PROPOSED FORESTED WETLAND MITIGATION BANK IN IBERVILLE PARISH
NAME OF APPLICANT: Palo Alto Conservation, LLC, 317 Mississippi Street, Donaldsonville, Louisiana 70346.
LOCATION OF WORK: In Section 23, T11S-R13E, near Donaldsonville, Louisiana, in Iberville Parish, as shown on the attached prospectus. (Lat. 30.09639, Long. -91.11528)
CHARACTER OF WORK: The proposed bank lands total approximately 475 acres of agricultural lands. The Sponsor proposes to restore the hydrology at the project area by degrading levees and backfilling canals, and cessation of pumping the project area. The Sponsor will reforest the site with an assemblage of species indicative of bottomland hardwood and baldcypress wetland forests native to the area. Attached for review, is the mitigation banking prospectus.
DEPARTMENT OF THE ARMY
NEW ORLEANS DISTRICT, CORPS OF ENGINEERS
P. O. BOX 60267
NEW ORLEANS, LOUISIANA 70160-0267
May 26, 2014
REPLY TO
ATTENTION OF:
Operations Division
Regulatory Branch
Brian Breaux
brian.w.breaux@usace.army.mil
(504) 862-1938
SUBJECT: MVN 2013-02202-MB
PUBLIC NOTICE
Public Notice Purpose: Pursuant to Section 10 of the Rivers and harbors Act of March 3, 1899
(30 Stat. 11512; 33 USC 403) and Section 404 of the Clean Water Act (86 Stat. 816; 33 USC
1344), the U.S. Army Corps of Engineers, New Orleans District, Regulatory Branch is soliciting
comments from all interested parties on the development, utilization, and long-term management
of a proposed mitigation bank. The purpose of this mitigation bank would be to provide
compensatory mitigation for unavoidable impacts to wetland resources, including other waters of
the United States, that result from projects authorized through the department of the Army permit
program.
PROPOSED FORESTED WETLAND MITIGATION BANK IN IBERVILLE PARISH
NAME OF APPLICANT: Palo Alto Conservation, LLC, 317 Mississippi Street,
Donaldsonville, Louisiana 70346.
LOCATION OF WORK: In Section 23, T11S-R13E, near Donaldsonville, Louisiana, in
Iberville Parish, as shown on the attached prospectus. (Lat. 30.09639, Long. -91.11528)
CHARACTER OF WORK: The proposed bank lands total approximately 475 acres of
agricultural lands. The Sponsor proposes to restore the hydrology at the project area by
degrading levees and backfilling canals, and cessation of pumping the project area. The Sponsor
will reforest the site with an assemblage of species indicative of bottomland hardwood and
baldcypress wetland forests native to the area. Attached for review, is the mitigation banking
prospectus.
The comment period will close 30 days from the date of this public notice advertisement.
Written comments, including suggestions for modifications or objections to the proposed work,
stating reasons therefore, are being solicited from anyone having interest in this permit request.
Letters must reference the applicant's name and the subject number, be addressed and mailed to
the above address, ATTENTION: REGULATORY BRANCH.
-2-
The decision whether to issue a permit will be based on an evaluation of the probable impact
including cumulative impacts of the proposed activity on the public interest. That decision will
reflect the national concern for both protection and utilization of important resources. The
benefit that reasonably may be expected to accrue from the proposal must be balanced against its
reasonably foreseeable detriments. All factors which may be relevant to the proposal will be
considered including the cumulative effects thereof; among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values,
flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation,
water supply and conservation, water quality, energy needs, safety, food and fiber production,
mineral needs, consideration of property ownership and, in general, the needs and welfare of the
people.
The Corps of Engineers is soliciting comments from the public; federal, state, and local
agencies and officials; Indian Tribes; and other interested parties in order to consider and
evaluate the impacts of this proposed activity. Any comments received will be considered by the
Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and the other public interest
factors listed above. Comments are used in the preparation of an Environmental Assessment
and/or Environmental Impact Statement pursuant to the National Environmental Policy Act.
Comments are also used to determine the need for a public hearing and to determine the overall
public interest of the proposed activity.
No properties listed in the National Register of Historic Places are near the proposed work.
The possibility exists that the proposed work may damage or destroy presently unknown
archeological, scientific, pre-historical or historical sites or data. Copies of this notice are being
sent to the State Archeologist and the State Historic Preservation Officer.
Our initial finding is that the proposed work would neither affect any species listed as
endangered by the U.S. Department of Interior nor affect any habitat designated as critical to the
survival and recovery of any endangered species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnus-Stevens Fishery Conservation and Management Act. The applicant's proposal would
result in the destruction or alteration of 0.0 acres of EFH utilized by various life stages of red
drum and penaeid shrimp. Our initial determination is that the proposed action would not have a
substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our
final determination relative to project impacts and the need for mitigation measures is subject to
review by and coordination with the National Marine Fisheries Service.
-3-
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency and certification that the proposed
activity will not violate applicable water quality standards will be required from the Louisiana
Department of Environmental Quality before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
Martin S. Mayer
Chief, Regulatory Branch
Attachment
PROSPECTUS FOR THE PROPOSED
BAYOU BIJOU MITIGATION BANK
IBERVILLE PARISH, LOUISIANA
MAY 2014
SUBMITTED BY:
PALO ALTO CONSERVATION, LLC
317 MISSISSIPPI STREET
DONALDSONVILLE, LOUISIANA 70346
PREPARED BY:
SOUTH LOUISIANA MITIGATION, LLC
331 GIROD STREET
MANDEVILLE, LOUISIANA 70448
AND
DEEP SOUTH MITIGATION, LLC
P.O. BOX 8394
CLINTON, LOUISIANA 70722
Table of Contents
1.0
1.1
1.2
1.3
2.0
2.1
3.0
3.1
3.2
3.3
3.4
3.5
4.0
4.1
4.2
4.3
4.4
5.0
6.0
6.1
6.2
6.3
6.4
6.5
7.0
8.0
INTRODUCTION .................................................................................................. 1
Site Location ....................................................................................................... 1
Ownership and Sponsorship
2
Driving Directions
2
PROJECT GOALS AND OBJECTIVES ............................................................... 2
Objectives
2
ECOLOGICAL SUITABILITY OF THE SITE ..................................................... 3
Historical Ecological Characteristics of the Site ................................................ 3
Current Ecological Characteristics of the Site .................................................... 4
Jurisdictional Determination ............................................................................... 4
General Need for the Project in this Area ........................................................... 5
Technical Feasibility
5
ESTABLISHMENT OF THE MITIGATION BANK ........................................... 5
Site Restoration Plan ........................................................................................... 6
Current Site Risks ............................................................................................... 7
Mortgages, Easements and Encumbrances
7
Long-Term Sustainability of the Site .................................................................. 8
PROPOSED SERVICE AREA............................................................................... 8
OPERATION OF THE MITIGATION BANK ...................................................... 8
Project Representatives ....................................................................................... 9
Qualifications of the Sponsor.............................................................................. 9
Proposed Long-Term Ownership and Management Representatives ................. 9
Site Protection ................................................................................................... 10
Long-Term Strategy .......................................................................................... 10
CONCLUSION ..................................................................................................... 10
REFERENCES............................................................................ 11
List of Tables
Table 1
Table 2
Acreage Breakdown
Percentage composition of species to be planted at the BBMB.
List of Figures
Figure 1
Figure 2
Figure 3
Figure 4
Figure 5
Figure 6
Figure 7
Figure 8
Figure 9
Figure 10
Figure 11
Vicinity Map
Location of Subject Property
LIDAR- Based Elevation Contours
Existing Wetland Map
Soils Map
Existing Hydrology
USGS Hydrologic Units
Proposed Rehabilitation & Re-establishment
Proposed Hydrology Restoration
Typical Cross-Sections of Canals
Typical Cross-Sections of Canals
ii
Bayou Bijou Mitigation Bank
1.0
INTRODUCTION
Palo Alto Conservation, LLC submits this prospectus in accordance with 33 CFR
332.8(d)(2). The proposed name of the mitigation bank is the Bayou Bijou Mitigation
Bank (BBMB). The proposed bank consists of 475 acres of wet-pasture, forested
wetlands, maintained right-of-way and other waters in Iberville Parish, Louisiana. Of the
475 acres, 422 acres will be rehabilitated to support bottomland hardwood forest and
cypress swamp and 30 acres of uplands, other waters and spoil banks will be reestablished with bottomland hardwood forest and cypress swamp habitats. The proposed
mitigation bank will be used as compensatory mitigation for the unavoidable impacts
associated with Department of the Army Permits. The following prospectus summarizes
the mitigation potential on the aforementioned property.
1.1
Site Location
The proposed BBMB is located on a 475-acre tract in Iberville Parish, Louisiana.
The project area is located in Section 23, Township 11 South and Range 13 East
off Louisiana Highway 943, approximately 4.5 miles west of the intersection of
Louisiana Highway 943 and Louisiana Highway 1. The project area is located at
latitude 30° 05' 47" North and Longitude 91° 06' 55" West near the city of
Donaldsonville, Louisiana in Iberville Parish (Figures 1 and 2).
Iberville Parish has a humid, subtropical climate characterized by relatively high
rainfall (average 57 inches per year). The average daily maximum temperature is
78.5° F and the average daily minimum temperature is 57.5°F. The growing
season in Iberville Parish averages 292 days ( 28°F; 5 years in 10) and spans
from February 23 to December 6. On the average there is sunshine, warm but not
excessive temperatures, a long frost-free season, and abundant precipitation with
high atmospheric humidity (United States Department of Agriculture [USDA]
Soil Conservation Service [SCS] 1977).
The proposed BBMB is located in recent Mississippi Valley Alluvium (Holocene
Deposits) in the backswamps that are associated with natural levees. The site is
located near Bayou Bijou and Bayou Sigur. Elevation ranges from less than +4
feet North American Vertical Datum (NAVD) to greater than +8 feet NAVD. A
majority of the site lies between +4 and +6 feet NAVD (Figure 3).
Currently the site is being used for agricultural purposes and is composed of 428
acres of wet pasture that is being used for agricultural purposes (cattle grazing and
crop production), 19 acres of uplands, 12 acres of forested wetlands, 7 acres of
roads, 6 acres of other waters and 3 acres of spoil piles. There are 6 acres of
maintained pipeline right-of-way within the 428 acres of wet-pasture (Figure 4).
1
Bayou Bijou Mitigation Bank
1.2
Ownership and Sponsorship
Palo Alto Conservation, LLC is the owner of the proposed bank site and will
serve as the Sponsor assuming long-term management of the site.
1.3
Driving Directions
From New Orleans take Interstate 10 West. Exit Highway 22 South. Cross the
Sunshine Bridge and exit Highway 70 West towards Donaldsonville. Take
Highway 1 South. Palo Alto Plantation will be on your right.
2.0
PROJECT GOALS AND OBJECTIVES
The goal of the BBMB is to rehabilitate and re-establish 441 acres of a bottomland
hardwood ecosystem and 41 acres of cypress swamp ecosystem, within a 475 acre tract,
all within USGS Hydrologic Unit Code 08090302 which designates that the proposed
mitigation bank lies within cataloging unit 02, accounting unit 03 and subregion unit 09
of the Lower Mississippi Region. The proposed land uses and mitigation types are
summarized in Table 1. The successful rehabilitation and re-establishment of bottomland
hardwood and cypress swamp ecosystems will provide additional wetland functions and
values not currently provided under the current land use. Hence, the objectives of the
BBMB are to increase water quality and flood storage and to improve wildlife habitat.
Establishment of the BBMB will restore and re-establish the unique wetland functions
and values associated with functioning bottomland hardwood and cypress swamp
ecosystems.
Table 1. Existing Habitat Types, Land Use and Mitigation Types
Present
Habitat
Wet
Pasture
Upland
Present
Land
Use
Cattle
Grazing/Crops
Cattle Grazing
Forested
Wetlands
Other
Waters
Roads
Cattle Grazing
Spoil
Banks
TOTAL
Cattle Grazing
2.1
Drainage Canals
Roads
Proposed Habitat
Mitigation Type
Bottomland
Hardwood/Cypress
Bottomland
Hardwood/Cypress
Forested Wetlands
Rehabilitation
Acres
Remain
6 (ROW)
to
Mitigation
Acres
422
Re-establishment
0
19
None
12
0
Bottomland
Hardwood/Cypress
Bottomland
Hardwood/Cypress
Bottomland
Hardwood/Cypress
Re-establishment
0
6
Re-establishment
5
2
Re-establishment
0
3
23
452
Objectives
The following site improvements will further the objectives of the BBMB:
·
Remove culverts and plug interior ditches to restore natural hydrology and
promote overland sheet flow
2
Bayou Bijou Mitigation Bank
3.0
·
Remove pump to restore natural hydrology and promote overland sheet flow
·
Remove livestock from the property thereby improving water quality
·
Rehabilitate and re-establish native bottomland hardwood forest and cypress
swamp by planting 452 acres with native species indicative of historic
bottomland hardwood forest and cypress swamp
·
Maintain 6 acres of an existing maintained right-of-way and 12 acres of
existing forested wetlands
·
Provide long-term maintenance to prevent colonization of noxious and
invasive species
·
Provide long-term protection through the execution a conservation servitude
to ensure perpetual existence of the site
ECOLOGICAL SUITABILITY OF THE SITE
The area encompassing the proposed Bayou Bijou Mitigation Bank was a historically
functioning bottomland hardwood forest, however clearing, channeling for drainage
purposes and its use for agricultural production altered the once functioning wetland. It
is anticipated that hydrologic restoration, planting of native bottomland hardwood species
and planting of baldcypress, on the lower elevations, will return the proposed site to a
fully functioning bottomland hardwood/cypress swamp ecosystem. When considering
the existing site characteristics it is highly likely that the proposed mitigation bank will be
successful.
3.1 Historical Ecological Characteristics of the Site
Historically, the area encompassing the proposed mitigation bank was a
functioning bottomland hardwood forest that drained naturally via gravity
drainage into Bayou Bijou and eventually into Grand Bayou.
In the 1950s the area encompassing the proposed mitigation bank was cleared
and ditched for the production of soybeans. Soybean production continued on
the property until the 1970s when rice became the agricultural crop of choice.
Sometime in the late 1970s to early 1980s sugarcane replaced rice as the
agricultural crop being produced on the property. Finally, in the 1990s the
sugarcane was replaced with cattle. The grazing of cattle presently constitutes
the main activity on the property, however a corn crop was planted on the
western portion of the property in 2013.
3
Bayou Bijou Mitigation Bank
3.2 Current Ecological Characteristics of the Site
3.2.1
Soils
Soils mapped within the project area are mapped as Sb: Shriever clay.
Shriever clay is listed on the National list of hydric soils (Figure 5). Field
observations found soil characteristics similar to the above mentioned soil
series description from NRCS (2007).
3.2.2
Vegetation
The project area consists primarily of open pastures and sugarberry - black
willow forests. The sugarberry and black willow habitat contains
primarily sugarberry, black willow, sweetgum (Liquidambar styraciflua),
Drummond red maple (Acer rubrum var. drummondii) and boxelder (Acer
negundo) in the overstory. The midstory is comprised of Chinese
tallowtree (Triadica sebiferum). The understory is comprised primarily of
palmetto (Sabal minor), blackberry (Rubus betulifolius), common rush
(Juncus effusus), elderberry (Sambucus canadensis) and roundleaf
greenbrier (Smilax rotundifolia). The open pastures contain herbaceous
species such as bahiagrass (Paspalum notatum), common rush, fragrant
flatsedge (Cyperus odoratus), Brazilian vervain (Verbena brasiliensis),
cocklebur (Xanthium strumarium), small beggarticks (Bidens discoidea),
perennial ryegrass (Lolium perenne), white clover (Trifolium repens),
smooth blue aster (Aster laevis), blackberry, palmetto and yellow foxtail
(Setaria glauca).
3.2.3
Hydrology
Water within the wet-pasture area drains east-west via shallow tertiary
agricultural ditches into six secondary agricultural ditches which flow
north-south into two primary drainage canals which flow in an east-west
direction across the site. There is an existing pump located on the western
boundary of the site (Figure 6). The pump consists of a hydraulic pump
connected to a tractor that, when operated, pumps water into an unnamed
canal on the western boundary. The water in this unnamed canal flows
south into the Bayou Bijou and eventually into Grand Bayou.
3.3
Jurisdictional Determination
A wetland delineation prepared by Deep South Mitigation, LLC was prepared and
submitted to the U.S. Army Corps of Engineers, New Orleans District,
Surveillance and Enforcement Section on June 18, 2013. A final jurisdictional
determination was issued on December 4, 2013, and is attached as Appendix A.
4
Bayou Bijou Mitigation Bank
3.4
General Need for the Project in this Area
The BBMB is located within United States Geological Survey (USGS) Cataloging
Unit 08090302 which includes all of Terrebonne Parish and portions of
Assumption, Iberville and Lafourche Parishes between Bayou Lafourche, the
Mississippi River, the Atchafalaya floodway, and the Gulf of Mexico (Figure 7).
Currently there are four active banks located in the proposed primary service area
HUC 08090302, however the amount of credits currently available in these banks
is not sufficient to meet expected demand in the coming years.
In addition to providing mitigation for residential and commercial development
related to continued population growth, the BBMB will provide mitigation for the
continuation of oil and gas exploration and production, which has historically
occurred in the proposed primary and secondary service areas. It is anticipated
that numerous pipelines will be constructed across the service areas of the BBMB
in the not-to-distant future as the demand for domestic oil increases. A recent
Times-Picayune article predicted that the southern US, including Louisiana, will
see nearly $500 billion in spending on oil and gas related infrastructure over the
next decade (Times-Picayune, 2008). This article corroborates recent discussions
with oil and gas companies that indicate the continued need for mitigation banks
in the proposed service areas related to planed oil and gas activity in the future.
Additional demand for mitigation in the service areas is likely to come from local,
state and federal governments related to hurricane protection in southeast
Louisiana. Since Hurricane Katrina there has been an increased demand for
mitigation credits in the service areas related to hurricane protection and this
demand is likely to continue in light of the push to obtain funding for the
Morganza to the Gulf levee system.
3.5
Technical Feasibility
The work required to restore and re-establish the BBMB is routine and feasible.
The sponsor has an extensive background in land manipulation. The consultants
hired by Palo Alto Conservation, LLC have extensive backgrounds in wetlands
science in general and mitigation banking in particular. The relatively flat
landscape and the documented presence of hydric soils imply that minimal soil
work will be required for successful restoration of wetland hydrology and
successful reforestation of bottomland hardwood forest and cypress swamp.
Further, the historical existence of bottomland hardwood forest and cypress
swamp on the project area and the presence of bottomland hardwood forest and
cypress swamp adjacent to the BBMB indicates a high potential for successful
restoration of a functional bottomland hardwood forest and cypress swamp.
4.0
ESTABLISHMENT OF THE MITIGATION BANK
The Sponsor proposes to rehabilitate and re-establish approximately 411 acres of
bottomland hardwood forest and 41 acres of cypress swamp from pasture, uplands, other
5
Bayou Bijou Mitigation Bank
waters, roads and spoil piles through surface hydrology restoration and native vegetative
plantings (Figure 8).
4.1 Site Restoration Plan
The proposed restoration activities include the removal of cattle and the
resultant grazing activities on the property, restoration of surface hydrology,
vegetative restoration and implementation of short-term, intermediate and
long-term management strategies.
4.1.1
Vegetative Restoration
Rehabilitation and re-establishment activities will be accomplished by
preparing the site as needed (mowing, herbicide, discing, tilling, etc.)
during the fall of 2014 and by planting an appropriate species mixture of
bottomland hardwood and cypress seedlings during the non-growing
season (i.e., December - March).
The bottomland hardwood rehabilitation and re-establishment areas will
be planted using a mixture of both hard mast and soft mast species in the
approximate percentages detailed in Table 2 below.
Table 2. Percent Composition of species to be planted at the BBMB.
Common Name
Scientific Name
Percent Composition
Nuttall Oak
Quercus nutalli
20%
Willow Oak
Quercus phellos
20%
Water Oak
Quercus nigra
10%
Bitter Pecan
Carya x lecontei
5%
Overcup Oak
Quercus lyrata
5%
Green Ash
Fraxinus
5%
pennsylvanica
Drummond
Red Acer
rubrum
var. 5%
Maple
drummondi
Sweetgum
Liquidambar
5%
styraciflua
Persimmon
Diospyros virginiana
5%
Sugarberry
Celtis laevigata
5%
American Elm
Ulmus americana
5%
Baldcypress
Taxodium distichum
5%
Mayhaw
Crataegus opaca
5%
The cypress rehabilitation and re-establishment areas will be planted using
Taxodium distichum. The planting of 100% cypress seedlings along with
natural recruitment should provide an appropriate species mixture in the
areas designated for cypress rehabilitation and re-establishment.
6
Bayou Bijou Mitigation Bank
4.1.2
Hydrologic Restoration
In Management Area 1, it is proposed that three flap-gated culverts will be
removed and the agricultural ditches backfilled with native material and
mechanically prepared for planting. Additionally, fourteen culverts will
be removed and all the agricultural ditches will be backfilled with native
material and mechanically prepared for planting. The existing municipal
canal which runs east-west through the northern third of the property will
be rerouted off of the proposed mitigation bank by Ascension Parish
allowing this drainage canal, along with the other east-west drainage canal
to the south, to be backfilled with native material and mechanically
prepare for planting. If the existing spoil banks and roads are insufficient
to completely backfill the existing drainage canals fill material will be
brought in from offsite. Although the drainage canal to be rerouted is in
Iberville Parish, the Parish line is the eastern boundary line of the
proposed mitigation bank, therefore Ascension Parish will reroute the
canal before it enters Iberville Parish. In Management Area 2, it is
proposed that the existing canals, along with the pump, remain under
active management until year 5. At year 5 the pump and all culverts will
be removed and the agricultural ditches and drainage canals will be
backfilled with native material and mechanically prepared for planting.
(See, Figures 9, 10 & 11). Maintaining the existing canals and pumping
capability in Management Area 2 until Year 5, for use in extreme high
water events associated with hurricanes and tropical storms, will allow for
increased survival of vegetative plantings at the BBMB and will lead to
greater project success. The proposed hydrologic restoration activities
will increase surface water retention, reduce nonpoint source runoff and
improve water quality within the project area. The anticipated schedule
for hydrologic restoration activities will occur in fall 2014 for
Management Area 1 and in Year 5 for Management Area 2.
4.1.3
Invasive Species Control
Invasive and exotic flora such as Chinese Tallow (Triadica sebifera) will
be controlled by either cutting, herbicide treatment or a combination of
these methods. Exotic fauna such as nutria (Myocastor coypus) will be
controlled by legal methods such as trapping, shooting, etc.
4.2 Current Site Risks
The Sponsor does not foresee any adverse impacts to the BBMB resulting from
the continued existence and operation of the neighboring land uses. The adjacent
properties consist of forested wetlands or are in active sugarcane production and
owned and operated by the Sponsor. There is one municipal drainage canal
located on the northern third of the property and running in an east-west
direction over which the Sponsor has no control, however Ascension Parish has
agree to reroute the existing municipal drainage canal off of the proposed
7
Bayou Bijou Mitigation Bank
mitigation bank allowing the canal to be backfilled. Iberville Parish will
abandon its drainage servitude that currently burdens the proposed mitigation
bank. The Sponsor controls all other hydrologic disturbances on the BBMB.
4.3 Mortgages, Easements and Encumbrances
A tile opinion has been rendered to the Sponsor and will be attached to the draft
Mitigation Banking Instrument. The Sponsor owns the property in fee simple
title and there are no mortgages, easements or encumbrances that would affect
the success or sustainability of the BBMB. There are existing pipeline rights-ofway located in Management Area 2 along the southwestern portion of the
proposed mitigation bank totaling 6 acres, however it is not anticipated that the
existing rights-of-way would negatively affect the success or sustainability of the
BBMB.
4.4 Long-Term Sustainability of the Site
Long-term viability and sustainability of the BBMB will be ensured through
active and adaptive management including, but not limited to, invasive species
control, appropriate monitoring and long-term maintenance. No long-term
structural management will be required because all actively managed structures
or devices will be removed in Management Area 2 at year 5. A long-term
management plan will be included within the mitigation banking instrument
which will be prepared subsequent to submission of this prospectus and will
contain a long-term management plan and costs associated with same and will
identify a funding mechanism in accordance with 33 CFR 332.7(d).
5.0 PROPOSED SERVICE AREA
The BBMB is located within United States Geological Survey (USGS) Cataloging Unit
08090302 which includes all of Terrebonne Parish and portions of Assumption, Iberville
and Lafourche Parishes between Bayou Lafourche, the Mississippi River, the Atchafalaya
floodway, and the Gulf of Mexico (Figure 6). Projects impacting bottomland hardwood
and baldcypress/tupelogum swamps and fresh/intermediate marsh, where determined
appropriate by CEMVN, within this cataloging unit could use the BBMB to compensate
for wetland impacts associated with Department of the Army permits. The Cataloging
Unit 08070300 would serve as the secondary service area as appropriate; however, the
use of the BBMB beyond the cataloging unit will be determined by the CEMVN on a
case-by-case basis.
6.0 OPERATION OF THE MITIGATION BANK
The BBMB shall be operated, maintained and managed by Palo Alto Conservation, LLC
and its agents, South Louisiana Mitigation, LLC and Deep South Mitigation, LLC, as
follows:
8
Bayou Bijou Mitigation Bank
6.1 Project Representatives
Sponsor:
Palo Alto Conservation, LLC
317 Mississippi Street
Donaldsonville, LA 70346
(985) 473-7927
Agents:
Chris M. Trepagnier
South Louisiana Mitigation, LLC
331 Girod Street
Mandeville, LA 70448
chris@treplawfirm.com
985.778.0888
Jerry Bolton
Deep South Mitigation, LLC
P.O. Box 8394
Clinton, LA 70722
(225) 719-3153
Landowner:
Palo Alto Conservation, LLC
317 Mississippi Street
Donaldsonville, LA 70346
(985) 473-7927
6.2 Qualifications of the Sponsor
The Sponsor has been involved in farming and manipulation of the project site
since the 1950s, as such the Sponsor is intimately familiar with the site
conditions and has the experience necessary to successfully implement all facets
of the mitigation banking agreement. Additionally, the Sponsor has hired Chris
M. Trepagnier and Jerry Bolton and their associated companies to provide
consulting services with regard to the establishment and management of the
Bayou Bijou Mitigation Bank.
6.3 Proposed Long-Term Ownership and Management Representatives
The long-term ownership of the site will be maintained by Palo Alto
Conservation, LLC.
The management of the of the BBMB will be the ultimate responsibility of Palo
Alto Conservation, LLC, however Palo Alto Conservation, LLC has contracted
9
Bayou Bijou Mitigation Bank
with Mr. Chris Trepagnier of South Louisiana Mitigation and Mr. Jerry Bolton of
Deep South Mitigation, LLC to oversee project management.
Mr. Trepagnier and Mr. Bolton have extensive experience in wetland science in
general and mitigation banking in particular and are well versed in all facets of
mitigation banking. Mr. Trepagnier and Mr. Bolton currently manage two active
mitigation banks within the New Orleans District: the Upper Bayou Folse
Mitigation Bank and the Laurel Oak Mitigation Bank. In addition, Mr.
Trepagnier owned and operated a mitigation bank in Avoyelles Parish and
represented the Sawgrass Bayou Mitigation Bank in St. John the Baptist Parish.
6.4 Site Protection
The Sponsor/Owner shall be responsible for protecting all lands within the entire
475 acre tract proposed for establishment of the BBMB. In order to ensure
protection of the property within the BBMB boundary, the Owner shall execute a
perpetual Louisiana conservation servitude in accordance with the Louisiana
Conservation Servitude Act (La. R.S. 9:1271, et seq.) on the entire 475 acre tract.
The conservation servitude shall be recorded in the Mortgage and Conveyance
Records of Iberville Parish.
The holder of the conservation servitude will be Nature Holding, LLC. Nature
Holding, LLC is a qualified, non-profit corporation approved to hold
conservation servitudes in accordance with Corps guidelines.
6.5 Long-Term Strategy
The Sponsor will ensure the long-term success and sustainability of the BBMB
through such mechanisms as vegetative plantings, hydrologic restoration and
maintenance, invasive species control, site monitoring, establishment of financial
assurances and perpetual protection through the filing of a Louisiana
conservation servitude. A long-term management plan will be included in the
Mitigation Banking Instrument that will address long-term management needs,
costs and the identification of a funding mechanism in accordance with 33 CFR
332.7(d).
7.0
CONCLUSION
In summary, the BBMB has a high potential of successfully rehabilitating and reestablishing 452 acres of bottomland hardwood wetlands and cypress swamp, preserving
12 acres of existing forested wetlands and maintaining 6 acres of existing pipeline rightof-way and 5 acres of existing roads within a 475 acre tract of land. By discontinuing
agricultural usage of the property, restoring natural hydrology and restoring bottomland
hardwood forest and cypress swamp habitat, the BBMB will improve local aquatic
resources and habitats while accomplishing the specific goals and objectives of the
BBMB.
10
Bayou Bijou Mitigation Bank
8.0
REFERENCES
Barras, J., Beville, S., Britsch, D., Hartley, S., Hawes, S., Johnston, J., Kemp, P., Kinler,
Q., martucci, A., Porthouse, J., Reed, D., Roy, K., Sapkota, S., and Suhayda, J.
2003. Historical and projected coastal Louisiana land changes; 1978-2050: USGS
Open File Report 03-334, 39 p.
Larino, J. (2014, January 8). Southern U.S. to see nearly $500 billion in oil and gas
infrastructure spending by 2025, report says.
Natural Resources Conservation Service (2007) The PLANTS Database, Version 3.5.
U.S. Department of Agriculture, Natural Resources Conservation Services,
National Plant Data Center. Accessed January 23, 2007. Available URL:
http://plants.usda.gov.
United States Army Corps of Engineers (1987) Corps of Engineers Wetland Delineation
Manual. USACE Waterways Experiment Station Technical Report Y-87-1.
United States Department of Agriculture, Soil Conservation Service 91995) Soil Mapping
Units and Hydric Soils Designations, Louisiana. Soil Conservation Service, 3rd
edition.
United States Department of Agriculture, Soil Conservation Service (1977) soil Survey of
Iberville Parish, Louisiana. USDA Soils Conservation Service, La. Ag.
Experiment Station, and La. Soil, and Water Conservation Committee.
11
Figure 1. Vicinity Map
µ
Property Location
0
5
10
Deep South Mitigation, LLC.
20
Miles
Copyright:© 2013 National Geographic Society, i-cubed
Date: September 9, 2013
Figure 2. Location of the Subject Property
µ
Legend
Subject Property
0
1
2
Deep South Mitigation, LLC.
4
Miles
National Geographic, Esri, DeLorme, NAVTEQ, UNEP-WCMC, USGS, NASA, ESA, METI, NRCAN,
GEBCO, NOAA, iPC
Date: August 27, 2013
Figure 3. LIDAR-Based Elevation Contours
µ
Legend
Subject Property
Elevation (Feet)
2
4
6
8
0
10
Deep South Mitigation, LLC.
1,000
2,000
4,000
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, Getmapping, Aerogrid, IGN,Feet
IGP,
swisstopo, and the GIS User Community
Date: February 13, 2014
Figure 4. Existing Wetland Map
!
!
D
!
C
!
Legend
!
Data Plots
Wet Pasture (428 ac)
µ
A
!
B
!
!
E
F
!
H
G
Uplands (19 ac)
Forested Wetlands (12 ac)
Other Waters (6 ac)
Roads (7 ac)
Spoil Piles (3 ac)
Deep South Mitigation, LLC.
0
1,000
2,000
4,000
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, Getmapping, Aerogrid, IGN,Feet
IGP,
swisstopo, and the GIS User Community
Date: April 17, 2014
Figure 5. Soils Map
Cm
µ
Cm
Cm
Sb
Sc
Legend
W
W
Se
Subject Property
Soils
Deep South Mitigation, LLC.
Se
Sb
0
1,000
2,000
Sc
4,000
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, Getmapping, Aerogrid, IGN,Feet
IGP,
swisstopo, and the GIS User Community
Date: February 13, 2014
Figure 6. Existing Hydrology
.
!
(
!
(
!
µ
(
!
!
(
(
!
(
!
(
!
(
!
(
!
.
!
(
!
(
!
!
(
(
!
(
!
(
!
(
!
(
!
"
J
Legend
!
(
(
!
(
!
(
!
(
!
(
!
Subject Property
!
(
.
!
(
!
Culvert
"
J
Pump
Flap Gate Culvert
Ditch Plug
.
!
.
!
(
!
Overland Flow
0
Ditches
Deep South Mitigation, LLC.
1,000
2,000
4,000
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, Getmapping, Aerogrid, IGN,Feet
IGP,
swisstopo, and the GIS User Community
Date: February 13, 2014
Figure 7. USGS Hydrologic Units
µ
08070202
08070100
08070204
08070300
08090302
08080101
08090301
Legend
Subject Property
USGS Hydrologic Units
0
2
4
8
Miles
Copyright:© 2013 Esri, DeLorme, NAVTEQ, TomTom
Deep South Mitigation, LLC.
Date: August 27, 2013
Figure 8. Proposed Rehabilitation and Re-establishment
µ
Area 1
Legend
Management Areas (475 ac)
Area 1 (377 ac)
Type
Area 2 (98 ac)
Area 2
BLH (411 ac)
Cypress (41 ac)
Existing Forested Wetlands (12 ac)
Existing Pipeline ROW (6 ac)
Roads to Remain (5 ac)
Roads to be Restored (2 ac)
Note: Acreage for BLH and Cypress
include the 2 acres of roads to be restored
Deep South Mitigation, LLC.
0
1,000
2,000
4,000
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP,
Feet
swisstopo, and the GIS User Community
Date: May 22, 2014
Figure 9. Proposed Hydrology Restoration
!
(
!
>
Legend
µ
!
(
!
(
!
(
!
(
!
(
!
(
(
!
(!
!
(
!
(
!
(
!
.
!
>
!
.
Subject Property
Culverts
!
(
!
>
Remove & Plug (Year 1)
Remove & Plug (Year 5)
Flap Gate Culverts
!
(
!
>
Remove & Plug (Year 1)
!
.
!
(
Install Plug (Year 1)
!
>
"
/
!
.
!
(
!
(
!
(
!
(
!
(
!
(
!
.
Remove & Plug (Year 5)
Ditch Plugs
No Action
Pump
"
/
!
>
!
(
!
.
Remove (Year 5)
Ditchs
Fill (Year 1)
0
Fill (Year 5)
Deep South Mitigation, LLC.
1,000
2,000
4,000
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, Getmapping, Aerogrid, IGN,Feet
IGP,
swisstopo, and the GIS User Community
Date: April 15, 2014
Figure 10. Typical Cross-Sections of Canals
Existing Surface
(Approx 6.0' NAVD)
Existing Road
(Approx 6.0' NAVD)
Note: Elevations in NAVD from LIDAR
Deep South Mitigation, LLC.
Date: May 21, 2014
Figure 11. Typical Cross-Section of Canals
5 ft
Existing Surface
(Approx. 6.0' NAVD)
24 ft
2 ft
10 ft
12 ft
6 ft
12 ft
Legend
Channel to be filled
Road
Notes: The channel will be filled with dirt from both the road and the spoil pile
Elevations in NAVD from LIDAR
Typical cross-section (Not to Scale)
Spoil
Deep South Mitigation, LLC.
Date: May 21, 2014