You can copy from here when filling out the rest of the page.
CONSTRUCT A NEW ETHANE PIPELINE IN FOUR PARISHES
NAME OF APPLICANT: Enterprise Products Operating LLC, c/o Atkins North America, Inc., Attn: Mr. J. Grant Barber, 909 ESE Loop 323, Suite 360, Tyler, Texas 75701.
LOCATION OF WORK: Within a 52.5 mile long pipeline corridor beginning at a tie-in point at the existing Section 28 facility, proceeding eastward, terminating near Paincourtville, Louisiana, in Assumption, Ascension, Iberville, and St. Martin Parishes, Hydrologic Unit Codes 08070300(Lower Grand), 08080101(Atchafalaya), 08080102(Bayou Teche, and 08090302(West Central Louisiana Coast), as shown on the attached drawings.
CHARACTER OF WORK: Clear rights-of-way (ROW), conduct trenching operations, temporarily stockpile and backfill with approximately 336,995 cubic yards of native earthen material, approximately 27,046 cubic yards of dredge material, and 4,924 cubic yards of gravel fill material; all as necessary to install approximately 52.5 miles of 20-inch ethane gas pipeline, associated laterals/interconnects, and 6 mainline valve (MLV) sites. Project implementation would impact approximately 160.34 acres through conversion of habitat on the permanent ROW, 208.04 acres through temporary construction ROW and workspaces, and the permanent impact of 9.98 acres due to fill, for a total of 378.36 acres of jurisdictional wetlands impacted. The pipeline ROW will have an overall 75-foot-wide construction ROW, of which 50 feet will be maintained as permanent ROW. The applicant proposes to compensate for project related unavoidable wetland impacts by creating permittee-responsible mitigation sites and purchasing mitigation credits at a Corps-approved mitigation bank within the New Orleans District.
JOINT PUBLIC NOTICE
May 19, 2014
United States Army
Corps of Engineers
New Orleans District
Attn: Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
State of Louisiana
Department of Environmental Quality
Attn: Water Quality Certifications
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
Project Manager: James W. Little, Jr.
(225)342-3099/FAX: (225)342-9439
James.little@usace.army.mil
Permit Application Number:
MVN-2013-02944-WII
Project Manager: Elizabeth Johnson
(225)219-3225/FAX: (225)219-3156
WQC Application Number
WQC 140515-03
Interested parties are hereby notified that a permit application has been received
by the New Orleans District of the U.S. Army Corps of Engineers pursuant to:
[X] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC
403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental
Quality, for a Water Quality Certification (WQC) in accordance with statutory authority
contained in LRS 30:2074 A(3) and provisions of Section 401 of the Clean Water Act
(P.L.95-17).
CONSTRUCT A NEW ETHANE PIPELINE IN FOUR PARISHES
NAME OF APPLICANT: Enterprise Products Operating LLC, c/o Atkins North America, Inc.,
Attn: Mr. J. Grant Barber, 909 ESE Loop 323, Suite 360, Tyler, Texas 75701.
LOCATION OF WORK: Within a 52.5 mile long pipeline corridor beginning at a tie-in point
at the existing Section 28 facility, proceeding eastward, terminating near
Paincourtville, Louisiana, in Assumption, Ascension, Iberville, and St. Martin Parishes,
Hydrologic Unit Codes 08070300(Lower Grand), 08080101(Atchafalaya), 08080102(Bayou Teche,
and 08090302(West Central Louisiana Coast), as shown on the attached drawings.
CHARACTER OF WORK: Clear rights-of-way (ROW), conduct trenching operations, temporarily
stockpile and backfill with approximately 336,995 cubic yards of native earthen material,
approximately 27,046 cubic yards of dredge material, and 4,924 cubic yards of gravel fill
material; all as necessary to install approximately 52.5 miles of 20-inch ethane gas
pipeline, associated laterals/interconnects, and 6 mainline valve (MLV) sites. Project
implementation would impact approximately 160.34 acres through conversion of habitat on
the permanent ROW, 208.04 acres through temporary construction ROW and workspaces, and
the permanent impact of 9.98 acres due to fill, for a total of 378.36 acres of
jurisdictional wetlands impacted. The pipeline ROW will have an overall 75-foot-wide
construction ROW, of which 50 feet will be maintained as permanent ROW. The applicant
proposes to compensate for project related unavoidable wetland impacts by creating
permittee-responsible mitigation sites and purchasing mitigation credits at a Corpsapproved mitigation bank within the New Orleans District.
The comment period for the Department of the Army Permit and the Louisiana
Department of Environmental Quality WQC will close 20 days from the date of this joint
public notice. Written comments, including suggestions for modifications or objections
to the proposed work, stating reasons thereof, are being solicited from anyone having
interest in this permit and/or this WQC request and must be mailed so as to be received
before or by the last day of the comment period. Letters concerning the Corps of
Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Individuals or parties may request an extension of time in
which to comment on the proposed work by writing, faxing, or e-mailing the Corps of
Engineers Project Manager listed above. Any request must be specific and substantively
supportive of the requested extension, and received by this office prior to the end of
the initial comment period. The Section Chief will review the request and the requestor
will be promptly notified of the decision to grant or deny the request. If granted, the
time extension will be continuous to the initial comment period and, inclusive of the
initial comment period, will not exceed a total of 30 calendar days. Similar letters
concerning the Water Quality Certification must reference the applicant's name and the
WQC Application number and be mailed to the Louisiana Department of Environmental Quality
at the address above.
The application for this proposed project is on file with the Louisiana Department
of Environmental Quality and may be examined during weekdays between 8:00 a.m. and
4:30 p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the
probable impacts, including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and
utilization of important resources. The benefit which reasonably may be expected to
accrue from the proposal must be balanced against its reasonably foreseeable detriments.
All factors which may be relevant to the proposal will be considered including the
cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food and
fiber production, mineral needs, considerations of property ownership and, in general,
the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal,
state, and local agencies and officials, Indian Tribes, and other interested parties in
order to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the U.S. Army Corps of Engineers to determine whether to
make, modify, condition, or deny a permit for this proposal. To make this decision,
comments are used to assess impacts on endangered species, historic properties, water
quality, general environmental effects, and other public interest factors listed above.
Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act.
Comments are also used to determine the need for a public hearing and to determine the
overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register
of Historic Places near the proposed work. The possibility exists that the proposed work
may damage or destroy presently unknown archeological, scientific, prehistorical,
historical sites, or data. Issuance of this public notice solicits input from the State
Archeologist and State Historic Preservation Officer regarding potential impacts to
cultural resources.
Our initial finding is that the proposed work would neither affect any species
listed as endangered by the U.S. Departments of Interior or Commerce, nor affect any
habitat designated as critical to the survival and recovery of any endangered species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of
the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal
would result in the destruction or alteration of N/A acres of EFH utilized by various
life stages of red drum and penaeid shrimp. Our initial determination is that the
proposed action would not have a substantial adverse impact on EFH or federally managed
fisheries in the Gulf of Mexico. Our final determination relative to project impacts and
the need for mitigation measures is subject to review by and coordination with the
National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable
waters, the evaluation of the probable impacts will include the application of guidelines
established by the Administrator of the Environmental Protection Agency. Also, a
certification that the proposed activity will not violate applicable water quality
standards will be required from the Department of Environmental Quality, Office of
Environmental Services before a permit is issued.
Any person may request, in writing, within the comment period specified in this
notice, that a public hearing be held to consider this application. Requests for public
hearings shall state, with particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application
complies with and will be conducted in a manner that is consistent with the Louisiana
Coastal Resources Program. The Department of the Army Permit will not be issued unless
the applicant received approval or a waiver of the Coastal Use Permit by the Department
of Natural Resources.
You are requested to communicate the information contained in this notice to any
other parties whom you deem likely to have interest in the matter.
Darrell S. Barbara
Chief, Western Evaluation Section
Regulatory Branch
Enclosures
TAG
1
DESCRIPTION
LINEAR DISTANCE
LAT. (NAD83)
LONG. (NAD83)
BEGIN 20" PIPELINE
30° 13' 14.033"
91° 45' 59.971"
2
ENTER COASTAL ZONE
TAG 1 TO TAG 2
MILES=5.39
FEET=28,433.95
30° 04' 37.336"
91° 04' 52.778"
3
END 20" PIPELINE
30° 00' 39.960"
91° 06' 16.538"
TAG 2 TO TAG 3
MILES=5.39
FEET=28,433.95
FOR THE ACQUISITION OF REGULATORY PERMITS
t
LOUISIANA
1
NEW ORLEANS DISTRICT
2
PROPOSED PIPELINE
3
LOUISIANA COASTAL
ZONE BOUNDARY
VICINITY MAP
ENTERPRISE TE PRODUCTS PIPELINE COMPANY LLC
AEGIS ETHANE HEADER, SEGMENT 3 PIPELINE PROJECT
REV
DATE
DESCRIPTION OF REVISION
ES NO.
BY
PROPOSED 20" AEGIS ETHANE
HEADER, SEGMENT 3 PIPELINE
LOCATED IN LOUISIANA
APP
THIS DOCUMENT IS CONFIDENTIAL AND IT SHALL NOT BE REPRODUCED OR
REDISTRIBUTED WITHOUT PRIOR PERMISSION.
NEITHER THE OPERATOR NOR THE
OWNER MAKE ANY WARRANTY AS TO THE CORRECTNESS OR COMPLETENESS
OF THE INFORMATION CONTAINED ON THIS DRAWING, AND THE USER ASSUMES ALL
RISK OF LOSS TO PERSONS AND PROPERTY AS A RESULT OF RELIANCE THEREON.
DATE
5/15/2014
DRAWN
ATKINS/LEWI4923
REV.
Document Path: N:\Clients\E_F\EPCO\Aegis_Ethane_Header\100035498_Segment_3\geo\figs\vicinity_map.mxd
t
0
!
!
!
?!
?
?
!
?!
5
!
!
!
?
!
?
10
!
!
0
0.5
1
2
3
Miles
Sources: Esri, HERE, DeLorme, TomTom, Intermap, increment P Corp., GEBCO, USGS, FAO,
NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China
(Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User
Community
ENTERPRISE TE PRODUCTS PIPELINE COMPANY LLC
AEGIS ETHANE HEADER, SEGMENT 3 PIPELINE PROJECT
Legend
Proposed Centerline
!
?
HDD Entry/Exit
!
!
Mile Post
REV
DATE
DESCRIPTION OF REVISION
ES NO.
BY
PROPOSED 20" AEGIS ETHANE
HEADER, SEGMENT 3 PIPELINE
LOCATED IN LOUISIANA
APP
THIS DOCUMENT IS CONFIDENTIAL AND IT SHALL NOT BE REPRODUCED OR
REDISTRIBUTED WITHOUT PRIOR PERMISSION.
NEITHER THE OPERATOR NOR THE
OWNER MAKE ANY WARRANTY AS TO THE CORRECTNESS OR COMPLETENESS
OF THE INFORMATION CONTAINED ON THIS DRAWING, AND THE USER ASSUMES ALL
RISK OF LOSS TO PERSONS AND PROPERTY AS A RESULT OF RELIANCE THEREON.
DATE
5/15/2014
DRAWN
ATKINS/LEWI4923
REV.
Document Path: N:\Clients\E_F\EPCO\Aegis_Ethane_Header\100035498_Segment_3\geo\figs\hdd_mp_alignment.mxd
t
!
!
!
!
15
!
?
!
?!
?
0
0.5
1
2
3
Miles
!
?
Sources: Esri, HERE, DeLorme, TomTom, Intermap, increment P Corp., GEBCO, USGS, FAO,
NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China
(Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User
Community
Legend
ENTERPRISE TE PRODUCTS PIPELINE COMPANY LLC
AEGIS ETHANE HEADER, SEGMENT 3 PIPELINE PROJECT
Proposed Centerline
!
?
HDD Entry/Exit
!
!
Mile Post
REV
DATE
DESCRIPTION OF REVISION
ES NO.
BY
PROPOSED 20" AEGIS ETHANE
HEADER, SEGMENT 3 PIPELINE
LOCATED IN LOUISIANA
APP
THIS DOCUMENT IS CONFIDENTIAL AND IT SHALL NOT BE REPRODUCED OR
REDISTRIBUTED WITHOUT PRIOR PERMISSION.
NEITHER THE OPERATOR NOR THE
OWNER MAKE ANY WARRANTY AS TO THE CORRECTNESS OR COMPLETENESS
OF THE INFORMATION CONTAINED ON THIS DRAWING, AND THE USER ASSUMES ALL
RISK OF LOSS TO PERSONS AND PROPERTY AS A RESULT OF RELIANCE THEREON.
DATE
5/15/2014
DRAWN
ATKINS/LEWI4923
REV.
Document Path: N:\Clients\E_F\EPCO\Aegis_Ethane_Header\100035498_Segment_3\geo\figs\hdd_mp_alignment.mxd
t
!
!
20
!
!
25
!
?
!
?
!
?
0
0.5
1
2
3
Miles
Sources: Esri, HERE, DeLorme, TomTom, Intermap, increment P Corp., GEBCO, USGS, FAO,
NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China
(Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User
Community
Legend
ENTERPRISE TE PRODUCTS PIPELINE COMPANY LLC
AEGIS ETHANE HEADER, SEGMENT 3 PIPELINE PROJECT
Proposed Centerline
!
?
HDD Entry/Exit
!
!
Mile Post
!
?
REV
DATE
DESCRIPTION OF REVISION
ES NO.
BY
PROPOSED 20" AEGIS ETHANE
HEADER, SEGMENT 3 PIPELINE
LOCATED IN LOUISIANA
APP
THIS DOCUMENT IS CONFIDENTIAL AND IT SHALL NOT BE REPRODUCED OR
REDISTRIBUTED WITHOUT PRIOR PERMISSION.
NEITHER THE OPERATOR NOR THE
OWNER MAKE ANY WARRANTY AS TO THE CORRECTNESS OR COMPLETENESS
OF THE INFORMATION CONTAINED ON THIS DRAWING, AND THE USER ASSUMES ALL
RISK OF LOSS TO PERSONS AND PROPERTY AS A RESULT OF RELIANCE THEREON.
DATE
5/15/2014
DRAWN
ATKINS/LEWI4923
REV.
Document Path: N:\Clients\E_F\EPCO\Aegis_Ethane_Header\100035498_Segment_3\geo\figs\hdd_mp_alignment.mxd
t
!
!
30
!
? !
?
!
!
!
?!
?
35
!
?!
?
!
?!
?
!
?!
? !
?!
?
0
0.5
1
2
3
Miles
Sources: Esri, HERE, DeLorme, TomTom, Intermap, increment P Corp., GEBCO, USGS, FAO,
NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China
(Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User
Community
Legend
ENTERPRISE TE PRODUCTS PIPELINE COMPANY LLC
AEGIS ETHANE HEADER, SEGMENT 3 PIPELINE PROJECT
Proposed Centerline
!
?
HDD Entry/Exit
!
!
Mile Post
REV
DATE
DESCRIPTION OF REVISION
ES NO.
BY
PROPOSED 20" AEGIS ETHANE
HEADER, SEGMENT 3 PIPELINE
LOCATED IN LOUISIANA
APP
THIS DOCUMENT IS CONFIDENTIAL AND IT SHALL NOT BE REPRODUCED OR
REDISTRIBUTED WITHOUT PRIOR PERMISSION.
NEITHER THE OPERATOR NOR THE
OWNER MAKE ANY WARRANTY AS TO THE CORRECTNESS OR COMPLETENESS
OF THE INFORMATION CONTAINED ON THIS DRAWING, AND THE USER ASSUMES ALL
RISK OF LOSS TO PERSONS AND PROPERTY AS A RESULT OF RELIANCE THEREON.
DATE
5/15/2014
DRAWN
ATKINS/LEWI4923
REV.
Document Path: N:\Clients\E_F\EPCO\Aegis_Ethane_Header\100035498_Segment_3\geo\figs\hdd_mp_alignment.mxd
!
?
!
?
!
?!
? ?
!!
?
!
?
!
?
40
!
? !
? !
! !
?!
?
!
?!
?
!
?
!
?
!
?!
?
t
!
?
!
?
!
?
!
?
!
!
0
0.5
1
2
3
Miles
45
Sources: Esri, HERE, DeLorme, TomTom, Intermap, increment P Corp., GEBCO, USGS, FAO,
NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China
(Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User
Community
Legend
ENTERPRISE TE PRODUCTS PIPELINE COMPANY LLC
AEGIS ETHANE HEADER, SEGMENT 3 PIPELINE PROJECT
Proposed Centerline
!
?
HDD Entry/Exit
!
!
Mile Post
REV
DATE
DESCRIPTION OF REVISION
ES NO.
BY
PROPOSED 20" AEGIS ETHANE
HEADER, SEGMENT 3 PIPELINE
LOCATED IN LOUISIANA
APP
THIS DOCUMENT IS CONFIDENTIAL AND IT SHALL NOT BE REPRODUCED OR
REDISTRIBUTED WITHOUT PRIOR PERMISSION.
NEITHER THE OPERATOR NOR THE
OWNER MAKE ANY WARRANTY AS TO THE CORRECTNESS OR COMPLETENESS
OF THE INFORMATION CONTAINED ON THIS DRAWING, AND THE USER ASSUMES ALL
RISK OF LOSS TO PERSONS AND PROPERTY AS A RESULT OF RELIANCE THEREON.
DATE
5/15/2014
DRAWN
ATKINS/LEWI4923
REV.
Document Path: N:\Clients\E_F\EPCO\Aegis_Ethane_Header\100035498_Segment_3\geo\figs\hdd_mp_alignment.mxd
t
!
!
50
!
?
!
?
0
0.5
1
2
3
Miles
Sources: Esri, HERE, DeLorme, TomTom, Intermap, increment P Corp., GEBCO, USGS, FAO,
NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China
(Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User
Community
Legend
ENTERPRISE TE PRODUCTS PIPELINE COMPANY LLC
AEGIS ETHANE HEADER, SEGMENT 3 PIPELINE PROJECT
Proposed Centerline
!
?
HDD Entry/Exit
!
!
Mile Post
REV
DATE
DESCRIPTION OF REVISION
ES NO.
BY
PROPOSED 20" AEGIS ETHANE
HEADER, SEGMENT 3 PIPELINE
LOCATED IN LOUISIANA
APP
THIS DOCUMENT IS CONFIDENTIAL AND IT SHALL NOT BE REPRODUCED OR
REDISTRIBUTED WITHOUT PRIOR PERMISSION.
NEITHER THE OPERATOR NOR THE
OWNER MAKE ANY WARRANTY AS TO THE CORRECTNESS OR COMPLETENESS
OF THE INFORMATION CONTAINED ON THIS DRAWING, AND THE USER ASSUMES ALL
RISK OF LOSS TO PERSONS AND PROPERTY AS A RESULT OF RELIANCE THEREON.
DATE
5/15/2014
DRAWN
ATKINS/LEWI4923
REV.
Document Path: N:\Clients\E_F\EPCO\Aegis_Ethane_Header\100035498_Segment_3\geo\figs\hdd_mp_alignment.mxd