You can copy from here when filling out the rest of the page.
The applicant proposes to discharge fill material into 14.8 acres of non-tidal wetlands.
Full Public NoticeProject Plans
The applicant proposes to discharge fill material into 14.8 acres of non-tidal wetlands (11.1 acres of temporary impacts and 3.7 acres of permanent impacts) for the proposed construction of infrastructure required to refrigerate, store, and load Liquid Petroleum Gas. Additionally, the applicant proposes to expand and relocate existing dock structures and install new loading arms, breasting dolphins, and pipe piles within open water of the Old Brazos River. Such activities include installing a total of 121 pilings into 3 dock areas, impacting approximately 0.4 acre of the Old Brazos River.