PROPOSED CONSTRUCTION OF ETHYLENE PLANT IN CALCASIEU PARISH

NAME OF APPLICANT: Axial Corporation, c/o: CH2M HILL, 700 Main Street, Suite B, Baton Rouge, Louisiana 70802.

DESCRIPTION: Proposed construction of the Axial Corporation Ethylene Plant to include: 1) Plant Site – clear/grade, excavate, and/or fill an approximately 260 acres site, including 108 acres of jurisdictional wetlands. Approximately 1,000,000 cubic yards of material would be excavated from the site and transported to an upland disposal area offsite. Approximately 1,700,000 cy of clean fill would be discharged to build up the site elevation. 2) Entrance Road – An entrance road would be constructed along the northwest side of the site from the existing Bayou d’Inde Pass Road. Approximately 1,600 cy of fill would be deposited, impacting 0.1 acre of jurisdictional forested wetlands. 3) Barge Slip Area – A proposed 460 feet by 280 feet barge slip would constructed to include a bulkhead and paved apron. Approximately 17,000 cy of excavated material be removed from jurisdictional wetlands and 46,000 cy would be removed from open waters for construction of the barge slip and apron. Approximately 0.74 acre of jurisdictional forested wetland would be permanently impacted by construction of the barge slip, bulkhead, paved apron, and construction work areas. 4) Heavy Haul Road – A 50 feet wide heavy equipment access road would be constructed between the barge slip and the plant site. The road site would be mechanically cleared of vegetation and then grubbed and graded to a final average elevation of 8 feet NAVD 88. Approximately 2,500 cy of clean fill would be deposited onto 0.73 acre of jurisdictional forested wetlands. 5) Elevated Pipeline – An elevated pipeline would be laid on an existing pipe rack, which would join the existing and proposed facilities. Impacts to approximately 0.60 acre of jurisdictional forested wetlands would occur as a result of the elevated pipeline construction. 6) Permittee Responsible Mitigation Plan (PRMP) – A PRMP for offsite mitigation has been developed to offset unavoidable wetland impacts. A copy of the proposed PRMP is attached to this JPN for review.

LOCATION: Located at Latitude 30.218, Longitude -93.302, Section(s) 3, 4, 5, and 8, Township 10 South, Range 9 West, near Lake Charles, Louisiana, in Calcasieu Parish. The Project is located within the Lower Calcasieu Watershed, Hydrologic Unit 08080206.

JOINT PUBLIC NOTICE May 19, 2014 United States Army Corps of Engineers New Orleans District Regulatory Branch Post Office Box 60267 New Orleans, La. 70160-0267

State of Louisiana Department of Environmental Quality Post Office Box 4313 Baton Rouge, La. 70821-4313 Attn: Water Quality Certifications

(504) 862-2548/ FAX (504) 862-2574 Project Manager Johnny Duplantis Permit Application Number MVN-2014-00692-WPP

(225) 219-3225/FAX (225) 325-8250 Project Manager Elizabeth Johnson WQC Application Number WQC # 140514-01

Interested parties are hereby notified that a permit application has been received by the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344). Application has also been made to the Louisiana Department of Environmental Quality, for a Water Quality Certification (WQC) in accordance with statutory authority contained in Louisiana Revised Statutes of 1950, Title 30, Chapter 11, Part IV, Section 2074 A(3) and provisions of Section 401 of the Clean Water Act (P.L.95-17). PROPOSED CONSTRUCTION OF ETHYLENE PLANT IN CALCASIEU PARISH NAME OF APPLICANT: Axial Corporation, c/o: CH2M HILL, 700 Main Street, Suite B, Baton Rouge, Louisiana 70802. DESCRIPTION: Proposed construction of the Axial Corporation Ethylene Plant to include: 1) Plant Site ­ clear/grade, excavate, and/or fill an approximately 260 acres site, including 108 acres of jurisdictional wetlands. Approximately 1,000,000 cubic yards of material would be excavated from the site and transported to an upland disposal area offsite. Approximately 1,700,000 cy of clean fill would be discharged to build up the site elevation. 2) Entrance Road ­ An entrance road would be constructed along the northwest side of the site from the existing Bayou d'Inde Pass Road. Approximately 1,600 cy of fill would be deposited, impacting 0.1 acre of jurisdictional forested wetlands. 3) Barge Slip Area ­ A proposed 460 feet by 280 feet barge slip would constructed to include a bulkhead and paved apron. Approximately 17,000 cy of excavated material be removed from jurisdictional wetlands and 46,000 cy would be removed from open waters for construction of the barge slip and apron. Approximately 0.74 acre of jurisdictional forested wetland would be permanently impacted by construction of the barge slip, bulkhead, paved apron, and construction work areas. 4) Heavy Haul Road ­ A 50 feet wide heavy equipment access road would be constructed between the barge slip and the plant site. The road site would be mechanically cleared of vegetation and then grubbed and graded to a final average elevation of 8 feet NAVD 88. Approximately 2,500 cy of clean fill would be deposited onto 0.73 acre of jurisdictional forested wetlands. 5) Elevated Pipeline ­ An elevated pipeline would be laid on an existing pipe rack, which would join the existing and proposed facilities. Impacts to approximately 0.60 acre of jurisdictional forested wetlands would occur as a result of the elevated pipeline construction. 6) Permittee Responsible Mitigation Plan (PRMP) ­

-2-

A PRMP for offsite mitigation has been developed to offset unavoidable wetland impacts. A copy of the proposed PRMP is attached to this JPN for review. LOCATION: Located at Latitude 30.218, Longitude -93.302, Section(s) 3, 4, 5, and 8, Township 10 South, Range 9 West, near Lake Charles, Louisiana, in Calcasieu Parish. The Project is located within the Lower Calcasieu Watershed, Hydrologic Unit 08080206. The comment period for the Department of the Army Permit and the Louisiana Department of Environmental Quality WQC will close 20 days from the date of this joint public notice. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must be mailed so as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality Certification must reference the applicant's name and the WQC Application number and be mailed to the Louisiana Department of Environmental Quality at the address above. The application for this proposed project is on file with the Louisiana Department of Environmental Quality and may be examined during weekdays between 8:00 a.m. and 5:00 p.m. Copies may be obtained upon payment of costs of reproduction. Corps of Engineers Permit Criteria The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. The New Orleans District is unaware of properties listed on the National Register of Historic Places near the proposed work. The possibility exists that the proposed work may damage or

-3destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of this public notice solicits input from the State Archeologist and State Historic Preservation Officer regarding potential impacts to cultural resources. Our initial finding is that the proposed work would neither affect any species listed as endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat designated as critical to the survival and recovery of any endangered species. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal would result in the destruction or alteration of 0.74 acre(s) of EFH utilized by various life stages of red drum and penaeid shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will not violate applicable water quality standards will be required from the Department of Environmental Quality, before a permit is issued. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter. The applicant has certified that the proposed activity described in the application complies with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program. The Department of the Army permit will not be issued unless the applicant received approval or a waiver of the Coastal Use Permit by the Department of Natural Resources.

Darrell S. Barbara Chief, Western Evaluation Section Regulatory Branch Attachments

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas