Home

Galveston District

Run scraper

Texas Department of Transportation

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

TxDOT proposes to modify Permit SWG-2007-00173 to add additional capacity for the long-term maintenance hydraulic dredging of Bolivar Ferry Landing.

Full Public NoticeProject PlansMitigation Plan TxDOT proposes maintenance dredging for a period of 10 years within three Port Bolivar Ferry slips and approach ways to maintain a depth of 22 feet below mean low tide. The project area is a 32.84-acre site. The proposed DMPAs include the following options: PA 2A, PA 2B, PA5, PA6 and BU 1 and BU 2. TxDOT proposes to remove 350,000 cubic yards of dredged material annually. Currently authorized PAs 41 and 43 have limited capacity. TxDOT also proposes to place fill material into 75 acres of waters of the United States to utilize the material beneficially as beach restoration. BU 1 would be approximately 66.86 acres, in size, and BU 2 would be approximately 8.12 acres, in size. TxDOT has provided a sediment testing and dredge material placement analysis. This information is available upon request.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas