Home

New Orleans District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

PROPOSED BARGE DEGASSING FACILITY AND DOCK ON THE MISSISSIPPI RIVER IN EAST BATON ROUGE PARISH

NAME OF APPLICANT: Tubal-Cain Holdings, c/o Lanier & Associates, 4101 Magazine Street, New Orleans, LA 70115. LOCATION OF WORK: On the left descending bank of the Mississippi River at mile point 225, approximately 7.1 miles southwest of Baton Rouge, Louisiana, in East Baton Rouge Parish, within the Lower Mississippi-Baton Rouge Basin in hydrologic unit (HUC 08070100), as shown on the attached drawings. CHARACTER OF WORK: The applicant has requested Department of the Army authorization to clear and place fill and pilings for the construction of a barge degassing facility. The facility will include a Mississippi River levee crossing, a large fixed pile supported platform, floating barge docks with capture piles, pile supported equipment platforms, a vehicle parking and turnaround area, fill of an existing borrow pit, and a barge fleeting area. Approximately 1,000 cubic yards of rip-rap, 1,425 cubic yards of crushed stone, and 1,600 cubic yards of select fill will be placed for revetment repair, the parking and turnaround area, and the levee ramp. The proposed project is situated on an approximately 33-acre tract in the bature of the Mississippi River and would impact approximately 0.51 acre of herbaceous wetlands. It is anticipated that the proposed action would have minimal impact on adjacent wetlands. The applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. Any further reduction would limit usage of the property and, therefore function deeming the project impracticable. As compensation for unavoidable wetland impacts, the applicant proposes to mitigate in-kind wetland credits from a Corps approved mitigation bank located in the watershed.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas