WETLAND ASSIMILATION DISCHARGE SYSTEM IN TERREBONNE PARISH
Name of Applicant: Terrebonne Parish Consolidated Government, c/o Providence/GSE Associates, LLC, 991 Grand Caillou Road, Houma, Louisiana 70363
Location of Work: Adjacent to St. Louis Canal and Bayou Chauvin, Terrebonne Parish South Wastewater Treatment Plant, Lat 29.5212°, Lon -90.65918°, Section 79, T18S-R18E, HUC: 08090302-West Central Louisiana Coastal, Ashland Landfill Road, near Ashland, Terrebonne Parish, Louisiana, as shown on the attached drawings.
Character of Work: Construct, install, and maintain a discharge system to provide wetland assimilation of treated sanitary wastewater. Approximately 871 cubic yards of native earthen material would be excavated, temporarily stockpiled, and used to backfill a trench for installation of 3,465 linear feet of 24-inch diameter HDPE discharge pipe. Approximately 1,621 linear feet of 24-inch diameter HDPE pipe would be installed by directional drill. Also proposed are clearing of approximately 1,171 linear feet of ATV access path and construction of a 12-ft by 73-ft timber bridge over St. Louis Canal. Project implementation would impact approximately 2.63 acres of wetlands and 0.02 acres of other waters of the U.S. As compensation for any unavoidable wetland impacts, the applicant proposes to purchase mitigation credits from a Corps-approved mitigation bank.
JOINT PUBLIC NOTICE
May 5, 2014
U.S. Army Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, LA 70160-0267
State of Louisiana
Department of Environmental Quality
Water Quality Certification Section
Post Office Box 4313
Baton Rouge, LA 70821-4313
Project Manager: John C. Price
(504) 862-2272
john.c.price@usace.army.mil
DA Permit Number: MVN-2011-01140-WNN
Project Manager: Elizabeth Johnson
(225) 219-3225
WQC Number: WQC 110511-02
Interested parties are hereby notified that a permit application has been received by the New Orleans
District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and Harbors Act
of March 3, 1899 (30 Stat. 1151; 33 U.S.C. 403); and/or [X] Section 404 of the Clean Water Act (86
Stat. 816; 33 U.S.C. 1344).
Application has also been made to the Louisiana Department of Environmental Quality for a Water
Quality Certification (WQC) in accordance with statutory authority contained in La. R.S. 30:2074(A)(3)
and provisions of Section 401 of the Clean Water Act (P.L. 95-217; 33 U.S.C. 1341).
The Louisiana Department of Natural Resources, Office of Coastal Management (OCM) has also
received an application for a Coastal Use Permit (P20131675) in accordance with the State and Local
Coastal Resources Management Act of 1978, as amended (La. R.S. 49:214.21-214.41).
WETLAND ASSIMILATION DISCHARGE SYSTEM IN TERREBONNE PARISH
Name of Applicant: Terrebonne Parish Consolidated Government, c/o Providence/GSE Associates,
LLC, 991 Grand Caillou Road, Houma, Louisiana 70363
Location of Work: Adjacent to St. Louis Canal and Bayou Chauvin, Terrebonne Parish South
Wastewater Treatment Plant, Lat 29.5212°, Lon -90.65918°, Section 79, T18S-R18E, HUC: 08090302West Central Louisiana Coastal, Ashland Landfill Road, near Ashland, Terrebonne Parish, Louisiana,
as shown on the attached drawings.
Character of Work: Construct, install, and maintain a discharge system to provide wetland
assimilation of treated sanitary wastewater. Approximately 871 cubic yards of native earthen material
would be excavated, temporarily stockpiled, and used to backfill a trench for installation of 3,465 linear
feet of 24-inch diameter HDPE discharge pipe. Approximately 1,621 linear feet of 24-inch diameter
HDPE pipe would be installed by directional drill. Also proposed are clearing of approximately 1,171
linear feet of ATV access path and construction of a 12-ft by 73-ft timber bridge over St. Louis Canal.
Project implementation would impact approximately 2.63 acres of wetlands and 0.02 acres of other
waters of the U.S. As compensation for any unavoidable wetland impacts, the applicant proposes to
purchase mitigation credits from a Corps-approved mitigation bank.
The comment period for the Department of the Army (DA) permit application and the Louisiana
Department of Environmental Quality WQC will close 20 days from the date of this joint public notice.
Written comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this DA permit and WQC request
and must be mailed, so as to be received before or by the last day of the comment period. Letters
concerning the DA permit application must reference the applicant's name and the DA Permit Number,
and be mailed to the U.S. Army Corps of Engineers at the address above. Similar letters concerning the
WQC must reference the applicant's name and the WQC Number and be mailed to the Louisiana
Department of Environmental Quality at the address above. Individuals or parties may request an
extension of time in which to comment on the proposed work by writing or e-mailing the Project
Manager listed above. Any request must be specific and substantively supportive of the requested
extension, and received by this office prior to the end of the initial comment period. The Section Chief
will review the request and the requestor will be promptly notified of the decision to grant or deny the
request. If granted, the time extension will be continuous to the initial comment period and, inclusive of
the initial comment period, will not exceed a total of 30 calendar days.
The application for this proposed project is on file with the Louisiana Department of Environmental
Quality and may be examined weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained
upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts,
including cumulative impacts of the proposed activity on the public interest. That decision will reflect the
national concern for both protection and utilization of important resources. The benefit which
reasonably may be expected to accrue from the proposal must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the proposal will be considered, including
the cumulative effects thereof; among these being: conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain
values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local
agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the
impacts of this proposed activity. Any comments received will be considered by the U.S. Army Corps of
Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make
this decision, comments are used to assess impacts on endangered species, historic properties, water
quality, general environmental effects, and other public interest factors listed above. Comments are
used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement
pursuant to the National Environmental Policy Act. Comments are also used to determine the need for
a public hearing and to determine the overall public interest of the proposed activity.
No properties listed on the National Register of Historic Places are known to be near the proposed
work. The possibility exists that the proposed work may damage or destroy presently unknown
archeological, scientific, prehistoric, or historical sites or data. Issuance of this public notice solicits
input from the State Archeologist and State Historic Preservation Officer regarding potential impacts to
cultural resources.
Our initial finding is that the proposed work would neither affect any species listed as endangered
by the U.S. Departments of Interior or Commerce, nor affect any habitat designated as critical to the
survival and recovery of any endangered species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. The applicant's proposal would result in the
destruction or alteration of 0.0 acres of EFH utilized by various life stages of red drum and penaeid
shrimp. Our initial determination is that the proposed action would not have a substantial adverse
impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to
project impacts and the need for mitigation measures is subject to review by and coordination with the
National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the U.S. Environmental Protection Agency. Also, a certification that the proposed
activity will not violate applicable water quality standards will be required from the Louisiana
Department of Environmental Quality before a permit is issued.
The applicant has certified that the proposed activity described in the application complies with and
will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program. The
Department of the Army permit will not be issued unless the applicant received approval or a waiver of
the Coastal Use Permit by the Department of Natural Resources.
Any person may request, in writing, within the comment period specified in this notice, that a public
hearing be held to consider this application. Requests for public hearings shall state, with particularity,
the reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
Darrell S. Barbara
Chief, Western Evaluation Section
Regulatory Branch