The applicant proposes to replace the existing stone revetment within the project limits.

Full Public Notice Project Plans PROJECT DESCRIPTION: The applicant proposes to replace the existing stone revetment within the project limits (408 authorization has been obtained) and replace it with a 205-foot-long steel sheet pile bulkhead; backfilled with concrete and capped with poured concrete. Approximately 3,860 square feet of waters will be displaced. The applicant also proposes the construction of two 112-foot-long by 8-foot-wide parallel travel lift piers and the construction of floating pier and gangway (108-foot-long by 5-foot-wide). The applicant also proposes to remove two concrete dolphins by cutting them at the mudline and dredging a 1.48-acre area to a depth of -10 feet at mean low tide, with up to 2 feet of allowable overdredge. Approximately 9,350 cubic yards of material will be hydraulically removed to the Corps’ San Jacinto placement site, on Galveston Island.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas