The applicant proposes to deepen the Houston Ship Channel (HSC) and turning basin around 39 wharves.

Full Public Notice Project Plans PROJECT DESCRIPTION: The applicant proposes to deepen 37 wharves around the HSC and turning basin and two wharves in the Manchester Wharf area to a depth of 36 feet below mean low tide (MLT) plus 1 foot of overdepth and 1 foot of advanced maintenance dredging for a total depth of 38 feet below MLT. Depths at the wharves are currently authorized at differing depths ranging from 28 feet below MLT to 36 feet below MLT. This project will authorize these wharves to be dredged to the same depth as the adjoining Federally-maintained channel. All dredged material will be placed in previously approved Port Authority-owned placement areas.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas