You can copy from here when filling out the rest of the page.
The applicant proposes to remove 2,000 cubic yards of dredged material from three existing canals.
Full Public NoticeProject Plans
The applicant proposes to remove 2,000 cubic yards of dredged material from three existing canals, authorized under Department of the Army (DA) Permit 16747. The dredged material will be hauled offsite to an upland dredge material placement area (DMPA) or placed on lots previously authorized by Amendment 1 and discussed in the Background Section. The applicant also proposes to place 1,205 linear feet of riprap along the shoreline of the GIWW to prevent further erosion.