You can copy from here when filling out the rest of the page.
Hatcher Holdings LLC Eigelberger Tract Community Dock
Beaufort County, South Carolina
Hatcher Holdings LLC Eigelberger Tract Community Dock
Beaufort County, South Carolina
JOINT
PUBLIC NOTICE
CHARLESTON DISTRICT, CORPS OF ENGINEERS
69A Hagood Avenue
Charleston, South Carolina 29403-5107
and
THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
Office of Ocean and Coastal Resource Management
1362 McMillan Avenue, Suite 400
Charleston, South Carolina 29405
REGULATORY DIVISION
Refer to: P/N # 2013-00794-1T
11 September 2013
Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), and the South Carolina Coastal
Zone Management Act (48-39-10 et.seq.) an application has been submitted to the Department of the Army and
the South Carolina Department of Health and Environmental Control by
HATCHER HOLDINGS, LLC
MR. EDWIN KING JR.
C/O SLIGH ENVIRONMENTAL CONSULTANTS, INC.
ATTN: JEFFREY WILLIAMS
for a permit to construct a private community dock on
MUNGEN CREEK
on the Eigelberger Tract on the southern end of Daufuskie Island, west of the Bloody Point development,
Daufuskie Island, Beaufort County, South Carolina (32.090681 Latitude/ -80.880717 Longitude)
NOTICE
is hereby given that written statements regarding the proposed work will be received by the Corps until
15 Days from the Date of this Notice,
and SCDHEC will receive written statements regarding the proposed work until
30 Days from the Date of this Notice
from those interested in the activity and whose interests may be affected by the proposed work.
The proposed work consists of the construction of a 6' X 40' fixed walkway, a 34' X 30' pier head of which
20' X 20' will be covered, a 4' X 30' aluminum gangway used to access a 10' X 60' floating dock that has two (2)
2' X 4' walkway access platforms, a 20' X 50' covered hoist, and a 4' X 55' catwalk that has two (2) 2' X 4'
walkway access platforms. The proposed dock will also have water and power.
The property, known as the Eigelberger Tract, is only accessible by water from the public boat landing on
Daufuskie Island. Since the property is not accessible via ground transportation, the purpose of the proposed
community dock is to provide access to the property by property owners and guest.
REGULATORY DIVISION
Refer to: P/N # 2013-00794-1T
11 September 2013
No compensatory mitigation is being proposed. According to the applicant, all activities will be performed in a
manner to minimize turbidity in the Mungen River. There will be no oils or other pollutants released from the
proposed activities, and the proposed project should have no adverse effect on water quality. All work performed
during construction will be done in a manner to prevent interference with legitimate water uses.
Please note that the proposed community dock is part of a dock master plan (DMP) for this property that was
approved by the Office of Ocean and Coastal Resource Management. The DMP includes 2 additional
community docks for this property. As of the date of this public notice, no additional community docks have been
constructed, no permit applications have been submitted to this office for the additional community docks, nor
have Corps permits been issued for the additional community docks.
The work shown on this application must also be certified as consistent with applicable provisions of the
Coastal Zone Management Program (15 CFR 930). The District Engineer will not process this application to a
conclusion until such certification is received. The applicant is hereby advised that supplemental information may
be required by the State to facilitate the review. Persons wishing to comment or object to State certification must
submit all comments in writing to the South Carolina Department of Health and Environmental Control at the
above address within thirty (30) days of the date of this notice.
This initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens
Fishery Conservation and Management Act. Implementation of the proposed project would impact 1,964
square feet of open waters above estuarine substrates utilized by various life stages of species comprising
the red drum, shrimp, and snapper-grouper management complexes. Our initial determination is that the
proposed action would not have a substantial individual or cumulative adverse impact on EFH or fisheries
managed by the South Atlantic Fishery Management Council and the National Marine Fisheries Service
(NMFS). Our final determination relative to project impacts and the need for mitigation measures is subject to
review by and coordination with the NMFS.
The District Engineer has consulted the most recently available information and has determined that the
project will have no effect on any Federally endangered, threatened, or proposed species and will not result in the
destruction or adverse modification of designated or proposed critical habitat. This public notice serves as a
request to the U.S. Fish and Wildlife Service and the National Marine Fisheries Service for any additional
information they may have on whether any listed or proposed endangered or threatened species or designated or
proposed critical habitat may be present in the area which would be affected by the activity, pursuant to Section
7(c) of the Endangered Species Act of 1973 (as amended).
Pursuant to Section 106 of the National Historic Preservation Act (NHPA), this public notice also
constitutes a request to Indian Tribes to notify the District Engineer of any historic properties of religious and
cultural significance to them that may be affected by the proposed undertaking.
In accordance with the NHPA, the District Engineer has also consulted the latest published version of
the National Register of Historic Places for the presence or absence of registered properties, or properties
listed as being eligible for inclusion therein, and this worksite is not included as a registered property or
property listed as being eligible for inclusion in the Register. To insure that other cultural resources that the
District Engineer is not aware of are not overlooked, this public notice also serves as a request to the State
Historic Preservation Office to provide any information it may have with regard to historic and cultural
resources.
REGULATORY DIVISION
Refer to: P/N # 2013-00794-1T
11 September 2013
Any person may request, in writing, within the comment period specified in this notice, that a public hearing be
held to consider this application. Requests for a public hearing shall state, with particularity, the reasons for
holding a public hearing.
The decision whether to issue a permit will be based on an evaluation of the probable impact including
cumulative impacts of the activity on the public interest and will include application of the guidelines promulgated
by the Administrator, Environmental Protection Agency (EPA), under authority of Section 404(b) of the Clean
Water Act and, as appropriate, the criteria established under authority of Section 102 of the Marine Protection,
Research and Sanctuaries Act of 1972, as amended. That decision will reflect the national concern for both
protection and utilization of important resources. The benefit which reasonably may be expected to accrue from
the project must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to
the project will be considered including the cumulative effects thereof; among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production and, in general, the needs and
welfare of the people. A permit will be granted unless the District Engineer determines that it would be contrary
to the public interest. In cases of conflicting property rights, the Corps of Engineers cannot undertake to
adjudicate rival claims.
The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and
officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this activity.
Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify,
condition or deny a permit for this project. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the activity.
If there are any questions concerning this public notice, please contact Tracy Dotolo Sanders at
843-329-8044 or toll free at 1-866-329-8187.