmental Quality Control Water Quality Certification and Wetlands Programs Section 2600 Bull Street Columbia, South Carolina 29201 REGULATORY DIVISION Refer to: P/N # 2011-1356-6IO

August 23, 2013

Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), Sections 401 and 404 of the Clean Water Act (33 U.S.C. 1344) an application has been submitted to the Department of the Army and the S.C. Department of Health and Environmental Control by Mr. Don Harris C/o South Carolina Electric and Gas Company 220 Operation Way Cayce, South Carolina 29033 for a permit to construct a cofferdam and remove a Tar-Like Material that is comingled with sediment in the Congaree River Located just south of the Gervais Street Bridge, in the City of Columbia, Richland County, South Carolina (Latitude 33.995127 Longitude -81.049628) In order to give all interested parties an opportunity to express their views NOTICE is hereby given that written statements regarding the proposed work will be received by Corps until 15 DAYS FROM THE DATE OF THIS NOTICE And SCDHEC will receive written statements regarding the proposed work until 30 DAYS FROM THE DATE OF THIS NOTICE The proposed work consists of the construction of a temporary cofferdam to facilitate the removal of a Tar-Like Material (TLM) comingled with sediment in the Congaree River. In detail, the applicant proposes to construct a 60' X 3990' temporary cofferdam in the Congaree River in three separate phases over three construction seasons (3 years). The applicant proposes to dewater the area and remove 27,000 cubic yards of TLM comingled with sediment by using a combination of physical methods which include excavation, dredging, vacuuming, and hand shoveling. The excavated material will be transported by truck to an on-site processing building where large objects that may be encountered in the sediment will be removed. The TLM entrained sediment will then be mixed with cement kiln dust or other readily available drying agents and transported

REGULATORY DIVISION Refer to: 2011-1356-6IO

August 23, 2013

to Waste Management's Richland County Landfill located at 1047 Highway Church Road, Elgin, S.C. Upon completion of each phase, the rock material used to construct the temporary cofferdam will be left in place and used to construct the next phase of the cofferdam and/or used to re-establish the shoreline slope of the disturbed area. The project area is approximately 23.0 acres with 10.5 acres consisting of the Congaree River and the other 12.5 acres consisting of st st uplands. All construction will begin on May 1 and cease by October 31 to minimize potential impacts to spawning fish and endangered species. The project purpose, as stated by the applicant, is to address the occurrence of TLM that is comingled with sediment along the eastern shoreline of the Congaree River, just south of the Gervais Street Bridge in the City of Columbia, South Carolina. The South Carolina Department of Environmental Control (SCDHEC) has entered into a Voluntary Cleanup Contract (VCC) with South Carolina Electric and Gas Company (SCE&G) to assess and remediate the TLM that originated from the Huger Street former Manufactured Gas Plant. The work will be performed by SCE&G at the direction of SCDHEC. No mitigation is proposed for the impacts due to the remedial nature of the project. The work shown on this application must be determined consistent with applicable provisions of the South Carolina Construction in Navigable Waters Permit Program. The applicant is hereby advised that supplemental information may be required by the State to facilitate the review. Persons wishing to comment or object to State navigable waters permit must submit all comments in writing to the S.C. Department of Health and Environmental Control at the above address within thirty (30) days of the date of this notice. Preliminary review of the scope of work sought by this application indicates that State and Federal permits should be processed concurrently. If the Federal permit is issued in advance of the State's a special provision will be included in the Federal permit expressing the endorsement of the District Engineer to any revisions or conditions subsequently imposed by the State permit. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens Fishery Conservation and Management Act. Implementation of the proposed project would impact freshwater habitat well inland of estuarine substrates and emergent wetlands utilized by various life stages of species comprising the red drum, shrimp, and snapper-grouper management complexes. Our initial determination is that the proposed action would not have a substantial individual or cumulative adverse impact on EFH or fisheries managed by the South Atlantic Fishery Management Council and the National Marine Fisheries Service (NMFS). Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the NMFS. Pursuant to Section 7(c) of the Endangered Species Act of 1973 (as amended), the District Engineer has consulted the most recently available information and has determined that the project is not likely to adversely affect any Federally endangered, threatened, or proposed species or result in the destruction or adverse modification of designated or proposed critical habitat. This public notice serves as a request for written concurrence from the U.S. Fish and Wildlife Service and/or the National Marine Fisheries Service on this determination. Pursuant to Section 106 of the National Historic Preservation Act (NHPA), this public notice also constitutes a request to Indian Tribes to notify the District Engineer of any historic properties of religious and cultural significance to them that may be affected by the proposed undertaking. In accordance with the NHPA, the District Engineer has also consulted the latest published version of the National Register of Historic Places for the presence or absence of

REGULATORY DIVISION Refer to: P/N # 2011-1356-6IO

August 23, 2013

registered properties, or properties listed as being eligible for inclusion therein, and this worksite is not included as a registered property or property listed as being eligible for inclusion in the Register. To insure that other cultural resources that the District Engineer is not aware of are not overlooked, this public notice also serves as a request to the State Historic Preservation Office to provide any information it may have with regard to historic and cultural resources. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for a public hearing shall state, with particularity, the reasons for holding a public hearing. The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the project must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the project will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production and, in general, the needs and welfare of the people. A permit will be granted unless the District Engineer determines that it would be contrary to the public interest. In cases of conflicting property rights, the Corps of Engineers cannot undertake to adjudicate rival claims. The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this project. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the activity. If there are any questions concerning this public notice, please contact Chip Ridgeway at 803-253-3906.

2011-1356-610 Cogaree River Remediation Project South Carolina Electric and Gas Company Richland County August 23, 2013

TABLE 1 AREA CALCULATIONS BY PHASE Congaree River Sediments Columbia, South Carolina

Phase

II II

Total

II

(linear-feet)

{feet)

(square feet)

Acres

(square feet)

Acres

(square feet)

1,443

60

86,580

2.0

122,843

2.8

209,423

4.8

1,302

60

78,120

1.8

148,292

3.4

226,412

5.2

1,245

60

74,700

1.7

134,265

3.1

208,965

4.8

239,400

5.5

405,400

9.3

644.800

14.8

458,000

10.5

3,990 4

Total Project Footprint Within River (All Phases)' l

Acre

Notes: 1 ( )

(Z)

31

t

4 ( )

The elevation of the river bottom within the project area varies, which directly impacts the final footprint width of the cofferdam. An average width of 60 feet wide at the base of the cofferdam (submerged in the bottom of the river) is shown on the attached figures and was used in the various area calculations. The 60-foot widtr is based on a 1.5 to 1 slope on both sides of the cofferdam with a 10-foot wide crest at elevation 123.5 (NGVD '29) and an assumed river bottom elevation of 107 (NGVD '29), which is conservative. The actual footprint of the temporary cofferdam and starter berm will vary. The total "isolated" area for each phase includes only the area inside the cofferdam. Total in-river footprint per phase (cofferdam +isolated area). The sum of the total area per phase overstates the overall project footprint because Phases 2 and 3 contain overlap areas as shown on the attached figures. This area represents the cumulative project footprint. It is smaller than the sum of the phase-specific areas due to the overlap of areas.

2011-1356-610 Cogaree River Remediation Project South Carolina Electric and Gas Company Richland County August 23, 2013 Page 2 of 13

8/21/2013

Feet

2011-1356-610 Cogaree River Remediation Project South Carolina Electric and Gas Company Richland County August 23, 2013 Page 3 of 13

LEGEND

PROJECT SITE · APPRQXIMATE ACRES

v' -

M11iYMETR!C LINE (FEET NAVO '88)

- APPROXIMATE COI'FERDAM/DIKE I..OCA'TION - UIIIIT OF PERIIff 1\CTM'!Y

\

- APPROXIMATE EOOE OF RIIIER

PROJECT SITE

23.0ACRES

UPLAND

12.5ACRES

RIVER

1D.5ACRES

PHASE 1 COFFERDAM FOOTPRINT 2.0 ACRES PHASE 1 EXCAVATION AREA

\\

2.8 ACRES

PHASE 2 COFFERDAM FOOTPRINT 1.8 ACRES 3.4ACRES

PHASE 2 EXCAVATION AREA

PHASE 3 COFFERDAM FOOTPRINT 1.1 ACRES 3.1 ACRES PHASE 3 EXCAVATION AREA NOTE: PHASE AREA ESTIMATES INCLUDE OVERLAP BETWEEN PHASES.

\_

NOTES: 1) SIZE AND LOCATIONS FOR SITE OPERATIONS ARE TENTATJVF.. ANO WiLl BE CONFiRMED WITH CONTACTOR PERSONNEL 2} THE ELEVATION OF THE RIVER BOITOM W!TH!N THE PROJECT

AREA VARIES. WHICH DIRECTLY IMPACTS THE FINAl WIDTH OF THE TEMPORARY COFFERDAM, AN AVERAGE WIDTI< OF 60 FEET WIDE AT THE BASE Oi= THE. COFFERDAM (SUBMERGED IN THE BOTTOM OF THE RIVER) IS SHOWN ON TiiE ATTACHED FIGURES AND WAS USED IN TilE VARIOUS AREA CAlCUlATIONS, THE OO.FOOT WIDTH IS BASED ON A 1.5 TO 1 SLOPE ON BOTH SlOES OF THE COFFERDAM WITii A 16-FOOT WIDE CREST AT ELEVATION 123.5 {NOVO '29} AND AN ASSUMED RIVER BOTTOM ELEVATION OF 107 (NGVC '29), WHICH IS CONSERVATIVE. THE

ACTUAL FOOTPRINT OF THE TEMPORARY COFFERDAM AND STAATE.R

BERM Wltl VARY. 3) FORADOmONAl DETAILS ASSOCIATEO WITH THE TEMPORARY COFFERDAM, PLEASE REFER TO THE RIZZO TRANSMITTAL FINAL DRAWINGS·· COFFERDAM DESIGN. DATED SEPTEMBER 20. 2012.

FIGURE3 SOUTH CAROLINA ELECTRIC & GAS COMPANY

o·

150'

'"""''Scale}

APPROXIMATE LIMIT OF PERMIT ACTIVITY CONGAREE RM::R SEDIMENTS COLUMBIA, SOUTH CAROUNA DATE: 8/7/13

Fll.E NAME: CONG0-45

MANAGEMEI'<'T AND TECHNICAL RFSOURCES, INC.

2011-1356-610 Cogaree River Remediation Project South Carolina Electric and Gas Company Richland County Auaust 23. 2013 P::vtP 4 nf

1~

300'

---n: . --nr

~

00-

-/ll&

01'

B;Sl- ~ AII£A Of' -

FIGURE 7 PHASE 2 TYPICAL CROSS SECTION

fr

30'

60'

90'

.120'

(Feet Scale)

liall!!h

1. FOOIPAINT

0 1 ' - I S - USING 4

eo~-Wl£1£ at.SE.

ltCR.W.. DIMEICUONS WHJ.. ·

i.£SS.

z. 1VFAI. I.HrNI FOC1lME .. PIWii 1 - · - !J' NJ MltASUREl) BV Clll'll1DE TOE OF SIJlP£.

FIGURE4 SOUTH CAROLINA ELECTRIC & GAS C()J~I"&I\I.Y__

_j

2011-1356-610 Cogaree River Remediation Project South Carolina Electric and Gas Company Richland County August 23,2013 Paae 5 of 1~

Pl.iiCEioiOO

West-Line 7

East-Line 7

2011-1356-610 Cogaree River Remediation Project South Carolina Electric and Gas Company Richland County August 23, 2013 Page 6 of 13 ,,. ..f....... ············-- -----......... .............................

................................

............·-··----

congaree .111.\la~lll(~

Congaree River

...........

..,.._~~~

~~19ft:.

tfGI:l>IO Coo~~e: Rl¥$! ear:~ t'!t!p¢:!'Hl~ · o~po~I'UQ~f &..'Wir<>nrMilt :s

oomovtn but rna~ b$ 'mf!~d ffl!.,.<>rli:tl to ~~*f

:t;ht.

tnarma ttran$wes.Weftegr'-ls:t:We sll?.qUena:~};. ~ ltt'toto~ ritrt>:;!:~~ fto~

.. [~ . . '!,'~:·: Cl

~~

~

~

('..fa~. t~ stu., to ;h'ie- to frf.!HihH':1 ';U!II1!.1s- or t."((ffltlin'*tlr:n'S. th~r*M an11s. !.::JY$red

ConjJafl8'fl, R:Wtl:f

Sed!m~rrt5 Qf

Reo.TtMmt&:¥ flt1e {;.1 coar»e

~ani!

.

fln· ta r.:o:.:use Qtavets. !XI-btJf91s, tl-OOf.fje.rS:, -a:r...Jl In j;'~3C0-S CS"ll h2'1e varrtnc ametltw.t of 5#1.

C<)<'I{W6·1Um SMt'Oii!lt 01 R~mnanl.s·

oray to blade:, sfft

cta):. i-Oct\1-ertfl~e tttfintfl sane :;'II tts!$\nalk~ l"lEmH~f. ~-n miat.O&WS

!19

w D

NotGS Granite Sectro~ ar:t:V:Jr t--oult!:e-ts

· aasumetj

,\,pp-ro.(l~~~t~ *)::QirH,.,f'tt

targeM

1. The surface water level was deterrnmed by us·n·~ the av·>rage ('f the maximum river geugos MHghts recordE>d during the S&ptember-October 20'10 investigations, accounting for river slope {2.10 feet/rnii

r

PHASE 1

.n........

I

FIGURES

SOUTH CAROLINA ELECUUC AND GAS CO. PH'A.S£'.1 TYPlCA.L CROSS SfCTIOH -----······················--

CONGAREE RIVER SEDtMENTS COLUMBf.A, SOUTH CAROliNA

.!.61.E. 0$.105/2013

__.......EJU; NAME; F'Hft.SEjJXE~&....

MANAGEMENT J~"D TECH!Ii1CAL RESOll!tCES,!NC.

0'

30'

80'

90'

120'

- 01'-

1. FOalPAINr IS SIIOWN USIIiO A 00'-'MD£ - . """"""- DIIIU4SIONS ..... liE 1.£11$, 2.. TarAL f.BrtE'M FOC:J1"I« fH PHitiiE a - 1302 LF M; IAl'IIIJIIEl) B< OIIISICE: TOE Of" SWPE.

FIGURES SOUTH CAROLINA ELECTRIC & GAS COMPANY

2011-135&-610 Cogaree River Remediation Project South Carolina Electric and Gas Company Richland County August 23, 2013 Page 7 of 13

West-Line 11

East·Line 11

2011-1356-610 Cogaree River Remediation Project South Carolina Electric and Gas Company Richland County August 23, 2013 Page 8 of 13

'"'

~~

Cofferdam (location and

'" .:j_

dimensions approximate)

-~ Approximate Area of Riprap Placement

$

~

Congaree River

*j ..,.l-

j

'""'"':5~~

i~

r._

a~~\i :r_·-c·rrr.+tt~rr----~~

)~

;,<.

X

~

~ :~

)C

Y. ~

:o<.x:;:::x~XWl!~X

llf.

)<'.

A

)(

X

X

'I<

:.-;

y.

<<

X

X

XXX:XXl

:w-·

>1

lD.

X

X X

~

X

X X

X X

X

<

" X"

" X X"X'

.

X

X

.' ..

X

Y.

X

X X

X

"

X

X

:·

~

X

X

X

X X

"

X

X

X X.

.

¥

X

X

:'1,

X

X

X X

" "- " ::..;X ·' XX X "

~

,.

X

X

..

~

' .x

~

X

X

"

X

~

..

" " X X "

X

X

X

X

';<.

X

X

X

X

X

X

X

X

X

~

X.

X

X

X

X

X

X

X

X

..

. X

X X

X

:;;

X X

"

:-<.:

X

X

X

'/(

X

X

v.

X X

' " X

-~(~·

Notes:

I.£G£110

Ccm..:taret< RNa-r B.aol>: D2p~alt$. 0>!3:PMi'fi¢'fm! ~rMtonmV~tis -~.Jn!YloiV/'1 trut m&y ~ \l'f.lti~d (ftU">

t-o !1it~r ~S-Il~ra m~riAa {'traMgt9£SW'tWre:gr&-es..!'~

s~t~«:~e-nc~a-n. :!...lfhQ!:~w

rangeHs trom

days, t!)sm:, tufmt-t~ rn&dium

sa!His .or com~lnationto l.h&reor i~l'ld !S faYt-£8<1.

Rt..rer Se~mM~t.$ !:lr Re~nnante- fine to ooaree sanG. tiM to Ci:RlC9'e l;lf6'4Gi.$. r;obcOio:m, Co-ngar~e

b~IIOOr5.

var{!ng

>lnd fn

pt~c~s.

c;ln l"ia>~~

amcunte ~.JJ »tit

Ccmg~r9f< RN~r Sh:.)~in~ or

Rfjrt1nants- grar to bla.t!r.. tilt, cl.iy, 3~dvnry flnt ill fin~.: iiat'1d wmr:.~nab>:"Jn tt~r&nf. Car: b~

mh::actous.

(H

D

'

" "

D

Grarn~e:

Sedf{J:<:J. an&

..;a:ss:nrrfllcl:

Af.:$1®~ffiM'7 ~J.iru-.t: ~1 :1:@>$.~'\I'H';t

tarQ"et~:i

tor f:e:mo·... ~!

1 The surface water !evei was ;jetermmc·d t·Y using the average of the maximum river gf;uge heights recorded during th<; Sopternb&r·O(:tober 2010 inv8stigations. accounting for river slope 12.10 feet/milE·, USA.CE Conga reo River Basin NllVr(Jab!lity Study 1977) and referencing to the elevation (112.25 feet, NAVD 'B8} of USGS gau9e 02159500, Congaree

Riv~?r >3t

I u---PHASE 2 · I

Columbia, SC

2. The coring/bonng locatwns are constructed along a fence lme. and bathyrneuy and topo(Jraptrv are from the "11" -strike line. 3. Th>9 C:e>ngaree River bank slope likely differs from that shOwn. 4. Since no corings/borings ware coli acted west of 011. lithology was int$rpreted fn:)tn existing corjngs/borings along Une 11 ? This geoloc~ical cross-sectron was preparwi t>y evaluaung exrstrng coring/toring logs and inferrE)d site conditions hetw&en data points. r\s such, ir.terprE!tation betv..Jeer. data points was base::.1 on best. professional judgeml9nt. Actual s1te conditions '.j0pictod bc-tt\~een O.J

FIGURE 1 SOUTH CAROLINA ElECTRIC AND GAS CO. PHASE 2 TYPJCAL CROSS SECTION

CONGARE£ RIVER SEDtMENTS

COLUMBIA. SOUTH CAR.OUNA

..£JLE NAMl;~.P.f:!?.,~-~PI~ MA>."lAGE.MENT 1\.."'-"D TECW><1C·.\l RESOURCES, INC.

~ATE: OM:l§/2013

\_-·-·-::-·-,

~

\

\

I~ \\ [ I~'-~ _____!

I 1I

'"-....,j

/\~J

f

\\

~

0"

\ \

30'

fiO'

\

90'

"""""

1. fOOll'RINf 01' COI'1'Ba»ool 1$ USIII(I A 10'-WIIl£ ElliE. - . WIU. liE LESll :!. WTAL UNEM FOOTAGE Ill I'KtiSE ;J · 1246 IF AS III&SUR£D 8't OUfSIOE "TO£ 01' SI.CP£.

FIGURES SOUTH CAROLINA ELECTRIC & GAS COMPANY

2011-1356-610 Cogaree River Remediation Project South Carolina Electric and Gas Company Richland County August 23, 2013 Paae 9 of 13

West-Line 16

..,._.

~:$

East-Line 16

2011-1356-610 Cogaree River Remediation Project South Carolina Electric and Gas Company Richland County August 23, 2013 Page 10 of 13

..·

Congaree River Bank

fl

i,..,,.j..._

~

I

Approximate Area of Riprap Placement

Congaree River

.

~~ i.::2.~=~2i wl~-~~i.:.~:.:. :~::a·~-~--~~r~_>"'-=~-::M.:.: . :~~-~~~:::;~A'X;(

XX X

y~~ *-2..:.~-~-::.:.2·:;xK-~ )(

X)( "'.X.,..

.f

~---~~:2..:.;~~~~=-=--~.:.~.:;~2:~

~;.e~~

l£Glilffi

112

C.¢f~l}m$Q- Rw~r f!.M~ D~PQtHs.~

Ot:po.sibon:at :&:l'tYiro-nrnent lts l.:!t'l!..l"K~wtl but rh'*Y" t;~ 'l>'WiiSd ~fh.:..-hll I¢ r;~.:t~ JStmrt! m~uin~

lfransgressW.Jr-.egreuJWJ fH~Qt-1$-tl~.S}f. l...itt!DIOQYrartlj)E:$11r(lm

d;a~.

tc Sin, tO tiM kc medium

san09 ::J:r c:orru~·il1af!M$1f19t~Qt

ano It t:arere

R-lv~r S!~men~

ey.r

Renlrl:ilf'IW· ftn>i! tl:l CC>M&G Bal'~d . !JI)~ t(} CC3r$~ 1;ll'W111!.i, CI){!!)JI(IS.

l>t!IJJ®rs, antttn ptaef'S. tanh~ var~h113 -a:n10Unt3

F/3

~J

at silt

C!1 ~!llr.eiJf Caf! h&

iY!Icaetau-s

or

D D

Crantie B~atoct<: ~;..rt-atJ::i· !)m~~~:rs: - &s:sumt:~d

~P~~Kim~6!' ~>:N:nt t~rget~d

m:sMlm~;r.t

rer remcr-(3:1

Notes· 1. Tt1e surface water level was .j'.lterminod by using the average of thE> maximum river gauge hoigiliS rt,Jcorded during tt1e Septembor-Octobor 2010 investigations. accountin9 for rivsr siooo (2:10 feotlrmle. l.I:O·ACE Congaree f l!ne :l. The Congarea River bank Slope likely differs frorn that shown 4. Since M corings!Mnngs were collected west of 01r'>. lrtMiogy was interpreted from existing conngs/borings along Line 1f;. 5. Tnis geological cross-section was prepared by evaluating ,,..,stinfJ coring/boring k\JS and inferred site conditions betwe6ln data points. As such, Interpretation tJJttw$en d rJepr(:ted between exi>ting corings/borings may vary.

L!HASE3J FtGURE9

SOUTH CAROUNA ELECTRIC AND GAS CO. PHASE 3 TYPICAL CROSS SECTION

CONC'..AAEE RNER SEDtMENTS

COUJMBIA. SOUTH ------....-....-.............. --- CAAOt.JNA An;;: OWQ5/Z:QJJ. .........._£tLE. !>JAME: PH&§.J;:...~.IYPfl.

ncHJ..'IC.AL P.:ESOORas, me

1

C; f·IOKE F

L'SO rni! TEXTURED····· r··1'[)Pr= -·'· ....... L.. INf::·p ·-··, nr:) ·--~ \ ""'~ 1

0

lJIGO!:\R D

/\F)PR0\;'[0

:;;IDE AASHTO

EQU 1\//\LE~~T

. JQs

"

.J..

j_2_,3 ~ ~5

i'~O.

57 STO!'JE

N.G..(:!.!~\R_C;~_ ::2JDE

i

SCDOT

ROCI< RIVER

8'±

BOTTOf\/1

V;\R ,ES) 1

---

STEEL FOR

F~'l

........,..,.~

PE

Gf~OLJTif'~G

(OPTiON.AL)

//..::/ /··' '·-., '---- ,./·./,:·//'Z/ . ' ',__ _ ,' '·-., ' /'/0.~)/0://-{_/ '-.. "'\. .,/ '-- '< // '··. ·-.,_ /' f

·

S CAL E

ST/\RTEF< BER~v4 TO BE COMPLETED PRIOI~ TO

6

0

6 FEET

SHEET 71 SHEET 8

PU\CEiv1ENT CW HDPE L..ll\JER OR SH()TF~OCK

LEGEND:

FIGURE 10

~DETAIL NO.

SEE DETAIL

~

(Sheet 7 of 13 from Rizzo Cofferdam Design)

TYPICAL COFFERDAM SECTION

? ?

SHEET WHERE _ / . . "".__SHEET WHERE DETAIL IS DETAIL CALLED OUT IS SHOWN

2011-1356-610 Cogaree River Remediation Project South Carolina Electric and Gas Company Richland County August 23, 2013 Page 11 of 13

114708A8

PREPARED FOR

SOUTH CAROLINA ELECTRIC & GAS CONGAREE RIVER REMEDIATION COLUMBIA, SOUTH CAROLINA

f""V""'"V"' ~

<._

Rul C. Rizzo Associates, Inc. ENGINEERS &

CONSULTANTS

AV_~~GE

_ _y_..____

RIVI;R ElEVATION

RIPRAP MOUND HEIGHT= APPROXIMATE DESIRED

SHORELINE (VARIES)----

GEOTEXTILE OR GRANULAR FILTER RIPRAP MOUND THICKNESS = APPROXIMATELY 2X LAYER THICKNESS 2011-1356-610 Cogaree River Remediation Project South Carolina Electric and Gas Company Richland County August 23, 2013 Page 12 of 13 FIGURE 11 SOUTH CAROLINA ELECTRIC & GAS COMPANY TYPICAL R!PRAP RIVER BANK STABIUZATION CONGAREE RIVER SEDIMENTS COLUMBIA, SOUTH CAROLINA

NOT TO SCALE

DATE: 8121/1.3

FILE NAME: CONG057

MANAGEMENT Ai~D TECHNICAL RESOURCES, INC.

2011-1356-610 Cogaree River Remediation Project South Carolina Electric and Gas Company Richland County August 23, 2013

TRUCK ROUTE TO LANDFILL

FIGURE 12 SOUTH CAROLINA & GAS COMPANY

1) FROM THE SITE ENTRANCE GATE TRUCKS WILL MAKE. A LEfT ONTO GIST STREET. 2) AT THE STOP SIGN AT THE END OF GIST STREET TRUCKS WILL MAKE A RIGHT TURN ONTO GERVAIS STREET. 3) AT THE NEXT INTERSECTION TRUCKS WILL MAKE A LEFT ONTO HUGER STREET.

4) TRUCKS WILL FOLLOW HUGER STREET FOR APPROXIMATELY 0.8 MILES AND MERGE ONTO i-126 W/US-76 W TOWARD GREENVILLEISPARIANBURG. 5) TRUCKS WILL MERGE ONTO 1..2QE AND CONTINUE FOR APPROXIMATELY 17.5 MILES TO EXIT 82 ·SPEARS CREEK CHURCH ROAD. S) TRUCKS WILL MAKE A RIGHT ONTO SPEARS CREEK CHURCH ROAD {SC-53) AND THEN TURN LEFT ONTO PERCIVAL ROAD (SC-12). 7) TRUGKS WILL BARE RIGHT ONTO SCREAMING EAGLE ROAD (SC-268) AND TURN LEFT !NTO THE LANDFILL ENTRANCE.

ROUTE TO LANDFILL CONGAREE RIVER SEDIMENTS COLUMB~. SOUTH CAROUNA

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas