You can copy from here when filling out the rest of the page.
Singleton Swash Stabilization (Horry County)
Singleton Swash Stabilization (Horry County)
JOINT
PUBLIC NOTICE
CHARLESTON DISTRICT, CORPS OF ENGINEERS
1949 Industrial Park, Room 140
Conway, South Carolina 29526
and the
S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
OFFICE OF OCEAN AND COASTAL RESOURCE MANAGEMENT
1362 McMillan Avenue, Suite 400
Charleston, South Carolina 29405
REGULATORY DIVISION
Refer to: P/N # 2014-00013-3H
9 January 2014
Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), Sections
401 and 404 of the Clean Water Act (33 U.S.C. 1344), and the South Carolina Coastal Zone
Management Act (48-39-10 et.seq.) an application has been submitted to the Department of the
Army and the S.C. Department of Health and Environmental Control by
HORRY COUNTY GOVERNMENT
c/o COASTAL SCIENCE & ENGINEERING, INC.
P.O. BOX 8056
COLUMBIA, SOUTH CAROLINA 29202-8056
for a permit to perform work to include the placement of a concrete open culvert to re-align and
stabilize
SINGLETON SWASH
at a location southeast of N. Ocean Boulevard, situated between Dunes Golf and Beach Club and
Sands Beach Club, in Myrtle Beach, Horry County, South Carolina (Latitude 33.756297°N,
Longitude -78.794612°W)
In order to give all interested parties an opportunity to express their views
NOTICE
is hereby given that written statements regarding the proposed work will be received by both of
the above mentioned offices until
30 Days from the Date of this Notice
from those interested in the activity and whose interests may be affected by the proposed work.
The proposed work consists of channel re-alignment and a plan for stabilization of
Singleton Swash. In detail, the work will include installation of a concrete open culvert to
channelize tidal flow between the tidal marsh area and the Atlantic Ocean. The applicant stated
that the proposed project is expected to eliminate the need for frequent channel manipulation and
potentially improve tidal exchange in Singleton Swash. The type and quantity of impacts to waters
of the United States associated with the proposed project include backfill and bedding 0.35 acres
and excavating 9,000 cubic yards of material from 0.62 acres of intertidal areas.
REGULATORY DIVISION
Refer to: P/N # 2014-00013-3H
9 January 2014
Specific Project Details Provided by the Applicant:
The County (per agreement with the US Army Corps of Engineers in 2007) has
established a preferred swash alignment across the beach which is a minimum of 450 ft south
of the Sands Beach Club south tower (Sheet 02, attached drawing). The Dunes Club
revetment, marking a historical meander along the south side of the swash, is positioned about
600 ft south of the Sands Beach Club tower. The proposed project will follow the existing
easement and install the culvert within this ~150-ft corridor across the beach. The maximum
proposed culvert length is 250 feet measured from the existing Dunes Club revetment, which
approximately equals the dry sand beach width in the area (Sheet 03, attached drawing). The
final position of the culvert and its length will be determined based on site conditions at the time
of construction so as to best direct the flow in and out of the swash and minimize encroachment
on the wet sand beach. The anticipated beach condition after the proposed project is illustrated
on Sheet 3A of the attached plans. Dry beach is expected to build up naturally, and dunes at
the backshore area are expected to form gradually with the aid of sand fencing.
Elevations of the proposed culvert are designed to match the dry-beach elevation (~+5 ft
NAVD) and to slope at the seaward end to limit the "reveal" of the structure with an invert
elevation close to mean low water (-3 ft NAVD) (Sheet 04, attached drawing). Seaward of the
structure, swash discharge will be unconfined across the wet-sand beach.
The sides of the proposed culvert will function as jetties to retain the dry beach and the
bottom of the culvert will control the maximum channel depth. The concept illustrated in Sheets
04-05 shows a 20-ft culvert bottom-width and 25-ft top-width. It controls the channel across the
dry beach and provides a fixed discharge point ~210 ft seaward of the existing dune line along
Dunes Club. The length of the culvert corresponds to the existing dry-beach width, and the
width of the culvert was determined so as to optimize flow velocities and maintain a discharge.
As Sheet 04 illustrates, the ends of the structure will require scour protection at the
landward end and a scour apron at the seaward end. Training walls of some dimension are
also necessary at the landward end to direct the flow into the channel. Once confined within
the box culvert, flows are expected to be more uniform and accelerate so as to scour sediment
that enters from littoral transport or aeolian transport across the dry beach.
By confining the channel across the dry beach, sand fillets (dry-beach area) are
expected to be maintained naturally on either side of the structure similar to the shoreline
response of a dual jetty system. Natural dune growth will be promoted or accomplished
artificially so as to build up the backshore and reduce the chance of flanking of the culvert by
swash flows on the north side. The up coast segment of beach between the swash and Sands
Beach Club is an inner bend ("point bar" spit) which is less likely to erode than the Dunes Club
("cut bank") side of the channel, and a healthy dry beach with excess sand in this area can be
stabilized by vegetation at the landward side adjacent to the swash. Typical profiles after the
project are shown in Sheet 06 of the attached plans.
Construction Plan:
Prior to installation of the culvert, the existing swash channel will be realigned by sand
scraping and excavation (similar to prior project performed under Department of the Army and
OCRM permit P/N 2005-2W-180P) at a position ~100 ft north (up coast) of the proposed culvert
within the limited easement corridor (Sheet 07 Construction Plan). Temporary ~3-ft diameter
pipes ~40-ft long will be installed in the realigned channel and covered with sand to provide
REGULATORY DIVISION
Refer to: P/N # 2014-00013-3H
9 January 2014
temporary access for land based equipment and maintain the tidal flow between the swash and
the ocean during the installation of the culvert.
A new channel basin with maximum dimensions ~350 ft long, ~50 ft wide and ~11 ft
deep (from approximately +5 ft to -6 ft NAVD) will be excavated in-the-dry across the beach at
the final location of the culvert determined by site conditions at the time of construction. Sand
dikes will be maintained along the basin especially at either end of the basin to keep out tidal
waters until the time of opening. The excavation will be dewatered during construction to allow
work to progress in-the-dry. Excavations will be stockpiled adjacent to the basin and used to
backfill the structure and dress up the beach at the end of construction.
Work will proceed from the landward end to the seaward end. Training walls of sheet
pile at the landward end will be driven by standard methods and cut to length according to the
final design. Scour protection (armor stone) at the landward end will be installed after the sheet
piles are in place.
Two-ft compacted bedding stone will be placed at the bottom of the basin to prepare an
underlayer for the culvert. Typical culvert units come as pre-cast in 6-ft to 9-ft segments with
tongue-and-groove edges that are sealed with grout upon placement. The number of segments
used will be adjusted according to the beach condition at construction. Each culvert section will
be brought to the site and placed on the prepared underlayer of bedding stone via crane. Toe
protection (armor stone) at the seaward end of the culvert will be incorporated after the culvert
units are in place.
The new culvert channel will be established during a single tide by excavating the
remaining sill at the seaward end of the basin during a falling tide. The subsequent rising tide
will overtop the sill and flood the basin. Near the time of high tide, a pilot channel will be
excavated through the sill at the landward end of the culvert. Tidal flows will complete the
excavation of the channel during succeeding tides. Upon completion of the structure and
successful opening of the new channel, the temporary flushing channel will be closed via sand
scraping, pipes and all equipment will be removed from the beach in the vicinity of the culverts
and the beach will be graded to natural contours so as to eliminate unnatural mounds and
depressions. The applicant anticipates redistributing sand from the basin excavations and
adjacent beach to produce continuous dry beach fillets to either side of the culvert.
All work will be performed via land-based equipment during 2-3 winter months or an
alternate period specified by federal and state resource agencies.
Avoidance and Minimization:
The applicant stated that prior to installation of the culvert, the existing swash channel
will be re-aligned, and temporary pipes will be installed in the re-aligned channel to maintain the
tidal flow between the swash and the ocean during the installation of the culvert to minimize
impacts to the aquatic resources. In addition, a channel basin will be excavated across the
beach, and sand dikes will be maintained at either end of the basin to keep out tidal waters until
time of opening of the proposed permanent culvert. The excavation will be dewatered during
construction to allow work to progress in-the-dry, and to avoid any discharge or impacts to the
ocean.
REGULATORY DIVISION
Refer to: P/N # 2014-00013-3H
9 January 2014
Proposed Mitigation:
The applicant offered no compensatory mitigation for the proposed impacts.
Project Purpose:
The project purpose as stated by the applicant is for stabilization of Singleton Swash.
The District Engineer has concluded that the discharges associated with this project, both
direct and indirect, should be reviewed by the South Carolina Department of Health and
Environmental Control in accordance with provisions of Section 401 of the Clean Water Act. As
such, this notice constitutes a request, on behalf of the applicant, for certification that this project
will comply with applicable effluent limitations and water quality standards. The work shown on
this application must also be certified as consistent with applicable provisions the Coastal Zone
Management Program (15 CFR 930). The District Engineer will not process this application to a
conclusion until such certifications are received. The applicant is hereby advised that
supplemental information may be required by the State to facilitate the review.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. Implementation of the
proposed project would impact (0.97) acres of intertidal marine habitat. Our initial determination
is that the proposed action would not have a substantial individual or cumulative adverse impact
on EFH or fisheries managed by the South Atlantic Fishery Management Council and the
National Marine Fisheries Service (NMFS). Our final determination relative to project impacts
and the need for mitigation measures is subject to review by and coordination with the NMFS.
The District Engineer has consulted the most recently available information and has
determined that the project is not likely to adversely affect any Federally endangered,
threatened, or proposed species and will not result in the destruction or adverse modification of
designated or proposed critical habitat. This public notice serves as a request to the U.S. Fish
and Wildlife Service and the National Marine Fisheries Service for any additional information
they may have on whether any listed or proposed endangered or threatened species or
designated or proposed critical habitat may be present in the area which would be affected by
the activity, pursuant to Section 7(c) of the Endangered Species Act of 1973 (as amended).
Pursuant to Section 106 of the National Historic Preservation Act (NHPA), this public
notice also constitutes a request to Indian Tribes to notify the District Engineer of any historic
properties of religious and cultural significance to them that may be affected by the proposed
undertaking.
In accordance with the NHPA, the District Engineer has also consulted the latest
published version of the National Register of Historic Places for the presence or absence of
registered properties, or properties listed as being eligible for inclusion therein, and this worksite
is not included as a registered property or property listed as being eligible for inclusion in the
Register. To insure that other cultural resources that the District Engineer is not aware of are
not overlooked, this public notice also serves as a request to the State Historic Preservation
Office to provide any information it may have with regard to historic and cultural resources.
REGULATORY DIVISION
Refer to: P/N # 2014-00013-3H
9 January 2014
Any person may request, in writing, within the comment period specified in this notice, that
a public hearing be held to consider this application. Requests for a public hearing shall state,
with particularity, the reasons for holding a public hearing.
The decision whether to issue a permit will be based on an evaluation of the probable
impact including cumulative impacts of the activity on the public interest and will include
application of the guidelines promulgated by the Administrator, Environmental Protection Agency
(EPA), under authority of Section 404(b) of the Clean Water Act and, as appropriate, the criteria
established under authority of Section 102 of the Marine Protection, Research and Sanctuaries
Act of 1972, as amended. That decision will reflect the national concern for both protection and
utilization of important resources. The benefit which reasonably may be expected to accrue from
the project must be balanced against its reasonably foreseeable detriments. All factors which
may be relevant to the project will be considered including the cumulative effects thereof; among
those are conservation, economics, aesthetics, general environmental concerns, wetlands,
historic properties, fish and wildlife values, flood hazards, flood plain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy
needs, safety, food and fiber production and, in general, the needs and welfare of the people. A
permit will be granted unless the District Engineer determines that it would be contrary to the
public interest. In cases of conflicting property rights, the Corps of Engineers cannot undertake to
adjudicate rival claims.
The Corps of Engineers is soliciting comments from the public; Federal, state, and local
agencies and officials; Indian Tribes; and other interested parties in order to consider and
evaluate the impacts of this activity. Any comments received will be considered by the Corps of
Engineers to determine whether to issue, modify, condition or deny a permit for this project. To
make this decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments
are also used to determine the need for a public hearing and to determine the overall public
interest of the activity.
If there are any questions concerning this public notice, please contact Rob Huff at
843-365-4239.
Project Area Map
Little River Inlet
Sooth Carolina
90
k" \.
lS.O
~
.
...
®
·"
'/0.~ ,.
,\
Atlantic Beach
Atlantic Ocean
··o
n +of.;
.-·
'·
W U·C.T Milt- a(ACM
*
~ ···
~
' '
>-'"'"· - - r " q
Myrtle Beach
r.7
County
Location
Map
·-=::::;::=-!111==-~ miles
1
2
3
4
5
83
$2
80
.... " -
,.
From Myrtle Beach, SC (South) · Head NEon US-17 BUS N toward 7th Ave N. (6.1 mi). Tum right onto Grande Dunes Blvd.(0.2 mi). Turn left
onto NOcean Blvd (0.2 mi). Take first right onto Ocean Blvd (0.6 mi). Project area is Northeast from the Dunes Golf Club along the beach.
From SC 22 E(North)· Exit onto US-17 SIN Kings Hwy toward Myrtle Beach (1.4 mi). Turn left onto Lake Arrowhead Rd. (1.2 mi). Lake
Arrowhead Rd. turns slightly right and becomes Shore Dr. (0.6 mi). Project area is Southeast from the Sands Beach Club along the beach.
-
·~
l
·r
I
t$
1:
..
~
.
1
l
,........
-f
{
,..-
0
N~~~
"'
~""
~/
t
"\. ..
''-q
'
....... ~
,,
\
/
-1>
..,,.,/
y
, ; l
~ ~ '
'
\,
:-..
<
\t
.....
N l(\n9sl-\W'/
,.,.oo
'>
...
..\ ' ...,
,4>-\'
'~
i
i
M 't.r41.~
~#"",........,
~\
\,.
.
~
~ ......
.......
l
,..,....
Q
~~M
'q,.
J.lfl9~~
~
!l
,,~
_J>'"0,
/
9
.o··~~ !
fl
{
........
i
{
~
·
Project Area
Sinaleton Swash
Singleton Swash Stabilization Project
SAC# 2014-00013-3H
Horry County, South Carolina
Sheet 1 OF 9 Dated: 01/7/2014
AGENT:
SCALE: AS SHOWN
Coastal Science &Engineering, Inc.
P.O. Box 8056
Columbia, SC 29202
DATE:
Dec 2013
TMS#
PROJECT#:
2371
J
:=::;-::--- - . .
SHEET#:
,,@''''~~~~'''"".-,
···..
.
!'
....
g Oi
..
/~.,.
/
N~
COASTAL
\ Z.~
:: ~ :
SCIENCE
: 0 ::
::::
:. & ENGINEERING .i '::::
r=
~~ \
No. C01950
~~··..
..··~~
".,,- ,,:'Ji...0···········~-·~,,,,<'
,,,,, F
~
,,,,,
,,,, , 111111 1
j$
f f
~-\. . . ., .,.
.,....oo
St... a.
N()(...,.N
!'~
K
i (
\ ........ll f
/~
t..· tf
~
~
f
9
r
l
i
\ ~·q
"q
9
~
1.,
f
9
\
t
t
~t·
*
Note: Existing easements allow the County to realign the channel
no closer than 450 ft South of the Sands Beach Club pool deck.
·
- ......
.,
Dunes Golf Course
@
r?1
00
00
®
C'~
Approximate location
of existing revetment
',~ <>
Marsh
'/'
'-.......
--_..._>---- -
North Ocean Blvd
ocean~\'-~~.. . .-
-~-- .. _,-------·
- MHW ---------1
r .......l
OCRM Setback Line ~
~. 1
OCRM Baseline ~ c--·
,---
3i1Jlr-~-----L-:-x·
II __.....-.......-
,. . --7 ---7 :::::::;::;;
~N!!f..'<:::'
___
t -./- /
...........
=
I~-
-:=:=-::=:=.::=::-.=:=.:=------.. . . .
m_ts_
Approximate location
of existing revetment
Myrtle Beach
-:::=::==::---------------------~O~CR~M~B~a~se~lin~e~~
~
-·
r - - - - - - +51!
1--
---OCR~Set~ack L~ne-p-
Arcadian Shores Beach
-- -MHW -----------------~------
+51!
------------ 01! --------------~-------------
- -·· ·
- MLW - --·
- -···-
···
···-......_
_ _ ___ _ _ __ _ _ _ _
Proposed Culvert
.A-···- ··· - · · · -···-
Survey Datu m:
See sheet 08 for longitudinal
HorizorM SPCS N.~D '83 (Feet) SC Zone 3900
section of alignment A·A'
Vertical: NAVD '83 (Feet)
Data Notes:
Data oollected by Coastal Science & Engineering:28 Sep 2011
OCRM Baseline & Setback Line Adopted February 2010
MHW (+2.04 f! NAVD)
MLW (·2.98 ft NAVD)
APPLICAN7
Horry Cou
Infrastruct
Singleton Swash Stabilization Project
SAC# 2014-00013-3H
Horry County. South Carolina
Sheet 2 OF 9 Dated: 01/7/2014
···- ···-
···-
Atlant i c
*
'
0
-
Scale (Feet)
:J
DRAWING TITLE:
OVERALL PLAN
AS SHOWN I SHEET#:
OATE:
Dec 2013
TMS#
PROJECT: Singleton Swash
Stabilization Project
PROJECH: 2371
@]
_
--·
...-
--·-- -MLW -
--·
Ocean
,,,,,, ~,,,,,
..$',, .··················· ~......"'/,...
\ IIIIII I IIJ/Jit
300
.··
()
i
~
··.
.
.
:::
~
COASTAL
\
::
:
SCIENCE
:
~
& ENGINEERING j
-::: =-. '·,
No. C01950
I
i
~
'Z~
0 ::
1-:: ~
N:q::::
·~ ......
0
··..
..··
/l..:: ~
...... :1<1').. ··
~·
~-'"
"'/. . 1/
. <.z:...: o··········· ,,,,
-- -,"
~·
~
/,,,, F N 1,,,,
lfiiJ JIll I I II
I
..~
{
\
Approximate location
of existing revetment
c:J
I
/-,\ ' \ \
....... - - - -MHW - - -
/
'
-J
I
/
/
/
/-,
7
(
.......
1
I
(
I
I
I
I
I
\
\
/
'
~~
\
' ' - ......
'-,
Myrtle Bea c h
I
'# ~
""' \ ,...
......
'
.,----- _I
I
'/ '/
' '--..
'
/ ....... '\
\
\
\
I
g
(")
'
\__,
Ci3
Cii
\
I
~
/
I
'
250ft
/
'
I
)
\
\
I
'
__,-
~
/-, \
'---
I
/
'-
'
{
I
\
I
'''
- ~M~"~
--
_"
I
I
-MHW /
/
/'"
I
,...--,
/
,..,.., I
~\
OCRMSETBACK LINE
OCRM BASEliNE ---------- \
\
{
\
\\_
\
\
''
~
\
\
-- -MHW - - )
Sands
Beach Club
Approximate Location Of Culvert
See Sheets 04-05 For Details.
Arcadian Shores Beach
' --------------- +5{1
''
Singleton Swash
I
\
I
I
I
\
~
'"
''
''
'\
\\
+5ft
/
/
'
-----
+5ft
. . . . . . . . . . - - - - - - - - - - ---- --- -MH w-------- - - - - ----- - - - - --- - - - - ---
,,,,,
,,,,,,, ~
. . .'.,, .·················t..···~//....~~
::::
1111111 II 111 1
Oft
0
Atlantic
APF
Hor
lnfr:
Singleton Swash Stabilization Project
SAC# 2014-00013-3H
Horry County, South Carolina
Sheet 3 OF 9 Dated: 01/7/2014
OttDRAWING TITLE:
neering, Inc.
II CONCRETE CULVERT PLAN
PROJECT: Singleton Swash
Stabilization Project
·
100
Scale (F-eet)
AS SHOWN I SHEET#:
DATE:
Dec2013
TMS#
PROJECT t. 2371
~
//
~ ()/
COASTAL
\ 'Z~
SCIENCE
: 0 ::
: & ENGINEERING : ~ :;
: &:
- .
::
~~ \
' 6
~
No. C01950
.
/tv::
~ -
·
.
~ -
0 ··..
..·· .t'l.:: .:::
//,,,,..... F N ,,,,,,
~ :od '),. ··
~
·
~ .......
/; f/Z...,.
· ·· ·· · · ····
,,
~0
'''''"'11 '''''
~
jt"
.~
/
Approximate location
of existing revetment
..
BASEL~E
OCRM SETBACK LINE
OCRM
y
/
-MHw - - - - - -
Existing Marsh Area
1/'-A
~/'\.
AAr"-..A
A
A
A /'..
,... /""'-..
I I
;::~~/'. --/\/
/'..~':!!:-~~.P
Dunes Club
/ /
+5ft
r"-.. ""'/'.. r"-..
A
A/""..
/'. /'.
r"-..
A
,
Anticipated Dune Accretion
,
'
A
OCRM SETBACK l~
OCRM BASELINE
Anticipat:;;"D ""' /\..
une Accretion
Anticipated Post Project Dry Beach
(For Illustration Only)
Myr tl e Bea ch
//
/
/
---
1/'J -------
- ~t-~1'1
_,
\
\
Anticipated Post Project Dry Beach
(For Illustration Only)
Sands
Beach Club
....
-- --
//
_,/
r"-..
~
/'..A
,-..... /"".,
/""..A, '
/
+5 ft
Arcad ian Shores Beach
---------........_
-- --
Sing l eton Swash
.......
.......
'~w --------- -
-----
......_.._.....
-Oft
.
. . . -
APF
Hor
lnfr.
-MLW -
· . .
___./
.·--- -----
Singleton Swash Stabilization Project
SAC# 2014-00013-3H
Horry County, South Carolina
Sheet 4 OF 9 Dated: 01/7/2014
-............ .
.
-ott- 0
c e an
J
*
l
Scale (t-eet)
DRAWING TITLE:
Anticipated Post Project Condition
AS SHOWN I SHEET#:
OATE:
Oec 2013
TMS#
PROJECT: Singleton Swash
Stabilization Project
PROJECT t: 2371
~
100
~,,
,,,,'''''''"'''"'''''
'>
,....
~,.,.
.::::-'
····· ···.. /~
::::
g() i
:::: m:t
-~':::(\ .\
~~
·········
.··
··.
-:..
COASTAL
\ 'Z~
SCIENCE
: 0 ::
& ENGINEERING : ~ ;:
No. C01950
··...
,,.~)..'·
/
.N2
~-
...·· ~.;-
~·
~-,
;; 7/ ~ ···········
,.,,,,''0F N
,,,,,,,
''''''"'"''''''
TRAINING WALL
SHEET PILES x30'-0'
@ 10 DEGREE BAITER
60'-0'
_j
;r
250'-0"
4'-0'
-
I
I I
6'-0' lYPICAL U.N.O.
~ ~
\
\
\
\O.OSER PANEl
4'-0' ARMOR STONE
AND FILTER
/c\
~
4t
CULVERT PLAN VIEW
SCALE 1/32' =1'-0'
4'-0' ARMOR STONE
AND FILTER
SHEET PILES x 30'-0"
PRE-CAST CONCRETE CULVERT
TYPICAL BEACHPROFILE
/TOP OF CULVERT +5 ft NAVD
CULVERT INVERT@ -3.0 ft NAVD
4'-0" ARMOR STONE
AND FILTER
4'-0" ARMOR STONE
AND FILTER
2'-0" COMPACTED #57 STONE
CULVERT ELEVATION
SCALE 1/32" =1'-0'
@
~
APPLICA
Harry C
lnfrastrL
Singleton Swash Stabilization Project
SAC# 2014-00013-3H
Horry County, South Carolina
Sheet 5 OF 9 Dated: 01/7/2014
::J
CULVERT PLAN
&ELEVATION
PROJECT: Singleton Swash
Stabilization Pro·eel
AS SHOWN
DATE:
Dec 2013
TMS#
f'ROJECH:
1111 II l/11 1
....
..·
....
2371
SHEET#:
§)
··..
O/
~
0
: &::
=
=
- .
.f ;s::
.,..//// '.S" a········· ,,,,
It,, F
,,,,
~
DRAWING TITLE:
III I
,,,,, ~''t,
~<''
········· ~,.........
COASTAL
\
~
SCIENCE
:
::
& ENGINEERING : 1-::
~~ \ No. C01950
., 6 .
· ~ ......
-:.. 0 ·..
..· ~~
~h.....
:JtJ ,'
~
'''"'''""'''
#5@ 12" OC EACH FACE HORIZONTAL WALLS
4" SCH 40 PVC@ 6' OC
#6@ 12" OC EACH FACE VERTICAL WALLS
MHW +2.04 ft NAVD
PRECAST CONCRETE 5000 PSI REBAR GRADE 60
20'-0"
#5@ 12" OC EACH FACE FLOOR
4" SCH 40 PVC@ 6' OC
b_,
..
#9@ 12" OC EACH FACE FLOOR
MLW -2.98 ft NAVD
I
2'-0" COMPACTED #57 STONE
~c~~~~s~ THRU CULVERT
,,,,,'''''"'"'''''
~~~,
@
bI
N
,,'
.:::;.'
:::-
~ () /
APPL/CJ
HorryC
lnfrastr
Singleton Swash Stabilization Project
SAC# 2014-00013-3H
Horry County, South Carolina
Sheet 6 OF 9 Dated: 01/7/2014
::J
DRAWING TITLE:
CULVERT SECTION
AS SHOWN I SHEET#:
DATE:
De<: 2013
TMS#
PROJECT: Singleton Swash
Stabilization Proiect
PROJECT;.: 2371
~
//
·················..~//,.....~
.··
··.
~
COASTAL
\ Z~
:: [!.:1 :
SCIENCE
: 0 ::
~ ~ \ & ENGINEERING j ~ ~
:::-::::::.. \
No. C01950
! N~:::
--,1:
.... & ··
··
..........
91'·....'········~·
....·· /1.:'.:::
~........
~
~ -.........
,...,.. r)>;.
//:.<::·
0 F N ,,,,,,,' '
/It,,
'"'"""'''
Existing Revetment
10.0
.,..landward
0
~
z
5.0
:E.
5
~
a; 0.0
iii
Dunes Club Section 12s+Oo 1
_____ ~-- ______ /Expected Dry Beach After Project
Vertical Exaggeration: 10
t
...... .......
Swash
c
-5.0
---
I
I
I
500
I
I
__
:'........
------
- --1
MHW(+2.04ftNAVD)
Beach
--- --- ------------------------------ --------------=1 MLW {-2.98 ft NAVD)
I
I
600
I
I
I
I
700
I
I
I
I
I
soc
I
I
I
I
900
I
I
I
I
1000
I
I
I
1100
1200
Distance from BL (Feet)
10.0
.,..landward
0
~
- ....\
5.0
Proposed Culvert At +5 ft NAVD
...._._..,_,
____ _______
-·~~z=~~~~-~- --~~-------------y,-~1
z:
Swash
:E.
~
1' ,
- --i
c:
~
iii
Swash Channel Section l3o+Oo I
Expected Upcoast Profile
0.0
-5.0
" , v,
Expected Sand AccumuIated
1
'--L_J___ _5J~~~~:!~~rt~--:1':~-:-==:-...:::::o.=:.=-=.:::.::.:::.=.... --.,::J
t= L=J. ~ : = ~
~
I
I
I
7QQ
I
I
I
600 Culvert Invert At-3ft NAVD
500
7-
I
I
I
SQC
900
Distance from BL (Feet)
I
I
I
1doo
I
I
10.0
~
z
1100
I
o
- --1
0
~
C
500
- -------------- - - - - - - ------- - - - - --
MLW (-2.98 ft NAVD)
MHW (+ 2.04 ft NAVD)
I
I
I
600
I
I
I
II
I
700
I
I
I
I
soc
I
I
I
I
900
I
I
I
I
I
---~
I~
1100
1000
1200
Distance from Bl (Feel)
Hot
lnfr
- - - - - Expected Profile
Beach
0.0
-5.0~1
API
Legend
- - - - September 2011
Minimum Impact
Swash
c:
w
1200
5.0
:E.
="'
·
MLW (-2.98 fl NAVD)
Washover Section 132+00 I
~landward
0
MHW(+2.04ftNAVD)
Beach
r---------~
Singleton Swash Stabilization Project
SAC# 2014-00013-3H
Horry County, South Carolina
Sheet 7 OF 9 Dated: 01 /7/2014
DRAWING TITLE:
neering, Inc.
SECTIONS
PROJECT: Singleton Swash
Stabilization Project
AS SHOWN I SHEET#:
OATE:
Dec2013
TMS#
PROJECT i : 2371
~
~II
,, '''''''"'""'''''
\\
·····················.~//,,....~
~
.··
f ()! COASTAL ···~ 'Z~
=
{J:j :
SCIENCE
: 0 ::
//
,,
.:::-'
....
~~ ~
-:;~
-:,.~,,
\
& ENGINEERING
1-: ~
No. C01950
I~:::
j
··
..
..
·· :v:::
~~~··..
..·· &~
,.,.. 'l'L:- .........~·~-,
,.,,,,,''0F N ,,,,,,,,
/
,,,,,111111111'
...~
I
S w
as
s
(
h
\
Temporary
Sand Dike
-
\
I
-MHW
'
-'\
/
'
w
s h
8
'
-....._,
OCRM Setback Line ~ /
OCRM Baseline ~ /
/
----- --./~
~
~
\
(
............ ............
I
' \
(
1
\
I
I
I
\
~
~~
'
'
'-
/-,,
Myrtle Beach
'
/~~/6
.J' .
'
'"'\ "'" ......
'''
I
I
/
\._,
'
..
~.$'
'
Cli'.r~
/ /
....... ~
- ~~I'~·
---
>'
I
\
I
I
I
\
'
.......
'\
I 450 f1 *
\
\
''
\\\_
'
\
\
\
-MHW -
)
Sands
Beach Club
Temporary
Sand Dike
+Sit
' '
'
---
- ·-
*Note: Existing easements allow the County to realign the channel
no closer than 450ft South of the Sands Beach Club pool deck.
CONSTRUCTION PLAN
?
Oft-
Scale (Feet)
AS SHOWN I SHEET#
DATE:
Dec2013
TMS#
PROJECT: Singleton Swash
StabiliZation ProJect
*
'
0 c e an
DRAWING TITLE:
'ing, Inc.
--- --- --
_..... _____ -MHW .... - - - - - - - - - - . _
Atlantic
Singleton Swash Stabilization Project
SAC# 2014-00013-3H
Horry County, South Carolina
Sheet 8 OF 9 Dated: 01/7/2014
+Sit
Arcadian Shores Beach
Oft
Horry C
lnfrastn
\
~
.......
-
APPLJC.t
OCRM Baseline
Temporary Channel
I
I
_/
\
I
I
I
.,...~-
I·
, ......I
2·3 ft Diameter Pipeline
& Construction Route
Construction Area
"'o
'
/--...,
\
,
,....'
'' \
'---.
+5ft
Temporary Sand Stockpiles
PROJECT t: 2371
~
Ifill'''
,,,,'''''"''II
~,,,,,
1?0
.$',,
...
···· ::~.:.~~
···· ..........~
-:..
.··
g()/
:::-
=~ :
=
-~"'(\:..\
··.
COASTAL
\_
SCIENCE
:
& ENGINEERING :
No. C01950
....
~~....,4:~··.
,...., rh,_' '·········'
. . ,. 1~~~~ rv't11
vr
~
0 ::
i.N2
......·
'''"""''''
Z~
~ ;:
~ -
~"
,.:::
,,''
,,,,,
Alignment End
A
Alignment End
A'
~
~
~
~
Existing Sill
I 1 I I I
j'o
o.o
-5.0
-5.0
0+00
1+00
2+00
3+00
4+00
5+00
6+00
7+00
8+00
9+00
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
20+00
Station Along Profile (feet)
Singleton Swash channel profile for conditions of 28 September 2011 through 3October 2011 showing the existing sill (controlling depth of +2ft NAVD).
The area of the sill (points L to S) is adjacent to the back beach (dry-sand beach) and generally aligns with the strand dune line. The natural sill
prevents full discharge of tides in the marsh.
See sheet 02 for profile location and reference points on the profile.
,,,1,11111111('''''
,,\\
,-
APPLI(
Horry
lnfras·
Singleton Swash Stabilization Project
SAC # 2014-00013-3H
Horry County, South Carolina
Sheet 9 OF 9 Dated: 01/7/2014
DRAWING TITLE.·
ering, Inc.
Existing Conditions Section
DATE;
Dee2013
PROJECT: Singleton Swash
Stabilization Project
PROJECT i: 2371
[!!]
~
m
:
- .
=
AS SHOWN I SHEET#.
TMS#
JLCOIUffiDia, :Sl,; L~LU~
~It/ /
....···········....~//
.··
··. ~
~ O/ COASTAL \ -. 'Z~
.::::',....
::::
SCIENCE
: 0 ::
& ENGINEERING i ~ ~
~ ~~ \
No.C01950 / N2
~
.
i
···
-:.-6~··.
~.::::
....
..·· ~,""
"..- '1-L-- ·········~· <'
~/
//' 111...- 0 F N ,,,,,,
1
,,,,IJ111111 '