PROPOSED FILL FOR THE CONSTRUCTION OF THE GEISMAR INDUSTRIAL PARK
NAME OF APPLICANT: Shriver Construction, c/o D & S Environmental Services, Inc., P.O. Box 510, French Settlement, Louisiana 70733.
LOCATION OF WORK: Section 63, T9S-R2E, at the junction of LA Hwy 30 and LA Hwy 73 in Geismar, Louisiana, in Ascension Parish, within the Lake Maurepas Basin in hydrologic unit (HUC 08070204), as shown on the attached drawings.
CHARACTER OF WORK: The applicant has requested Department of the Army authorization to clear, grade, excavate and deposit fill to construct and maintain the Geismar Industrial Park to include two office/warehouse buildings, with 52 units, parking, loading ramps, two storm water management areas, a sewer treatment plant, and ingress/ egress. Approximately 5,831 cubic yards of native earthen fill material, lime treated base and concrete will be required to achieve grade elevation requirements. The proposed project is situated on an approximate 8-acre tract that has jurisdictional forested wetlands, uplands, and jurisdictional “other waters of the US” included within its boundaries. The applicant proposes to permanently impact 1.48 acres of forested jurisdictional wetlands, and 0.24 acre of “other waters of the US”. It is anticipated that the proposed action would have minimal impact on adjacent wetlands.
The applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. Any further reduction would limit usage of the property and, therefore function deeming the project impracticable. As compensation for unavoidable wetland impacts, the applicant proposes to mitigate in-kind wetland credits from a Corps approved mitigation bank located in the watershed.
JOINT PUBLIC NOTICE
November 14, 2016
United States Army Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
State of Louisiana
Department of Environmental Quality
Office of Environmental Services
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-1301
Project Manager
Neil T. Gauthier
Neil.T.Gauthier@usace.army.mil
MVN 2014-00867-CM
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
140520-01
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the US Army Corps of Engineers pursuant to: [ ] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section
404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality,
Office of Environmental Services, for a Water Quality Certification (WQC) in accordance
with statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401 of
the Clean Water Act.
PROPOSED FILL FOR THE CONSTRUCTION OF THE GEISMAR INDUSTRIAL PARK
IN ASCENSION PARISH
NAME OF APPLICANT: Shriver Construction, c/o D & S Environmental Services, Inc.,
P.O. Box 510, French Settlement, Louisiana 70733.
LOCATION OF WORK: Section 63, T9S-R2E, at the junction of LA Hwy 30 and LA Hwy
73 in Geismar, Louisiana, in Ascension Parish, within the Lake Maurepas Basin in
hydrologic unit (HUC 08070204), as shown on the attached drawings.
CHARACTER OF WORK: The applicant has requested Department of the Army
authorization to clear, grade, excavate, and deposit fill to construct and maintain the
Geismar Industrial Park to include four (4) office/warehouse buildings with parking and
sidewalks, a 91 space Boat and RV parking lot, two storm water management areas with
pertinent outfalls, a sewer treatment plant, and ingress/ egress. Approximately 8,567
cubic yards of native earthen fill material, lime treated base, limestone, and concrete will
be required to achieve grade elevation requirements. The proposed project is situated on
an approximate 8-acre tract that has jurisdictional forested wetlands, uplands, and
jurisdictional "other waters of the US" included within its boundaries. The applicant
proposes to permanently impact 1.48 acres of forested jurisdictional wetlands, and 0.04
acre of "other waters of the US". It is anticipated that the proposed action would have
minimal impact on adjacent wetlands.
2
The applicant has stated that they designed the project to avoid and minimize direct and
secondary adverse impacts to the maximum extent practicable and any further reduction
would limit usage of the property and, therefore function, deeming the project
impracticable. As compensation for unavoidable wetland impacts, the applicant proposes
to mitigate in-kind wetland credits from a Corps approved mitigation bank located in the
watershed.
The comment period for the Department of Army will close in 20 days from the date of
this joint public notice. Written comments, including suggestions for modifications or
objections to the proposed work, stating reasons thereof, are being solicited from anyone
having interest in this permit and/or this WQC request and must be mailed so as to be
received before or by the last day of the comment period. Letters concerning the Corps of
Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality
Certification must reference the applicant's name and the WQC application number and
be mailed to the Louisiana Department of Environmental Quality at the address above.
Individuals or parties may request an extension of time in which to comment on the
proposed work by writing or e-mailing the Corps of Engineers Project Manager listed
above. Any request must be specific and substantively supportive of the requested
extension, and received by this office prior to the end of the initial comment period. The
Section Chief will review the request and the requestor will be promptly notified of the
decision to grant or deny the request. If granted, the time extension will be continuous to
the initial comment period and, inclusive of the initial comment period, will not exceed a
total of 30 calendar days.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and
4:30 p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal
must be balanced against its reasonably foreseeable detriments. All factors which may be
relevant to the proposal will be considered including the cumulative effects thereof; among
those are conservation, economics, aesthetics, general environmental concerns,
wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land
use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral
needs, considerations of property ownership and, in general, the needs and welfare of the
people.
3
The US Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to
consider and evaluate the impacts of this proposed activity. Any comments received will
be considered by the US Army Corps of Engineers to determine whether to make, modify,
condition, or deny a permit for this proposal. To make this decision, comments are used
to assess impacts on endangered species, historic properties, water quality, general
environmental effects, and other public interest factors listed above. Comments are used
in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, prehistorical, historical
sites, or data. Copies of this notice are being sent to the State Archeologist and State
Historic Preservation Officer.
Our initial finding is that the proposed work would not affect any species, nor affect any
habitat designated as critical to the survival and recovery of such species, listed as
endangered by the U.S. Department of Commerce.
Our initial finding is that the proposed work would not affect any species, nor affect any
habitat designated as critical to the survival and recovery of such species, listed as
endangered by the U.S. Department of Interior. Utilizing Standard Local Operating
Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014,
between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and
Wildlife Service, Ecological Services Office, the Corps has determined that the proposed
activity would have no effect on any listed species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal
would result in the destruction or alteration of up to 0 acres of EFH utilized by various life
stages of red drum and penaeid shrimp. Our initial determination is that the proposed
action would not have a substantial adverse impact on EFH or federally managed fisheries
in the Gulf of Mexico. Our final determination relative to project impacts and the need for
mitigation measures is subject to review by and coordination with the National Marine
Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established
by the Administrator of the Environmental Protection Agency. Also, a certification that the
proposed activity will not violate water quality standards will be required from the
Department of Environmental Quality, Office of Environmental Services before a permit is
issued.
4
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings
shall state, with particularity, the reasons for holding a public hearing. You are requested
to communicate the information contained in this notice to any other parties whom you
deem likely to have interest in the matter.
HERMAN.JOHN.MA
TTHEW.1119334280
Digitally signed by
HERMAN.JOHN.MATTHEW.1119334280
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI,
ou=USA,
cn=HERMAN.JOHN.MATTHEW.1119334280
Date: 2016.11.10 15:19:17 -06'00'
JOHN M. HERMAN
Chief, Central Evaluation Section
Regulatory Branch