You can copy from here when filling out the rest of the page.
DREDGE AND FILL FOR OIL AND GAS EXPLORATION AND PRODUCTION IN VERMILION PARISH
NAME OF APPLICANT: Hilcorp Energy Corporation, Attn: Robert Tannehill, P.O. Box 61229, Houston, Texas 77208
LOCATION OF WORK: Approximately 3.5 miles southeast from Pecan Island, Louisiana, Vermilion Parish as shown on the attached vicinity map. (Hydrologic Unit Code 08080103, Vermilion Watershed)
CHARACTER OF WORK: Bucket dredge to remove an earthen plug and hydraulically dredge to clean out an existing oilfield canal and slip for the purpose of placing a drilling rig on location to drill the Reliant Prospect. The material that will be excavated to remove the earthen plug will be stockpiled for future use in rebuilding the earthen plug upon abandonment of operations. A portion of the dredged material will be used to fill in an existing oilfield canal and the remainder placed in open water area at a height that is conducive to establishment of marsh. The flowlines will be installed on a proposed pipe rack constructed in the well slip to a proposed 20-foot by 20-foot platform, and from that platform they will be bored across the marsh to an existing pipe rack located at the production facility. Project implementation would impact no vegetated wetlands and approximately 20 acres of open waters.