Permit Modification: Fill Placement for a Private Beach in Slidell, LA
NAME OF APPLICANT: Tammany Holding Company, LLC, ℅ ELOS Environmental, ATTN: James Prather, 43177 East Pleasant Ridge Road, Hammond, Louisiana, 70403.
LOCATION OF WORK: Between the two rock jetties within Lake Pontchartrain and in the Lakeshore Estates subdivision in Slidell, Louisiana, Saint Tammany Parish, as shown on the enclosed drawings.
Latitude: 30.219389/Longitude: -89.758222, Hydrologic Unit Code: 08090201 – Liberty Bayou-Tchefuncte
CHARACTER OF WORK: To deposit 85,887 cubic yards of sand and 2,284 cubic yards of rock rip-rap for a private beach. All rock and sand material will be hauled in. Construction would directly impact 10 acres of non-vegetated waterbottoms. This work will extend off a portion of the previously permitted subdivision. No wetland impacts are anticipated with this modification.
JOINT PUBLIC NOTICE
June 30, 2014
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
State of Louisiana
Department of Environmental Quality
ATTN: Water Quality Certifications
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-2225
Brad.LaBorde@usace.army.mil
Project Manager
Brad LaBorde
Permit Application Number
MVN 2002-1717 EOO
(225) 219-3225
Project Manager
Elizabeth Johnson
WQC Application Number
WQC 140626-01
Interested parties are hereby notified that a permit application has been received by the New
Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and
Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean
Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, Water
Quality Certifications, for a Water Quality Certification (WQC) in accordance with statutory authority
contained in LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17).
Permit Modification: Fill Placement for a Private Beach in Slidell, LA
NAME OF APPLICANT: Tammany Holding Company, LLC, ELOS Environmental, ATTN: James
Prather, 43177 East Pleasant Ridge Road, Hammond, Louisiana, 70403.
LOCATION OF WORK: Between the two rock jetties within Lake Pontchartrain and in the Lakeshore
Estates subdivision in Slidell, Louisiana, Saint Tammany Parish, as shown on the enclosed drawings.
Latitude: 30.219389/Longitude: -89.758222, Hydrologic Unit Code: 08090201 Liberty BayouTchefuncte
CHARACTER OF WORK: To deposit 85,887 cubic yards of sand and 2,284 cubic yards of rock riprap for a private beach. All rock and sand material will be hauled in. Construction would directly
impact 10 acres of non-vegetated waterbottoms. This work will extend off a portion of the previously
permitted subdivision. No wetland impacts are anticipated with this modification.
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 20 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment period.
Letters concerning the Corps of Engineers permit application must reference the applicant's name
and the Permit Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality
-2Certification must reference the applicant's name and the WQC Application number and be
mailed to the Louisiana Department of Environmental Quality at the address above.
Individuals or parties may request an extension of time in which to comment on the proposed
work by writing or e-mailing the Corps of Engineers Project Manager listed above. Any
request must be specific and substantively supportive of the requested extension, and
received by this office prior to the end of the initial comment period. The Section Chief will
review the request and the requestor will be promptly notified of the decision to grant or deny
the request. If granted, the time extension will be continuous to the initial comment period
and, inclusive of the initial comment period, will not exceed a total of 30 calendar days.
The application for this proposed project is on file with the Louisiana Department of Environmental
Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be
obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts,
including cumulative impacts of the proposed activity on the public interest. That decision will reflect
the national concern for both protection and utilization of important resources. The benefit which
reasonably may be expected to accrue from the proposal must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the proposal will be considered including
the cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local
agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate
the impacts of this proposed activity. Any comments received will be considered by the U.S. Army
Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are
also used to determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or
destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of
this public notice solicits input from the State Archeologist and State Historic Preservation Officer
regarding potential impacts to cultural resources.
Our initial finding is that the proposed work is Not Likely to Adversely Affect the West Indian
manatee (Trichechus manatus) and Gulf sturgeon (Acipenser oxyrinchus desotoi). Concurrence for
this determination is requested via an informal consultation with US Fish and Wildlife Service. The
applicant has agreed to comply with the Standard Manatee Construction Conditions and Gulf
sturgeon's "Bucket Drop" method if required by USFWS.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. The applicant's proposal would result in the
destruction or alteration of 10 acres of EFH utilized by various life stages of red drum and penaeid
shrimp. Our initial determination is that the proposed action would not have a substantial adverse
-3impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative
to project impacts and the need for mitigation measures is subject to review by and coordination with
the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity
will not violate applicable water quality standards will be required from the Department of
Environmental Quality, Water Quality Certifications, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application complies with
and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program.
The Department of the Army permit will not be issued unless the applicant received approval or a
waiver of the Coastal Use Permit by the Department of Natural Resources.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
Michael V. Farabee
Chief, Eastern Evaluation Section