Kinder Morgan North Charleston Terminal Dredging (Charleston County)
Kinder Morgan North Charleston Terminal Dredging (Charleston County)
J 01 NT
PUBLIC NOTICE
CHARLESTON DISTRICT, CORPS OF ENGINEERS
69A Hagood Avenue
Charleston, South Carolina 29403-5107
and the
S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
OFFICE OF OCEAN AND COASTAL RESOURCE MANAGEMENT
1362 McMillan Avenue, Suite 400
Charleston, South Carolina 29405
REGULATORY DIVISION
Refer to: P/N #2008-01871-21R
March 7, 2014
Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), Sections
401 and 404 of the Clean Water Act (33 U.S.C. 1344), and the South Carolina Coastal Zone
Management Act (48-39-1 0 et.seq.) an application has been submitted to the Department of the
Army and the S.C. Department of Health and Environmental Control by
KINDER MORGAN TERMINALS
ATTN: CRAIG MULLINS
1500 GREENLEAF ROAD
CHARLESTON, SOUTH CAROLiNA 29405
for a permit to perform maintenance dredging in the
COOPER RIVER
at Kinder Morgan North Charleston Terminal at 5165 Virginia Avenue, North Charleston,
Charleston County, North Charleston, South Carolina.
(Latitude: 32.887027; Longitude: -79.966652).
In order to give all interested parties an opportunity to express their views
NOTICE
is hereby given that written statements regarding the proposed work will be received by the Corps
until
15 Days from the Date of this Notice
and SCDHEC will receive written statements regarding the proposed work until
30 Days from the Date of this Notice
from those interested in the activity and whose interests may be affected by the proposed work.
The proposed work consists of dredging approximately 32,000 cubic yards of material
initially from a 2.3 acre area in front of the wharf at the Kinder Morgan facility on Virginia Avenue.
In detail, the dredged material will be hydraulically dredged to a project depth of -45.0' MLW with
2.0' of over depth for a total depth of -47.0' MLW. Subsequent annual berth maintenance
dredging events are anticipated to generate approximately 15,000 cubic yards of material. The
material is proposed for placement in the Clouter Creek Confined Disposal Facility via pipeline. A
sampling and analysis plan was not submitted with the application; however, the applicant has
REGULATORY DIVISION
Refer to: SAC# 2008-01871-21R
March 7, 2014
Page 2 of 3
stated that sediment sampling and testing will be conducted. The dredging history at this site is
unknown and therefore may include new work. The project purpose is to maintain safe operating
depths at all tidal stages for deep draft vessels utilizing the Kinder Morgan facility.
NOTE: Plans depicting the work described in this notice are available and will be
provided, upon receipt of a written request, to anyone that is interested in obtaining a copy
of the plans for the specific project. The request must identify the project of interest by
public notice number and a self-addressed stamped envelope must also be provided for
mailing the drawings to you. Your request for drawings should be addressed to the
U.S. Army Corps of Engineers
ATTN: REGULATORY DIVISION
69A Hagood Avenue
Charleston, South Carolina 29403-5107
The District Engineer has concluded that the discharges associated with this project, both
direct and indirect, should be reviewed by the South Carolina Department of Health and
Environmental Control in accordance with provisions of Section 401 of the Clean Water Act. As
such, this notice constitutes a request, on behalf of the applicant, for certification that this project
will comply with applicable effluent limitations and water quality standards. The work shown on
this appiication must aiso be certified as consistent with applicable provisions the Coastal Zone
Management Program (15 CFR 930). The District Engineer will not process this application to a
conclusion until such certifications are received. The applicant is hereby advised that
supplemental information may be required by the State to facilitate the review.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. Implementation of the
proposed project would impact 2.3 acres of estuarine substrates and emergent wetlands
utilized by various life stages of species comprising the red drum, shrimp, and snapper-grouper
management complexes. Our initial determination is that the proposed action would not have a
substantial individual or cumulative adverse impact on EFH or fisheries managed by the South
Atlantic Fishery Management Council and the National Marine Fisheries Service (NMFS). Our
final determination relative to project impacts and the need for mitigation measures is subject to
review by and coordination with the NMFS.
Pursuant to Section ?(c) of the Endangered Species Act of 1973 (as amended), the
District Engineer has consulted the most recently available information and has determined that
the project is not likely to adversely affect any Federally endangered, threatened, or proposed
species or result in the destruction or adverse modification of designated or proposed critical
habitat. This public notice serves as a request for written concurrence from the U.S. Fish and
Wildlife Service and/or the National Marine Fisheries Service on this determination.
Pursuant to Section 106 of the National Historic Preservation Act (NHPA), this public
notice also constitutes a request to Indian Tribes to notify the District Engineer of any historic
properties of religious and cultural significance to them that may be affected by the proposed
undertaking.
In accordance with the NHPA, the District Engineer has also consulted the latest
published version of the National Register of Historic Places for the presence or absence of
registered properties, or properties listed as being eligible for inclusion therein, and this worksite
is not included as a registered property or property listed as being eligible for inclusion in the
Register. To insure that other cultural resources that the District Engineer is not aware of are
REGULATORY DIVISION
Refer to: SAC# 2008-01871-21R
March 7, 2014
Page 3 of 3
not overlooked, this public notice also serves as a request to the State Historic Preservation
Office to provide any information it may have with regard to historic and cultural resources.
Any person may request, in writing, within the comment period specified in this notice, that
a public hearing be held to consider this application. Requests for a public hearing shall state,
with particularity, the reasons for holding a public hearing.
The decision whether to issue a permit will be based on an evaluation of the probable
impact including cumulative impacts of the activity on the public interest and will include
application of the guidelines promulgated by the Administrator, Environmental Protection Agency
(EPA), under authority of Section 404(b) of the Clean Water Act and, as appropriate, the criteria
established under authority of Section 102 of the Marine Protection, Research and Sanctuaries
Act of 1972, as amended. That decision will reflect the national concern for both protection and
utilization of important resources. The benefit which reasonably may be expected to accrue from
the project must be balanced against its reasonably foreseeable detriments. All factors which
may be relevant to the project will be considered including the cumulative effects thereof; among
those are conservation, economics, aesthetics, general environmental concerns, wetlands,
historic properties, fish and wildlife values, flood hazards, flood plain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy
needs, safety, food and fiber production and, in general, the needs and welfare of the people. A
permit will be granted unless the District Engineer determines that it would be contrary to the
public interest. In cases of conflicting property rights, the Corps of Engineers cannot undertake to
adjudicate rival claims.
The Corps of Engineers is soliciting comments from the public; Federal, state, and local
agencies and officials; Indian Tribes; and other interested parties in order to consider and
evaluate the impacts of this activity. Any comments received vvill be consideied by the Coips of
Engineers to determine whether to issue, modify, condition or deny a permit for this project. To
make this decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments
are also used to determine the need for a public hearing and to determine the overall public
interest of the activity.
If there are any questions concerning this public notice, please contact Robin Coller-Socha
at 843-329-8044 or toll free at 1-866-329-8187.
--1.
-_:
PURPOSE: MAINTAIN SAFE OPERATING DEPTH
FOR DEEP-DRAFT VESSELS
AQVAGENT PROPERTY OWNERS
BUCKEYE ENERGY SERVICES, LLC
DELFIN GROUP USA, LLC
SURVEY DATUM: NGVD 29.
SHIP00614
-
FIGURE 1
LOCATION MAP
USGS QUAD "CHARLESTON"
PROPOSED:
BERTH MAINTENANCE DREDGING
AT:
NORTH CHARLESTON TERMINAL
NOT TO SCALE
IN:
COOPER RIVER
NORTH CHARLESTON TERMINAL
KINDER MORGAN BULK TERMINALS
CHARLESTON, SOUTH CAROLINA
GEL ENGINEERING, INC.
..,
COUNTY OF: CHARLESTON
SOUTH CAROLINA
SHEET: 1 OF 4
DATE:
2/12/14
o Mornbol" of THE GEL GROUP. INC.
~-
\
\ \
I
SAC#2008-01871-2R
FIGURE 2
PLAN VIEW
PURPOSE: MAINTAIN SAFE OPERATING DEPTH
FOR DEEP-DRAFT VESSELS
PROPOSED: BERTH MAINTENANCE DREDGING
AQJACEN[ PROPERTY QWNEBS
BUCKEYE ENERGY SERVICES, LLC
DELFIN GROUP USA, LLC
-- -SCALE: 1"
o·
SURVEY DATUM: NAD 83.
SHIP00614
75'
=
150'
150'
225'
NORTH CHARLESTON TERMINAL
KINDER MORGAN BULK TERMINALS
CHARLESTON, SOUTH CAROLINA
GEL ENGINEERING. INC.
AT:
NORTH CHARLESTON TERMINAL
IN:
COOPER RIVER
COUNTY
0~
CHARLESTON
SOUTH CAROUNA
SHEET: 2 OF 4
DATE:
2/12/14
a llomber of THE GEl. GROUP, INC.
f----------132'---------l
MEAN HIGH WATER 5.20'_ _ _ _ __
MEAN LO\A/ \4/ATER 0.00' ML\A/
...:.:.:..:=---+--
-45.0' MLW
PLUS 2'
OVERDEPTH
PROPOSED DREDGED DEPTH
SAC#2008-01871-2R
PURPOSE: MAINTAIN SAFE OPERATING DEPTH
FOR DEEP-DRAFT VESSELS
LANDWARD EDGE OF
PRISM OF FEDERAL
CHANNEL
FIGURE 3
CROSS-SECTION
ADJACENT PROPERTY OWNERS
BUCKEYE ENERGY SERVICES, LLC
DELFIN GROUP USA, LLC
REFERENCE: MLW
SHIP00614
NOT TO SCALE
NORTH CHARLESTON TERMINAL
KINDER MORGAN BULK TERMINALS
CHARLESTON, SOUTH CAROLINA
GEL ENGINEERING, INC.
PROPOSED: BERTH MAINTENANCE DREDGING
AT:
NORTH CHARLESTON TERMINAL
IN:
COOPER RIVER
COUNTY OF: CHARLESTON
SOUTH CAROLINA
SHEET: 3 OF 4
DATE:
2/12/14
a Member of THE GEL GROUP, INC.
_:---)·
("'
-sPOIL
AREA
SAC#2008-01871-2R:..
~~=~:?. :;~~~~. · -·
PURPOSE: MAINTAIN SAFE OPERATING DEPTH
FOR DEEP-DRAFT VESSELS
FIGURE 4
DISPOSAL SITE
ADJACENT PROPERTY OWNERS
BUCKEYE ENERGY SERVICES, LLC
DELFIN GROUP USA, LLC
SURVEY DATUM: NGVD 29.
SHIP00614
NOT TO SCALE
NORTH CHARLESTON TERMINAL
KINDER MORGAN BULK TERMINALS
CHARLESTON, SOUTH CAROLINA
GEL MNEERINCi. INc.
PROPOSED:
BERTH MAINTENANCE DREDGING
AT:
NORTH CHARLESTON TERMINAL
IN:
COOPER RIVER
COUNTY OF: CHARLESTON
SOUTH CAROLINA
SHEET: 4 OF 4
DATE:
2/12/14