You can copy from here when filling out the rest of the page.
Norfolk Southern Corporation Brosnan Forest Mitigation Bank
Dorchester County, South Carolina
Norfolk Southern Corporation Brosnan Forest Mitigation Bank
Dorchester County, South Carolina
PUBLIC NOTICE
CHARLESTON DISTRICT, CORPS OF ENGINEERS
69A Hagood Avenue
Charleston, South Carolina 29403-5107
REGULATORY DIVISION
Refer to: P/N # SAC-2011-00912
September 17, 2013
Pursuant to Sections 401 and 404 of the Clean Water Act (33 U.S.C. 1341) and the South Carolina
Coastal Zone Management Act (48-39-10 et.seq.) a Prospectus has been submitted to the Department of the
Army and the South Carolina Interagency Review Team by
NORFOLK SOUTHERN CORPORATION
BROSNAN FOREST
ATTN: MR. JOSH RAGLIN
125 BROSNAN FOREST ROAD
DORCHESTER, SOUTH CAROLINA 29437
for a proposal to establish and operate a wetland mitigation bank that is adjacent to
COLDWATER BRANCH
at a location 2.5 miles southwest of the intersection of US Highway 78 and Brosnan Forest Road in Dorchester
County, South Carolina (Latitude 33.11724 N, Longitude -80.456260 W).
In order to give all interested parties an opportunity to express their views
NOTICE
is hereby given that written statements regarding the proposed work will be received by the Corps of Engineers
until
12 O'CLOCK NOON, FRIDAY, OCTOBER 17, 2013
from those interested in the activity and whose interests may be affected by the proposed work.
The proposed project consists of establishing and operating a freshwater wetland mitigation bank that is
located on the hydrologic divide between the Four Hole Swamp and Edisto River watersheds (USGS 8-digit
Hydrologic Unit Codes 3050205 and 03050206). The 289.7-acre project site is a portion of Brosnan Forest, a
14,406-acre corporate conference facility and outdoor retreat center. In 2008, Norfolk Southern Corporation
voluntarily protected 12,488 acres of Brosnan Forest, including the forested area that surrounds the project site, by
granting and conveying a conservation easement to the Lowcountry Open Land Trust.
The proposed mitigation bank is expected to enhance vegetation and hydrology within 15 acres of existing
wetlands, to restore vegetation and hydrology within 202.4 acres of drained wetlands that are currently identified
as uplands, and to preserve 61 acres of upland buffers. According to the Prospectus, the project site also includes
approximately 11.5 acres of existing roads and ditches that will not generate mitigation credits. The mitigation
work plan consists of removing planted loblolly pine and plugging existing ditches on the project site to restore
natural hydrology. Groundwater monitoring wells were installed on the mitigation bank site in 2009 to document
baseline hydrology conditions and these monitoring wells will also be used to document the restoration of natural
hydrology on the project site.
REGULATORY DIVISION
Refer to: P/N # SAC-2011-00912
September 17, 2013
The proposed mitigation bank will provide in-kind compensatory mitigation for authorized impacts to
aquatic resource functions and services associated with future development activities within the Middle Atlantic
Coastal Plain and Sea Islands Coastal Marsh ecoregions, as shown on the attached Service Area Map. The work
required to complete the restoration and enhancement of aquatic resources on the mitigation site may be
authorized under Nationwide Permit #27 after review by the Corps, the South Carolina Department of Health and
Environmental Control, and the Interagency Review Team. The mitigation bank site will be protected by granting
and conveying an additional conservation easement to the Lowcountry Open Land Trust, Inc.
The District Engineer has concluded that the discharges associated with this project, both direct and
indirect, should be reviewed by the South Carolina Department of Health and Environmental Control in
accordance with provisions of Section 401 of the Clean Water Act. As such, this notice constitutes a request, on
behalf of the bank sponsor, for certification that this project will comply with applicable effluent limitations and
water quality standards. The work shown in this Prospectus must also be certified as consistent with applicable
provisions of the South Carolina Coastal Zone Management Act (15 CFR 930). The bank sponsor is hereby
advised that supplemental information may be required by the State to facilitate the review.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. Implementation of the proposed project would impact
approximately 0.5 acres of wetlands which are located upstream of estuarine substrates and emergent
wetlands utilized by various life stages of species comprising the red drum, shrimp, and snapper-grouper
management complexes. Our initial determination is that the proposed action would not have a substantial
individual or cumulative adverse impact on EFH or fisheries managed by the South Atlantic Fishery
Management Council and the National Marine Fisheries Service (NMFS). Our final determination relative to
project impacts and the need for mitigation measures is subject to review by and coordination with the NMFS.
Pursuant to Section 7(c) of the Endangered Species Act of 1973 (as amended), the District Engineer has
consulted the most recently available information and has determined that the red-cockaded woodpecker
(Picoides borealis) a Federally endangered species is present in the vicinity of the project. However, it has been
determined that the project will have no effect on this species and will not result in the destruction or adverse
modification of designated or proposed critical habitat. This public notice serves as a request for written
concurrence from the U.S. Fish and Wildlife Service and/or the National Marine Fisheries Service on this
determination.
Pursuant to Section 106 of the National Historic Preservation Act (NHPA), this public notice also
constitutes a request to Indian Tribes to notify the District Engineer of any historic properties of religious and
cultural significance to them that may be affected by the proposed undertaking.
In accordance with the NHPA, the District Engineer has also consulted the latest published version of
the National Register of Historic Places for the presence or absence of registered properties, or properties
listed as being eligible for inclusion therein, and this worksite is not included as a registered property or
property listed as being eligible for inclusion in the Register. To insure that other cultural resources that the
District Engineer is not aware of are not overlooked, this public notice also serves as a request to the State
Historic Preservation Office to provide any information it may have with regard to historic and cultural
resources.
Any person may request, in writing, within the comment period specified in this notice, that a public hearing
be held to consider this application. Requests for a public hearing shall state, with particularity, the reasons for
holding a public hearing.
REGULATORY DIVISION
Refer to: P/N # SAC-2011-00912
September 17, 2013
The decision whether to approve or deny the proposed mitigation bank will be based on an evaluation of
the probable impact including cumulative impacts of the activity. All factors which may be relevant to the project
will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics,
general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, flood plain
values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water
quality, energy needs, safety, food and fiber production and, in general, the needs and welfare of the people.
The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and
officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this activity.
Any comments received will be considered by the Corps of Engineers to determine whether to approve or deny
the proposed mitigation bank. To make this decision, comments are used to assess impacts on endangered
species, historic properties, water quality, general environmental effects, and the other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for
a public hearing and to determine the overall public interest of the activity.
The Prospectus for the proposed mitigation bank is available for review by appointment between the
hours of 9:00 am and 4:00 pm Monday through Friday at the address listed above. Please note if information
about the location of Federally listed Threatened or Endangered species or the location of cultural resources is
included in this Prospectus, this portion of the document may be withheld in accordance with the appropriate
statutes for the protection of this information. If there any questions concerning the proposed mitigation bank
or the information included in this public notice please contact Mr. Nat Ball by e-mail at
nathaniel.i.ball@usace.army.mil or by telephone at 843-329-8044 or toll free at 1-866-329-8187.
,_ ,1
Legend
c:::J
)
.. .
Bank Boundaries, 289.7±Acres
/
.. ...
-/
I
i
~ --
. .,
Wal!sr ·
·'
'
l
1
.,
;
;.,
u
'
~- t l<
I
Il l :
I
.'
/
'
,-
--~
I
~.
.::.:;·.
: .
-.
...
,·'
!,
..··
Co· l \
'CcorSI'.·
r. nl<
...
-.,,r.
'
l.
I
;lj_~;
-:-1
,..
;,
(
I
'
J
f.
.. Wateor i·
. ra n..... ,·
,t
I!"""'" r."'ll l"";·; ~ · ·
~= .
.......
I
t
I
"'If
'
.'/ ...
./I
~
·J
·'
..,.
.'
\
I
'
I
>
'·
/
"'
tC.: ~~ '
.·
...
· -~~,J
I·
~
·'._;/
,.
I,
I /
\r
~·
·- ~--- ~ ~--·
~
...
MITIGATION SITE '
·.
...
-..
'
>
~
i
r
,/-
. ...
..~ -
'
:-.~-.·-
·.t
·.
.....
-,
r
-
.
I
'
.
/
,f·
!
. ....
· . ·.
~.
,,
.]
."'
..,.,
.
'
/
0
1
~·_ :.()
/·
·
~
\,
I
6.
./f'
.'·
·
lf·~ ""l
. \ ...
I
.
'·
·-J
:
1
.....
/
..{
{·
..
- \I
-\
t
MILLIKEN
FORESTRY
\A/W\1\/ Jvtll II K I 1'-J I t l .. " l
·~t
.. ' l'" c f"Jfvt
21640
0
s
Feet
Proposed Wetland Mitigation Bank
Topographic Map
Brosnan Forest
Norfolk Southern Corporation
Dorchester County, SC
228.3± Acres
January 2010
Legend
L
Bank Boundaries, 289.7±Acres
CJ
·
Historical Wetland Line, 228.3± Acres
Water Control Device
-··-·· Ditches
MILLIKEN
FORESTRY
WWW tv1 1111 KI
N l (JJ·= I
:-.tl-~Yl.tHvl
N
·~·
s
660
0
Feet
Wetland Mitigation Bank
Proposed Wetland Restoration
1938 Aerial Photography
Brosnan Forest
Norfolk Southem Corporation
Dorchester County, SC
228.3± Acres
January 2010
Legend
MILLIKEN
FORESTRY
WVVW lv1\l I lt>- 1 t-il
tH~" I
' :0 1 .. ""(" (.. (.Jtvt
660
0
s
Feet
Wetland Mitigation Bank
Timber Type Map
2006 Aerial Photography
Brosnan Forest
Norfolk Southern Corporation
Dorchester County, SC
228.3± Acres
January 2010
Orangeburg
County
·
-
~
Ditch Plug
Primary Ditch
- - - Secondary Ditch
--- --- Tertiary Ditch
c:J Historical Wetiand Line , 228.3±Acres
c::J Bank Site Boundary, 289.7± Acres
Dorcheste
County
·
Col/eton
~~
MILLIKEN
FORESTRY
WWVV' ......,.II I It< I
Nt ~
.. lt- ' 'V
(
CHv t
660
0
s
Feet
Wetland Mitigation Bank
Ditch Plug Map
2011 Aerial Photography
Brosnan Forest
Norfolk Southem Corporation
Dorchester County, SC
October 2012
Stand
Timber Type
Primary Species
1
2
3
4
5
6
Total
Bay Pond Hardwood
Bay Pond Hardwood
Bay Pond Hardwood
Planted Hardwood
Planted Hardwood
Planted Pine
1\faple
1\faple
1\faple
Swamp Chestnut Oak
Atlantic White Cedar
Longleaf
II
II
I
I
II
11
\_\
II
I
II
,,'I'
I
Secondary k
res
Species
\1
Gum Spp.
11.2
Gum Spp.
25.3
Gum Spp.
18.0
WillowOak 137.5
36.3
41. 8
270.1
II
I
I
II
II
n
/
~'/
~
//
\i
II
/,
:v<~
,,
If
If
II
II
I
"
I
I
11
ll
(j
,,
;;-~c::-::-,
I
/
It
~ ~I
J
/1
\J/
~
::::::.:::::::.:::..!J
It
It\
{}
II
/1
1/
II
,,
,,
II
,,
\
It
IJ
/(/
\
,,
<'/
/J
'l'l
,,I I __ c-'l
,,
,,
It-.-:-"
\
u
,,"
,,,,
It
If
...... ::.-::::::-
1
1/
II
II
·
··
~
··
·
\
Non-Timber
Timber
Bay!Pond Hardwood - Merch
Bay/Pond Hardwood - PreMerch
Bottomland Hardwood - Merch
Bottomland Hardwood- PreMerch
Cypress-Tupelo - Merch
Cypress-Tupelo - PreMerch
Creek Hardwood
Cutover
Hardwood-Ptne
·
~
CRP Ptne
Natural Pine- Merch
Natural Pine - PreMerch
Planted Ptne- March
Planted Ptne- PreM erch
Planted Hardwood
Pine-Hardwood
·
·
·
\
\
II
Beaver Pond
CuHivated Field
Game Patch
lnvastve Spectes
Non-Timber
D
\
D
~ SMZ
=:J
MILLIKEN
FORESTRY
VVWW . M
II
II
I LL I KE:. N FORE;.. S TRY .C OM
water
Wet
Wi ldlife Habttat
Historical Wetland Line, 228 .3± Acres
Bank Site Boundary, 289 .7±Acres
N
w-¢-·
s
660
0
Feet
Reforestation Planning Map
Brosnan Forest
Mitigation Site
Norfolk Southern Corporation
Dorchester County, SC
August 2013
Aiken
Calhoun
Williamsburg
County
J
Georgetown
County
Barnwell
County
~
Berkeley
County
Bamberg
County
Jasper
County
MILLIKEN
FORESTRY
\NVVVV . fV1 11 I
lt<. ~NF. . Mitigation Site
CJ Brosnan Forest Boundary
s
c=J Proposed Primary Service Area
12
0
Miles
Proposed Wetland Mitigation Bank
Service Area
Brosnan Forest
Norfolk Southern Corporation
Dorchester County, SC
August 2013