PROPOSED BULL ISLAND MITIGATION BANK IN VERMILLION PARISH
PROPOSED BULL ISLAND MITIGATION BANK IN VERMILLION PARISH
NAME OF APPLICANT: JMB Partnership, LLC, 203 Main St., Franklin, Louisiana 70538, Attention: Russell Walters.
LOCATION OF WORK: Approximately a 560 acre site located 11.2 miles southwesterly of Kaplan, Louisiana (Latitude: 29.85083N; Longitude:-92.3733888W) (HUC: 08080202) as shown in the attached drawings.
CHARACTER OF WORK: Excavation of approximately 3,440 cubic yards of material on site for use in the restoration of approximately 180.7 acres of bottomland hardwoods, 188.7 acres of cypress-tupelo, and 99.7 acres of fresh marsh along with removal of pumps, degradation of interior levees and ditches, and installation of replacement culverts all for the purpose of establishing a mitigation bank.
JOINT PUBLIC NOTICE
June 16, 2014
United States Army
Corps of Engineers
New Orleans District
Post Office Box 60267
New Orleans, Louisiana 70160-0267
State of Louisiana
Department of Environmental Quality
Attention: Water Quality Certifications
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-2595 FAX (504) 862-1697
Project Manager
Jacqueline Farabee
Jacqueline.R.Farabee@usace.army.mil
Permit Application Number
MVN-2014-00294 MR
(225) 219-3225 FAX (225) 325-8250
Project Manager
Elizabeth Johnson
WQC Application Number
WQC 140606-01
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the U.S. Army Corps of Engineers pursuant to: [X} Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30Stat. 1151; 33USC 403); and/or [X} Section 404 of
the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality,
for a Water Quality Certification (WQC) in accordance with statutory authority contained in
LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17).
PROPOSED BULL ISLAND MITIGATION BANK IN VERMILLION PARISH
NAME OF APPLICANT: JMB Partnership, LLC, 203 Main St., Franklin, Louisiana 70538,
Attention: Russell Walters.
LOCATION OF WORK: Approximately a 560 acre site located 11.2 miles southwesterly of
Kaplan, Louisiana (Latitude: 29.85083N; Longitude:-92.3733888W) (HUC: 08080202) as shown
in the attached drawings.
CHARACTER OF WORK: Excavation of approximately 3,440 cubic yards of material on site for
use in the restoration of approximately 180.7 acres of bottomland hardwoods, 188.7 acres of
cypress-tupelo, and 99.7 acres of fresh marsh along with removal of pumps, degradation of
interior levees and ditches, and installation of replacement culverts all for the purpose of
establishing a mitigation bank.
The comment period for the Department of the Army Permit and the Louisiana
Department of Environmental Quality WQC will close 30 days from the date of this joint public
notice. Written comments, including suggestions for modifications or objections to the proposed
2
work, stating reasons thereof, are being solicited from anyone having interest in the permit
and/or this WQC request must be mailed so as to be received before or by the last day of the
comment period. Letters concerning the Corps of Engineers permit application must reference
the applicant's name and the Permit Application Number, and be mailed to the Corps of
Engineers at the address above, ATTENTION: REGULATORY BRANCH. Similar letters
concerning the Water Quality Certification must reference the applicant's name and the
WQC Application number and be mailed to the Louisiana Department of Environmental
Quality at the address above.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m.
Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to the
proposal will be considered including the cumulative effects thereof, among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy
needs, safety, food and fiber production, mineral needs, considerations of property ownership
and , in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to consider
and evaluate the impacts of this proposal activity. Any comments received will be considered by
the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a
permit for this proposal. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and other
public interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the national Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or
data. Issuance of this public notice solicits input from the State Archeologist and State Historic
Preservation Officer regarding potential impacts to cultural resources.
3
Our initial finding is that the proposed work is Not Likely to Adversely Affect any species
listed as endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat
designated as critical to the survival and recovery of any endangered species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal would
result in the destruction or alteration of N/A acres of EFH utilized by various life stages of red
drum and penaeid shrimp. Our initial determination is that the proposed action would not have
a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our
final determination relative to project impacts and the need for mitigation measures is subject to
review by and coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established by
the Administrator of the Environmental Protection Agency. Also, a certification that the proposed
activity will not violate applicable water quality standards will be required form the Department of
Environmental Quality, Water Quality Certifications, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings shall
state, with particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application complies
with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources
Program. The Department of the Army permit will not be issued unless the applicant received
approval or a waiver of the Coastal Use Permit by the Department of Natural Resources.
You are requested to communicate the information contained in this notice to any other
parties whom you deem likely to have interest in the matter.
Martin S. Mayer
Chief, Regulatory Branch
ENCLOSURE
Prospectus for the Proposed
Bull Island Mitigation Bank
Vermilion Parish, Louisiana
April 30, 2014
Amended May 23, 2014
JMB Partnership, LLC
P.O. Box 333
Franklin, Louisiana 70538
(337) 828-7090
POC: Mr. Russell Walters
russell@jmbcompanies.com
Table of Contents
1.0
INTRODUCTION ............................................................................................................................. 1
1.1
Site Location ................................................................................................................................. 1
2.0
PROJECT GOALS AND OBJECTIVES .......................................................................................... 1
3.0
ECOLOGICAL SUIYABILITY OF SITE ........................................................................................ 2
3.1
Historical Ecological Characteristics of the Site ........................................................................... 2
3.2
Current Ecological Characteristics of the Site .............................................................................. 3
3.2.1
Existing Soil ......................................................................................................................... 3
3.2.2
Existing Vegetation .............................................................................................................. 3
3.2.3
Existing Hydrology............................................................................................................... 4
3.2.4
Hydrological Influences ....................................................................................................... 4
3.2.5
Jurisdictional Determination ............................................................................................... 4
General Bank Need ....................................................................................................................... 4
3.3
3.4
Technical Feasibility ..................................................................................................................... 5
4.0
ESTABLISHMENT OF THE MITIGATION BANK ...................................................................... 5
4.1
Site Restoration Plan ..................................................................................................................... 5
4.1.1
Hydrologic............................................................................................................................ 6
4.1.2
Soil Preparation ................................................................................................................... 6
4.1.3
Vegetative Plantings............................................................................................................. 6
4.1.4
Noxious Plant Control .......................................................................................................... 7
Current Site Risk ........................................................................................................................... 7
4.2
4.3
Long-Term Sustainability of the Site ............................................................................................ 8
5.0
PROPOSED SERVICE AREA ......................................................................................................... 8
6.0
OPERATION OF THE MITIGATION BANK ................................................................................ 9
6.1
Project Representatives ................................................................................................................. 9
6.1.1
Sponsor and Operations Manager ....................................................................................... 9
6.1.2
Landowner............................................................................................................................ 9
Qualifications of the Sponsor ........................................................................................................ 9
6.2
6.3
Proposed Long-Term Ownership and Management Representatives ........................................... 9
6.4
Site Protection ............................................................................................................................... 9
6.5
Long-Term Strategy .....................................................................................................................10
7.0
REFERENCES .................................................................................................................................10
List of Tables
Table 1
Table 2
Table 3
Table 4
Mitigation Plan Summary: Habitats; Methods; and Area Affected.
Current Site Conditions: Existing Soils, Water Table, and Potential Habitat.
Representative Species: suitable for BIMB.
Historical Salinity Data Graph Surrounding BIMB.
List of Figures
Figure 1.0
Figure 2.0
Figure 2.1
Figure 2.2
Figure 2.3
Figure 2.4
Figure 3.0
Figure 3.1
Figure 3.2
Figure 4.0
Figure 4.1
Figure 4.2
Figure 5.0
Figure 5.1
Vicinity Map
Boundary Exhibit
Current Land Use Exhibit
Current Hydrology Exhibit
Pre JD Wetlands Exhibit
Lidar Exhibit
Proposed Mitigation Type Exhibit
Conservation Servitude Exhibit
Hydrology Modification Exhibit
Hydrologic Unit Exhibit
National Hydrography Dataset Exhibit
Salinity Exhibit
NRCS Soils Exhibit
NRCS Hydric Soils Rating Exhibit
Bull Island Mitigation Bank
1.0 INTRODUCTION
JMB Partnership, LLC (JMB), submits this Prospectus to the U.S. Army Corps of Engineers New Orleans District (CEMVN) and the CEMVN Mitigation Banking Interagency Review Team
(IRT) in sponsorship of establishing Bull Island Mitigation Bank (BIMB). The Project area is
located in Vermilion Parish approximately 12 miles south east of Kaplan within the Louisiana
Coastal Zone Boundary. BIMB is intended to provide compensatory mitigation for wetland
impacts within the mitigation service areas of the Mermentau Basin and the Louisiana Coastal
Zone Boundary (Figure 1.0 and 2.0).
BIMB is comprised of approximately 485 acres of cattle grazing fallow rice fields on natural
ridges (Figure 2.1). The project area has potential to be restored to high quality fresh marsh (FM),
cypress-tupelo (CT), and bottomland hardwoods (BLH). BIMB will be preserved and protected
by a Conservation Servitude. Implementation of re-establishment and rehabilitation of Mitigation
Types as defined in the Corps of Engineers, New Orleans District (CEMVN) Modified
Charleston Method (MCM), Guidebook for the Use of the Excel Workbook (March 2013),
resulting in a total of 469.1 acres of wetlands.
1.1
Site Location
The project area is located on Bull Island Road and Doc Road, South of the Gulf Intracoastal
Waterway (GIWW), and 12 miles south of Kaplan, Louisiana. More specifically, the project area
is located in Sections 32 and 33, T-13-S, R-1-E, and Sections 3, 4, 5, 9, and 10, T-14-S, R-1-E in
Vermillion Parish, Louisiana. NAD83, Louisiana South 1702 X=2,950,957.2 ft.; Y=492,446.3 ft.
BIMB is located in the Hydrologic Unit, Cataloging Code No. 08080202 Mermentau. The project
area is bordered by the GIWW to the east, fallow and productive agricultural fields and cow
pastures to the west and south, and bottomland hardwood forest neighboring to the north. (Figure
1.0 and 2.0)
1.2
Historical Aerial Imagery
Historical aerial imagery from 1935 and 1940 reveal the ridge and swale topography within the
project area boundaries (Figure 2.5 and 2.6). Characteristics within the imagery such as the
bridge in the northern half of the southern portion of the proposed mitigation bank are indicative
of consolidated sediments along the ridges to support travel.
Tree density is relatively sparse; however logging activities are known to have occurred within
this area. This can be seen on the western portion of the north half of the project area. The 1935
imagery indicates trees are present on the ridge however in the 1940 imagery the trees are no
longer present. It is also known that this area has historically been utilized for cattle grazing.
2.0 PROJECT GOALS AND OBJECTIVES
The goal of BIMB is the cumulative re-establishment and re-habilitation of approximately 196.8
acres of bottom land hardwoods (BLH), 188.0 acres of cypress-tupelo (CT) and 100.2 acres of
fresh marsh (FM) (Figure 3.0). This candidate acreage represents actual acreage of bottomland
hardwood, cypress-tupelo and fresh marsh to be re-established. Acreage associated with nonmitigation features, existing roads, ditches and drainage areas, existing rights-of-way, and
servitudes, have been excluded.
1
Bull Island Mitigation Bank
Table: 1 Mitigation Plan Summary: Habitats; Methods; and Area Affected.
Mitigation Plan Summary
Current Habitat
Acres
Proposed Habitat
Acres
Chinese Tallow Forest (wet)
2.9
Fresh Marsh
100.2
Cattle Grazing Pasture (wet)
360.1
Cypress-Tupelo Swamp
188
Cattle Grazing Pasture (non-wet) 122
Bottomland Hardwoods 196.8
Total Acreage 485
Total Acreage 485
BIMB is strategically situated in the Mermentau Basin and capable of reinstating a range of
physical, hydrological, biogeochemical, biotic, and atmospheric functions to the watershed.
Therefore the objectives of the mitigation bank area are diverse. The re-establishment and
rehabilitation of fresh marsh, cypress-tupelo swamp, and bottomland hardwood assorted with
coastal live oak-hackberry like habitats will positively affect the physical structure of the area by
serving as a protection from storm surge from hurricanes and tropical storms. Restoration of
BIMB's topography and vegetative habitats can institute reclamation of the organic material to
the systems soil and filter sediment deposition runoff into the GIWW and Warren Canal.
Hydrologic restoration would restore natural hydrologic cycling and flood storage which would
inundate soils and return them to their natural historic hydric process. Re-building marsh and
swamp habitats can restore biogeochemical processes in the soil considerably via additional plant
and invertebrate detritus. Restoration will also provide improved biotic conditions and create
habitat for hundreds of species of migratory birds including threatened and endangered species
such as the Whooping Crane (Grus americana). All of these functions working together also
provide atmospheric maintenance and natural aesthetics.
3.0 ECOLOGICAL SUITABILITY OF SITE
3.1
Historical Ecological Characteristics of the Site
Historically, hydrology in the project area has been intensively managed through a combination
of levees, drainage ditches, detention ditches and lift pumps. This forced drainage was necessary
to make area suitable for agriculture and cattle grazing use. The mechanized clearing and
hydrologic alteration of this site began in the early 1900's or sooner, prior to aerial photography.
The National Wetlands Research Center lists five different NWI habitat classifications within
Project Area. The majority of the area is classified as Upland agriculture or Upland range. The
remaining three classifications consist of: Palustrine forested broad-leaved deciduous temporarily
flooded, Palustrine scrub shrub broad-leaved deciduous temporarily flooded, and Upland forested
evergreen.
The five locks and control structures surrounding the Mermentau Basin were constructed
primarily to control saltwater intrusion into the freshwater reservoir and maintain a sufficient
water level for navigation. The control structures would not have been necessary were it not for
construction of the GIWW, the Inland Waterway, and the Freshwater Bayou Canal, and the
expansion of the lower Mermentau River. (LCWCRTF pg. 31)
2
Bull Island Mitigation Bank
Reference sites with similar geology and potentially similar historical/current habitat type would
include the areas adjacent to Goat Island, Big Woods Island, and Palmetto Island "Palmetto State
Park"
3.2
Current Ecological Characteristics of the Site
3.2.1
Existing Soil
According to the Vermilion Parish Soil Survey (2005) maps of the subject property the
following soils are found to occur: Gueydan muck; Judice-Kaplan complex, gently
undulating; Crowley silt loam; Kaplan silt loam; and Udifluvents. Said study characterized
approximately 87% of the restoration tracts as mostly hydric soils and 13% as non-hydric
soils. (Figures 5.0 and 5.1) However the southern boundary is listed as non-hydric but was
determined to be hydric during the Jurisdictional Determination. The majority of the soil
type within the project area is Judice-Kaplan Silt loam and generally associated with
coastal prairies but also supports forested sites, as stated in the Vermilion Parish Soil
Survey. The geology and elevation of the project area is similar to that of area adjacent to
Goat Island, Big Woods Island and Palmetto Island which contains forested wetlands.
Table 2: Current Site Conditions: Existing Soils, Water Table, and Potential Habitat.
NRCS Vermilion Parish Soil Data for Bull Island Mitigation Bank
Soil and Hydric Rating
Soil Name
High Water Table
Potentail for Habitat Element
Hydric Rating
Depth Ft
Kind
Months
Gueydan muck
Mostly Hydric
Judice-Kaplan Complex Mostly Hydric
Crowley Silt Loam
Not Hydric
Kaplan Silt Loam
Not Hydric
Udifluvents
Not Hydric
1.0 - 3.0
0 - 1.5
0.5 - 1.5
1.5 - 2.5
N/A
Apparent
Apparent
Perched
Apparent
N/A
Jan-Dec
Dec-Apr
Dec-Apr
Dec-Apr
N/A
Wetland Plants Herbaceous Plants Shrubs Hardwood Trees
Good
Good
Good
Good
Good
Fair
Fair
Fair
Fair
Very Poor
Fair
Good
Good
Good
Very Poor
Fair
Good
Fair
Good
Very Poor
3.2.2 Existing Vegetation
During multiple site visits and during the wetland delineation performed by JMB biologists,
diverse vegetation was observed in different topographical and historical agriculture areas.
(Figure 2.1)
In areas of the site that have been historically managed for agriculture use are now mostly
maintained for grazing. Species observed include: Bermuda grass (Cynodon dactylon), Carpet
grass (Axonopus affinis) and Mountain spikerush (Eleocharis montana).
Areas of lower elevation exhibited wetter varieties of plants; Species observed include: Tapertip
rush (Juncus acuminatus), Bulltongue (Sagittaria lancifolia), Alligator weed (Alternanthera
pliloxeroides) and Typhya sp.
3
Bull Island Mitigation Bank
Areas not historically used for agriculture production consisted of a habitat similar to a coastal
live oak-hackberry forest. Species observed include: live oak (Quercus virginiana), hackberry
(Celtis laevigata), green ash (Fraxinus pennsylvanica), and water oak (Quercus nigra).
3.2.3 Existing Hydrology
The Mermentau Basin lies in the eastern portion of the Chenier Plain in Vermillion, Cameron,
Jefferson Davis, Acadia and Calcasieu Parishes. The 734,000-acre basin is bounded on the east
by Freshwater Bayou Canal, on the South by the Gulf of Mexico, on the west by Louisiana State
Highway 27, and on the north by the coastal prairie. The Grand Chenier and Pecan Island ridge
systems are linked by Louisiana Highway 82 and divide the basin into two distinct sub-basins: the
Lakes Sub-basin which BIMB is located, north of the highway and the Chenier Sub-basin south
of the highway (CWPPRA).
The average annual rainfall over the Mermentau Basin ranges from about 58 inches along the
coastal area to about 60 inches in the northern part of the watershed. During the year July is the
wettest month and September is the driest. Slightly over 50 percent of the rainfall occurs during
the six month period April through September (NRCS). Watershed sources include inputs from
surface runoff, precipitation delivery.
3.2.4 Hydrological Influences
The Project Site is located with the Mermentau Hydrologic Unit, Cataloging Code No. 08080202.
Site hydrology has been manipulated historically for the production of rice and the grazing of
cattle. Remnants of unmaintained agriculture levees from past rice production influences
hydrology. There is internal drainage located between fields that eventually drain into man-made
canals along the perimeter and within the property which in turn moves west towards the Warren
Canal or north east, where it is eventually pumped into the GIWW (Figure 2.2 and 4.1).
3.2.5 Jurisdictional Determination
Based on the routine field investigation and wetland delineation conducted by JMB companies in
November 2013 the following was information was assembled. The project site contains
approximately 339 acre or 74.8% of potential jurisdictional wetlands. Additionally,
approximately 19,600 linear feet of potential waters of the U.S. are located in the project area in
the form of drainage ditches along the perimeter and through the interior of the property. The
final JD was finalized by the New Orleans district under MVN-2013-02585-SC and MVN-028581-SC . (Figure 2.3)
3.3
General Bank Need
Wetlands loss in the Mermentau Basin and its watershed has been studied by several research
efforts and the findings indicate a need for wetlands restoration. Human activities related to
wildlife management, navigation improvement, flood control, agriculture, and petrochemical
exploitation have dramatically altered the hydrology of the Mermentau Basin (LDWF). That and
other natural factors has caused a total of 104,380 acres of marsh to be converted into open water
since 1932, a loss of 19% of the historical wetlands in the basin which represents 9% of wetland
loss in Louisiana (LaCoast 2005). Bottomland hardwood forest loss is estimated to be 50 to 75 %
of the original presettlement acreage, statewide (Smith 1993). Old-growth examples of BLH are
very rare. According to CWPPRA In absence of remedial action, about 18 percent, or 62,900
acres, of the land in the Mermentau Basin Lakes Sub-basin would be lost over 50 years. This loss
would occur in wetlands adjacent to the shorelines of White and Grand Lakes and the banks of
the GIWW and Freshwater Bayou Canal (CWPPRA).
4
Bull Island Mitigation Bank
BIMB would also accommodate the vision, goals, and objectives of the Mermentau Basin
Watershed "Basin Plan" plan stated by CWPPRA. Plan includes:
1. The short-term supporting projects within the Lakes Sub-basin protect interior wetlands
by hydrologic restoration, and protect shorelines and banks (along the GIWW).
2. The long-term supporting projects within the Lakes Sub-basin treat critical loss areas by
hydrologic restoration and vegetative plantings (GIWW).
BIMB would also accommodate the vision, goals, and objectives for LDWF Habitat Conservation
Strategies for BLH, CT, and FM. Plan includes
1. Work with private landowners, etc. to promote corridors of BLH forests for wildlife
species.
2. Partner with state and federal agencies, NGOs' private landowners, etc. to increase
conservation efforts on natural ridges.
3. Develop methods to encourage landowners to removed cattle from natural ridges and
manage the land for wildlife conservation.
4. Work with LCA, CWPPRA to broaden coastal restoration projects to include freshwater
marsh.
Therefore, the general need for a mitigation bank to re-establish natural habitats of BLH, CT, and
FM is greatly needed. BIMB will provide compensatory mitigation primarily for the 08080202
HUC. This area is well-suited to provide compensatory mitigation for CEMVN permitted projects
with unavoidable wetland impacts. In the aftermath of Hurricane Lili, Rita, Gustav, and Ike there
has been an increased need for mitigation banks in this area due to increased oil and gas activity,
industrial development, residential development, agriculture development and the need to expand
the hurricane and flood protection levee system statewide.
3.4
Technical Feasibility
The construction work required to develop the bank is routine in nature and feasible. The
mitigation activities involve primarily reforestation using bare-root seedlings. These activities
have long been utilized in wetland restoration and mitigation projects and are proven methods.
The Sponsor has the necessary funds and personnel to successfully implement the proposed
vegetative plantings. A more specific examination of the technical restoration methods is
presented in Section 4.0.
4.0 ESTABLISHMENT OF THE MITIGATION BANK
4.1
Site Restoration Plan
In order to achieve the goals and objectives of the mitigation bank, the Sponsor proposes to reestablish and restore certain hydrologic and soil conditions and to conduct the necessary seedling
plantings. (Figure 3.0)
5
Bull Island Mitigation Bank
4.1.1 Hydrologic
During the process of conversion and management as agricultural crop land, certain hydrologic
modifications were put in place. In order to restore the area to a natural hydrologic state, these
modifications must be removed. To that end a breach will be made on the north side of project
area to connect the GIWW tidally with BIMB. Also the perimeter and internal levees will be
mechanically degraded to permit tidally influenced outside waters to enter and exit the restoration
tracts via the GIWW and Warren Canal.
The lift pumps currently in use to pump off waters from the fallow agricultural fields with in
BIMB will be removed from the Mitigation Bank area and placed on landowner's adjacent
property for hydrological control of areas not under the conservation servitude. All surface
gravity drainage ditches and subsurface tiles in the restoration tracts will be filled and removed,
respectively. Culverts that are part of the drainage system of the restoration tracts will be
removed or expanded (Figure 3.2).
Areas included in the proposed mitigation bank were chosen based on upon State sponsored Lidar
with an average elevation of less than Five (5) feet NAVD88 (Figure 2.4). Since average water
levels in the GIWW, near and around the proposed mitigation bank are approximately +1.6 feet
NAVD88, it is believed that this will allow tidal movement of waters within the project area and
maintain the proper ratio on wet and dry periods, allowing for the establishment of a functioning
BLH, CT, and FM ecosystem. (Figure 2.4 and 3.2)
4.1.2 Soil Preparation
Soil preparation has been shown to significantly increase reforestation success in BLH and CT
restoration (Lockhart et al., 2003). Prior to perimeter levee degradation and after interior ditches
and tiles have been removed, restoration tracts will have the soils mechanically prepared to
receive vegetative plantings. The soil surface will be disk plowed. Subsequently subsoiling using
a ripping implement will be used at a depth of 18 inches to alleviate soil compaction and
encourage air and water pore space for root growth (Allen et al., 2004). If needed aerial
application of herbicides will be used to control weeds and reduce competition for seedlings.
4.1.3 Vegetative Plantings
The Sponsor intends to re-establish the original BLH and CT wetland vegetation in the former
rice/cattle grazing areas by conducting plantings within the mitigation areas. Based on the
established FM currently on BIMB, FM areas will be allowed to regenerate naturally with no
plantings. The BLH and CT planting will be conducted during the first planting season,
approximately December 15 to March 15. The site will first be prepared by conducting mowing,
grading, and the application of herbicides. The goal is to match plant species to the closest extent
possible to those species on adjacent wetlands. Commercial species will be chosen where appropriate
to tolerate the same hydrological conditions as those on the adjacent lands and according to
elevations on the proposed sites. Appropriate seedlings of mixed BLH species or CT, where
appropriate, will then be planted at approximately 9' X 9' spacing at a minimum initial stand density
of 538 stems per acre. Hard mast species for the BLH areas shall comprise of not less than 50% or
greater than 80% of the planted seedlings.
Table 3: Representative Species Suitable for BIMB:
CYPRESS TUPELO AREAS
Bald cypress (Taxodium distichum)
Black gum (Nyssa sylvatica var biflora)
6
SOFT MAST
X
X
Bull Island Mitigation Bank
BOTTOMLAND HARDWOOD SPECIES
Willow oak (Quercus phellos)
Laurel oak (Quercus laurifolia)
Nuttall oak (Q. nuttallii)
Bald cypress (Taxodium distichum)
Sweetgum (Liquidambar styraciflua)
Hackberry (Celtis laevigata)
Swamp Chestnut oak
Bitter Pecan (Carya aquatica)
Water oak (Q. nigra)
American elm (Ulmus americana)
Drummond maple (Acer rubrum var Drummondii)
Red mulberry (Morus rubra)
Green ash (Fraxinus pennsylvanica)
Elderberry (Sambucus canadenisis)
Deciduous holly (I. decidua)
Wax Myrtle (Myrica Cerifera)
SOFT MAST HARDMAST MIDSTORY <15% of Total
x
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
4.1.4 Noxious Plant Control
The Sponsor intends to use all prudent efforts, physical, chemical, or mechanical, to eliminate
existing undesirable/exotic vegetation present such as Chinese tallow (Triadica sebiferum) on the
site. These noxious plants will be treated with herbicide so as to reduce long-term presence to 1%
per acre or less. In addition, following the planting in the re-establishment areas of the Bank, the
Sponsor will control these undesirable/exotic species as part of the maintenance and monitoring
plan.
4.2
Current Site Risk
Environmental threats associated with BIMB are extensive flooding from the GIWW and the
erosion of banklines of the GIWW due to heavy barge and tugboat traffic. Currently the
encumbrances located on the property are a parish road right of way and a USACE dredge spoil
disposal easement adjacent to the GIWW. The parish road right of way will not be included in
the conservation easement. The sponsor has been working with the New Orleans District Real
Estate Section to have the disposal easement released. The district engineer has stated that the
easement can be released upon completion of environmental testing of the spoil placed on the
property. There are no mortgages, liens, or oil and gas leases on the property. Also, there is no
zoning in the area and there are no plans of development adjacent to the proposed bank site.
After research into the risk of "Salt Water Intrusion" on the proposed BIMB JMB has learned
with natural rainfall sheet flow into the GIWW and the Leland Bowman locks the proposed
habitat will not be significantly affected by salinity. Salinity data from the Army Corps of
Engineers and surrounding CRMS sites shows that there are short term spikes of salinity but there
is no data/evidence (even during major hurricanes) that there is no long term high salinity events
associated with this area. As a good management practice JMB will consult with approved
forestry consultants to create a mix of tree species that could handle a spike in salinity and
prolonged ponding conditions, to help the long term sustainability and success of the habitat.
7
Bull Island Mitigation Bank
Table 4: Historical Salinity Data Surrounding BIMB. For date point locations see Figure 4.2
4.3
Long-Term Sustainability of the Site
Due to its location and project design, the proposed Mitigation bank has a very high likelihood of
success. BIMB will be restored to the types of communities that were historically present in the
project area. The natural hydrologic and landscape processes that have been altered for
agriculture production will be reversed by a hydrological connection to the GIWW and Warren
Canal, tying them into the region's natural hydrologic processes. No weirs or structures will be
required to maintain the BIMB's post-restoration hydrologic regime, so structural maintenance
will not be an issue. Similarly, the reliance on the systems natural vs. engineered hydrology will
ensure that the restored habitats are subject to a regionally-appropriate, natural hydro-period. All
existing culverts used to support an existing ROW will be replaced with either a bridge span or
box culvert. Additionally, if the implementation of a culvert for access is deemed necessary after
a period of time, appropriate action will be taken with IRT approval for long term management of
the site.
5.0 PROPOSED SERVICE AREA
Considering a watershed approach JMB suggest using the Mermentau Basin as its service area for
unavoidable impacts to wetlands and "Waters of the United States". The primary service area for
BIMB will be the southern region of the Mermentau Basin (USGS) Code No. 08080202
Mermentau, Hydrologic Unit, which includes Vermillion, Cameron, Jefferson Davis, Acadia and
Calcasieu Parishes. The northern region of the Mermentau Basin (USGS) Code No.8080201
Mermentau Headwaters, Hydrologic Unit which includes St. Landry, Evangeline, Allen,
Jefferson Davis, and Acadia Parishes will serve as the secondary service area. BIMB is located
within the coastal zone boundary set by Louisiana Department of Natural Resources (DNR).
Because of this ideal location and BIMB's hydrological connectivity to the vast marshes of the
Mermentau Basin JMB suggest that the service area also include the Chenier Plain within the
coastal zone boundary set by DNR. Use beyond this area will be determined by the CEMVN on a
case by case basis. (Figure 4.0)
8
Bull Island Mitigation Bank
6.0 OPERATION OF THE MITIGATION BANK
6.1
6.1.1
Project Representatives
Sponsor and Operations Manager
JMB Partnership, LLC
203 Main Street
Franklin, Louisiana 70538
(337) 522-7207
POC: Russell Walters
russell@jmbcompanies.com
6.1.2
Landowner
Richard Family, LLC
8228 Hwy 82 North
Youngsville, Louisiana 70592
POC: Russell Richard
russell@jmbcompanies.com
6.2
Qualifications of the Sponsor
JMB Partnership, LLC is a subsidiary of the JM Burguieres Co. Limited which is a family legacy
partnership established in 1877. The sponsor has 113 years of land management experience in
Louisiana such as raising sugar cane and cattle ranching. JMB also has an established Mitigation
Banking business and is currently managing five mitigation banks in Louisiana: CypremortTeche, Cypress Creek, Bee Bayou, Kilgore Plantation, and Nabours No Hope Mitigation Bank.
JMB currently has a staff of qualified scientists that have multiple years' experience in wetland
science and land management. An essential element of the family vision is rehabilitating and
preserving its land holdings, as practicable, in first-class condition. Mitigation banking fits this
vision.
6.3
Proposed Long-Term Ownership and Management Representatives
The property encompassing the proposed 485 acre BIMB is currently owned by Richard Family,
LLC who will remain the legal owner upon implementation as a mitigation bank (i.e.
conservation servitude filing and implementation of the mitigation work plan). JMB Partnership
LLC will serve as the mitigation service provider (Sponsor) and the long-term steward of BIMB.
6.4
Site Protection
Pursuant to the Louisiana Conservation Servitude Act, R.S. 9:1271 et seq., a perpetual
conservation servitude will be placed on the 485 acre BIMB. This servitude will be held by a
conservation-oriented 501(c)(3) organization to be determined. The conservation servitude will
be binding to and run with the title of the property. This conservation servitude will prohibit
activities that would reduce the quality and quantity of the restored/enhanced wetlands, such as
clear cutting, the discharge of fill, construction activities, and cattle grazing or other agricultural
activities.
9
Bull Island Mitigation Bank
The servitude will also specify permissive activities such as hunting, fishing, recreational use, and
mineral exploration given that the activity does not negatively affect the functions and values of
the rehabilitated, reestablished, and enhanced wetlands (Figure 3.1)
6.5
Long-Term Strategy
The amount of the required short and long term financial assurances must be determined by the
CEMVN in consultation with JMB Partnership, LLC.
In determining the assurance amount, the CEMVN may consider the following:
1. Cost of providing replacement mitigation;
2. Including costs for land acquisition;
3. Planning and engineering;
4. Legal fees;
5. Mobilization; and
6. Construction and monitoring.
It is our plan to establish a Letter of Credit with a suitable banking institution for the Short Term
financial Assurances. The Long Term Financial Assurances will be in the form of an Escrow
Account funded either annually or as credits are sold. This will be defined in the mitigation
banking instrument. These funds will generate annual interest (revenues) based on anticipated
maintenance and management costs, which shall be entitled to the long-term steward of the Bank.
7.0 REFERENCES
Allen, J., Keeland, B., Stantuf, J., Clewell, A., and Kennedy, H. 2004. A guide to
bottomland hardwood restoration. USGS/BRD/ITR-2000-0011. General Technical
Report SRS-40. 132 pp.
Bailey, R.G. 1995. Description of the ecoregions of the United States. 2d ed. Rev. and
expanded (1st ed. 1980). Misc. Publ. No. 1391 (rev.) Washington, DC: USDA Forest
Service. 108 p. with separate map at 1:7,500,000.
Barras, J. 2006. Land area change in coastal Louisiana after the 2005 hurricanes a
series of three maps. USGS Open File Report 2006-1274.
Barras, J., Beville, S., Britsch, D., Hartley, S., Hawes, S., Johnston, J., Kemp, P., Kinler,
Q., Martucci, A., Porthouse, J., Reed, D., Roy, K., Sapkota, S., and Suhayda, J. 2003.
Historical and projected coastal Louisiana land changes: 1978-2050. USGS Open File
Report 03-334 (Revised January 2004).
Barras, J., Bourgois, P., Handley, L. 1994. Land loss in coastal Louisiana 1956-1990.
NBS/NWRC/Open file Report 94-01.
Code of Federal Regulations, Title 33, Parts 325 and 332 and Title 40, Part 230, as
published on pages 19594-19704 in the Federal Register dated 8 January 2014.
10
Bull Island Mitigation Bank
Gosselink, J.G. 1984. The ecology of delta marshes of coastal Louisiana: a community
profile. U.S. Fish Wildl. Serv. FWS/OBS-84/09.
Lester, G., Sorensen, S., Faulkner, P., Reid, C., and Maxit, I. 2005. Louisiana
comprehensive wildlife conservation strategy. LDWF.
Louisiana Coastal Wetlands Conservation and Restoration Task Force. 2002. Hydrologic
Investigation of the Louisiana Chenier Plain. Baton Rouge, LA: Louisiana Department of
Natural Resources, Coastal Restoration Division. 135 pp. plus appendices.
Lockhart, B., Keeland, B., McCoy, J., and Dean, T. 2003. Comparing regeneration
techniques for afforesting previously farmed bottomland hardwood sites in the Lower
Mississippi Alluvial Valley, USA. Forestry, Vol. 76, No. 2, p. 169-180.
Soil survey of Vermilion Parish, Louisiana. 2007. USDA-NRCS. Retrieved December
2013. http://soildatamart.nrcs.usda.gov/manuscripts/LA113/0/vermilion.pdf .
The Mermentau Basin. The Mermentau Basin. CWPPRA, n.d. Web. 08 Jan. 2014.
http://lacoast.gov/new/About/Basin_data/me/Default.aspx
US Census Bureau. State and County Quick Facts. Retrieved December 2013.
http://quickfacts.census.gov/qfd/states/22/22101.html .
USDA Natural Resources Conservation Service. Plants Database. Retrieved
December 2013. http://plants.usda.gov/ .
USEPA Watersheds Database. Retrieved December 2013.
http://cfpub.epa.gov/surf/huc.cfm?huc_code=08080202
11
_
^
Not to Scale
Project Area
Copyright:© 2013 National Geographic Society, i-cubed
Legend
Bull Island Project Boundary
0
0.5
1
2
Miles
3
4
¹
PROPOSED BULL ISLAND
MITIGATION BANK
VICINITY EXHIBIT
VERMILION PARISH, LA
Drawing No.: R:\Mitigation Banks\Bull Island\GIS\BIMB_Vicinity.mxd
Date: 01/02/14
Author: BDS
FIGURE 1.0
PROPOSED BULL ISLAND MITIGATION BANK
Approximately 485.0 Acres
T13S-R01E, Sec, 32 and 33
T14S-R01E, Sec. 003, 004, 009 and 010
NAD83, LOUISIANA SOUTH 1702
X = 2,950,957.2 ft
Y=
492,446.3 ft
T13S R01E - Sec 32
T13S R01E - Sec 33
WGS84
LONG = 092° 22' 26.186" W
LAT =
29° 51' 00.046" N
T13S R01E - Sec 34
Pa
h
ris
Ro
ad
P51
6-
Do
c
T14S R01E - Sec 3
T14S R01E - Sec 5
T14S R01E - Sec 4
Ru
B
sla
lI
ul
ss
nd
T14S R01E - Sec 8
T14S R01E - Sec 9
T14S R01E - Sec 10
Pine Island
Legend
Bull Island Mitigation Bank Boundary
Local Roads
0
500
1,000
1,500
Feet
2,000
2,500
¹
PROPOSED BULL ISLAND
MITIGATION BANK
BOUNDARY EXHIBIT
VERMILION PARISH, LA
Date: 05/22/14
FIGURE 2.0
Author: BDS
Document Path: N:\Mitigation Banks\Bull Island\Mapping\GIS Projects (.MXD)\Prospectus Maps 04.15.14\BIMB_Boundary PLSS 04.21.14.mxd
Legend
BULL ISLAND PROJECT BOUNDARY
Land_Use
Cattle Grazing Pasture
Chinese Tallow Forest
0
500
1,000
1,500
Feet
2,000
2,500
¹
PROPOSED BULL ISLAND
MITIGATION BANK
CURRENT LAND USE EXHIBIT
VERMILION PARISH, LA
Date: 05/22/14
FIGURE 2.1
Author: BDS
Document Path: N:\Mitigation Banks\Bull Island\Mapping\GIS Projects (.MXD)\Prospectus Maps 04.15.14\BIMB_LandUse 04.21.14.mxd
Existing Pump to
GIWW and Earthen
Plug
Existing Culvert
Existing Culvert
Existing Culvert
Existing Culvert
Existing Pump to
Warren Canal
Existing Culvert
Existing Culvert
Existing Culvert
Eroded Earthern Plug
Legend
BULL ISLAND PROJECT BOUNDARY
Current Hydrology
Primary Pumped Drainage Flow
Secondary Gravity Drainage Flow
Levee
0
500
1,000
1,500
Feet
2,000
2,500
¹
PROPOSED BULL ISLAND
MITIGATION BANK
CURRENT HYDROLOGY EXHIBIT
VERMILION PARISH, LA
Date: 05/22/14
FIGURE 2.2
Author: BDS
Document Path: N:\Mitigation Banks\Bull Island\Mapping\GIS Projects (.MXD)\Prospectus Maps 04.15.14\BIMB_Hydro_Conditions 04.21.14.mxd
Legend
BULL ISLAND PROJECT BOUNDARY
Wetlands
Jurisdictional Determination Wetland
Waters of the US
Existing Levee
0
500
1,000
1,500
Feet
2,000
2,500
¹
PROPOSED BULL ISLAND
MITIGATION BANK
PRE JD WETLANDS EXHIBIT
VERMILION PARISH, LA
Date: 05/22/14
FIGURE 2.3
Author: BDS
Document Path: N:\Mitigation Banks\Bull Island\Mapping\GIS Projects (.MXD)\Prospectus Maps 04.15.14\BIMB_Wetlands 04.21.14.mxd
Legend
BULL ISLAND PROJECT BOUNDARY
3.6 - 4.0
LIDAR
NAVD88 (feet)
4.1 - 4.5
4.6 - 5.0
0.0 - 0.5
5.1 - 5.5
0.6 - 1.0
5.6 - 6.0
1.1 - 1.5
6.1 - 6.5
1.6 - 2.5
6.6 - 7.0
2.6 - 3.0
7.1 - 7.5
3.1 - 3.5
0
500
1,000
1,500
Feet
2,000
2,500
¹
PROPOSED BULL ISLAND
MITIGATION BANK
LIDAR EXHIBIT
VERMILION PARISH, LA
Date: 05/22/14
FIGURE 2.4
Author: BDS
Document Path: N:\Mitigation Banks\Bull Island\Mapping\GIS Projects (.MXD)\Prospectus Maps 04.15.14\BIMB_LIDAR 04.21.14.mxd
Legend
BIMB Mitigation Bank Outline
0
500
1,000
1,500
Feet
2,000
2,500
¹
PROPOSED BULL ISLAND
MITIGATION BANK
1935 AERIAL IMAGERY EXHIBIT
VERMILION PARISH, LA
Date: 05/19/14
FIGURE 2.5
Author: BDS
Document Path: N:\Mitigation Banks\Bull Island\Mapping\GIS Projects (.MXD)\Prospectus Maps 04.15.14\BIMB_1935_Aerial 05.19.14.mxd
Legend
BIMB Mitigation Bank Outline
0
500
1,000
1,500
Feet
2,000
2,500
¹
PROPOSED BULL ISLAND
MITIGATION BANK
1940 AERIAL IMAGERY EXHIBIT
VERMILION PARISH, LA
Date: 05/19/14
Author: BDS
FIGURE 2.6
Document Path: N:\Mitigation Banks\Bull Island\Mapping\GIS Projects (.MXD)\Prospectus Maps 04.15.14\BIMB_1940_Aerial 05.19.14.mxd
Legend
BULL ISLAND PROJECT BOUNDARY
Proposed Habitat
Bottomland Hardwood - 196.8 acres
Cypress Tupelo Swamp - 188.0 acres
Fresh Marsh - 100.2 acres
0
500
1,000
1,500
Feet
2,000
2,500
¹
PROPOSED BULL ISLAND
MITIGATION BANK
PROPOSED MITIGATION TYPE EXHIBIT
VERMILION PARISH, LA
Date: 05/22/14
FIGURE 3.0
Author: BDS
Document Path: N:\Mitigation Banks\Bull Island\Mapping\GIS Projects (.MXD)\Prospectus Maps 04.15.14\BIMB_Mitigation_Type 04.21.14.mxd
Legend
BULL ISLAND PROJECT BOUNDARY
BLH Enhancement (106.21 Acres)
BLH Re-Establishment (90.55 Acres)
Cypress Enhancement (154.05 Acres)
Cypress Re-Establishment (33.97 Acres)
Marsh Enhancement (80.80 Acres)
Marsh Re-Establishment (19.48 Acres)
0
500
1,000
1,500
Feet
2,000
2,500
¹
PROPOSED BULL ISLAND
MITIGATION BANK
PROPOSED MITIGATION TYPE EXHIBIT
VERMILION PARISH, LA
Date: 06/06/14
Author: BDS
Document Path: N:\Mitigation Banks\Bull Island\Mapping\GIS Projects (.MXD)\Prospectus Maps 04.15.14\BIMB_COE_Classification 06.06.14.mxd
Co n
atio
ract
nT
serv
atio
Co n
serv
ract
nT
1-
2-
195
71.
.9 a
7 ac
res
cres
Conservation Tract 3 - 29.8 acres
Conservation Tract 4 - 187.6 acres
Legend
Proposed Conservation Servitude reduced
0
510
1,020
1,530
Feet
2,040
2,550
¹
PROPOSED BULL ISLAND
MITIGATION BANK
CONSERVATION SERVITUDE EXHIBIT
VERMILION PARISH, LA
Date: 05/22/14
FIGURE 3.1
Author: BDS
Document Path: N:\Mitigation Banks\Bull Island\Mapping\GIS Projects (.MXD)\Prospectus Maps 04.15.14\BIMB_Conservation_Servitude 04.21.14.mxd
- Remove existing pump.
- Replace earthern plug with
box culverts or bridge.
Install pump and earthern plug.
- Remove existing culvert.
Remove existing culvert.
Remove existing pump
and earthen plug.
- Remove existing culvert and
replace with box culverts or
bridge.
- Remove existing culvert and
replace with box culverts or
bridge.
- Remove existing culvert.
- Remove existing culvert.
Remove earthern plug.
Legend
Name
Primary Source (GIWW/Warren Canal)
Secondary Source
Tertiary Source
Gapped Levee
Existing Levee
0
500
1,000
1,500
Feet
2,000
2,500
¹
PROPOSED BULL ISLAND
MITIGATION BANK
HYDROLOGY MODIFICATION EXHIBIT
VERMILION PARISH, LA
Drawing No.: R:\Mitigation Banks\Bull Island\GIS\BIMB_Proposed_Hydrology.mxd
Date: 01/09/14
FIGURE 3.2
Author: BDS
Rapides
Vernon
Avoyelles
Evangeline
Beauregard
Allen
St. Landry
08080201 - Mermentau Headwaters (Secondary)
Acadia
St. Martin
Jefferson Davis
Calcasieu
Lafayette
08080202 - Mermentau (Primary)
Cameron
Vermilion
Iberia
St. Mary
Legend
Bull Island Project Boundary
Louisiana Parishes
Hydrologic Units
Mermentau (Primary HUC)
Mermentau Headwaters (Secondary HUC)
Adjacent Hydrologic Units
0
4
8
12
Miles
16
20
¹
PROPOSED BULL ISLAND
MITIGATION BANK
HYDROLOGIC UNIT EXHIBIT
VERMILION PARISH, LA
Drawing No.: R:\Mitigation Banks\Bull Island\GIS\BIMB_HUC.mxd
Date: 01/09/14
FIGURE 4.0
Author: BDS
Ca
na
l
iv
e
be
rF
m
Nu
co
tra
In
l
ta
as
l
na
Ca
Warren Canal
Legend
Bull Island Project Boundary
National Hydrography Dataset
Primary Hydrologic Connection
Hydrologic Connection
0
1,000
2,000
Feet
3,000
4,000
¹
PROPOSED BULL ISLAND
MITIGATION BANK
NAT'L HYDROGRAPHY DATASET EXHIBIT
VERMILION PARISH, LA
Drawing No.: R:\Mitigation Banks\Bull Island\GIS\BIMB_NHD.mxd
Date: 05/22/14
FIGURE 4.1
Author: BDS
CRMS0567
1/2 WAY NORTH PRONG
AND BRIDGE FORKED ISLAND
CRMS0570
CRMS0572
Legend
Proposed BIMB Boundary
0
2
4
Miles
6
¹
PROPOSED BULL ISLAND
MITIGATION BANK
SALINITY EXHIBIT
VERMILION PARISH, LA
Date: 04/15/14
FIGURE 4.2
Author: BDS
Document Path: N:\Mitigation Banks\Bull Island\Mapping\GIS Projects (.MXD)\Prospectus Maps 04.15.14\BIMB_Salinity_CRMS_USACE.mxd
AE
Cw
Cw
Gy
Gy
Gy
Cw
UD
GE
Cw
Jk
Jk
W
Gy
Gy
W
W
W
W
Cw
GE
Gy
UD
W
UD
UD
Gy
Ka
Legend
Gy
BULL ISLAND PROJECT BOUNDARY
W
Soil Map Units
UD
Gy
Cw - Crowley silt loam,
Cw 0 to 1 percent slopes
AE
Gy - Gueydan muck
Jk - Judice-Kaplan complex, gently undulating
Ka
Ka - Kaplan silt loam
Ka
UD - Udifluvents, 1 to 20 percent slopes
Jd
0
Jd
Cw
W - Water, large
500
1,000
1,500
Feet
2,000
2,500
¹
PROPOSED BULL ISLAND
MITIGATION BANK
NRCS SOILS EXHIBIT
VERMILION PARISH, LA
Date: 05/22/14
FIGURE 5.0
Author: BDS
Document Path: N:\Mitigation Banks\Bull Island\Mapping\GIS Projects (.MXD)\Prospectus Maps 04.15.14\BIMB_Soils 04.21.14.mxd
Legend
NRCS Soil Survey Hydric Rating
0-10% (Not Hydric)
50-90% (Mostly Hydric)
0
500
1,000
1,500
Feet
2,000
2,500
¹
PROPOSED BULL ISLAND
MITIGATION BANK
NRCS HYDRIC SOILS RATING EXHIBIT
VERMILION PARISH, LA
Date: 05/22/14
FIGURE 5.1
Author: BDS
Document Path: N:\Mitigation Banks\Bull Island\Mapping\GIS Projects (.MXD)\Prospectus Maps 04.15.14\BIMB_Hydric_Soils 04.21.14.mxd
Legend
BULL ISLAND PROJECT BOUNDARY
Descript
GIWW Easement (Digitized and Not Verified)
Parish ROW
0
500
1,000
1,500
Feet
2,000
2,500
¹
PROPOSED BULL ISLAND
MITIGATION BANK
ROW AND EASEMENT EXHIBIT
VERMILION PARISH, LA
Date: 06/06/14
Author: BDS
Document Path: N:\Mitigation Banks\Bull Island\Mapping\GIS Projects (.MXD)\Prospectus Maps 04.15.14\BIMB_Easements 06.06.14.mxd
REMOVE EARTHEN PLUG AND INSTALL
BOX CULVERTS OR SPAN BRIDGE
SEE DETAIL "A"
T
IN
RA
CO
AS
L
TA
E
AT
W
INSTALL EARTHEN
PLUG AND PUMP
SEE DETAIL "C"
AY
RW
REMOVE EXISTING CULVERTS (2)
SEE DETAIL "E"
EARTHEN PLUG AND
PUMP TO BE REMOVED
SEE DETAIL "D"
137 Acres
196 Acres
INSTALL BOX CULVERTS
SEE DETAIL "F"
EXISTING LEVEES TO
BE GAPPED 100' EVERY 1000'
SEE DETAIL "H"
Legend
Project Area
NOTES:
¹
THESE PLANS WERE PREPARED EXCLUSIVELY FOR
OBTAINING REGULATORY CLEARANCES, AND DO NOT
PURPORT TO BE ENGINEERING DRAWINGS, OR
SPECIFICATIONS. THESE PLANS DO NOT PURPORT TO
ACCURATELY PORTRAY PROPERTY BOUNDARIES.
0
250
500
1,000
Feet
1,500
2,000
PROPOSED BULL ISLAND
MITIGATION BANK
NORTHERN CONSTRUCTION EXHIBIT
VERMILION PARISH, LA
Drawing No.: R:\Mitigation Banks\Bull Island\GIS\COE Plans\BIMB 3.mxd
Date: 03/03/14
Author: BDS
PAGE 3 OF 9
197.2 Acres
EARTHEN PLUG TO BE REMOVED
SEE DETAIL "B"
EXISTING LEVEES TO
BE GAPPED 100' EVERY 1000'
SEE DETAIL "H"
PIPE CULVERTS TO BE REMOVED
AND REPLACED WITH BOX
CULVERTS OR SPAN BRIDGE
SEE DETAIL "G"
REMOVE EXISTING CULVERTS (2)
SEE DETAIL "E"
¹
29.8 Acres
Legend
Project Area
NOTES:
THESE PLANS WERE PREPARED EXCLUSIVELY FOR
OBTAINING REGULATORY CLEARANCES, AND DO NOT
PURPORT TO BE ENGINEERING DRAWINGS, OR
SPECIFICATIONS. THESE PLANS DO NOT PURPORT TO
ACCURATELY PORTRAY PROPERTY BOUNDARIES.
0
250
500
1,000
1,500
2,000
PROPOSED BULL ISLAND
MITIGATION BANK
SOUTHERN CONSTRUCTION EXHIBIT
VERMILION PARISH, LA
Drawing No.: R:\Mitigation Banks\Bull Island\GIS\COE Plans\BIMB 4.mxd
Date: 03/03/14
Feet
Author: BDS
PAGE 4 OF 9
DETAIL "A"
DETAIL "B"
NORTHERNBOUNDARYGAPTO
NTRACOAS TALWATERWAY
I
S OUTHERNBOUNDARYGAPTO
NTRACOAS TALWATERWAY
I
ON
TI
NG CONDI
S TI
EXI
ON
TI
NG CONDI
S TI
EXI
GI
WW
GI
W
W
ES
C
AC
S
EARTHENPLUG
TO BEREMOVED
AD
O
R
PUMPCANAL
PU
M
P
CA
NA
L
NG PUMP
S TI
EXI
TO BEREMOVED
EARTHENPLUG
TO BEREPLACED
VERT
THBOXCUL
WI
DGE
ORS PANBRI
PROPOS EDCONS TRUCTI
ON
PROPOS EDCONS TRUCTI
ON
GI
W
W
GI
WW
S
AD
O
R
CO
NN
EC
TI
ON
ES
C
AC
TO
G
I
W
W
S POI
L
PLACEMENT
CONNECTI
ONTO GI
WW
S POI
L
PLACEMENT
NOTES:
NOTES:
20'
x 35'
x 5'
EARTHENPLUG TO BEREMOVED.
EARTHENPLUG TO BEREMOVED.
x 4'
x 50'
20'
APPROXI
MATEL
Y129.6 CU YDS OFMATERI
AL
TO BEDI
S PLACED.
AL
Y148.1 CU YDS OFMATERI
MATEL
APPROXI
S PLACED.
TO BEDI
EXCAVATEDMATERI
ALTO BE S TACKED 1
FOOTANDPLACEDONEXI
S TI
NG UPLAND
AREA(
0.
09a c res)
.
ALTO BE S TACKED 1
EXCAVATEDMATERI
NG UPLAND
S TI
FOOTANDPLACEDONEXI
.
10a c res)
0.
AREA(
NOTES:
THES EPLANS WEREPREPAREDEXCLUS I
VEL
YFOR
OBTAI
NI
NG REGULATORYCLEARANCES ,ANDDO NOT
PURPORTTO BEENGI
NEERI
NG DRAWI
NGS ,OR
S PECI
FI
CATI
ONS .THES EPLANS DO NOTPURPORTTO
ACCURATEL
YPORTRAYPROPERTYBOUNDARI
ES .
PROPOSED BULL ISLAND
MITIGATION BANK
PROPOS EDGI
WW GAPS EXHI
BI
T
VERMI
LI
ONPARI
S H,LA
Dra wing No.
:R:
\ Mit
ig a t
ion Ba nk s\BullI
sla nd\GI
S \COEPla ns\ BI
MB5.
m xd
Da t
e:03/
03/
14
Aut
hor:
BDS
PAGE 5 OF 9
DETAIL "D"
DETAIL "C"
NG EARTHEN
S TI
REMOVEEXI
PLUGANDPUMP
ON
TI
NG CONDI
S TI
EXI
NS TALLEARTHENPLUGANDPUMP
I
ON
TI
NG CONDI
S TI
EXI
EXI
S TI
NG LEVE
E
CA
NA
L
PUMPCANAL
EX
I
ST
I
NG
EXI
S TI
NG L
EVE
E
EARTHENPLUGAND
PUMPTO BEREMOVED
PROPOS EDCONS TRUCTI
ON
PROPOS EDCONS TRUCTI
ON
NG LEVEETO BEGAPPED
S TI
EXI
ALUS EDFOR
ANDMATERI
EARTHENPLUG
EXI
S TI
NG L
EVE
E
GI
WW
EXI
S TI
NG LEVE
E
CO
CN
ON
NE
NC
ET
C
I
O
TI
N
ON
TO
TO
WW
AR
AR
RE
R
N
EN
DI
TC
D
I
T
H
CH
CO
NN
EC
TI
ON
TO
PUM
PCA
NAL
EARTHENPLUG
ANDPUMPTO BE
NS TALLED
I
NOTES:
20'
x30'
x8'
EARTHENPLUG TO BEI
NS TALLED
(
0.
01ACRES )
.
NOTES:
EARTHENPLUG TO BEREMOVED.
x8'
x10'
10'
AL
Y29.6 CU YDS OFMATERI
MATEL
APPROXI
S PLACED.
TO BEDI
LL
APPROXI
MATEL
Y177.7 CU YDS OFFI
MATERI
ALTO BEUS ED.
ALTO BES TACKED 1
EXCAVATEDMATERI
.
02a c res)
0.
NG UPLANDLEVEE(
S TI
FOOTONEXI
NOTES:
THES EPLANS WEREPREPAREDEXCLUS I
VEL
YFOR
OBTAI
NI
NG REGULATORYCLEARANCES ,ANDDO NOT
PURPORTTO BEENGI
NEERI
NG DRAWI
NGS ,OR
S PECI
FI
CATI
ONS .THES EPLANS DO NOTPURPORTTO
ACCURATEL
YPORTRAYPROPERTYBOUNDARI
ES .
PROPOSED BULL ISLAND
MITIGATION BANK
PROPOS EDCONS TRUCTI
ONEXHI
BI
T
VERMI
LI
ONPARI
S H,LA
Dra w ing No.
:R:
\ Mitig a tion Ba nk s\BullI
sla nd\GI
S \COEPla ns
\ BI
MB6.
m xd
Da te:03/
03/
14
Author:
BDS
PAGE 6 OF 9
DETAIL "F"
VERTS
NS TALLBOX CUL
I
CAL)
TY P I
(
DETAIL "E"
VERTS
NTERNALCUL
REMOVEI
CAL)
TY P I
(
EX I
S TI
NG LEVEE
VERT
P ECUL
PI
TO BE
REMOVED
EX I
S TI
NG LEVEE
ACCES S ROAD
ON
TI
NG CONDI
S TI
EX I
ON
TI
NG CONDI
S TI
EX I
20'
EX I
S TI
NG LEVEE
EX I
S TI
NG LEVEE
X 2'
NS TALL4'
I
VERT
BOX CUL
DRAI
NAGE
DRAI
NAGE
DRAI
NAGE
ACCES S ROAD
P ROP OS EDCONS TRUCTI
ON
P ROP OS EDCONS TRUCTI
ON
EX I
S TI
NG LEVEE
DRAI
NAGE
DRAI
NAGE
EX I
S TI
NG LEVEE
DRAI
NAGE
VERT
P ECUL
PI
TO BE
REP LACED
NOTES:
NOTES:
FOUR(
4)-20"CUL
VERTS TO BEREMOVED.
VERTTO BEREMOVED
P ECUL
1)-20"P I
ONE(
VERT.
x20'BOX CUL
x2'
TH4'
ANDREP LACEDWI
EACHWORKAREAI
S AP P ROX I
MATEL
Y
8'
x10'
x4'
ANDES TI
MATED1
1.
0CUY DS OF
MATERI
ALTO BEDI
S P LACED.
TOTALOF44 CU YDS TO BEDI
S P LACED
FORALLCUL
VERTREMOVAL.
EX CAVATEDMATERI
ALTO BES TACKED1
FOOTANDP LACEDONEX I
S TI
NG LEVEE
(
0.
03ac
r
e s)
.
NOTES:
THES EP LANS WEREP REP AREDEX CLUS I
VEL
Y FOR
OBTAI
NI
NG REGULATORY CLEARANCES ,ANDDO NOT
P URP ORTTO BEENGI
NEERI
NG DRAWI
NGS ,OR
S P ECI
FI
CATI
ONS .THES EP LANS DO NOTP URP ORTTO
ACCURATEL
Y P ORTRAY P ROP ERTY BOUNDARI
ES .
AL
Y 4.3 CU YDS OFMATERI
MATEL
AP P ROX I
S P LACED.
TO BEDI
ALTO BES TACKED1
EX CAVATEDMATERI
NG LEVEE
S TI
FOOTANDP LACEDONEX I
.
e s)
r
01ac
0.
(
PROPOSED BULL ISLAND
MITIGATION BANK
P ROP OS EDCONS TRUCTI
ONEX HI
BI
T
VERMI
LI
ONP ARI
S H,LA
Dr
aw ing No.
:R:
\Mitig ation Banks\BullI
sland \GI
S \COEP lans\BI
MB7.
m xd
Date :03/
03/
14
Auth or
:
BDS
PAGE 7 OF 9
DETAIL "H"
NTO
CREATEGAPSI
NG LEV EE
STI
EXI
CAL)
TYPI
(
EXI
STI
NG CO NDI
TI
O N
DETAIL "G"
V ERTS
NTERNALCU L
REM O V EI
CAL)
TYPI
(
V ERT
PECU L
PI
TO BE
REPLACED
ACCESSRO AD
O N
TI
NG CO NDI
STI
EXI
EXI
STI
NG LEV EE
EXI
STI
NG LEV EE
EXI
STI
NG DRAI
NAGE
DRAI
NAGE
DRAI
NAGE
EXI
STI
NG LEV EE
30'
PRO PO SEDCO NSTRU CTI
O N
EXI
STI
NG LEV EE
x3'
NSTALL6'
I
V ERT
BO XCU L
DRAI
NAGE
ACCESSRO AD
PRO PO SEDCO NSTRU CTI
O N
SPO I
LPLACEM ENTI
NEXI
STI
NG DRAI
NAGE
100'
LEV EE
EXI
STI
NG LEV EE
LEV EE
10'
PLAN VIEW
DRAI
NAGE
LEV EE
100'
TO PO FLEV EE
3'
TO PO FLEV EE
PROFILE VIEW
NATU RALGRADE
SPO I
LPLACEM ENT1FO O T
BELO W NATU RALGRADE
EXI
STI
NG LEV EE
NATU RALGRADE
CROSS SECTION VIEW
NOTES:
NOTES:
O NE(
1)-20"CU L
V ERTTO BEREM O V ED
ANDREPLACEDW I
TH6'
x
3'
x
30'
BO X
CU L
V ERT
.
1CU YDS.
1.
1
Y1
M ATEL
SAPPRO XI
GAPI
x3'
x10'
EACH100'
NEARFO O TAGEO FLEV EETO BEGAPPED
TO TALLI
.
800'
S25,
I
APPRO XI
M ATEL
Y17.6 CU YDS O F
M ATERI
ALTO BEDI
SPLACED.
NTHE
Y26GAPSAREPRO PO SEDI
M ATEL
APPRO XI
ECTAREA.
PRO J
EXCAV ATEDM ATERI
ALTO BESTACKED1
ALTO BE
Y2,888.6 CU YDS O FM ATERI
M ATEL
APPRO XI
FO O TANDPLACEDO NEXI
STI
NG LEV EE
ALTO BESTACKED
SPLACED.EXCAV ATEDM ATERI
DI
(
0.
01a c res )
.
NG
STI
NEXI
1FO O TBELO W NATU RALANDPLACEDI
.
19a c res )
1.
NAGE(
DRAI
NOTES:
THESEPLANSW EREPREPAREDEXCLU SI
V EL
YFO R
O BTAI
NI
NG REGU LATO RYCLEARANCES,ANDDO NO T
PU RPO RTTO BEENGI
NEERI
NG DRAW I
NGS,O R
SPECI
FI
CATI
O NS.THESEPLANSDO NO TPU RPO RTTO
ACCU RATEL
YPO RTRAYPRO PERTYBO U NDARI
ES.
PROPOSED BULL ISLAND
MITIGATION BANK
PRO PO SEDCO NSTRU CTI
O NEXHI
BI
T
V ERM I
LI
O NPARI
SH,LA
Dra wing No.
:R:
\M it
iga t
ionBa nks \BullI
s la nd \GI
S\CO EPla ns \BI
M B8.
m xd
Da t
e:03/
05/
14
Aut
hor:
BDS
PAGE 8 OF 9
DETAIL "I"
VEGETATIVE PLANTING
BOTTOMLAND HARDWOODS/
CYPRESS TUPELO SWAMP
NOTES:
A TOTAL OF 3,440 CU YDS OR 1.46 ACRES OF
MATERIAL IS ESTIMATED TO BE DISPLACED
IN ASSOCIATION WITH PROPOSED BULL ISLAND
MITIGATION BANK PROJECT CONSTRUCTION.
BOTTOMLAND HARDWOOD/
CYPRESS TUPELO PLANTING
AS-BUILT DRAWING SHALL BE SUBMITTED
WITHIN 30 DAYS OF COMPLETION OF THIS
PROJECT TO THE LOUISIANA DEPT. OF
NATURAL RESOURCES, COASTAL
MANAGEMENT DIVISION, P.O. BOX 44487,
BATON ROUGE, LA 70804-4487.
9'
9'
FRESH MARSH
FRESH MARSH PLANTING
9'
9'
NOTES:
BOTTOMLAND HARDWOODS TO BE PLANTED
AT 9 FOOT SPACING. PROPOSED TREE
DENSITY IS 538 TREES PER ACRE.
FRESH MARSH VEGETATION WILL BE PLANTED
(if required) AT 9 FOOT SPACING.
NOTES:
THESE PLANS WERE PREPARED EXCLUSIVELY FOR
OBTAINING REGULATORY CLEARANCES, AND DO NOT
PURPORT TO BE ENGINEERING DRAWINGS, OR
SPECIFICATIONS. THESE PLANS DO NOT PURPORT TO
ACCURATELY PORTRAY PROPERTY BOUNDARIES.
PROPOSED BULL ISLAND
MITIGATION BANK
VEGETATIVE PLANTING EXHIBIT
VERMILION PARISH, LA
Drawing No.: R:\Mitigation Banks\Bull Island\GIS\COE Plans\BIMB 9.mxd
Date: 03/05/14
Author: BDS
PAGE 9 OF 9