Kinder Morgan Terminals

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to expand a liquid bulk cargo facility

Full Public NoticeProject Plans The applicant proposes to dredge approximately 250,000 cubic yards of material, place approximately 80,000 cubic yards of material into 3.25 acres of open water, construct 2,400 linear feet of sheet pile bulkheading, and construct two pile-supported barge dock loading platforms. Dredged material not used for back fill behind bulkheads will be placed in one or more privately owned previously authorized placement areas. The purpose of this construction is to expand operations at an existing liquid bulk cargo facility.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas