The applicant proposes to install a salinity control structure in Lighthouse Bayou

Full Public NoticeProject Plans The applicant proposes to install a salinity control structure in Lighthouse Bayou to protect intermediate and brackish marsh complexes. Target salinity levels would be consistent with an intermediate marsh management regime. The control structure would be comprised of five 60-inch barrels with one open fish access bay. Approximately 1,680 cubic yards of select fill material would be installed within the High Tide line of Lighthouse Bayou. The fill material would be discharged into approximately 0.52 acres of Lighthouse Bayou. The structure would be installed using a backhoe and pile-driving rig. The site would be accessed by boat using existing deep-water channels.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas