Intermodal Container Transfer Facility- Notice of Scoping Meeting
Charleston County, South Carolina
Intermodal Container Transfer Facility- Notice of Scoping Meeting
Charleston County, South Carolina
Public Notice and Drawings
Public Notice
April 15, 2014
U.S. Army Corps of Engineers
Charleston District
Community Meeting for the Proposed Navy Base Intermodal Facility,
North Charleston, South Carolina, Project Number SAC 2012-00960
The U.S. Army Corps of Engineers, Charleston District (Corps) is preparing an Environmental Impact
Statement (EIS) to assess the potential social, economic and environmental effects of the proposed Navy
Base Intermodal Container Transfer Facility (ICTF) at the former Charleston Naval Complex in North
Charleston, South Carolina. This EIS will assess the potential effects of the South Carolina Department of
Commerce Division of Public Railways d/b/a Palmetto Railways' (Palmetto Railways) proposed project,
and a range of alternatives, including alternate sites for the proposed ICTF, alternate configurations for
the proposed ICTF, and the No-Action alternative.
The Corps conducted a public Scoping Meeting to solicit input on the proposed project on November 14,
2013. Information gathered at this meeting was used to identify studies and analyses that will be required
to evaluate the proposed project. In addition, the Corps is working with Palmetto Railways to develop the
project purpose and need, the description of the proposed project, and a discussion of the alternatives that
have been considered for evaluation in the EIS. This information will be presented in a report called the
Description of Proposed Action and Alternatives.
The Corps is holding a community meeting to allow for open and informal discussion between members of
the community, interested parties, and the Project Team, which includes the Corps, Palmetto Railways, and
the third-party consultant (Atkins) preparing the EIS. Information will be presented on posters and the
Project Team will be available to discuss project details and to answer questions.
WHAT
Community Meeting
WHEN
Tuesday, May 6, 2014
WHERE
Military Magnet Academy
2950 Carner Avenue
North Charleston, South Carolina 29405
To provide information and to allow for open and informal discussion about the
studies that will be prepared and the alternatives that will be evaluated in the EIS
for the proposed Navy Base Intermodal Facility project.
WHY
Open House 6:00-8:00 PM
The Corps will continue to encourage input throughout the preparation of the EIS via a number of
possible means: participation in community meetings, email at www.comments@navybaseictf.com, online at www.NavyBaseICTF.com, or in writing to: U.S. Army Corps of Engineers, Regulatory Division,
Attn: Nat Ball, 69-A Hagood Avenue, Charleston, SC 29403. Project information is available on the
project website at www.NavyBaseICTF.com.
If there are any questions concerning this public notice, please contact Mr. Nat Ball at 843-329-8044 or
toll-free at 1-866-329-8187. For inquiries from the media, please contact the Corps, Charleston District
Corporate Communications Officer (CCO), Ms. Glenn Jeffries by telephone: 843-329-8123.
1
Public Notice
October 25, 2013
U.S. Army Corps of Engineers
Charleston District
Notice of Intent to Prepare a Draft Environmental Impact Statement for the
Proposed Navy Base Intermodal Facility at the former Charleston Naval Complex, North
Charleston, South Carolina, and Notice of Scoping Meeting, P/N SAC 2012-00960
The South Carolina Department of Commerce Division of Public Railways d/b/a Palmetto Railways
(Palmetto Railways) has submitted a proposal to construct a state-of-the-art Intermodal Container
Transfer Facility (ICTF) at the former Charleston Naval Complex (CNC). The proposed ICTF will
provide equal access to the Class I railroads: CSX Transportation and Norfolk Southern Railway that
serve the Port of Charleston and various local businesses and industries. The proposed facility will be
designed to accommodate future intermodal growth within the region.
Based on the available information, the proposed Intermodal Facility will adversely impact approximately
6.1 acres of tidal salt marsh and other waters of the United States associated with Noisette Creek and
Shipyard Creek. Therefore, a Department of the Army permit will be required to develop the project site.
In addition, the U.S. Army Corps of Engineers, Charleston District (Corps) has determined that the
construction and operation of the proposed ICTF has the potential to significantly affect the quality of the
human environment and therefore warrants the preparation of an Environmental Impact Statement (EIS).
In accordance with the National Environmental Policy Act (NEPA), a Notice of Intent was published in
the Federal Register on Wednesday, October 23, 2013. The purpose of the Notice of Intent is to inform
the public that the Corps is preparing an EIS and to announce the location and time of the Public Scoping
Meeting. However, to ensure that all interested parties are notified, this local public notice is also being
issued to announce a Public Scoping Meeting on Thursday, November 14, 2013.
WHAT
WHEN
WHERE
WHY
COMMENT
DEADLINE
Public Scoping Meeting
Thursday, November 14, 2013
Meeting Format: Open House 5:30-7:00 PM
Formal Meeting 7:00-9:00 PM
Chicora School of Communications
(former Ronald C. McNair Elementary School)
3795 Spruill Avenue
North Charleston, South Carolina 29405
Map directions to the meeting location are included in Attachment B
The Corps requests input and comments from the public in order to evaluate the
Navy Base Intermodal Facility in a DEIS
December 14, 2013 (30 days after the Public Scoping Meeting)
Background: Palmetto Railways submitted a request to initiate the NEPA process for the proposed
Intermodal Facility on March 11, 2013. NEPA and the Corps' regulations provide for the use of third
party contracts in the preparation of an EIS. The term "third party contract" refers to a contractor that is
paid by the applicant, but selected by (and ultimately responsible for NEPA compliance to) the Federal
1
agency responsible for the preparation of the EIS. Therefore, Palmetto Railways issued a Request for
Proposals, and the Corps and Palmetto Railways selected Atkins North America, Inc. to assist the Corps
with the preparation of the EIS for the proposed project.
NEPA is the "basic national charter for protection of the environment" and it contains provisions that
require Federal agencies (the Corps in this case) to integrate environmental values into their decisionmaking processes by considering the environmental impacts of their proposed actions, and reasonable
alternatives to those actions. One of the basic tenets of these regulations is that comprehensive
information is made available to public officials and citizens before decisions are made or actions are
taken. This information must be of high quality and must contain accurate scientific analysis which is
normally documented in an Environmental Assessment (EA), or a more detailed document entitled an
EIS. Both of these documents must identify and evaluate the issues that are significant in relation to the
action in question. Essential to the completion of the NEPA process are expert agency comments and
public input. The purpose of the NEPA process is to help public officials (in this case the Corps) to make
informed decisions that are based on an understanding of the environmental consequences and the
alternatives available, and to take actions that protect, restore, and enhance the environment.
As indicated above, the Corps has determined that an EIS is required for the proposed Navy Base
Intermodal Facility at the former CNC. The EIS will be prepared in two stages, a Draft EIS (DEIS) and a
Final EIS (FEIS). Both of these documents will be circulated for public comment and a Public Hearing
will be held following the circulation of the DEIS. Ultimately, when the Corps is prepared to make a final
decision on the application, the agency will prepare a Record of Decision (ROD).
Scoping: One of the first ways that the public can participate in the NEPA process is called scoping.
Scoping is an early and open process for determining the types and range of issues and alternatives to be
addressed in the EIS, and for identifying the significant issues related to the proposed action.
In order to ensure that the public and interested stakeholders have an opportunity to provide input, the
Corps will hold a Public Scoping Meeting. The purpose of the Public Scoping Meeting is for the public
and interested stakeholders to provide input to the Corps on the type and range of issues to be addressed
in the EIS, to identify the potential social, economic, and environmental impacts related to the proposed
project, and to identify potential alternatives to the proposed project. This meeting is not a Public Hearing
nor is it the proper forum to express broad-ranging opinions either for or against the proposed project.
As previously stated, the public's input is essential to the NEPA process in identifying significant issues,
offering relevant information based on personal experience or knowledge, and providing assistance in
defining the scope of the EIS. Upon arrival at the Public Scoping Meeting, each attendee will be asked to
sign in and indicate whether they would like to make a formal statement at the meeting for the project
record. In addition, attendees are welcome to bring written comments or to complete a comment form,
which will provided at the meeting. Written comments will be accepted at the meeting or up to 30 days
after the date of the meeting, in this case December 14, 2013. Information on how to submit written
comments will be provided at the meeting and below in this Public Notice. Attendees will also be asked
if they would like to be included on the Corps mailing list for future project updates and information.
2
How can you assist the Corps in complying with the letter and spirit of NEPA and be an active
participant in the NEPA process?
At the meeting, you are encouraged to offer your input on the issues you think should be evaluated in the
EIS. The following topics may help you identify the issues important to you:
·
What are the potential impacts of the proposed project?
·
What is the scope of the EIS?
·
Are there potential alternative locations, layouts, or construction methods available that may have
fewer impacts to the public or the environment?
·
In what ways do you see the proposed project affecting you, your community, and/or the
environment?
·
Are there methods of communication, which the Corps has not considered, that could keep you
better informed about the proposed project or the NEPA process?
·
What criteria should the Corps use to choose which alternatives should be fully assessed in the
EIS?
NOTE: So that the Corps can hear everyone who wants to provide their input at the Public Scoping
Meeting, a time limit will be placed on each speaker. Therefore, if you will be providing oral
comments, it is essential that they are concise to ensure that you are able to provide the input that you
deem important. Written comments will also be accepted by the Corps through December 14, 2013.
Existing Information. In order to assist you in providing the Corps with your comments and input during
the scoping process, the latest information about the proposed project is provided.
1. Proposed Project. According to Palmetto Railways, there are two existing intermodal terminals
in the Charleston Region that are operated by the Class I railroads: CSX Transportation (CSX)
and Norfolk Southern Railway (NS). Both terminals operate at high volumes today and are at or
near their sustainable throughput capacity. The proposed Navy Base Intermodal Facility project
is being designed to accommodate existing intermodal rail traffic and projected intermodal
growth associated with the Port of Charleston and local businesses and industries.
The proposed project includes the construction and operation of a 90-acre Intermodal Facility
where containerized freight will be transferred between trucks and rail cars. This portion of the
project will include storage and processing railroad tracks, wide span gantry cranes, container
stacking areas, administrative and maintenance buildings, automated gate systems, and vehicle
driving lanes. The current design has nearly 20,000 track feet of processing tracks and 30,000
track feet of classification tracks.
In addition, approximately 42-acres of road and rail improvements will be required to operate the
proposed ICTF. As shown in Attachment A- Exhibit 1, CSX will access the proposed ICTF from
the west and NS will access the proposed project from the east along the Bexley Street Corridor.
Although the majority of the rail right-of-way exists today, additional right-of-way will need to
3
acquired and new at-grade crossings will need to be constructed near the intersection of Spruill
Avenue and Aragon Street to provide access from the west and to allow locomotives and railway
equipment to be turned around.
Exhibit 2 shows proposed improvements to an existing rail right-of-way that is located adjacent to
Spruill Avenue and an existing rail trestle that crosses Noisette Creek. Near the intersection of
Spruill Avenue and McMillan Avenue, two new rail lines will provide access to the proposed
ICTF. In order to avoid and minimize potential impacts associated with a new at-grade rail
crossing, a cul-de-sac will be constructed at the southern end of St. Johns Avenue and the portion
of McMillan Avenue between Spruill Avenue and Noisette Boulevard will be closed. The
portion of Cosgrove Avenue that is located east of Spruill Avenue will be realigned and a flyover
will be constructed over the new rail lines to provide future roadway access between Spruill
Avenue and North Hobson Avenue.
Exhibit 5 shows proposed improvements to the existing Viaduct Road flyover and the relocation
of a portion of Bainbridge Avenue. The bottom elevation of the Viaduct Road flyover will be
increased to accommodate double-stack intermodal rail cars similar to the new Cosgrove Avenue
flyover. The relocation of Bainbridge Avenue will provide more efficient access to and from
Spruill Avenue and from Interstate 26 once the new Port Access Road is constructed. Exhibit 6
shows the location of a limited access, private drayage road that would allow the direct transfer of
containers to and from the proposed ICTF and the new Navy Base Marine Container Terminal. If
constructed, this roadway would reduce the total number of trucks entering and exiting the new
port facility using the Port Access Road.
2. Issues. Issues and potential impacts associated with the proposed project that are likely to be
given detailed analysis in the DEIS include, but are not necessarily limited to: transportation
infrastructure (roadways and railways), waters of the United States, air quality, noise, light,
environmental justice, socioeconomics, visual resources/aesthetics, cultural resources, biological
resources including Federally listed threatened or endangered species, land use, water quality, and
hazardous waste and materials.
3. Alternatives. The alternatives analysis "is the heart of the EIS," which is quoted directly from
NEPA regulations. The Corps must evaluate reasonable and practicable alternatives to the project
as proposed by Palmetto Railways that will avoid and/or minimize effects on the quality of the
human environment. By definition, "Reasonable" alternatives are those that are practical or
feasible from the technical and economic standpoint and using common sense, rather than simply
desirable from the standpoint of the applicant. "Practicable" alternatives are those that are
available and capable of being done after taking into consideration cost, existing technology, and
logistics in light of overall project purposes.
When determining which alternatives to the applicant's proposal should be rigorously explored
and objectively evaluated in the EIS, the Corps will assess at least the following for comparison
against the applicant's proposed alternative:
4
·
·
·
No Action,
Alternatives that may result in avoidance and/or minimization of impacts to waters of the
U.S., and
Mitigation measures not in the proposed action.
The "No Action" alternative means that the proposed activity would not take place. This
alternative is used to compare the effects of the proposed project to what would occur if the
proposed project were not constructed. Keep in mind that the effects from the proposed project
will not be compared to conditions that exist today; the effects will be compared to the projected
future conditions. Therefore, a specific period of time in the future will be chosen and projections
will be made on what the conditions will be at that time and that is what will be used to compare
the proposed project's effects under the "No Action" alternative.
Of course, every possible alternative cannot be rigorously explored in the EIS. Therefore, the
Corps will use a process and evaluation criteria to identify a set of alternatives that represent a
range of reasonable, practicable alternatives to be examined in detail in the EIS. Your input on
what those criteria should be is requested as part of the scoping process.
4. Scope. The scope of the EIS is a term used to define the range of actions, alternatives, and
impacts to be considered in an EIS, which evaluates an applicant's permit application and
proposed action. There are three types of actions, alternatives, and types of impacts that the
Corps must consider in determining the "scope" of an EIS.
Three (3) types of Actions:
· Connected closely related
· Cumulative viewed with other proposed actions
· Similar common timing or geography
Three (3) types of Alternatives:
· No Action
· Other reasonable courses of action to achieve the project purpose (driven by purpose and
need)
· Mitigation Measures (not in the proposed action)
Three (3) primary types of Impacts:
· Direct caused by the action and occurs at the same time and place
· Indirect caused by the action but are later in time or removed in distance, but are still
reasonably foreseeable
· Cumulative additive effects impacting the same resource, but may be caused by
different projects
Public Outreach Program. The Corps wants you to remain involved throughout the NEPA process. At
present, the following methods are planned to keep you informed and get your input. Therefore, please
remember to let the Corps representatives know at the Public Scoping Meeting and/or in your written
5
comments, the method by which you prefer to obtain information and provide input during the process.
Also please be sure to sign in at the Scoping Meeting to ensure that the Corps has your contact
information for future project updates and information.
A) Project Website: www.NavyBaseICTF.com. Information and updates on the project will be
available on the project website. Frequently Asked Questions (FAQ), descriptions of the proposed
project, explanation of terminology, project status, maps, project schedule, meeting
announcements, directions to meeting locations, and an overview of the NEPA process are
examples of the information that will be available at the project website. Visitors to the website
will also be able to register for the project mailing list, sign up for an e-mail notification system,
request copies of documents, and submit comments via a standard comment form.
B) Public Meetings and Workshops: If you are a representative of a group or organization that you
believe is a stakeholder in the proposed project, please introduce yourself to a Corps
representative at the Public Scoping Meeting and/or through written comments following the
Meeting. Currently, it is planned that future public meetings and/or hearings will be announced
on the project website and through the mailing list.
C) Project Updates: Project Updates will be distributed at certain milestones during the NEPA
process in order to update the public on the status of the EIS and the Corps decision-making
process. The Project Updates will feature a project status update, articles explaining aspects of
NEPA, and updates on studies being performed for the EIS evaluation.
D) Special Need: Should you have special needs (e.g., hearing impaired, language), please contact
the Corps at least seven (7) days prior to the Public Scoping Meeting by calling (843) 329-8044
or toll free at (866) 329-8187, or at the mailing address below.
Additional Review and Consultation. Additional review and consultation, which will be incorporated
into the preparation of the DEIS, will include, but will not necessarily be limited to, Section 401 of the
Clean Water Act; Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens
Fishery Conservation and Management Act; the Endangered Species Act; and the National Historic
Preservation Act.
Contact Information. For further information and/or questions about the proposed project, please
contact Mr. Nathaniel I. Ball, Corps Project Manager, by telephone: 843-329-8044 or toll free at 1-866
329-8187, or by mail at the address provided below. The Corps respectfully requests that comments
regarding the proposed Navy Base Intermodal Facility project and the NEPA process be submitted in one
of the following ways:
1. Public Scoping Meeting November 14, 2013
2. Written comments submitted by December 14, 2013 (during public scoping period):
6
U.S. Army Corps of Engineers, Charleston District
c/o Nathaniel I. Ball, Special Projects Branch
69-A Hagood Avenue
Charleston, South Carolina 29403
3. Project website www.NavyBaseICTF.com
4. Project email www.comments@navybaseictf.com
Using one or more of these methods will ensure that your comments are made a part of the Corps' formal
record. For inquiries from the media, please contact the Corps, Charleston District Corporate
Communications Officer (CCO), Ms. Glenn Jeffries by telephone: 843-329-8123.
Nathaniel I. Ball
U.S. Army Corps of Engineers
69-A Hagood Avenue
Charleston, South Carolina 29403
7
Attachment A: Map of Proposed Project
8
VICINITY MAP
I
CDMth
Sml
.li iJ)ISystems)
Navy Base
Intermodal
Facility
Navy Base
Container
Terminal
(UNDER
CONSTRUCTION)
e o
RAILWAYS
Navy Base Intermodal
o
3ooo
Facility
October 2013
SCALE IN FEET
(PERMITTED
FUTURE
CONSTRUCTION)
II
("")
0
0
"0
(J)
"""
::0
KEY MAP
II
CDMth
Sm1
<
(J)
"""
.li ~I ;I Systems)
Navy Base
Intermodal
Facility
LEGEND
- - NEWRAIL
I - ---. INTERMODAL YARD/
L __
I TRANSFER FACILITY
(PERMI1TED
FUTURE
CONSTRUCTION)
Navy Base Intermodal
o
1soo
Facility
October 2013
Ashley
River
SCALE IN FEET
Navy Base
Container
Terminal
(UNDER
CONSTRUCTION)
Active
(I)
I
Exhibit 1
~
F
r
I
Rail
~
ITI
zc:
CDMth
Sm1
.I Ii ijiSystems)
csx
""0
~
ITI
!"1
Existing
At-Grade
Crossing
..,
NCTC Connection
for Local Traffic
--
-
To/From
csx
==-~~ND
I]
L-- _j EXISTING csx R.O.W.
c
-
f
New At-Grade
Crossings
I
J EXISTING NCTC R.O.W.
.....___,I NEW R.O.W.
- NEW RAIL
c:::::=
___,.----
0
c
0
~
~
~.=========================~ ~
Navy Base Intermodal
o
2oo
Facility
October 2013
SCALE IN FEET
Tidal
Salt
Uarsh
Exhibit 2
Tidal
Salt Marsh
CDMth
Sm1
I
I
Tidal
Salt Marsh
N oisette Creek
Rail Trestle
Improvements
Tidal
Salt Marsh
LEGEND
c
Tidal
Salt
Marsh
I
I
October 2013
SCALE IN FEET
EXISTING CSX R.O.W.
.._____.I NEW R.O.W.
I
Navy Base Intermodal
o
1oo
Facility
J
I
I
PROPOSED RAILWAY
.....______._ BRIDGE
I
- NEW RAIL
CDI
CD
-~1
01-
Ji
I..
~
alai
~-;;
~
"lO
CT ·
"'!'
"'
- ~
q
Aironme_n_t - -
Ui
'
'
en
,·- ~------
C1
i
i
~
__centerline
Ji
'
1
Ji
Ji
I
i
Ji
'
'
'
'
g7
"lO
CT ·
I
1
1
'
'
'
~o·oo·
I
I
J
'
~
Ji
'
i
i
_J ___ J_____
' __ I_ ___ l ___ J ___ J __
~
"'!'
Ji
'\_go·
~
$
PLAN
Toe of Fill
!Typ.)
E - Denotes Expansion Bent
I
1
'
'
\_~ L~od
~~
!Typ.)
NOTES:
\
I
w
w
'6~
w
en
~
No Scale
(II&
SPAN H-.,
¥
21' -6"
:{Finished Grode/
Top of Roll
21' -6"
21' -6"
21' -6"
22' -6"
22' -6"
21' -6"
21' -6"
lW!...!.
SPAN B
SPAN C
SPAN D
SPAN E
SPAN F
SPAN G
~g
:2
1..
Ill
_ Q_ - - - - -
X
Track I
305'
~
I
(II
F - Denotes Fixed Bent
=:~ ===
1
m
,.(\
......
l+l=
O.OOY.
======
=====~-
N 00
~
110
~
>
...c 110.
ID
----
-; ---Ill
"CD
m ~ ---- ;;..
.,., 00
...c 110.
ID
~
g
...c 110~
g
...c 110~
lt'l
oq"
.- - - - - j ~
>
Ill >
---- ~
-----
-----·
>
0
.... 0
...c 110.
ID
~ ----
"""CD
iii ----
~
Ill
Ill
-
_____ _F1 ~~-----~.E---~--!=li----~ E
-5
---------------------
0
...c 110.
ID 0
ID
! ---- ~ ~ --- -~ ~ ---- ~ !- ---- WI ~
Ill
-----
-----
:~ -------------------------~ ----- ~ -----
~ F
~~
--
..0
N
E - - -·-
w
z
-o·
...J
0
110 0
...c aO
- - - - - "CD
ID
; --
&--- -~ S. 1&.1
E;_ ____
~-
-------- ----- --~
~
It
--------- ----~
----------------
PROFILE
No Scale
Navy Base Intermodal
Facility
Noisette Creek Rail Trestle
Plan and Profile
October 2013
Not to Scale
Sheet 1 of 2
CDMth
Sml
.ata"systems)
Exhibit 2a
CD. I
Ji Ji Ji
Jii
i
i
Jii
Jii
~ -1----~----.----L---l---l----
.,_
l
1
l
1
l
_________
Centerlln~
Alignment
1
m~9·====9·~1==~·===4'9'r====F'====~·~==Y
~
I
~ ~~90"0~'00'
W
~
0~
'6
\1)
......
8
r
c
"$&
z
...J
l{ Tr~ck
Leod
!Typ.l
I
1
NOTES:
PLAN
Toe of Fill
!Typ.l
No Scale
E - Denotes Expansion Bent
¥
SPAN H
w
.
,.(\
F - Denotes Fixed Bent
21' -6'
________________________________________~
~t-~----2-1'--6'
a>
22' -6'
g
g
CD
g
22' -6'
=
g
CD
CD
~ ~
~ ~
~
_ +-m
c ~ ___ +-m
c - · - ____ ....£ ao· _ _ _
-
~
> - - -
(:II!-
(::lli5""" ---
21' -6'
g
!!!
CD
-
- !d!Lii - - - -
g
CD
....c ao·
~
21' -6'
.... ·
21' -6'
:!:
g
CD o
_Q
~{;Finished
Grode/
Top of Roll
-gO
.... "!
t:"'!
.£ ao
> - - - -~
> - - - - ~c ao>- - - - ~mao> - -
-~! --- - ~~ ---- ~!----
-.S! --
----------------
~~
=-=- ~ =--=--=---
-------------
f+fo-:-oo)':- --------
-~-..===- -
IJ-1. - - - - 1¥ - - - - - 41 - - - - - 41 - - - - - .J~0- - - - - - - - - - - - - - - - - - - -
------------------------------------------------------------41
_E____ ili f-F
__
j:___
E
E _
_L
f___
41
PROFILE
CDMth
Sml
No Scale
Navy Base Intermodal
Facility
Noisette Creek Rail Trestle
Plan and Profile
October 2013
Not to Scale
Sheet 2 of 2
.ata"systems)
Exhibit 2b
Navy Base Intermodal
Facility
o
Joo
October 2013
SCALE IN FEET
LEGEND
L--J
EXISTING
csx
R.O.W.
- - NEWRAIL
L....-____.1
L....-____.1
~
PROPOSED PAVEMENT
PROPOSED ROADWAY BRIDGE
PAVEMENTREMOVAL
CDMth
Sm1
.Iii\ 1!1 Systems)
Intersection
Improvements
I
Exhibit 3
Cooper
River
LEGEND
- - NEWRAIL
1 - ---.
L __
INTERMODAL YARD/
I TRANSFER FACILITY
._______.I
PROPOSED PAVEMENT
.________,I
PROPOSED ROADWAY BRIDGE
~
PAVEMENT REMOVAL
Navy Base
Intermodal
Facility
CDMih
Sml
.II ii)i systems)
Wetland Area
Impact = 0.24 Acre
Navy Base Intermodal
o
4oo
Facility
October 2013
SCALE IN FEET
NOISE
BARRIER
WALL
w
j_~~~LJ~~==~~JI~==~~~,gg·~~~==~~J!~:::::=:::==:::~:r~~~
z
376.98'
ORIVING LANES
CDMth
sm1
Navy Base Intermodal
Facility
0
October 2013
30
SCALE IN FEET
Railyard Typical Section
Sheet 1 of 4
Exhibit 4a
-1~---------------------=======~~~~~2~68~.8~·~~~~~~~~~~~~
~""'-. ~
r
co
o:::t
r-
.~
Ill
I
13.4'
><
w
w
w
rn
20'
~
I
lC
F9
...J
I= ~
I
()
~
23'
\
12~
20'
0
~
a::
1
w
z
·I
o.5'
·
80'
20'
20'
49.5'
MJ
f?-l
20'
SERVICE
~ LANE
;::
0
I
~
11.
40'
35'
50.5'~
140'
51.5'
r
~
w
F
I
~
1
9
·-'
I= ~
~
"~'
52.75'
376.98'
\_DRIVING LANES
435.02
ONTAINER STACKING
CDMth
sm1
Navy Base Intermodal
Facility
0
October 2013
30
SCALE IN FEET
Railyard Typical Section
Sheet 2 of 4
Exhibit 4b
.o H:::E:::EE:::E:I=:=~
o:::t"L__ _ _ _ _____._
l
ID
I
><
w
l
ID
I
50.5'
~
w
w
(J)
435.02'
WHEELED PARKING
CDMth
sm1
Navy Base Intermodal
Facility
0
October 2013
30
SCALE IN FEET
Railyard Typical Section
Sheet 3 of 4
Exhibit 4c
(.)
""'"
IIll
I
><
w
w
w
C/)
w
EDGE/PAVEMENT
z
::J
EDGE/ROAD
OUT-IN GATES
I
()
~
~
70'
55'
55'
WHEELED PARKING
WHEELED PARKING
CDMth
sm1
Navy Base Intermodal
Facility
0
October 2013
30
SCALE IN FEET
Railyard Typical Section
Sheet 4 of 4
Exhibit 4d
12'~·--~.0'o~ i~r·~n""·f~ 1~2·~-0"~fi~~~~. Ffjf1=s·-=o·==~~-1~--~
12'-0" "" 12'""""
1---:9-e
~Ai~~~~~~~~E~f~~~~~~~~sii~~
s
b
,.
·-o·- ~..~, .lL-~r:t---~$1H---1~-t---ti~t·t---T1I_.q.
r.
2
,_
4'0'
8" CMU PILASTER W/CMU - -..... ,,,
,. ~
FEATURE STRIPS
11""
4' ""
4' 0'
,........,
· ~
1·
,.-,
1··~
~
CANOPY ABOVE_/
DRIVE AROUND LANE
CDMth
sm1
.~taM systems)
Navy Base Intermodal
Facility
NBIF Gate Plan
October 2013
Not to Scale
Exhibit 4e
LEGEND
- NEWRAIL
~- --.
L _
_
INTERMODAL YARD/
1 TRANSFER FACILITY
L______J
~
~
~
PROPOSED PAVEMENT
PROPOSED ROADWAY BRIDGE
1111111111 PAVEMENT REMOVAL
North Hobson/
Viaduct/Bainbridge
Intersection
Realignment
~~
Viaduct Road
Overpass
Inaprovernent~
Drayage
Road
CDMth
Sm1
Tidal Soli
Uorsh
Port Access
Road
Navy Base Intermodal
o
3oo
Facility
October 2013
SCALE IN FEET
(Permitted Future
Construction)
I
Exhibit 5
Navy Base Intermodal
Facility
o
soo
October 2013
SCALE IN FEET
LEGEND
- - NEW RAIL
I - ---. INTERMODAL YARD/
L __
Drayage
Road
AS~~~~~~;:
I TRANSFER FACILITY
._______.I
PROPOSED PAVEMENT
._______.I
PROPOSED ROADWAY BRIDGE
~
PAVEMENT REMOVAL
Wetland
Area
Impact
Port Access
Road
CDMih
Sml
(Permitted Future
Construction)
Exhibit 6
Wetland
Area
Impact
Navy Base
Container
Terminal
(Under
Construction)
Drayage
Road
Attachment B: Directions to Public Meeting
9
Directions to Scoping Meeting at the Chicora School of Communications
From the North:
Travel south on I-26 East toward Exit 212. Take Exit 212 for I-526 toward Mt. Pleasant/Savannah. Take
Exit 212C on the left for I-526 East toward Mt. Pleasant. Continue on I-526 East for 0.5 miles. Take Exit
18A to merge onto US-52 East/US-78 East/Rivers Avenue. Continue for 2.7 miles. Turn left onto Verde
Avenue. After 0.4 miles, turn right onto Spruill Avenue/State Road S-10-32. The Chicora School of
Communications will be on the right.
From the South:
Travel north on I-26 West toward Exit 218. Take Exit 218 for Spruill Avenue toward Naval Base. Turn
left onto Spruill Avenue/State Road S-10-32. The Chicora School of Communications will be on the left.
From the West:
Travel east on US-17 North/Savannah Highway. Turn left onto SC-7 North/Sam Rittenberg Boulevard.
After 5.9 miles, turn left onto Rivers Avenue. After 0.4 miles, take the first right onto McMillan Avenue.
After 0.3 miles, take the third left onto Spruill Avenue/State Road S-10-32. The Chicora School of
Communications will be on the left.
10
Attachment C: Preliminary List of Issues to be
Addressed in the EIS
11
Preliminary List of Issues that May Be Addressed In The EIS
Transportation Roadways and Railways
Land Use and Zoning
Water Resources/Water Quality Surface and
Groundwater
Energy Use and Greenhouse Gases (GHG)
Wetlands and Waters of the U.S.
Noise and Vibration
Federally-Listed Threatened or Endangered Species
Light
Hazardous Materials and Solid Waste
Air Quality
Socioeconomics and Environmental Justice
Visual Resources/Aesthetics
Public Health and Safety
Historic Properties
Environmental Justice
Geology and Soils
Flood Hazards and Floodplain Values
Economic Analysis
Fish and Wildlife Values
Recreation
12
Attachment D: Definition of Terms
13
Three (3) Types of Actions:
·
Connected Actions, which means that they are closely related to the proposed action and
therefore should be discussed in the same impact statement. Actions are connected if they:
o
Automatically trigger other actions which may require Environmental Impact Statements
o
Cannot or will not proceed unless other actions are taken previously or simultaneously
o
Are independent parts of a larger action and depend on the larger action for their
justification
·
Cumulative Actions, which when viewed with other proposed actions have cumulatively
significant impacts and should therefore be discussed in the same impact statement
·
Similar Actions, which when viewed with other reasonably foreseeable or proposed agency
actions, have similarities that provide a basis for evaluating their environmental consequences
together, such as common timing or geography. An agency may wish to analyze these actions in
the same impact statement. It should do so when the best way to assess adequately the combined
impacts of similar actions or reasonable alternatives to such actions is to treat them in a single
impact statement.
Three (3) Types of Alternatives:
·
No Action Alternative
·
Other Reasonable Courses of Action to Achieve the Project Purpose
·
Mitigation Measures (in addition to and not in the proposed action) Include:
o Avoiding the impact altogether by not taking a certain action or parts of an action
o Minimizing impacts by limiting the degree or magnitude of the action and its
implementation
o Rectifying the impact by repairing, rehabilitating, or restoring the affected environment
o Reducing or eliminating the impact over time by preservation and maintenance
operations during the life of the action
o Compensating for the impact by replacing or providing substitute resources or
environments
Three (3) Primary Types of Impacts
·
·
Direct Impacts, which are caused by the action and occur at the same time and place
Indirect Impacts, which are caused by the action but occur later in time or farther removed in
distance, but are still reasonably foreseeable. Indirect impacts may include growth-inducing
impacts and other impacts related to the induced changes in the pattern of land use, population
density or growth rate, and related effects on air and water and other natural systems, including
ecosystems.
14
Effects and impacts as used in the context of NEPA are interchangeable. Effects includes
ecological (such as the effects on natural resources and on the components, structures, and
functioning of affected ecosystems), aesthetic, historic, cultural, economic, social, or health,
whether direct, indirect, or cumulative. Effects may also include those resulting from actions
which may have both beneficial and detrimental effects, even if on balance the agency believes
that the effect will be beneficial.
·
Cumulative Impact is the impact on the environment which results from the incremental impact
of the action when added to other past, present, and reasonably foreseeable future actions
regardless of what agency (Federal or non-federal) or person undertakes such other actions.
Cumulative impacts can result from individually minor but collectively significant actions taking
place over a period of time.
15