Bucksport Marine Industrial Park (Horry County)
Bucksport Marine Industrial Park (Horry County)
JOINT
PUBLIC NOTICE
CHARLESTON DISTRICT, CORPS OF ENGINEERS
1949 Industrial Park Road, Room 140
Conway, South Carolina 29526
and
THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
Office of Environmental Quality Control
Water Quality Certification and Wetlands Programs Section
2600 Bull Street
Columbia, South Carolina 29201
REGULATORY DIVISION
Refer to: P/N # 1989-09259-3
November 15, 2013
Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), Sections 401 and 404 of the
Clean Water Act (33 U.S.C. 1344), the South Carolina Coastal Zone Management Act (48-39-10 et.seq.), and
the S.C. Construction in Navigable Waters Permit Program (R. 19-450, et. seq., 1976 S.C. Code of Laws, as
amended), an application has been submitted to the Department of the Army and the S.C. Department of Health
and Environmental Control by
Grand Strand Water & Sewer Authority
c/o The Brigman Company
Britt Feldner
PO Box 1532
Conway, SC 29582
for a permit to construct an industrial marine commerce facility and dredge in the
Waccamaw River
located at
135 Bucksport Road, Conway, Horry County, South Carolina
(Latitude: 33.651278; Longitude: -79.095603).
In order to give all interested parties an opportunity to express their views
NOTICE
is hereby given that written statements regarding the proposed work will be received by the Corps until
30 Days from the Date of this Notice,
and SCDHEC will receive written statements regarding the proposed work until
30 Days from the Date of this Notice
from those interested in the activity and whose interests may be affected by the proposed work.
The proposed work consists of the construction of an industrial marine commerce facility and dredging a
portion of the Waccmaw River. Specifically, the project consists of replacing the existing public use marina
REGULATORY DIVISION
Refer to: P/N # 1989-09259-3
November 15, 2013
(docks, piers, buildings, etc) with an industrial marine commerce facility through multi-phase development that
will accommodate boat building enterprises, bulk cargo industry, and heavy transport barge operations. The
proposed construction activities involve filling .10 acres of waters of the U.S. (1705 cubic yards) for the
construction of a bulkhead. In addition, the project includes the construction of barge slips, a dual travel lift well,
and multiple docks and piers as well as a "protection pier" for an existing 30" waterline which spans (submerged)
the Waccamaw River. The configurations and dimensions of the slips and piers are depicted on Figure 5 of the
attached plans. A loading trestle will also be constructed to facilitate the loading and offloading of bulk cargo at
the proposed facility (Figure 4 of the attached plans). The applicant also proposes to dredge approximately
40,000 cubic yards of material from the Waccamaw River to allow for sufficient depths for navigation and facility
operation. Dredging will be conducted by utilizing a long-arm (60 70 ft) excavator that will operate from uplands
as well as a barge. The dredged material will be temporarily stored on barges and then offloaded onto transport
trucks which will be water-tight with a gate seal and lined with geotextile filter fabric to prevent excess material
from directly or indirectly entering the Waccmaw River during operation. A turbidity curtain will be installed
around the perimeter of the area to be dredged and anchored to shore. Silt fencing will be installed around the
material transfer area. All dredged material will be temporarily stored on-site in an upland confined disposal
facility (CDF). The CDF will be a double-chambered design that utilizes a weir dike between the primary holding
basin and the secondary sediment basin. The CDF will be surrounded by an earthen berm designed to intercept
all supernatant. The supernatant from the dredged material will be directed into the secondary sediment basin to
further allow suspended solids to settle our prior to being discharged. The outfall structure will consist of a
flashboard-riser that allows the supernatant to discharge into adjacent wetlands through a series of upland
excavated ditches, eventually returning to the Waccmaw River. The purpose of the proposed work is to
construct a commercial marine facility. The applicant offered no mitigation for the proposed work.
NOTE: Plans depicting the work described in this notice are available and will be provided, upon receipt of a
written request, to anyone that is interested in obtaining a copy of the plans for the specific project. The
request must identify the project of interest by public notice number and a self-addressed stamped envelope
must also be provided for mailing the drawings to you. Your request for drawings should be addressed to the
U.S. Army Corps of Engineers
ATTN: REGULATORY DIVISION
1949 INDUSTRIAL PARK ROAD
ROOM 140
CONWAY, SOUTH CAROLINA 29526
The District Engineer has concluded that the discharges associated with this project, both direct and
indirect, should be reviewed by the South Carolina Department of Health and Environmental Control in
accordance with provisions of Section 401 of the Clean Water Act. As such, this notice constitutes a request, on
behalf of the applicant, for certification that this project will comply with applicable effluent limitations and water
quality standards. The work shown on this application must also be certified as consistent with applicable
provisions of the Coastal Zone Management Program (15 CFR 930). The District Engineer will not process this
application to a conclusion until such certifications are received. This activity may also require evaluation for
compliance with the S.C. Construction in Navigable Waters Permit Program. State review, permitting and
certification is conducted by the S.C. Department of Health and Environmental Control. The applicant is hereby
advised that supplemental information may be required by the State to facilitate the review. Persons wishing to
comment or object to State certification or the navigable waters permit must submit all comments in writing to the
S.C. Department of Health and Environmental Control at the above address within thirty (30) days of the date of
this notice.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. Implementation of the proposed project would impact
(3.27) acres of estuarine substrates and emergent wetlands utilized by various life stages of species
comprising the red drum, shrimp, and snapper-grouper management complexes. Our initial determination is
REGULATORY DIVISION
Refer to: P/N # 1989-09259-3
November 15, 2013
that the proposed action would not have a substantial individual or cumulative adverse impact on EFH or
fisheries managed by the South Atlantic Fishery Management Council and the National Marine Fisheries
Service (NMFS). Our final determination relative to project impacts and the need for mitigation measures is
subject to review by and coordination with the NMFS.
The District Engineer has consulted the most recently available information and has determined that
the project is not likely to adversely affect any Federally endangered, threatened, or proposed species and will
not result in the destruction or adverse modification of designated or proposed critical habitat. This public
notice serves as a request to the U.S. Fish and Wildlife Service and the National Marine Fisheries Service for
any additional information they may have on whether any listed or proposed endangered or threatened
species or designated or proposed critical habitat may be present in the area which would be affected by the
activity, pursuant to Section 7(c) of the Endangered Species Act of 1973 (as amended).
Pursuant to Section 106 of the National Historic Preservation Act (NHPA), this public notice also
constitutes a request to Indian Tribes to notify the District Engineer of any historic properties of religious and
cultural significance to them that may be affected by the proposed undertaking.
In accordance with the NHPA, the District Engineer has also consulted the latest published version of
the National Register of Historic Places for the presence or absence of registered properties, or properties
listed as being eligible for inclusion therein, and this worksite is not included as a registered property or
property listed as being eligible for inclusion in the Register. To insure that other cultural resources that the
District Engineer is not aware of are not overlooked, this public notice also serves as a request to the State
Historic Preservation Office to provide any information it may have with regard to historic and cultural
resources.
Any person may request, in writing, within the comment period specified in this notice, that a public
hearing be held to consider this application. Requests for a public hearing shall state, with particularity, the
reasons for holding a public hearing.
The decision whether to issue a permit will be based on an evaluation of the probable impact including
cumulative impacts of the activity on the public interest and will include application of the guidelines promulgated
by the Administrator, Environmental Protection Agency (EPA), under authority of Section 404(b) of the Clean
Water Act and, as appropriate, the criteria established under authority of Section 102 of the Marine Protection,
Research and Sanctuaries Act of 1972, as amended. That decision will reflect the national concern for both
protection and utilization of important resources. The benefit which reasonably may be expected to accrue from
the project must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to
the project will be considered including the cumulative effects thereof; among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production and, in general, the needs and
welfare of the people. A permit will be granted unless the District Engineer determines that it would be contrary
to the public interest. In cases of conflicting property rights, the Corps of Engineers cannot undertake to
adjudicate rival claims.
The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and
officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this activity.
Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify,
condition or deny a permit for this project. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the activity.
REGULATORY DIVISION
Refer to: P/N # 1989-09259-3
November 15, 2013
If there are any questions concerning this public notice, please contact T. Brian Hardee at
843-365-0848.
ForesltJrook
BUCKSPORT
ROAD
HortjF bounty
PROP0~ED
I
BUCKSRQRT
MARl~~~. PARK/:-.·.~~=:--._..
~~.
Atlantic Ocean
VICINITY MAP
PERMIT DRAWINGS
NOT FOR CONSTRUCTION
FIGURE 1:
VICINITY MAP
NOT TO SCALE
DATUM: NAD83, NAVD88
AUTHORIZED AGENT: THE BRIGMAN GROUP
DATE: NOVEMBER 2013
DRAWN BY:
MOFFATT & NICHOL
BUCKSPORT
MARINE PARK
GRAND STRAND
WATER & SEWER AUTHORITY
166 JACKSON BLUFF ROAD
CONWAY, SC 29526
PERMIT DRAWINGS
USGS TOPO MAP
NOT FOR CONSTRUCTION
FIGURE 2:
NOT TO SCALE
USGS TOPO MAP
DATUM: NAD83, NAVD88
AUTHORIZED AGENT: THE BRIGMAN GROUP
DATE: NOVEMBER 2013
DRAWN BY:
MOFFATT & NICHOL
BUCKSPORT
MARINE PARK
GRAND STRAND
WATER & SEWER AUTHORITY
166 JACKSON BLUFF ROAD
CONWAY, SC 29526
LEGEND
(#}IMPACT SUMMARY TABLE 10,
SEE FIGURE 15
PERMIT DRAWINGS
NOT FOR CONSTRUCTION
FIGURE 3:
OVERALL PLAN
0
600'
1200'
DATUM: NAD83, NAVD88
AUTHORIZED AGENT: THE BRIGMAN GROUP
DATE: NOVEMBER 2013
DRAWN BY:
MOFFATI & NICHOL
BUCKSPORT
MARINE PARK
GRAND STRAND
WATER & SEWER AUTHORITY
166 JACKSON BLUFF ROAD
CONWAY, SC 29526
PROJECT LIMITS
~
~-
·-'----11
11i
PROPOSED
- - -PILE
--
.SUPPORTED ACCESS
ITRESTLE FOR LOADING
flULK CARGO, 1050'x40'
I
I
I
I
I
I
I
I
WETLANDS
I
I
N 663145.10
E 2579640.36 --...._
N 663952.61
E 2579267.37
l
D
8
II
PROPOSED
MARINE FACILITIES
PHASE4
(COMPLETION WILL BE
MARKET DRIVEN)
ij
WETLANDS LIMITS
D
fl
U
PROPOSED
TURN-AROUND Ll
AREA, 100'
"
DIAMETER
n
N 663177.47
E 2579734.07 ---..«...
PROPOSED
ACCESS
WALKWAY,
........12l?9~'
II
a·
M
IL
· ·-··-·· ··.!Al':'>,l,·-··~··,-.,,.,!l~.!.'~-·1~··.::"!·;.~··':;,.:· .........~ ··
N 663367.47
E 2579872.59
· N 66314?.47
E 2579842.59 "------'-,,-.o;..,..J-...L..,
·
...
__. ·-·~···
··. . ~ 'I·
PROPOSED
,LOADING ·
PLATFORM,
30'x50'
--
. N 662967-:
--~,___ ___-=--:::-----
---------------
----
_
APPROXWATERWAY
·
I.
..
APPROX WATERWAY LIMITS
PROPOSED
MOORING/
BREASTING
DOLPHIN, TYP.
-----------
----------.. ._
--------y--
WACCAMAWRflfER.--
(AflANTIQ~_J~':_c_o:~TAL WATERWAY}________
--
LIMITS
--
-
CHANNEL CENTERLINE
---
_
----------
____
---
--
-- --
-- ---
PERMIT DRAWINGS
NOT FOR CONSTRUCTION
SECTION 10 PERM IT AREA = 44,200 SF
NOTE:
WATER ELEVATIONS BASED ON NOAA STATION 8661139 BUCKSPORT, WACCAMAW RIVER
HTL = +1.95'
MHW = +1.83'
SHORELINE LIMITS BASED ON TOPOGRAPHIC SURVEYS BY SANTEE COOPER.
FIGURE 4:
MARINE FACILITIES PLAN
--------------
o
1so·
3oo·
OATUM: NA083, NAVD88
AUTHORIZED AGENT: THE BRIGMAN GROUP
DATE: NOVEMBER 2013
DRAWN BY:
MOFFATT&: NICHOL
BUCKSPORT
MARINE PARK
GRANO STRANO
WATER & SEWER AUTHORITY
166 JACKSON BLUFF ROAD
CONWAY, SC 29526
/< ",
/
r-~
I
\
SEE PROFILE' FIGURE 12A
\._
--'---
)
r
1
,.
· N 665872.21
E 2579767.37
11 1
.
.BULKHEAD
(220 LF)
666197.66
E2579719.73
PROPOSED BOAT
BUILDERS DOCKS
AND PIERS - - - - '
6
.
~~~
I
[J,.. :::.:::- :::-
I
~'(..)._
.·
,....., .....
"
,' "
//
"
.
,----- N 666316.54
\;.\I
E 2579788.21
/ /..,.>(---
...-"'
//
/
/
...-----::.- /
/
.;
/
/
---
CENTERLINE
------~
-
/.
/
__
~
.....
/
//
............
- _-
///
~
---·'
-- --
~
/.· /
MARINE FACILITIES PLAN
0
150'
300'
AUTHORIZED AGENT: THE BRIGMAN GROUP
DRA\\N BY:
MOFFATI & NICHOL
/ . ~ ... WACCAMAW NATIONA
WILDLIFE REFUGE
.. ...---:···--
~~~~~;~~
PERMIT DRAWINGS
NOT FOR CONSTRUCTION
/
FIGURE 5:
DATUM: NAD83, NAVDBB
DATE: NOVEMBER 2013
PROPOSED
DREDGING LIMITS
~
/-CHANNEL
£
/
~·
/N666381.11
~E257985.2~
300
~
/
,...-...-" //'-PROPOSEDBULKHEADAND / / /
/
/
BARGE SLIPS (650 LF)
/
)AIAcS'CAMAW RIVER
//
-~- -......_
~
"'--;:. (1ttLANTIC INTRACOASTAL
//
~"'"' /
WATERWAY)
~/
-~
........... ........
--~/
~
...........
/
--/
/
/
,I
///
NOTE:
WATER ELEVATIONS BASED ON
NOAA STATION 8661139
BUCKSPORT, WACCAMAW RIVER
HTL = + 1 .95'
MHW = + 1.83'
MHW LOCATED BY SPARTINA LAND
SURVEYING, LLC JUNE 2011.
.·
--/
/
/-
PROPOSED WATERLINE
~.
PROTECTION PIER (PHASE 1) ~-
_/_/--/
,~.I
"'
~\
..
~ ::.-::::...-"'~""""
. -
"' "'
N 66001 0.12
, E25~~4.23
..WATERLINE.
EASEMENT
///
---
"' "'
\.
EXISTING.
N 666175.23
E 257982D.Bf/
APPROX
WATERWAY
LIMITS
"' "'
""
1\
1i
j
.
. .
"' "
"
+(P.
..
~:::"J=.:::r
t
--:-;""::S..;:-'\
140'
~--1
,r
-
~)
.~
"' "'
PROPOSED
MARINE FACILITIES
PHASE 3
(COMPLETION WILL
BE MARKET DRIVEN)
"I
PHASE 2
(COMPLETION WILL
BE MARKET DRIVEN)
~ ·~··
FIG
"
PROPOSED
MARINE FACILITIES
\ ·.
-*
'\ .
···
~N·
B'
\ ~·
·· \
UPON PERMITAPP.ROVAL)
.
.
APPRO X
MHW/HTL.
"
~'3.
\
PROPOSED
MARINE· FACILITIES
PHASE .1
(TO BE COMPLETED
" "'
..
~i
EXISTING 30" WATERLINE, . .
"' "'
BUCKSPORT
MARINE PARK
GRAND STRAND
WATER & SEWER AUTHORITY
166 JACKSON BLUFF ROAD
CONWAY, SC 29526
+·
EXISTING 30"
WATERLINE,
MARINE
FACILITIES
LIMIT
-
---
-·
..-
~-~- -~I
!- ·I
...
...- - --....
... ~ \
...
. . ). .
(
\/
);
U
'\;
-
\
\
,
""
WILLBE.MARKET
DRIVEN)
I
I
"""
\
UPON PERMIT
APPROVAL)
APPROX
MHW/HTL
I
I
... I
't--~-.:::::
~~
...
\
(PHASE 2)
.·-··-.
~-
_
\,
--
·-"-
. .X.....
,./
.... ,... _....
/
./
-
I
L-- ._-
__ ~
-
DOCK (PHASE 3)
,.......
REMOVE PORTION ................
OF EXISTING
DOCK (~HASE 2)
,........-
_
--
_ .... - - .... -
.........-
.........-
£
CENTERLINE
.........-
.........
OF EXISTING
DOCK (PHASE 1)
.... - - -
.........
___...;,....
.........-.
....,...
............
..........
............
_....-....
_,.............. __
........................ ....
....r.. .
...,.;:..-·"
/ ........
~ ... /···
...--···
..._........- WACCAMAW NATIONAl
WILDLIFE REFUGE
.-·--=r--------------.
. ./
... /
.../
0
150'
PERMIT DRAWINGS
NOT FOR CONSTRUCTION
FIGURE SA:
DATUM: NAD83, NAVDBB
DATE: NOVEMBER 2013
,...
WACCAMAW RIVER
(ATLANTIC INTRACOASTAL
WATERWAY)
,.../
,... ............
APPROX
WATERWAY
LIMITS
/
-.........-- ~
MARINE FAGILITIES
DEMOLITION PLAN
/_.... ............ ~~~~
....
,.......... ,........,........-
,........-
,....... ....
............
REMOVE PORTior,(....
-
__ ...-·
....-CHANNEL
REMOVE EXISTING
DOCK(PHASE3)
/
----
........
/
/
/
\
\
-
/
REMOVE PORTION
OF EXISTING
....
1
NOTE:
WATER ELEVATIONS BASED ON
NOAA STATION 8661139
BUCKSPORT, WACCAMAW RIVER
MHW= +1.83'
HTL = +1.95'
MHW LOCATED BYSPARTINA LAND
SURVEYING, LLC JUNE 2011.
).
//
/
I
APPROX
WATERWAY
LIMITS
/
.
'
.........
/
:.--··
\\ .
/
./
.
//
... /
.
·...... ..:...\._:
N 666349.16
E 2579827.03
1
:
·
/
(PHAsE 3) .:/
.. /
:,...::;
N 666985.33
E 2579591.04
'\;
\
_._.,_,___ .. _.. _·-· _.. _.. -.......
I
I
I
BUILDING
~'\;
\
_
;EXISTINGg.~
'-
.
\
_
··-··~---·_.....
""\ \ ' " "-..
'". .
\\
......._
,-·
REMOVE
.....,_, ~
. \.
\
_
/
"
\
J
......._
"-..
"V
REMOVE
EXISTING
BUILDING
\\
"-..
.PHAS 3
(COMPLE
L BE MAR
(COMPLETION
\
PROPOSED
PHASE 1
(TO SE COMPLETED
......._ "-..
~-~~~~
-~~IVEN)
\.
PROPOSED
PHASE 2 _ . "
\
"-..
~
PROPOS
'\;
\
·
~--
..
'\;
PAVEMENT
(PHASE 3)
\
- - - - -
I
I
I
I
I
'
'\
l
..
./ _ J '\;
TO REMAIN\/
/
_ _ _... --\
I
- -
" "-.. ......._
~REMOVE......._
EXISTING
II
1'-:::
300'
AUlHORIZEO AGENT: lHE BRIGMAN GROUP
DRA\\N BY: MOFFATI &: NICHOL
BUCKSPORT
MARINE PARK
GRAND STRAND
WATER &: SEWER AUTHORITY
166 JACKSON BLUFF ROAD
CONWAY, SC 29526
VARIES- 80' TO 120'
HTL
EL. +1.95'
PROPOSED CONCRETE
PIER EL. 8.0' - - - ,
PROPOSED FINISHED GRADE EL. 8.0'
PROPOSED BULKHEAD
i-0
MLW
:~
1~
EL. -0.33'
PROPOSED DREDGE LINE, EL VARIES
I;,;,; ·'"
1.,..,...,.
1~
:~
~I>< nn.nl ~"""""" l
;;d
PROPOSED
20" SQUARE
PRESTRESSED
CONC PILE, TYP.
PROPOSED
BATTERED
PILE, TYP.
ELEVATION
PERMIT DRAWINGS
NOT FOR CONSTRUCTION
FIGURE 6:
TRAVEL LIFT PIER ELEVATION
DATUM: NAD83, NAVD88
DATE: NOVEMBER 2013
0
20'
40'
AUlHORIZEO AGENT: lHE BRIGMAN GROUP
DRA\\N BY: MOFFATI & NICHOL
BUCKSPORT
MARINE PARK
GRAND STRAND
WATER & SEWER AUTHORITY
165 JACKSON BLUFF ROAD
CONWAY, SC 29525
SUMMARY
BULKHEAD
FILL AREA (BELOW MHW) = 4690 SF
TOTAL AREA = 9700 SF
SIDE TIE = 650 LF
16' WIDE PIER
TOTAL AREA = 1600 SF
NO. PILES = 32
SIDE TIE = 220 LF
8' WIDE PIER
TOTAL AREA = 640 SF
NO. PILES = 23
SIDE TIE = 160 LF
PROPOSED
FINISHED
GRADE
EL. 8.0'
32'
10'
PROPOSED
BULKHEAD
16'
8'
26'
PROPOSED
CONCRETE
PIER
HTL
EL. +1.95'
PROPOSED
CONCRETE PIER
>uo;;~~
PROPOSED 20" SQUARE
~·PRESTRESSED CONCRETE~
"'
--· -·
. k
1
· un»lll PILE (BATTERED), TYP.
TIE-ROD
PROPOSED 20" SQUARE
PRESTRESSED CONCRETE
PILE (PLUMB),TYP.
PROPOSED STEEL
SHEET PILE
EL. -14.5'
(
PROPOSED
DREDGE LINE
MLW
EL. -0.33'
EL. -8.5'
~~~~~~~~~w
~~~~~\0\0\0\0\0\0'0:
nl
PROPOSED
~KING PILE
~
tr1J
WELL & PIERS TYPICAL SEC]ON
PERMIT DRAWINGS
NOT FOR CONSTRUCTION
FIGURE 7:
TRAVEL LIFT WELL &
PIER SECTION
DATUM: NAD83, NAVDBB
DATE: NOVEMBER 2013
0
20'
40'
AUTHORIZED AGENT: THE BRIGMAN GROUP
DRA't\N BY:
MOFFATT & NICHOL
BUCKSPORT
MARINE PARK
GRAND STRAND
WATER & SEWER AUTHORITY
166 JACKSON BLUFF ROAD
CONWAY, SC 29526
SUMMARY
NO. SLIPS = 11 (520 LF)
TOTAL AREA = 5200 SF
NO. PILES = 130
VARIES - 42' TO 60'
FINGER/END PIERS
8'
PROPOSED MAIN WALKWAY
I I
HTL
EL. +1.95'
MHW
PROPOSED CONCRETE
SLAB, TYP.
PROPOSED CONCRETE CAP, TYP.
EL. +5.0'
\
~
PROPOSED 16" SQUARE CONCRETE PILE, TYP.
PROPOSED DREDGE LINE
EL. -8.5'
oo~o'
o
o
PROPOSED PRESTRESSED CONCRETE PILE, TYP.
TYPICAL SECTION
PERMIT DRAWINGS
NOT FOR CONSTRUCTION
FIGURE 8:
BOAT BUILDERS DOCKS &
PIERS SECTION
OA TUM: NA083, NA V088
OATE: NOVEMBER 2013
0
20'
40'
AUlHORIZEO AGENT: lHE BRIGMAN GROUP
ORA~ BY: MOFFATI & NICHOL
BUCKSPORT
MARINE PARK
GRANO STRANO
WATER & SEWER AUTHORITY
166 JACKSON BLUFF ROAD
CONWAY, SC 29526
SUMMARY
TRESTLE
TOTAL AREA = 43200 SF
NO. PILES
= 219
TURN-AROUND AREA
TOTAL AREA = 7855 SF
NO. PILES
= 14
40'
PROPOSED
CONCRETE SLAB
+-
i-rlf
HTL
EL. +1.95'
EL. +1.83'
sz
(
~ sz
~
EL. 12.0'
.
PROPOSED 24" SQUARE CONCRETE PILE, TYP.
~
~
~~
>::v>::Y
0
/'
0
EXISTING GROUND,
EL. VARIES 2.0' TO 12.0'
0
TRESTLE SECTION
PERMIT DRAWINGS
NOT FOR CONSTRUCTION
FIGURE 9:
TRESTLE SECTION
DATUM: NAD83, NAVDBB
DATE: NOVEMBER 2013
a
2~
4a
AUTHORIZED AGENT: THE BRIGMAN GROUP
DRAWN BY:
MOFFATI &: NICHOL
BUCKSPORT
MARINE PARK
GRAND STRAND
WATER & SEWER AUTHORITY
166 JACKSON BLUFF ROAD
CONWAY, SC 29526
107'±
TURN-AROUND
AREA
PROPOSED
~ONCRETE SLAB
__
[
~~.
( --r-1
Ij II .
{1-7--.
fI.
30'
PROPOSED
LOADING PLATFORM
v
~PROPOSED 20"
SQUARE PRESTRESSED
_CONCRETE PILE, TYP.
J1
' II. .----1-1
. ..f f,) . i1
F ·.
-----.-j,
EL. 12.0'
i-0
. .
II ·
.; I .
.-----,
..
~
EL. +1.95'
(
s:zlv
P?l
ti'l
..,.~\1
ra'l~1 ~~~ ~~\\1 ~~ ~
''""~' ~
..,. MLW
EL. -0.33'
1
o:U'~==~~~o~-.o~
u
~o
f\i;I'J
:t
MHW
EL. +1.83'
=:~0~=:=:~0~=====to:T-----u
EXISTING RIVER
VARIES
BOTTOM, EL.
L..l
LOAQING PLATFORM
PERMIT DRAWINGS
NOT FOR CONSTRUCTION
FIGURE 10:
LOADING PLATFORM
0
20'
40'
DATUM: NAD83, NAVD88
AUTHORIZED AGENT: THE BRIGMAN GROUP
DATE: NOVEMBER 2013
DRAWN BY:
MOFFATT & NICHOL
BUCKSPORT
MARINE PARK
GRAND STRAND
WATER & SEWER AUTHORITY
166 JACKSON BLUFF ROAD
CONWAY, SC 29526
SUMMARY
TOTAL AREA = 3640 SF
NO. CONCRETE PILES = 28
NO. TIMBER DOLPHINS = 8
SIDE TIE = 450 LF
25'
r
PROPOSED
3 - 12" ¢
TIMBER PILE
DOLPHIN,
25'
50'
PROPOSED LOADING PLATFORM
l
PROPOSED
fCONCRETE SLAB
I
i-0+-r-1-----1.-
t
PROPOSED
20" SQUARE
PRESTRESSED
CONCRETE PILE,
TYP.--
TYP.~
I I
I
~I
I I
HTL
EL. +1.95'
EL. 8.0'
\7;; \7
I I
~
-e=-
~
~
~%~
':};_%%%%%%%~
MHW
EL. +1.83'
MLW
EL. -0.33'
%%~
w
LOADING PLATFORM ELEVATION
PERMIT DRAWINGS
NOT FOR CONSTRUCTION
FIGURE 11:
LOADING PLATFORM ELEVATION
0
2~
4~
DATUM: NAD83, NAVD88
AUTHORIZED AGENT: THE BRIGMAN GROUP
DATE: NOVEMBER 2013
DRAWN BY:
MOFFATT & NICHOL
BUCKSPORT
MARINE PARK
GRAND STRAND
WATER & SEWER AUTHORITY
166 JACKSON BLUFF ROAD
CONWAY, SC 29526
SUMMARY
TOTAL AREA = 1020 SF
10'
PROPOSED
CONCRETE
CAP, TYP
PROPOSED
REMOVABLE
CONCRETE PANELS
I
HTL
EL. +1.95'
MHW
EL. +1.83'
BULKHEAD, TYP
EL. +8.0'
\7\z_
PROPOSED
STEEL SHEET
PILE BULKHEADS
EXISTING RIVER BOTTOM,
EL. VARIES
EXIST. 30"
WATERMAIN
PROPOSED DREDGE LINE
EL. -14.0'
~~~~~~~~~
~~"'0:'0~"'0:'0?<'0~
~~~~~~~~~<
~0;0;~~0;0;0«:
0
V'
0
NOTE:
30" WATERLINE PROTECTION
PIER WILL BE CONSTRUCTED IN
PHASE 1 PRIOR TO DREDGING.
TYPICAL SECTION
PERMIT DRAWINGS
NOT FOR CONSTRUCTION
FIGURE 12:
30" WATERLINE
PIER PROTECTION SECTION
o
1a
2a
DATUM: NAD83, NA VD88
AUTHORIZED AGENT: THE BRIGMAN GROUP
DATE: NOVEMBER 2013
DRAWN BY:
MOFFATT & NICHOL
BUCKSPORT
MARINE PARK
GRAND STRAND
WATER & SEWER AUTHORITY
166 JACKSON BLUFF ROAD
CONWAY, SC 29526
20
10
---- - '
0
L
/
-
/
1--.
fOP OF
Fll I~TIN(.;~fl''\1\
HF~IINF
L
-
~
I
.....
.....
20
r-A PROXIMATE EXISTING
G OUND
~AI
-
-
/
-.
-
r--·
I-
ePeSE
TEeTteN
Ec -~.~
/
-
0
r-
\
/
PROPOSE
EL-14.5
/
'
-10
_......._'
!"-/
\"
--
"
" - I--
-20
0+50
1+00
1+50
2+00
2+50
3+00
3+50
4+00
r-A PROXIMAT EXISTING
RVER BOTTO
/
/
-20
DREDGING
'\.
'\
0+00
10
4+50
5+00
'
!-""
:.-
-----....
-
--
--
-10
-20
~
-30
5+50
6+00
6+50
7+00
7+50
PERMIT DRAWINGS
NOT FOR CONSTRUCTION
FIGURE 12A:
WA TERUNE & PIER PROFILE
0
100'
200'
HORIZONTAL
0
20'
40'
VERTICAL
DATUM: NAD83, NA VD88
AUTHORIZED AGENT: THE BRIGMAN GROUP
DATE: NOVEMBER 2013
DRAWN BY:
MOFFA n & NICHOL
BUCKSPORT
MARINE PARK
GRAND STRAND
WATER & SEWER AUTHORITY
166 JACKSON BLUFF ROAD
CONWAY, SC 29526
I
WETLANDS
MARINE
FACILITIES
PHASE 3
DREDGE
PROFILE3,
"- Si:;E FIGURE<13A
MARINE
FACILITIES
f?HASE1
\.:~···~
"' "
APPROX.
MHW/HTL
~\
.::~···
BOAT BUILDERS
DOCKS AND PIERS
·-;;...-"""
.·
''6
-·~
DREDGE
PROFILE 1,
/ SEE FIGURE 13A
_
.
-7
.~
8··
APPROX
WATERWAY
LIMITS
--- £:;')._:::-:--.
---~-,...--'-./~-
.
DUAL TRAVEL LIFT
WELL AND PIERS
/
~'
,.r/1
.......
·
............
.;...----'.;...---
-··.
__
_;;;'.....
_.. . . /,- /
_...<
/
_...--···
LEGEND
~-
C::S::S:::::::: PHASE 1 DREDGE LIMITS
I2SZSZ3 PHASE 2 DREDGE LIMITS
CZ:::::Z:::Z::: PHASE 3 DREDGE LIMITS
-~-.
~
/
FIGURE 13:
DREDGE PLAN
0
· ..~ ...../···
/.'.
CEN.T~LINE
~
NOTE:
WATER ELEVATIONS BASED ON
NOAA STATION 8661139
BUCKSPORT, WACCAMAW RIVER
HTL = +1.95'
MHW= +1.83'
MHW LOCATED BY SPARTINA LAND
SURVEYING, LLC JUNE2011.
':1"""'
---,-/---~."<
.
....
. WATERLINE
PROTECTION PIER
_,/-
........
: ;.:...-:---CHANNEL
............
,.....:.'
.........
DREDGING
LIMITS
150'
300'
DATUM: NAD83, NAVD88
AUTHORIZED AGENT: THE BRIGMAN GROUP
DATE: NOVEMBER 2013
DRAWN BY:
MOFFATI & NICHOL
...
/"""
-----·
...__.../ WACCAMAW NATIONAL
WILDLIFE REFUGE
PERMIT DRAWINGS
NOT FOR CONSTRUCTION
BUCKSPORT
MARINE PARK
GRAND STRAND
WATER & SEWER AUTHORITY
166 JACKSON BLUFF ROAD
CONWAY, SC 29526
DREDGE PROFILE 4 (PHASE 3)
PROPOSED BULKHEAD EL. +8.0'
10
--- --- -
z
0
I=
<(
>
w
0
10
HTL EL. +uJ5'
z
0
I \1 MHW EL. +1.B3'
_____--..,~ -------y:_
.... ___ E_XI::iJJN(;__GRA[)_E
I=
. \1
<(
__
0
__J
>
w
__J
w
-
w
i
~-',/PROPOSED
'-......_,
-10
!
-10
-,
DREDGE EL. -14.5
,
' ' '-....,
-20
1+00
0+00
DREDGE LINE
-20
--------
2+00
STATION
3+00
DREDGE PROFILE 3 (PHASE 2)
PROPOSED BULKHEAD EL. +8.0'
10
z
~---
0
I=
<(
>
w
0
-- ----
__J
w
7
10
HTL EL +1.e5'
~ vMHW
--- =
z
0
I=
EL. +1.B3'
<(
0
EXISTING.GRADE
',,'',,, .-1:. ""''~" """'""
-.,.,-....
-10
DREDGE EL -14.5
'-...
....
i_
-20
0+00
1+00
>
w
__J
w
-10
------ -
-20
3+00
2+00
STATION
DREDGE PROFILE 2 (PHASE 1)
10
z
0
I=
<(
>
w
__J
w
0
PROPOSED BULK~EAD EL +8.0'
- --- --
--
10
HTL EL. +1.95'
-
/
....
,_
z
I \7 MHW EL + 1.83'
0
I=
/
~;;;:;,.-,-rn;;;;ccu,c----- '',,,
\7
EXISTING GRADE
<(
0
-10
>
w
__J
w
-10
DREDGE EL. -14.5
............
----------
i
.
-20
0+00
1+00
-20
3+00
2+00
STATION
DREDGE PROFILE 1 (PHASE 1)
L
PROPOSED MAIN WALKWAY EL. +5.0'
10
z
HTL EL. +1.95'
MHW EL +1.83'
0
I=
<(
>
w
__J
w
10
z
EXISTING GRADE
0
PROPOSED DREDGE LINE
I=
<(
0
0
-- ....
-10
-10
---- ----
-20+------r-----+----~------r-----r-----+-----,_-----r-----+----_,------r-----+-20
0+00
1+00
2+00
STATION
PERMIT DRAWINGS
CUT
138,960 SF
AREA
VOLUME = 40,000 CY
NOT FOR CONSTRUCTION
FIGURE 13A:
DREDGE PROFILES
3+00
SUMMARY
0
50' HORIZ
100' HORIZ
0
25' VERT
50' VERT
DATUM: NAD83, NAVD88
AUTHORIZED AGENT: THE BRIGMAN GROUP
DATE: NOVEMBER 2013
DRAWN BY:
MOFFATT & NICHOL
FILL (BELOW MHW)
AREA
= 4,690 SF
VOLUME = 1, 705 CY
BUCKSPORT
MARINE PARK
GRAND STRAND
WATER & SEWER AUTHORITY
166 JACKSON BLUFF ROAD
CONWAY, SC 29526
>
w
__J
w
1.
LOCATION AND SIZE OF SPOIL CONTAINMENT AREA TO BE FIELD
LOCATED WITH OWINER PRIOR TO COMMENCEMENT OF DREDGING
OPERATIONS.
2.
CONTAINMENT AREA SHALL BE CONSTRUCTED AND MAINTAINED
IN ACCORDANCE WITH THE ENVIRONMENTAL RESOURCES
PERMIT.
3.
DIMENSIONS SHOWIN ARE APPROXIMATE BASED ON THE
ESTIMATED VOLUME OF DREDGE SPOIL MATERIAL. CONTRACTOR
IS RESPONSIBLE FOR VERIFYING THE DIMENSIONS AND MAKING
ANY NECESSARY ADJUSTMENTS TO CONTAIN THE MATERIAL
VOLUME. DESIGN OF DOUBLE CHAMBERED BASIN, FLASHBOARD
RISER AND OUTFALL PIPE TO BE DETERMINED BASED ON
VOLUME OF DREDGE SPOIL MATERIAL.
4.
SPOIL AREAS SHALL HAVE A MINIMUM BUFFER ZONE OF 50'
FROM ADJACENT PROPERTY LINES AND 25' FROM EXISTING
PAVED ROADWAYS.
5.
CONTRACTOR SHALL NOT DISTURB ANY EXISTING UTILITIES
DURING CONSTRUCTION OR SPOIL PLACEMENT. THE
CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGES
TO EXISTING UTILITIES.
6.
SILT FENCE SHALL BE IN ACCORDANCE WITH SCOOT
STANDARDS AND SPECIFICATIONS FOR MATERIALS,
INSTALLATION AND MAINTENANCE.
SPOIL DISPOSAL PLAN
CONTAINMENT DIKE
DREDGED MATERIAL
EXCAVATE AS REQUIRED
FOR DIKE CONSTRUCTION
SILT FENCE
EXISTING GRADE
SECTION
NOT TO SCALE
CMP OR RCP
RISER PIPE
PERMIT DRAWINGS
SECTION
NOT FOR CONSTRUCTION
NOT TO SCALE
FIGURE 14:
DREDGE MATERIAL
CONTAINMENT AREA
0
600'
1200'
DATUM: NAD83, NAVD88
AUTHORIZED AGENT: THE BRIGMAN GROUP
DATE: NOVEMBER 2013
DRAWN BY:
MOFFATT & NICHOL
BUCKSPORT
MARINE PARK
GRAND STRAND
WATER & SEWER AUTHORITY
166 JACKSON BLUFF ROAD
CONWAY, SC 29526
AREA SUMMARY TABLE
ID
(FIG 3)
1
LOCATION
BARGES LIPS &
BULKHEAD
3
TRAVEL LIFT &
BULKHEAD
BOAT BUILDERS
DOCKS
4
TRESTLE
5
6
LOADING PLATFORM
WATERLINE
PROTECTION PIER
7
DREDGING
TOTAL
2
TOTAL AREA
(SF)
NO. PILES
SLIPS
DEMOLITION AREA
(SF)
6900
N/A
650 LF
14430
4440
55
380 LF
N/A
5200
130
11/520 LF
N/A
SlOSS
233
N/A
N/A
3640
52
450 LF
N/A
137940
N/A
N/A
210195
470
1020
N/A
14430
JURISDICTIONAL IMPACT SUMMARY TABLE
ID
(FIG 3)
2
LOCATION
BARGE SLIPS &
BULKHEAD
TRAVEL LIFT &
BULKHEAD
3
BOAT BUILDERS
DOCKS
4
TRESTLE
5
LOADING PLATFORM
6
WATERLINE
PROTECTION PIER
1
7
BULKHEAD FILL
IMPACT BELOW
MHW(SF)
BULKHEAD FILL
IMPACT BELOW
MHW(CY)
4000
1450
690
255
WETLAND
SHADING (SF)
TNW DREDGING
(SF)
TNW DREDGING
(CY)
137940
40000
137940
40000
38725
650
DREDGING
TOTAL
4690
1705
39375
PERMIT DRAWINGS
NOT FOR CONSTRUCTION
BUCKSPORT
MARINE PARK
FIGURE 15:
IMPACT SUMMARY
TABLE
DATUM: NAD83, NAVD88
AUTHORIZED AGENT: THE BRIGMAN GROUP
DATE: NOVEMBER 2013
DRAWN BY:
MOFFATT & NICHOL
GRAND STRAND
WATER & SEWER AUTHORITY
166 JACKSON BLUFF ROAD
CONWAY, SC 29526
\
\(\
v9LT FENCE, TYP
~\
DUMP
TRUCK
I
I
SHORELINE
"'
I
I
I
Ill
T--T
I
I
L--..L
I
I
I
I
t----t
t--t
\
L--..L
I
I
I
I
.-~
"'
~==t
\
\
&~
/Ill
BARGE
Ill
~R'!:NE
1
)
~
'----m~~"'A
.
\TURBIDITY
CURTAIN
PERMIT DRAWINGS
NOT FOR CONSTRUCTION
FIGURE 16:
DREDGE MATERIAL
TRANSFER
0
30'
60'
DATUM: NAD83, NAVD88
AUTHORIZED AGENT: THE BRIGMAN GROUP
DATE: NOVEMBER 2013
DRAWN BY:
MOFFATT & NICHOL
BUCKSPORT
MARINE PARK
GRAND SffiAND
WATER & SEWER AUTHORITY
166 JACKSON BLUFF ROAD
CONWAY, SC 29526