Nuclear Power Training Unit
Berkeley County, South Carolina
Nuclear Power Training Unit
Berkeley County, South Carolina
JOINT
PUBLIC NOTICE
CHARLESTON DISTRICT, CORPS OF ENGINEERS
69A Hagood Avenue
Charleston, South Carolina 29403-5107
and the
S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
OFFICE OF OCEAN AND COASTAL RESOURCE MANAGEMENT
1362 McMillan Avenue, Suite 400
Charleston, South Carolina 29405
REGULATORY DIVISION
Refer to: P/N # SAC-2011-00715
October 25, 2013
Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), Sections
401 and 404 of the Clean Water Act (33 U.S.C. 1344), and the South Carolina Coastal Zone
Management Act (48-39-10 et.seq.) an application has been submitted to the Department of the
Army and the S.C. Department of Health and Environmental Control by
JOINT BASE CHARLESTON
C/O MR. GLENN EASTERBY
210 WEST STEWART AVENUE (628 CES/CEIEP)
CHARLESTON, SOUTH CAROLINA 29404
for a permit to excavate and place fill material in waters of the United States in the
COOPER RIVER
at a location near the intersection of Old Tom Road and Wilkinson Way at the Naval Weapons
Station-Charleston in Berkeley County, South Carolina (Latitude 32.944183, Longitude-79.930514)
In order to give all interested parties an opportunity to express their views
NOTICE
is hereby given that written statements regarding the proposed work will be received by the Corps
until
15 Days from the Date of this Notice,
and SCDHEC will receive written statements regarding the proposed work until
30 Days from the Date of this Notice
from those interested in the activity and whose interests may be affected by the proposed work.
The proposed work consists of constructing improvements to the existing infrastructure at
the Nuclear Power Training Unit Charleston (NPTU Charleston). These improvements were
designed to alleviate current overcrowding, to accommodate increased student throughput, to allow
for uninterrupted student training during MTS transition, and to ensure all facilities meet
Department of Defense, Navy, and Air Force security requirements. The proposed work in
navigable waters of the United States includes the replacement of an existing 344-foot finger pier
with a 300-foot long by 35-foot wide concrete wharf, the construction of a pile supported utility
REGULATORY DIVISION
Refer to: P/N # SAC-2011-00715
October 25, 2013
platform (approximately 2,100 square feet), extending the existing Port Security Barrier to
accommodate new Moored Training Ships, and the installation of new mooring dolphins and
hurricane survival mooring systems.
The berth where the new Moored Training Ship will be located will be dredged a depth of
-42 feet MLW (approximately 36,000 cubic yards) in accordance with Joint Base Charleston's
existing maintenance dredging permit (SAC-2009-00175). In addition to the maintenance
dredging, approximately 780 linear feet of shallow trenches (an additional 900 cubic yards) will be
dredged below the surface of the river bottom to install the anchors and chains associated with the
new hurricane survival mooring system. Potential impacts associated with the upland portion of
the proposed project include the placement of fill material in 6.48 acres of freshwater wetlands to
relocate existing roadways, to construct additional parking areas, to install new storm water outfall
structures, and to install new security fences and light poles.
The District Engineer has concluded that the discharges associated with this project, both
direct and indirect, should be reviewed by the South Carolina Department of Health and
Environmental Control in accordance with provisions of Section 401 of the Clean Water Act. As
such, this notice constitutes a request, on behalf of the applicant, for certification that this project
will comply with applicable effluent limitations and water quality standards. The work shown on this
application must also be certified as consistent with applicable provisions the Coastal Zone
Management Program (15 CFR 930). The District Engineer will not process this application to a
conclusion until such certifications are received. The applicant is hereby advised that supplemental
information may be required by the State to facilitate the review.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. Implementation of the
proposed project would impact 6.48 acres of freshwater wetlands and 0.4 acres of estuarine
substrates and emergent wetlands utilized by various life stages of species comprising the red
drum, shrimp, and snapper-grouper management complexes. Our initial determination is that
the proposed action would not have a substantial individual or cumulative adverse impact on
EFH or fisheries managed by the South Atlantic Fishery Management Council and the National
Marine Fisheries Service (NMFS). Our final determination relative to project impacts and the
need for mitigation measures is subject to review by and coordination with the NMFS.
Pursuant to Section 7(c) of the Endangered Species Act of 1973 (as amended), the
District Engineer has consulted the most recently available information and has determined that
Federally threatened and/or endangered species, such as the West Indian Manatee (Trichecus
manatus), shortnose sturgeon (Acipenser brevirostrum), and Atlantic sturgeon (Acipenser
oxyrinchus), may be present in the vicinity of the proposed project. However, it has been
determined that the proposed project is not likely to adversely affect these species or result in
the destruction or adverse modification of designated or proposed critical habitat. This public
notice serves as a request for written concurrence from the U.S. Fish and Wildlife Service
and/or the National Marine Fisheries Service on this determination.
Pursuant to Section 106 of the National Historic Preservation Act (NHPA), this public
notice also constitutes a request to Indian Tribes to notify the District Engineer of any historic
properties of religious and cultural significance to them that may be affected by the proposed
undertaking.
In accordance with the NHPA, the District Engineer has consulted the latest published
version of the National Register of Historic Places for the presence or absence of registered
properties, or properties listed as being eligible for inclusion therein. MILH was placed on the
REGULATORY DIVISION
Refer to: P/N # SAC-2011-00715
October 25, 2013
National Register of Historic Places in 1982. This public notice serves as a request to the State
Historic Preservation Office to provide any additional information it may have with regard to
historic and cultural resources in the vicinity of MILH.
Any person may request, in writing, within the comment period specified in this notice, that
a public hearing be held to consider this application. Requests for a public hearing shall state, with
particularity, the reasons for holding a public hearing.
The decision whether to issue a permit will be based on an evaluation of the probable
impact including cumulative impacts of the activity on the public interest and will include application
of the guidelines promulgated by the Administrator, Environmental Protection Agency (EPA), under
authority of Section 404(b) of the Clean Water Act and, as appropriate, the criteria established
under authority of Section 102 of the Marine Protection, Research and Sanctuaries Act of 1972, as
amended. That decision will reflect the national concern for both protection and utilization of
important resources. The benefit which reasonably may be expected to accrue from the project
must be balanced against its reasonably foreseeable detriments. All factors which may be relevant
to the project will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline
erosion and accretion, recreation, water supply and conservation, water quality, energy needs,
safety, food and fiber production and, in general, the needs and welfare of the people. A permit will
be granted unless the District Engineer determines that it would be contrary to the public interest.
In cases of conflicting property rights, the Corps of Engineers cannot undertake to adjudicate rival
claims.
The Corps of Engineers is soliciting comments from the public; Federal, state, and local
agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate
the impacts of this activity. Any comments received will be considered by the Corps of Engineers
to determine whether to issue, modify, condition or deny a permit for this project. To make this
decision, comments are used to assess impacts on endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
Comments are used in the preparation of an Environmental Assessment and/or an Environmental
Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the activity.
If there are any questions concerning this public notice, please contact Mr. Nat Ball at
843-329-8044 or toll free at 1-866-329-8187.
2
3
4
5
HENRY E BROWN
JR BLVD.
POMFFANT
ACCESS ROAD
D
PROJECT LOCATION
'---~~~-"!"'·PROJECT LOCATION
N RHETT AVE
c.'"
0
c
N RHETT AVE
ENTRY GATE
PLAN
NORTH
s~?7f~M=IO=N~M~A~P--------~Ci)
PLAN
NORTH
~~~~~IN~ITY~M~A~P----------~Ci)
B
PROJECT LOCATION
A
WILKINSON WAY/
OLD TOM RD./
SNOWPO!NT RD.
401/404 PERMIT
APPENDIX B
FIGURE 1
PLAN
NORTH
2
3
4
5
3
4
~""'"'"G'M'
I ~~u:,~'CANEMooR,NG
D
c
~
PEM WETLANDS
B
B
401/404 PERMIT
APPENDIX 8
FIGURE 2
A
PLAN
NORTH
~~tiV.E~M~LL~E~XI~ST~IN~G~S~IT~E~P~~~N~-------------------------------------------------------------------------Ci)
2
3
4
5
A
2
3
4
5
DIMENSIONS ARE TO EXTERIOR CORNER OF BUILDING SLAB,
BACK OF CURB, OR EDGE OF PAVEMENT AND ARE IN FEET
UNLESS INDICATED OTHERWISE
2, SIDEWALKS AT BUILDING DOORS ARE CENTERED ON DOOR
STOOP.
SEE SHEET V100 FOR HORIZONTAL AND VERTICAL CONTROL
POINTS. SEE SHEET C001 FOR CIVIL LEGEND
D
. SEE SHEETS C250, C251, C252 AND C253 FOR CONCRETE
JOINTING AND ELEVATION PLANS.
5. PAVEMENT MARKINGS SHALL BE IN ACCORDANCE WITH THE
~~~~~~~ ~~~~~i';~~7~~~;EK~~L~~~ ~~~~~~7;EMARKINGS
H++--f-+-+=+'-1
INDICATED ON PLANS. SEE DETAIL DRAWINGS FOR PAVEMENT
MARKINGS.
PARKING SPACES ARE 9-FEET WIDE AND 18- FEET DEEP EXCEPT
HANDICAP ACCESSIBLE PARKING SPACES. HANDICAP
ACCESSIBLE PARKING SPACES ARE 9-FEET WIDE WITH A 5.00
FEET WIDE DISABLED ACCESS LANE ADJACENT TO THEM. A
HANDICAP ACCESSIBLE PARKING SIGN SHALL BE PLACED AS
INDICATED ON PLANS. SEE DETAIL DRAWINGS FOR PAVEMENT
MARKINGS.
SEE ES100 TO ES108 FOR SITE ELECTRICAL DETAILS.
c
SEE STRUCTURAL DRAWING S331 TO S334 FOR DETAILS ON THE
UTILITY TRENCH.
1D.SEE STRUCTURAL DRAWING S009 FOR TYPICAL EQUIPMENT PAD
DETAIL.
11.SEE DRAWING C120, C121, C122 FOR CLEARING LIMITS.
B
401/404 PERMIT
APPENDIXB
FIGURE 3a
A
PLAN
NORTH
~?~~V~~,RA*,."~~~L~SI~T~E~~~Y~O~U~T------------------------------------------------------------------------------------------~Cl)
2
3
4
5
A
15 Aug 2013
~iORll-1
SHORE
illlMIN1.1101~ ELE'
{1{4t4
~D- ~--'"""""--A-
0
0
(>
$AJ:'I. $lffi HILES "
"
~····~
ll
e
~Gro!G
1··
ANCHOO
"l-~
PERIWITER FEIK:E
·
NORTH SHOHE TERMINATION PlAN VIEW
Figure 3b. Modified North Shore Termination
2.
DO NOT DISTURB ANY AREAS OUTSIDE THE LIMITS
IDENTIFIED. L!MITS NOTED ARE INCLUDED IN STORM WATER
AND ENVIRONMENTAL PERMIT DOCUMENTS. ANY ADDITIONAL
DISTURBANCE IS IN VIOLATION OF FEDERAL, STATE AND U.S.
ARMY COE ENVIRONMENTAL REGULATIONS.
D
c
LEGEND
~
r
TIDAL WETLANDS
PFO WETLANDS
~
PEMWETLANDS
-
PFO WETLAND DISTURBANCE AREAS
-
-
-
-
· ·
LIMITS OF CONSTRUCTION
401/404 PERMIT
APPENDIX B
FIGURE 4
A
PLAN
NORTH
f~~~T~,,~~N~D~D~I~ST~U~R~BA~N~C~E~A~R~~S~---------------------------------------------------------------------------Ci)
2
3
4
B
75' TIDAL WETLANDS BUFFER
5
A
4.
5.
6.
7.
8.
RECEIVE NPDES COVERAGE FROM DHEC.
ON SITE PRE-CONSTRUCTION MEETING.
NOTIFY DHEC EQC REGIONAL OFFICE OR OCRM OFFICE 48
HOURS PRIOR TO BEGINNING LAND-DISTURBING
ACTIVITIES.
CLEARING & GRUBBING ONLY AS NECESSARY FOR
INSTALlATION OF PERIMETER CONTROLS.
INSTALL DOUBLE ROW SILT FENCE PERIMETER CONTROLS
AROUND LIMITS OF DISTURBANCE AND EXISTING
WETLANDS NOT TO BE DISTURBED PRIOR TO CLEARING
AND GRUBBING OPERATIONS AND/OR ANY DEMOLITION
OPERATIONS.
UPON COMPLETION OF CLEARING AND GRUBBING THE
AREA WHERE THE SECONDARY CONTRACTOR TRAILER
AND THE STAGING AREA ARE TO BE LOCATED,
CONSTRUCT GRAVEL SURFACING AND STABILIZED
CONSTRUCTION ENTRANCE TO THIS AREA.
INSTALL INLET PROTECTION AT INLETS LOCATED WITHIN
THE PRIMARY CONTRACTOR TRAILER COMPLEX.
INSTALL CONCRETE TRUCK WASHOUT AT ENTRANCE TO
PRIMARY CONTRACTOR TRAILER COMPLEX.
401/404 PERMIT
APPENDIX B
FIGURE 5
PLAN
NORTH
~~~~~f,s7,~~,!#,0~V~E~RA~L=L~E~RO~S~IO~N~CO~N~T~R~O~L~P~~~N~----------------------------------------------------------------------~Cl)
2
3
4
5
2
3
4
. PRESERVE EXISTING TREES AND VEGETATION UNLESS
INDICATED FOR REMOVAL. TAKE NECESSARY PRECAUTIONS TO
PROTECT ROOT SYSTEMS OF SHRUBS, PLANTS AND TREES
ALONG THE AREA OF EXCAVATION.
D
4. EXISTING VEGETATION AND FACILITIES WHICH ARE NOT
INDICATED TO BE REMOVED SHALL BE PROTECTED FROM
DEMOLITION OR OTHER CONSTRUCTION ACTIVITIES BY
CONSTRUCTING A FENCE WITH A MINIMUM HEIGHT OF 6.00'
AND/OR DOUBLE ROW OF SILT FENCE .
. CONTRACTOR SHALL CONSTRUCT FENCE BARRIER AROUND
INDICATED TIDAL WETLAND AREAS AND SHALL NOT I
TIDAL WETLAND AREAS. CONTRACTOR SHALL NOT
AREAS OUTSIDE THE LIMITS INDICATED DUE TO ENV'IRONME'NTIILI
REGULATIONS AND CONTRACT REQUIREMENTS .
. SEE TABLE ON C122 FOR LAYOUT OF CLEARING LIMITS LINE.
c
m
TIDALWETLANDAREA
~
PFOWETLANDS
~
PEMWETLANDS
-
-
75' TIDAL WETLANDS BUFFER
_
, ·_
-
·· _
CLEARING LIMITS/
LIMITS OF CONSTRUCTION
B
B
401/404 PERMIT
APPENDIX 8
FIGURE Ga
A
NORTH
SITE CLEARING LIMITS
CD
SCALE: 1"=100'
2
3
4
5
A
(]1
w
)>
g
8
0
~
I
~:w
;s:l.o
"
~
6.89
~
7.02
~l. ;'i.'
6,78
I
I
I
i
"
~
6,16
2.67
.::.61' 01
OJ
.
I
,.
I
I
I'
I
I
lm
~:~
I
I'
.
.I
.!NV IN= 2:.72 6a·· So'sW)
~
· STA,=0+41.16
RIM=6.15
· SDCB30A
· STA:=0+23.20
·RIM=·4.03
JN.V IN =.2.70 (.18" SO SE)
'OF-1
.
· SDMi-11A
(18" so NWJ
RIM =3.37
I NV IN= 1.47 (18" SD6W)
INV OUT =.1.47 (18" SD.SE)
' STA:=o+39.11
RIM =7.07
.
!NV IN= 1.45
.
OF-3
0
0
w
(J):!\;
S,r
r
~·~
<-I
="o
roc
a
\J
SJA.. =Q+2:1.35
~
0
w
(J)N
-'It
:;;: r
0 r
-· "T1
CD )>
<-I
CD C
a~0
\J
!NV IN ='3.00 (18" SD SE)
·JNV OUT= 2.72 (1"8" SD"NW)
··.··-~<:.
·
'fa~
I
I
'I
.:
:I
N
;;;::l.u>
0
~
g
-j
z
m'
om
(J)
)>
:p-,;
~~
t;;
a a
~
§ q§
:;;:
~
rom
OJ~
-I
oo
z
H
~
g
~T .... , .....
=,...,......,..
;:;
;:;
'" '"
'" '"
Q o+"'"'"···Hjgc~,~~
-I
(J)
pj
0
2
3
5
4
2. SEE ELECTRICAL SITE DRAWINGS ES100 TO ES108 FOR DETAILS
ON SITE ELECTRICAL AND COMMUNICATION SYSTEMS
3
D
H+-\-H--1-'+-J
SEE BUILDING PLUMBING DRAWINGS FOR CONTINUATION OF
WATER AND SEWER LINES INTO THE BUILDING.
4. INSTALL STORM DRAIN IN AREAS ACCORDING TO THE PHASING
PLANS.
5. COORDINATE INSTALLATION OF THE RAIN WATER HARVESTING
SYSTEM AND STORM CHAMBERS WITH USE OF HEAVY
EQUIPMENT ON SITE. VERIFY CHAMBERS CAN SUPPORT
PlANNED TRAFFIC AND EQUIPMENT LOADS INCLUDING
CRANES, ETC.
NEW
OUTFALL#1
6, CONTRACTOR SHALL CLEAN ALL EXISTING STORM DRAIN PIPES
BLOCK OUTFALLS TO NOT ALLOW ANY DEBRIS OR MATERIAL TO
ENTER WETlAND AREA. SUBMIT PlAN AND PROCEDURES FOR
REVIEW PRIOR TO DOING ANY WORK.
STORM CHAMBERS
ROOF RUNOFF
COLLECTION
NEW
OUTFALLtf-2
,~··' ~~~~~~~ 300,000
~-~ADDITIVE BID ITEM 0006
c
·
REDUCE TO
240,000 GALLONS
,~
EXPANDED PRE·MILCON
NORTH STORMWATER BASIN
B
EXPANDED PRE-MILCON
SOUTH STORMWATER BASIN
NEW
OUTFALL#3
401/404 PERMIT
APPENDIX B
FIGURE 7
A
PLAN
NORTH
OVERALL STORM WATER PLAN
CD
SCALE: 1"=100'
2
3
4
5
A
2
4
3
5
LOCATION POINT AND
INVERT ELEVATION ON PLANS
RCP FLARED END SECTION
D
-CLPIPE
FINAL GRADE
#5@12" E.W.
NOTES:
1. TOE WALL SHAll BE 18"BELOWBOTTOM OF END SECTION ON UPSTREAM END AND
24" ON DOWNSTREAM END.
2. PLACE RIP-RAP AT ALL END SECTIONS AND CULVERT HEADWALLS.
3, RIP-RAP MUST EXTEND BEHIND OUTLET TO THE PIPE COUPLINGS AND AT AN
ELEVATION EQUAL TO THE TOP OF THE PIPE.
c
®
~~RED
END SECTION WITH RIP-RAP PROTECTION
>-4" X 15" SQUARE BRASS GRATED FLOOR
DRAIN COVER SCREWED TO CONCRETE.
12" DIAMETER HOLE
Yl RECESS SLOPE
FLOOR TO DRAIN
t - - -1"''-"---~r PRECAST POLYMER CONCRETE
TRENCH DRAIN AS MANUFACTURED
BYACO POLYMER PRODUCTS, INC.
OR APPROVED EQUAL
#4 @8" D.C. E.W.
B
r
FLOW LINE AT MAX. CHANNEL DEPTH
NOTE:
SEE TRENCH DETAILS ON
S331 AND S332.
A
COV----"'ER"-----------j
1--1
L__~---------~
r---.--------~
18" THICK CLEAN 1"
GRAVEL WRAPPED
IN FILLER FABRIC.
401/404 PERMIT
APPENDIX B
FIGURE 8
\._ INVERT EL
SEEDWGC4
@ J~~NCH DRAIN DETAIL
2
3
5
2
3
4
5
FOR WORK ON PIER X-RAY SOUTH SEE 2312 PACKAGE.
2.
FOR BORING LOGS SEE B·SHEETS.
D
,_SCOOPERRIVER
j
PROPOSED SURVNAL MOORING
SYSTEM(SMS),TYP, NIC
BPE
REFERENCE
POINT
EXISTING ELECffiiCAL &MECHANICAl. SERVICE PIER
PROPOSED
MOORING
DOLPHIN,
SEE'PIER
; ] MODIFICATION
X·RAYSOUTH
(2312)" PACKAGE
~PROPOSED
6-#~
APPROXIMATEBORINGLOCATION
MOORlNG
TIMBER DOLPHIN BARRIER.
DOLPHIN,
SEE'PIER
MODIFICATION
B
X-RAY SOUTH
(2312)' PACKAGE
401/404 PERMIT
APPENDIX 8
FIGURE 9
A
PLAN
NORTH
~?Y~,;~M~L~L~ST~R~U~CT~U~M~L~S~ITE~P~~~N~-~P~RO~P~O~SE~D~-------------------------------------------------------------~
2
3
4
SCALE: 1"=60'
5
2
D
3
5
4
EDGE OF EXISTING UTILITY PIER AT X-RAY NORTH PIER
299'-6'
S'EXPJOINT
I
CIPCONCRETETOPPINGSLAB
I
UTIUTY TRENCH
/DFPJ,BEYONO
PILE BENT DESIGNATION, TYP
VTlUTYTROUGH
CIPCONCRETESLAB,TYP
EXISnNGX·RAYNORlHPIER~
~
r--
Cf!cr ~
@
I
cr cr cr ~
2"
ELO.OONAVD
APPROXEXISTING MUDUNE
c
DREDGE EL..o!2.BB NAVD
(-40MLLW)
PIC PIS CONCRETE COMBI PILE, TYP
STINGER,TYP
c1
BPE LONGITUDINAL- TYPICAL SECTION
SCALE:1/6'=1'-D'
,.,..,.
EDGE OF EXISTING UTILITY PIER AT X-RAY NORTH PIER
S'EXPJOINT
oo;
JB
o=DK
PPCU"Ct"'"'AO""
B
EXISTING X·RAY NORTH PIER
<><><
B
UTILITY TROUGH
@
fN/
GANNA~""'"'
CORNER TIMBER
FENDER PILE
I
CLUSTER
MH'NEL2.64
MLWEL-2.68
g
ELD.OONAVD
DREDGE EL-42 aa NAVD
{-40MLLW)
PILETIPEL
SEE PilE SCHEDULE
ONSHEETS502
P/CPISCONCRETECOMBIPILE,TYP
A
.A
STINGER,TYP
NOTE: PILES BEYOND NOT SHOWN FOR CLARITY
A1
2
BPE LONGITUDINAL- ELEVATION
SCALE:1/16"'1'-0'
3
401/404 PERMIT
APPENDIX B
FIGURE 10
4
GRAPHIC SCALES
SCALE: 1116"::1'-D"
S201
5
2
3
4
5
r
PILE ROW DESIGNATION, TYP
~----------------------~w~~~·----------------------~
r
®
5·-o·
~I
PILE ROW DESIGNATION, TYP
r-----------------~=-----------------~~
D
D
:2'-6'
Z-2'-CURB WI SCUPPER HOLES
BENT CAP
BENT CAP
@20'-D' MIN D.C., TYP
EXTENSION,
BENTS2,4,&6
RACKED UTILITIES,
CURS W/ SCUPPER HOLES
@20'-0'MINO.C.,TYP
EXTENSION,
BENTBONLY
RACKED UTILmES,
SEE MECHANICAL
DRAWINGS
SEEMECfW.IICAL
DRAWINGS
~/C PIS, CONC PANEL, TYP
PIC CONC BENT CAP
I I
E
MHWEL2.64
CIP CONC TOPPING SLAB, TYP
I
c
~ ELO.OO NAVD
20' SO PIC PIS CONC COMBI PILE, TYP
2
MLWEL-2.68
18'SOPISPICCONC
FENDERPILEWHERE
INDICATED ON PLANS
1B'SQP/SP/CCONC
FENDER PILE WHERE
INDICATED ON PLANS
APPROX EXISTlNGMUDUNE
APPROX EXISTING t.mDLINE
DREDGE EL -42.88 NAVD
(-40MLLW)
DREDGE EL-42.BB NAVD
(-40ML1W]
B
B
APPROX EXIST. MARL.
APPROX EXIST. MARL,
El VARIES FROM APPROX
-38±T0-43tNAVD
EL VARIES FROM APPROX
-38±T0-43tNAVD
PllETlPEL
PILETIPEL
SEEPILESCHEDULE
STEELHP10x42STINGER
SEEPILESCHEDULE
DNSHEETS$503
PILETlPEL
SEE PILE SCHEDULE
ONSHEETS502
ONSHEETSSOS
STEELHP10x42.STINGER
STEELHPI0x42STINGER
A
A
BPE TYPICAL SECTION
A1 SCAI.E,1/4'·1'~'
0BPE SECTION AT PRESTRESSED BEAMS
sc
liQill;
1.
2.
2
STlNGERTlPEL
SEE PILE SCHEDULE
ONSHEETS5G2
CONTRACTOR SHALL COORDINATE lNSTAUATlON OF SLEEVED UTILITY
PENETRATIONS WITH MECHANlCALANO ELECTRICAL DRAWINGS, UTIUTIES
SHOWN ARE FOR REFERENCE ONLY.
REFER TO NOTES 3, 4AND 5 ON SHEET 5132.
3
401/404 PERMIT
APPENDIX B
FIGURE 11a
GRAPHIC SCALES
SCALE: 1/4"=1'-0"
5
S301
3
2
D
,....
B'-0'
®
5
4
B'-0'
CURBW/SCUPPERHOLES
@20'-{I"Q,C.,lYP
RACKED UTllfTIES,
SEE MECHANICAL
DRAWINGS
c
)Z MLWa-2.68
12'11ll1MBERFENDERPILE
APPRQX EXISTING MUDUNE
~
DREDGEEL-42.88NAVD
B
B
APPROX EXIST. MARL, El VARIES
FROM APPROX-36± TO -43± NAVO
~
STEELHP12>84STINGER, lYP
'iJ
PILETIPEL
SEE PILE SCHEDULE
ONSHEETS502
STINGERTlPEL
SEE PILE SCHEDULE
ONSHEETS502
A
A BPE &UTILITY PLATFORM TYPICAL SECTION
1 SCAI.E:1/4'=1'-0'
401/404 PERMIT
APPENDIX B
FIGURE 11b
GRAPHIC SCALES
NOTES:
'i:""""CONTRACTOR SHALL COORDINATE INSTALLATION OF SLEEVED UTlliTY
PENETRATIONS WITH MECHANICAL AND ELECTRICAL DRAWINGS. UTILITIES
SHOWN ARE FOR REFERENCE ONLY.
2.
2
REFER.TONOTES3,4AND50NSHEErS1J2.
3
SCALE: 114"=1'-0"
4
5
A
2
3
4
5
SHEET NOTES
1
PILEBENTDESIGNATION,TYP
2.
FOR BORING LOGS, SEE 6-SHEETS.
3.
FOR 20" SQ P/C P/S GONG COMBI PILE CUT OFF AND TIP
ELEVATIONS, SEE PILE SCHEDULE ON SHEET 5502.
2{1"SOP/CP/SFENDERPILES'
D
SMS 26'-{)" SPAN LDCATIO~S·
BATHYMETRIC DATA IS BASED ON MULTI-BEAM SURVEY
PERFORMED BY CASHMAN DREDGING & MARINE
CONSTRUCTION COMPANY, LLC IN JULY OF 2013
4.
FOR 18" AND 20" SO PIC PIS CONC FENDER PILE CUT OFF AND
11P ELEVATIONS, SEE PILE SCHEDULE ON SHEET 5503.
5
THE CONCRETE PORTION OF ALL P/C PIS PILES SHALL BE
DRIVEN TO A MINIMUM EMBEDMENT OF 15'-0" INTO THE
COOPER MARL. STEEL STINGER SHALL BE DRIVEN AS
INDICATED ON THE PILE SCHEDULES.
6.
THE BPE DECK SHALL MATCH THE HEIGHT AND GRADE OF
THE EXISTING PIER X-RAY NORTH DECK.
7.
THE EAST FACE OF THE BPE SHALL BE ALIGNED VV1TH THE
EAST FACE OF EXISTING PIER X-RAY NORTH.
I
I
.I
c
SYMBOL LEGEND
B4l~
0
APPROXIMATE BORING LOCATION
20" SQ PfC PIS CONCRETE COMB! PILE (PLUMB)
""'
"""'OK <><·
JB
"""-"C'~"'SW
GA'"""'""
20" SO PIC PIS CONCRETE COMB! PILE (BATTERED)
20" SO PIC PIS CONCRETE FENDER PILE
B
18" SQ PIC PIS CONCRETE FENDER PILE
COMB! PILES TO BE PDA TESTED (DYNAMIC PILE TESTING)
0
.
~-··
TIMBER FENDER PILE
tJ;;
g
8
I
~ § ~ .Q
~6~ ~
..... -·
£~~
X~
~
ii:5
~(5
= wo:::
<
r-----------------,1 ~
§ ~
~~
"I
~SHORESIDEj
! /
I I
lj
I
I __
'
~/
::;;~;;,M@BERDDLPHIN,
13'-10"
30'-6'
AI
401/404 PERMIT
APPENDIX 8
FIGURE 12a
43'-0'
PLAN
NORTH
~~~~~~,~~~!L=E~P=LA~N~~~~~~~~~--------------------------------------------------------------------------------~~
2
3
4
g'Z
m
..
)
23'-9'
~~
~
I
··.
18'5!JP/C£'/SFENDERPIL_ES
B
~
U)
~~~ ~
~x
~~ ~~a:
':l'i
~~
i~ ~
u
p~§ ~
i!l
If
Q
GRAPHIC SCALE
SCALE: 118"==1'-0"
5
S101
A
3
2
4
5
SHEET NOTES
1.
BATHYMETRIC DATA IS BASED ON MULTI-BEAM SURVEY
2.
FOR BORING LOGS, SEE B-SHEETS.
3.
FOR 20" SO P/C PIS CONC COMB! PILE CUT OFF AND TIP
ELEVATIONS, SEE PILE SCHEDULE ON SHEET 8502.
4.
FOR 18" AND 20" SQ P/C PIS CONC FENDER PILE CUT OFF AND
TIP ELEVATIONS, SEE PILE SCHEDULE ON SHEET S503
5.
THE CONCRETE PORTION OF ALL PIC PIS PILES SHALL BE
DRIVEN TO A MINIMUM EMBEDMENT OF 15'-0'"INTO THE
COOPER MARL. STEEL STINGER SHALL BE DRIVEN AS
INDICATED ON THE PILE SCHEDULES.
6.
THE BPE DECK SHALL MATCH THE HEIGHT AND GRADE OF
THE EXISTING PIER X-RAY NORTH DECK.
7.
THE EAST FACE OF THE BPE SHALL BE ALIGNEDWlTH THE
EAST FACE OF EXISTING PIER X-RAY NORTH.
PERFORMED BY CASHMAN DREDGING & MARINE
CONSTRUCTION COMPANY, LLC IN JULY OF 2013.
PILEBENTDESIGKATION,TYP,
2'-6'
20'SQP/CP/SFENDERPILES
D
. I
I
c
r----J
COOPER RWER
s-'
6'EXPANSIONJOINT
'l
i
2~ SQ PIC P/SCONC FENDER
EXISTING
X~YNORTH
I
PILE,TYP,SEE~&~
~vv
I
~'~'f)
iI
1;
/;
1;
-
1;
I
I
PIE~UTilllYPIER~
BPE REFERENCE POINT
CORNER OF XRAY
NORTH PIER
D
PILE ROW DESIGNATION, TYP
I
FENDER PILE ROW
DESIGNATION, TYP
~
~
/fj
"
'
~~
c
SYMBOL LEGEND
<%)
..
~
[J
-···
B
..
'
[J
· · " \ _ APPROX EXISTING
BPE REFERENCE POINT LOCATED AT THE CORNER OF
EXISTING NORTH X-RAY APPROACH PIER. ALL
DIMENSIONS ARE REFERENCED TO THIS POINT
APPROXIMATE BORING LOCATION
0
IT:J
IZI
20"
sa PIC PIS CONCRETE COMB I PILE (PLUMB)
20"
sa PIC PIS CONCRETE COMB I PILE {BATTERED)
20"
sa PIC PIS CONCRETE FENDER PILE
I2J
18" sa PIC PIS CONCRETE FENDER PILE
·
0
COMBI PILES TO BE PDA TESTED (DYNAMIC PILE TESTING)
TIMBER FENDER PILE
CPWDK a.· s-N
··o.£oTM"''""" ""'"'w'>-"1<
"'" JB
~
X~
~~(.)
~~
·-t
~
~
[5
~~
~
ruo::
0:
/ .'
"'
m
"'
401/404 PERMIT
APPENDIX 8
FIGURE 12b
A
PLAN
!;
C
5 ~ '-' .Q
~ .
i~!
~~~
MUDLINE CONTOUR. TYP
B
t-~a g~
"U)
~ ~ ~- ~
~
:J
~x
c:~
=e.~
g 't:O....
~~i ~ ~
i~~g:~
p~~
\'!
~
i
!:?
GRAPHIC SCALE
NORTH
~~~
. ~~,.~~!L~E~P~~N~.~~~~~~------~--------------------------------------------------------~~
2
3
4
SCALE: 118"':1'..()"'
5
S102
A
2
3
5
4
DREDGING NOTES
1.
BATHYMETRIC DATA IS BASED ON MULTI-BEAM SURVEY
PERFORMED BY CASHMAN DREDGING & MARINE
CONSTRUCTION COMPANY, LLC IN JULY OF 2013.
2
CONTOURS SHOWN ARE AT A 5' INTERVAL AND TO NAVDBB
VERTICAL DATUM. BATHYMETRY SHOWN REPRESENT
CONDITIONS AT THE TIME OF THE SURVEY.
3.
D
DREDGING SHALL COMMENCE AFTER DEMOLITION OF THE
EXISTING FINGER PIER IS COMPLETED AND PRIOR TO
CONSTRUCTION OF THE BPE.
4.
NO DREDGING SHALL BE PERMITTED BEYOND THE WESTERN
AND SOUTHERN DREDGE LIMITS AS SHOWN ON THE PLAN
PER USAGE PERMIT.
5.
CONTRACTOR SHALL NOT DISTURB THE CURRENT SHIP 1
SMS ANCHOR CHAIN AND PILE ANCHOR DURING DREDGING
OPERATIONS. CONTRACTOR SHALL FIELD VERIFY LOCATION.
6
IV
I
:i:
--:
APPROXIMATE LOCATION OF IX-513 BARGE
TEMPORARY MOORING PILE ANCHOR AND CHAlN,
1YP,SEENOTE6
APPROXIMATE BOUNDARY OF
NAVAL WEAPON STATION CHANNEl,
--~:~
7.
THE DREDGE BASELINE SHALL BE ALIGNED WITH THE EAST
FACE OF EXISTING PIER X-RAY NORTH.
8.
ESTIMATED DREDGE VOLUMES ARE AS FOLLOWS;
VOLUME TO DESIGN DEPTH= 31,000 C.Y.
VOLUME OF ALLOWABLE 2' OVER-DEPTH= 5,000 C. Y.
AREA TO BE DREDGED
RANGE'f'
TO EL.4()' MllW (-42.88 NAVDBB)
WITH 2' ALLOWABLE OVER-DEPTH,
SEESECTIONSONSHEETCN301
I
c
CONTRACTOR SHALL BE AWARE THAT THE TEMPORARY
MOORING CHAINS FOR THE IX-513 BARGE MAY STILL BE
PRESENT. CONTRACTOR IS RESPONSIBLE FOR VERIFYING
LOCATION AND RELOCATING CHAINS AS REQUIRED TO MEET
DREDGE REQUIREMENTS.
APPROXIMATE PROPOSED
DREDGING SLOPE LIMITS, TYP
I
I
SYMBOL LEGEND
(%}
BPE REFERENCE POINT LOCATED AT THE CORNER OF
EXISTING NORTH X-RAY APPROACH PIER. ALL DIMENSIONS
ARE REFERENCED TO THIS POINT
·
SMS CHAIN PILE ANCHOR
B
AREA TO DREDGE AT
4H:1VSLOPE,SEEDREDGE
SECTIONS ON SHEETCN301
I
I
EXISTING FINGER PIER
TO BE REMOVED, SEE
DEMOliTION PI.MI SD-101
""
401/404 PERMIT
APPENDIX B
FIGURE 13a
A
PLAN
GRAPHIC SCALE
NORTH
~~~~,;~o~GI~NG~P~~N~-B~P~E~~~~~-----------------------------------------------------------------~
2
3
4
SCALE: 1"=50'
5
CN101
2
3
5
4
~ !
I
I
I
~
D
~
~
~
~
ol
'
'
"
"
~
~
~
~
~
~
!
~
~
i"
I
!;
~
~
"~
D
~
·
~
~
ol
!
i"
I
~
~
~
~
I
I
i
c
I
i
§
~
i
"
~
""
i!
~
~
"
"
~
I
"'
§
le-1
.,en~
~~~
i§~
I
§
I§"
·20
~~~
~~~
'
~
I
~
-6(1[
-100
I"
~
i5.
i
··20
401/404 PERMIT
APPENDIX 8
FIGURE 13b
0
·u;
c
~a
XN
w..,.
z
;::
~-
""'
til
m·
~X
w
oc~
c
H3
'"
~~~
~~§
..,
~
SCALE: 1":=30'
2
3
4
5
0
w
0
~~
~
'""!
~ze; ~
GRAPHIC SCALES
·"
""'
§tO:
N00<\50-14-C-17511
.,
"'0
n::s "w
.£~ "'"'z
<~:
~
·100
A
u
z.
I
B
L
"'"z
"
"
'w
~
~~
"~
~
~ -40l
i
..,,
-D<
""'"·w""''"
"
PNAGOI'
~
~
~
B
I
CN301
A
2
3
5
4
I ~ieREMo"D
. DEMOLITION, WASTE, DEBRIS, AND UNSATISFACTORY
VEXISOING'M'm
SHALL BE DISPOSED OF OFF SITE/OFF JB CHS.
COORDINATE LIMITS OF SAWCUT AND PAVEMENT REMOVAL
PAVEMENT LAYOUT AND JOINTING PLAN.
D
I
PAVEMENT DESIGNATED FOR REMOVAL SHALL BE SAWCUT FULL
DEPTH AT LOCATIONS INDICATED ON THE DRAWINGS AND
DETAILS.
D
EXISTING PAVEMENT EDGES SHALL BE SAWCUT IN LOCATIONS
SHOWN TO PROVIDE EDGE FOR CONSTRUCTION OF PAVEMENT.
PAVEMENT REMOVAL LIMITS SHALL BE TO THE NEAREST
EXISTING PAVEMENT JOINT TO PREVENT PARTIAL PANEL
REMOVAL. PAVEMENT REMOVAL SHALL INCLUDE REMOVAL OF
PAVEMENT AND SUBBASE MATERIAL PRESENT.
DAMAGE TO PAVEMENT AREAS DESIGNATED TO REMAIN SHALL
BE REPAIRED AT NO ADDITIONAL COST TO THE GOVERNMENT
c
B
401/404 PERMIT
APPENDIX 8
FIGURE 14
A
PLAN
NORTH
OVERALL SITE DEMOLITION PLAN
CD
SCALE: 1"==120'
2
3
4
5
A
2
3
4
I
I
I
I'\_
INFORMATION SHOWN ON PLANS AND DETAILS IS TAKEN
FROM RECORD DRAWINGS PROVIDED. CONTRACTOR SHALL
FIELD VERIFY BEFORE SUBMITIING BID. NOTIFY
CONTRACTING OFFICER OF ANY DISCREPANCIES PRIOR TO
DEMOLI110N.
2.
THE EXISTING FINGER PIER CONNECTED TO THE EXISTING
PIER X-RAY NORTH AND ANY PILING FROM PREVIOUSLY
DEMOLISHED FINGER PIER (APPROXIMATE LOCATIONS ARE
DEFINED IN NAVFAC DRAWING NUMBERS 5203022 THRU
5203027) SHALL BE DEMOLISHED TO ENABLE CONSTRUCTION
OF THE BPE AND INSTALLATION OF THE SMS MOORING
SYSTEM. ALL PILES SHALL BE COMPLETELY REMOVED.
TEMPORARY MOORING
I
D
1
EXISTING IX-516 BARGE .
I
1
TO BE RELOCATED BY NAVY
I
I
b
GU
REMOVE AND DISPOSE OF EXISTING
CONCRETEWM.KWAYSUPPORT,SEE ~
I
CONCRETE MOORING DOLPHIN,
SEE~
LcJ:
-~
~
c
i(Jl
LOCATION OF
EXISTINGFM..LENWP!l'mAY,
4'-!l'WIDEx'ZTHICKx3'-3'HIGH
BENTCAPAN02-14' PILES
Al'PROXIMAlE LOCATION OF
EXISTING FALLENWAUMAY,
4'-6'WlDEx2'THICKx3'-3'HIGH
BENTCAPAND2·14' PILES
REMOVE AND DISPOSE OF
EXISTlNGPilESUPPORTED
CONCRETE BREASTlNG DOLPHIN, SEE
@
Kl.
I
I
I
EXISTING CONCRETE FINGER PIER
"'"'
APPROXIMATE LOCATION OF EXISTING
~~-~-
FALLEN BREASTING DOLPHIN, REMOVE
------ /
PLAN
NORTH
COMPLETELY
~~~~~~,.:~. -~M~Y~N~O~R~TH~D~E~M~O~L~IT~IO~N~P~~~N~--~~~--------------------------------------------------------------~~
----~~-Jv
-----------'y------------'iro==''"OISPOSEOFEXISTING
13-PILE CQRNER TlMBER FENDER
PILECLU~ER,SEE
REMOVE&SALVAGE
EXISTING CWN/AY, TYP
l
~
B
B
REMOVEANDDISPOSEOF
EXISTlNGCONCRETEWmMAY,SEi:
@
K3
""'
~I
WI
s~
A
Q<(l
.
REMOVE AND DISPOSE OF EXISTING
:;;:I
WALif:/iAYPILEBENT,SEE~
I
~
1--------=""'--------~
REMOVE AND DISPOSE OF
EXISTINGPILESUPPORTED
CONCRETE BREASTING DOLPHIN, SEE
401/404 PERMIT
APPENDIX 8
FIGURE 15
@
SD31ll
REMDVEANDSALVAGE
EXISTINGC\.EAT.TYP
PIER X-MY NORTH DEMOLITION P~N
118"=1'-0"
SCALE: 118"=1'-0"
2
3
4
5