SIDING TRACK EXTENSION AND RUN-THROUGH SLOT IN CALCASIEU PARISH
Name of applicant: Union Pacific Railway Corporation, c/o CH2M Hill, Attn: Angela Dalsis, 14701 St. Mary’s Lane, Suite 300, Houston, Texas 77079
Location of work: 30.23799oN, 93.283395oW, in Westlake, Louisiana, in CALCASIEU Parish, as shown on the enclosed drawings.
Character of work: Place approximately 12,737 cubic yards of earthen material, 2,863 cubic yards of subballast, and 1,950 cubic yards of ballast, all to facilitate construction of a siding track extension and run-through slot. Approximately 2.95 acres of unavoidable wetland impacts will be compensated for through the purchase of credits from an approved mitigation bank in the same hydrologic basin (HUC 08080206).
JOINT PUBLIC NOTICE
July 7, 2014
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, LA 70160-0267
State of Louisiana
Department of Environmental Quality
Office of Environmental Services
Post Office Box 4313
Baton Rouge, LA 70821-4313
(504) 862-1879
Project Manager
Ms. Angelle Greer
Permit Application Number
MVN-2014-00920-WMM
(225) 219-3225
Project Manager
Elizabeth Johnson
WQC Application Number
WQC 140702-02
Interested parties are hereby notified that a permit application has been received by the New Orleans
District of the U.S. Army Corps of Engineers pursuant to: [ ] Section 10 of the Rivers and Harbors Act of March
3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC
1344).
Application has also been made to the Louisiana Department of Environmental Quality for a Water Quality
Certification (WQC) in accordance with statutory authority contained in LRS 30:2074 A(3) and provisions of
Section 401 of the Clean Water Act."
SIDING TRACK EXTENSION AND RUN-THROUGH SLOT IN CALCASIEU PARISH
Name of applicant: Union Pacific Railway Corporation, c/o CH2M Hill, Attn: Angela Dalsis, 14701 St.
Mary's Lane, Suite 300, Houston, Texas 77079
o
o
Location of work: 30.23799 N, 93.283395 W, in Westlake, Louisiana, in CALCASIEU Parish, as shown on
the enclosed drawings.
Character of work: Place approximately 12,737 cubic yards of earthen material, 2,863 cubic yards of
subballast, and 1,950 cubic yards of ballast, all to facilitate construction of a siding track extension and runthrough slot. Approximately 2.95 acres of unavoidable wetland impacts will be compensated for through the
purchase of credits from an approved mitigation bank in the same hydrologic basin (HUC 08080206).
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 20 days from the date of this joint public notice. Written comments,
including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being
solicited from anyone having interest in this permit and/or this WQC request and must be mailed so as to be
received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit
application must reference the applicant's name and the Permit Application Number, and be mailed to the Corps
of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Individuals or parties may
request an extension of time in which to comment on the proposed work by writing to the project
manager or clicking on the project manager's name on the public notice grid on the web page. Any
request must be specific and substantively supportive of the requested extension and received by this
office prior to the end of the initial comment period. The Section Chief will review the request and the
requestor will be promptly notified of the decision to grant or deny the request. If granted, the time
extension will be continuous to the initial comment period and, inclusive of the initial comment period,
will not exceed a total of 30 calendar days. Letters concerning the Water Quality Certification must reference
the applicant's name and the WQC Application number and be mailed to the Louisiana Department of
Environmental Quality at the address above.
The application for this proposed project is on file with the Louisiana Department of Environmental Quality
and may be examined weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of
costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts, including
cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern
for both protection and utilization of important resources. The benefit which reasonably may be expected to
accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which
may be relevant to the proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production,
mineral needs, considerations of property ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, Federal, state, and local
agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts
of this proposed activity. Any comments received will be considered by the U.S. Army Corps of Engineers to
determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision,
comments are used to assess impacts on endangered species, historic properties, water quality, general
environmental effects, and other public interest factors listed above. Comments are used in the preparation of
an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National
Environmental Policy Act. Comments are also
used to determine the need for a public hearing and to determine the overall public interest of the proposed
activity.
The New Orleans District is unaware of properties listed on the National Register of Historic Places near
the proposed work. The possibility exists that the proposed work may damage or destroy presently unknown
archeological, scientific, prehistorical, historical sites, or data. Copies of this notice are being sent to the State
Archeologist and the State Historic Preservation Officer.
Our initial finding is that the proposed work would neither affect any species listed as endangered by the
U.S. Departments of Interior or Commerce, nor affect any habitat designated as critical to the survival and
recovery of any endangered species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens
Fishery Conservation and Management Act. The applicant's proposal would result in the destruction or
alteration of 0.0 acre(s) of EFH utilized by various life stages of red drum and penaeid shrimp. Our initial
determination is that the proposed action would not have a substantial adverse impact on EFH or federally
managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for
mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of
the probable impacts will include the application of guidelines established by the Administrator of the
Environmental Protection Agency. Also, a certification that the proposed activity will not violate applicable water
quality standards will be required from the Department of Environmental Quality, Office of Environmental
Services before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a public
hearing be held to consider this application. Requests for public hearings shall state, with particularity, the
reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to any other parties whom you
deem likely to have interest in the matter.
Darrell S. Barbara
Chief, Western Evaluation Section
Enclosures
VICINITY MAP
W Fork Calcasieu River
(c) OpenStreetMap and
contributors, Creative
Commons-Share Alike
POE
Latitude: 30°14'17.323" N
Longitude: 93°15'19.360" W
POB
Latitude: 30°14'16.691" N
Longitude: 93°17' 9.569" W
Lake Charles
Calcasieu River
Bayou D Inde
Contraband Bayou
Prien Lake
Indian Bay
Copyright:© 2013 National Geographic Society, i-cubed
Date: 3/21/2014
Legend
Survey Boundary
0
2,000
Feet
Source: USGS Topo Maps
4,000
$
Sheet 1 of 10
FIGURE 1
Topographic Map
UPRR Calcasieu Run Through Slot
UNK R:\GIS\HOU\UPRR\CALCASIEU_RUN\MAPFILES\PJD\CALCASIEU_RUN_TOPO_MAP.MXD BTHOMSON 2/13/2014 6:11:13 PM
VICINITY MAP
W Fork Calcasieu River
(c) OpenStreetMap and
contributors, Creative
Commons-Share Alike
POE
Latitude: 30°14'17.323" N
Longitude: 93°15'19.360" W
POB
Latitude: 30°14'16.691" N
Longitude: 93°17' 9.569" W
Lake Charles
Calcasieu River
Bayou D Inde
Contraband Bayou
Prien Lake
Copyright:© 2013 Esri, DeLorme, NAVTEQ, TomTom, Source: Esri,
Indian
Bay
DigitalGlobe,
GeoEye, i-cubed, USDA, USGS, AEX, Getmapping,
Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
Legend
Survey Boundary
Waterways (NHD)
Source: ESRI World Imagery
Date: 3/21/2014
?
?
Flow Line (NHD)
0
2,000
Feet
4,000
$
Sheet 2 of 10
FIGURE 1
Aerial Vicinity Map
UPRR Calcasieu Run Through Slot
UNK R:\GIS\HOU\UPRR\CALCASIEU_RUN\MAPFILES\PJD\CALCASIEU_RUN_VICINITY_MAP.MXD BTHOMSON 3/21/2014 8:15:02 AM
VICINITY MAP
3
4
5
6
7
8
9 10
(c) OpenStreetMap and
contributors, Creative
Commons-Share Alike
POB
Latitude: 30°14'16.691" N
Longitude: 93°17' 9.569" W
LW-4
Gy
LS003
W001
!
( OBS001
S001
SP006
S002 SP002
!
( OBS002
!
(
LEGEND
!
(
!
(
LW-1
W001
Kd
LS001
LW-2
LS002
LW-3
!
(
W012
S006
W013
S006
S001
S001
SP001
S008
Up
Observation Point
Survey Boundary
NRCS Soils
Waterways (NHD)
Wetlands
Potential Jurisdictional Waters of the U.S.
Potential Jurisdictional Wetlands
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX,
Kd
Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User
Community
Potential Jurisdictional Waters of the U.S. (MVN-2013-02964)
Potential Jurisdictional Wetlands (MVN-2013-02964)
Legend
Soil Series Name
Ac
Aca di a s i l t l oa m, 1 to 3 percent s l opes
BB
Ba s i l e a nd Brul e, 0 to 3 percent s l opes , frequentl y
fl ooded
AR
Gy
Kd
UA
Up
W
Source: ESRI World Imagery
Date: 3/21/2014
Ara t mucky s i l t l oa m
Guyton-Mes s er s i l t l oa ms
Ki nder-Mes s er s i l t l oa ms
Udi fl uvents , 1 to 20 percent s l opes
Urba n l a nd
Wa ter
0
100
Feet
200
$
Sheet 3 of 10
FIGURE 1
Preliminary Jurisidictional Wetland Map
UPRR Calcasieu Run Through Slot
UNK R:\GIS\HOU\UPRR\CALCASIEU_RUN\MAPFILES\PJD\CALCASIEU_RUN_PJD_DATADRIVEN_SHEET10.MXD BTHOMSON 3/21/2014 9:04:58 AM
VICINITY MAP
BB
Gy
3
4
5
6
7
8
9 10
(c) OpenStreetMap and
contributors, Creative
Commons-Share Alike
!
( OBS011
W013
W013
S006
S006
Bayou Ver
din
W015
W014
!
(
e
W
Ac
Kd
S003
W016
S007
S001
!
(
!
( OBS003
W003
W002
OBS004 W004
!
(
!
(
!
(
S008
W005
!
( OBS006
W006
SP008
Up
LEGEND
!
(
Observation Point
Survey Boundary
NRCS Soils
BB
Waterways (NHD)
Wetlands
W
Kd
Potential Jurisdictional Waters of the U.S.
Potential Jurisdictional Wetlands
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX,
Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User
Community
Potential Jurisdictional Waters of the U.S. (MVN-2013-02964)
Potential Jurisdictional Wetlands (MVN-2013-02964)
Legend
Soil Series Name
Ac
Aca di a s i l t l oa m, 1 to 3 percent s l opes
BB
Ba s i l e a nd Brul e, 0 to 3 percent s l opes , frequentl y
fl ooded
AR
Gy
Kd
UA
Up
W
Source: ESRI World Imagery
Date: 3/21/2014
Ara t mucky s i l t l oa m
Guyton-Mes s er s i l t l oa ms
Ki nder-Mes s er s i l t l oa ms
Udi fl uvents , 1 to 20 percent s l opes
Urba n l a nd
Wa ter
0
100
Feet
200
$
Sheet 4 of 10
FIGURE 1
Preliminary Jurisidictional Wetland Map
UPRR Calcasieu Run Through Slot
UNK R:\GIS\HOU\UPRR\CALCASIEU_RUN\MAPFILES\PJD\CALCASIEU_RUN_PJD_DATADRIVEN_SHEET10.MXD BTHOMSON 3/21/2014 9:04:58 AM
VICINITY MAP
3
4
6
5
7
8
9 10
(c) OpenStreetMap and
contributors, Creative
Commons-Share Alike
ConocoPhillips Westlake
W016
!
(
SP007
W008_OW
W008
S007
(
OBS009 !
Up
!
(
S004
W006
!
(
OBS007
!
(
SP004
LEGEND
!
(
Observation Point
Survey Boundary
NRCS Soils
Waterways (NHD)
Wetlands
Potential Jurisdictional Waters of the U.S.
Potential Jurisdictional Wetlands
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX,
Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User
Community
Potential Jurisdictional Waters of the U.S. (MVN-2013-02964)
Potential Jurisdictional Wetlands (MVN-2013-02964)
Legend
Soil Series Name
Ac
Aca di a s i l t l oa m, 1 to 3 percent s l opes
BB
Ba s i l e a nd Brul e, 0 to 3 percent s l opes , frequentl y
fl ooded
AR
Gy
Kd
UA
Up
W
Source: ESRI World Imagery
Date: 3/21/2014
Ara t mucky s i l t l oa m
Guyton-Mes s er s i l t l oa ms
Ki nder-Mes s er s i l t l oa ms
Udi fl uvents , 1 to 20 percent s l opes
Urba n l a nd
Wa ter
0
100
Feet
200
$
Sheet 5 of 10
FIGURE 1
Preliminary Jurisidictional Wetland Map
UPRR Calcasieu Run Through Slot
UNK R:\GIS\HOU\UPRR\CALCASIEU_RUN\MAPFILES\PJD\CALCASIEU_RUN_PJD_DATADRIVEN_SHEET10.MXD BTHOMSON 3/21/2014 9:04:58 AM
VICINITY MAP
3
4
5
6
7
8
9 10
(c) OpenStreetMap and
contributors, Creative
Commons-Share Alike
ConocoPhillips Westlake
W008
W008_OW
!
(
S004
!
( OBS008
Up
W007
LEGEND
!
(
Observation Point
Survey Boundary
NRCS Soils
Waterways (NHD)
Wetlands
Potential Jurisdictional Waters of the U.S.
Potential Jurisdictional Wetlands
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX,
Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User
Community
Potential Jurisdictional Waters of the U.S. (MVN-2013-02964)
Potential Jurisdictional Wetlands (MVN-2013-02964)
Legend
Soil Series Name
Ac
Aca di a s i l t l oa m, 1 to 3 percent s l opes
BB
Ba s i l e a nd Brul e, 0 to 3 percent s l opes , frequentl y
fl ooded
AR
Gy
Kd
UA
Up
W
Source: ESRI World Imagery
Date: 3/21/2014
Ara t mucky s i l t l oa m
Guyton-Mes s er s i l t l oa ms
Ki nder-Mes s er s i l t l oa ms
Udi fl uvents , 1 to 20 percent s l opes
Urba n l a nd
Wa ter
0
100
Feet
200
$
Sheet 6 of 10
FIGURE 1
Preliminary Jurisidictional Wetland Map
UPRR Calcasieu Run Through Slot
UNK R:\GIS\HOU\UPRR\CALCASIEU_RUN\MAPFILES\PJD\CALCASIEU_RUN_PJD_DATADRIVEN_SHEET10.MXD BTHOMSON 3/21/2014 9:04:58 AM
VICINITY MAP
3
4
5
6
7
8
9 10
(c) OpenStreetMap and
contributors, Creative
Commons-Share Alike
ConocoPhillips Westlake
Up
W008_OW
W008_OW
W008
W007
LEGEND
!
(
Observation Point
Survey Boundary
NRCS Soils
W
Waterways (NHD)
Wetlands
Potential Jurisdictional Waters of the U.S.
Potential Jurisdictional Wetlands
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX,
Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User
Community
Potential Jurisdictional Waters of the U.S. (MVN-2013-02964)
Potential Jurisdictional Wetlands (MVN-2013-02964)
Legend
Soil Series Name
Ac
Aca di a s i l t l oa m, 1 to 3 percent s l opes
BB
Ba s i l e a nd Brul e, 0 to 3 percent s l opes , frequentl y
fl ooded
AR
Gy
Kd
UA
Up
W
Source: ESRI World Imagery
Date: 3/21/2014
Ara t mucky s i l t l oa m
Guyton-Mes s er s i l t l oa ms
Ki nder-Mes s er s i l t l oa ms
Udi fl uvents , 1 to 20 percent s l opes
Urba n l a nd
Wa ter
0
100
Feet
200
$
Sheet 7 of 10
FIGURE 1
Preliminary Jurisidictional Wetland Map
UPRR Calcasieu Run Through Slot
UNK R:\GIS\HOU\UPRR\CALCASIEU_RUN\MAPFILES\PJD\CALCASIEU_RUN_PJD_DATADRIVEN_SHEET10.MXD BTHOMSON 3/21/2014 9:04:58 AM
VICINITY MAP
3
4
6
5
7
8
9 10
(c) OpenStreetMap and
contributors, Creative
Commons-Share Alike
ConocoPhillips Westlake
W008
OBS010
W009
W010
Up
!
(
W007_PSS
W007
LEGEND
!
(
Observation Point
Survey Boundary
NRCS Soils
Waterways (NHD)
Wetlands
Potential Jurisdictional Waters of the U.S.
Potential Jurisdictional Wetlands
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX,
Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User
Community
Potential Jurisdictional Waters of the U.S. (MVN-2013-02964)
Potential Jurisdictional Wetlands (MVN-2013-02964)
Legend
Soil Series Name
Ac
Aca di a s i l t l oa m, 1 to 3 percent s l opes
BB
Ba s i l e a nd Brul e, 0 to 3 percent s l opes , frequentl y
fl ooded
AR
Gy
Kd
UA
Up
W
Source: ESRI World Imagery
Date: 3/21/2014
Ara t mucky s i l t l oa m
Guyton-Mes s er s i l t l oa ms
Ki nder-Mes s er s i l t l oa ms
Udi fl uvents , 1 to 20 percent s l opes
Urba n l a nd
Wa ter
0
100
Feet
200
$
Sheet 8 of 10
FIGURE 1
Preliminary Jurisidictional Wetland Map
UPRR Calcasieu Run Through Slot
UNK R:\GIS\HOU\UPRR\CALCASIEU_RUN\MAPFILES\PJD\CALCASIEU_RUN_PJD_DATADRIVEN_SHEET10.MXD BTHOMSON 3/21/2014 9:04:58 AM
VICINITY MAP
3
4
5
6
7
8
9 10
(c) OpenStreetMap and
contributors, Creative
Commons-Share Alike
ConocoPhillips Westlake
Gy
OBS013
OBS014
W018
W011
!
(
!
(
!
(
Up
W007_PSS
!
(
S005
!
(
W026
!
(
!
(
OBS028
OBS027
S
LEGEND
!
(
Observation Point
Survey Boundary
NRCS Soils
Waterways (NHD)
Wetlands
Potential Jurisdictional Waters of the U.S.
Potential Jurisdictional Wetlands
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX,
UA
Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User
Community
Potential Jurisdictional Waters of the U.S. (MVN-2013-02964)
Potential Jurisdictional Wetlands (MVN-2013-02964)
Legend
Soil Series Name
Ac
Aca di a s i l t l oa m, 1 to 3 percent s l opes
BB
Ba s i l e a nd Brul e, 0 to 3 percent s l opes , frequentl y
fl ooded
AR
Gy
Kd
UA
Up
W
Source: ESRI World Imagery
Date: 3/21/2014
Ara t mucky s i l t l oa m
Guyton-Mes s er s i l t l oa ms
Ki nder-Mes s er s i l t l oa ms
Udi fl uvents , 1 to 20 percent s l opes
Urba n l a nd
Wa ter
0
100
Feet
200
$
Sheet 9 of 10
FIGURE 1
Preliminary Jurisidictional Wetland Map
UPRR Calcasieu Run Through Slot
UNK R:\GIS\HOU\UPRR\CALCASIEU_RUN\MAPFILES\PJD\CALCASIEU_RUN_PJD_DATADRIVEN_SHEET9.MXD BTHOMSON 3/21/2014 9:00:57 AM
VICINITY MAP
3
4
7
6
5
8
9 10
(c) OpenStreetMap and
contributors, Creative
Commons-Share Alike
Kd
OBS014
Gy
OBS016
OBS013
W018
!
(
!
(
W026
!
(
!
(
!
(
W024
!
(
OBS019
!
(
!
(
!
(
W025
!
(
!
(
W023
OBS026
OBS023
OBS025
OBS028
W017
W022
!
(
W021
!
(
!
(
S005
!
(
W020
W019
!
(
OBS020
OBS018
OBS017
OBS015
OBS022
POE
Latitude: 30°14'17.323" N
Longitude: 93°15'19.360" W
OBS021
OBS024
SP005
!
(
OBS027
AR
LEGEND
!
(
Observation Point
Up
Survey Boundary
NRCS Soils
Waterways (NHD)
Wetlands
Potential Jurisdictional Waters of the U.S.
Potential Jurisdictional Wetlands
UA
Potential Jurisdictional Waters of the U.S. (MVN-2013-02964)
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX,
Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User
Dm
Community
Potential Jurisdictional Wetlands (MVN-2013-02964)
Legend
Soil Series Name
Ac
Aca di a s i l t l oa m, 1 to 3 percent s l opes
BB
Ba s i l e a nd Brul e, 0 to 3 percent s l opes , frequentl y
fl ooded
AR
Gy
Kd
UA
Up
W
Source: ESRI World Imagery
Date: 3/21/2014
Ara t mucky s i l t l oa m
Guyton-Mes s er s i l t l oa ms
Ki nder-Mes s er s i l t l oa ms
Udi fl uvents , 1 to 20 percent s l opes
Urba n l a nd
Wa ter
0
100
Feet
200
$
Sheet 10 of 10
FIGURE 1
Preliminary Jurisidictional Wetland Map
UPRR Calcasieu Run Through Slot
UNK R:\GIS\HOU\UPRR\CALCASIEU_RUN\MAPFILES\PJD\CALCASIEU_RUN_PJD_DATADRIVEN_SHEET10.MXD BTHOMSON 3/21/2014 9:03:56 AM
20
210
Alfred Benesch & Company
20
262-652-6677
20
20
49
Kenosha, WI 53144
Job No. 20152.03
220
49
10
110
10
12
10
10
12
10
10
10
610
PROJECT LOCATION
State of Louisiana
Project Location Map
M P 221.
31 -M P 222.
92
CO M PLETE
N O T FO R CO N STRUCTI
ON
30%
BUDG ET REFEREN CE:12CP270
PRO JECT N UM BER:79610
W O RK O RDER:17780
CALCASI
EU RUNTHROUGH SLOT
10
LAFAYETTE SUBDI
VI
SI
ON
CALCASI
EU,LA
3132
LAST REVI
SED
SEPTEM BER 6,2013
4633 Washington Road
10
55
10
55
49
310
49
ENGINEERING
DESIGN/CONSTRUCTION
PROJECT INDEX
PROJECT DESIGN
DESCRIPTION
G001
COVER SHEET WITH VICINITY MAP
G002
PROJECT INDEX & REVISION SHEET
G003
GENERAL NOTES & PROJECT CONTACTS
G004
ABBREVIATIONS & LEGEND
G005
CONTROL POINTS AND GEOMETRY
G006
DESCRIPTION
to 007
TRACK PLAN & PROFILE
T001
to 002
TYPICAL SECTIONS
X001
to 027
CROSS SECTIONS
MECHANICAL DESIGN
DESCRIPTION
ELECTRICAL DESIGN
DESCRIPTION
DESCRIPTION
PROJECT REVISIONS
REV. #
BY
DATE:
SHEET:
DESCRIPTION
DRAWN BY:
Office of Assistant Vice President
Engineering Design/Construction
HRD
CHECKED BY:
9/6/201
3
MJK
Default
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\G002.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
STRUCTURES DESIGN
CURVE DATA
P001
STANDARDS
Color table:UPRR.
tbl
PROJECT INDEX (CONTINUED)
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
DATE:
09/06/13
LOCATION & DESCRIPTION:
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET NUMBER
SHEET TITLE:
G 002 of006
PROJECT INDEX & REVISIONS
X:\20100S\20152.03\Eng_Docs\Sheets\G002.dgn
GENERAL NOTES
1.
2.
3.
Contractors shall notify Service Alert, (800) 642-2444 and UPRR Fiber Optics
Hotline (800) 336-9193, 48 hours prior to any excavation. The USA Authorization
Numbers shall be kept at the job site.
No work whatsoever shall be commenced without first notifying the UPRR
Engineer.
The Contractor shall comply with all Federal, State, County, and City Laws
and Ordinances and Regulations of the Department of Industrial Relations, OSHA,
NPDES and Industrial Accident Commission related to the safety and character of
the work, equipment and labor personnel.
PROJECT CONTACTS
15. No field changes will be permitted without direct written authorization
from the UPRR Engineer or his representative.
CONTACT
PHONE NUMBER
UPRR
TED HASKELL
281-350-7628
Civil Construction Project Manager
NICK COLEMAN
281-714-9808
Civil Construction Field Manager
RUSS BRITT
501-373-2323
Track Construction Project Manager
DAVID SKIBINSKI
402-544-2421
Project Design Manager
17. The contractor is responsible for preparing a Stormwater Pollution
Prevention Plan (SWPPP) to comply with State regulations. General
specifications and typical erosion control details are included in the plan set.
KEVIN RICE
402-544-2213
18. Right-of-way lines shown on the plans were taken from existing UPRR
right-of-way map and are approximate.
PAUL PINO
402-544-3582
Information Technology - Fiber
STEVE SAND
402-544-8568
Real Estate - Utilities
16. Contractor shall coordinate work which affects adjacent property owners.
Any questions or agreements between adjacent property owners and contractor
shall be made in writing. A copy of such agreement shall be provided to the
UPRR Engineer or his representative.
Project Design Sr. Project Designer
Structures Design Sr. Manager
Structures Design Manager
4.
5.
6.
Contractor shall be responsible for coordinating with all Utility agencies.
Contractor shall protect in place (by any means necessary) all existing
utilities to remain unless otherwise specified herein, contractor shall be
responsible for the complete repair at his expense, for any damage to existing
utilities, structures, or other site features, as a result of his work.
Prior to placing curbs, pavements, base, subbase, track, etc., all
underground utilities shall be installed, backfill completed, and the Engineer
notified by each of the utility companies having facilities within the work
area, that the utility installation has satisfactorily passed acceptance tests.
7.
All existing underground utilities, that are not to be re-used shall be
abandoned in place. All existing pipelines to be abandoned in place shall be
cement slurry filled and capped at least 3'-0" below top of proposed subgrade.
8.
Contractor shall verify locations and elevations of existing utilities
whether known or unknown prior to beginning construction.
9.
Any underground structures such as cesspools, cisterns, mining shafts,
tunnels, septic tanks, wells, and pipelines not located prior to construction
shall be brought to the attention of the engineer for determiniation of
appropriate action such as removal or treatment in a manner judged suitable to
the engineer.
19. Match lines for sheets are based on the existing Main Line stationing
unless otherwise specified.
20. Track laying, ballasting, and installation of road crossing panels will be
done by UPRR unless otherwise stated.
21. Where existing culverts are to be extended, the contractor shall expose
existing drainage structures and field verify size and type before ordering.
CONTACT
PHONE NUMBER
FIBER
CONTACT
PHONE NUMBER
UTILITIES
CONTACT
PHONE NUMBER
FEDERAL AND LOCAL GOVERMENT AGENCY
22. The contractor is responsible for the removal of all pavement markings that
will be in conflict with the proposed work.
23. Contractor shall comply with all Louisiana and Calcasieu Parish standard
specifications for construction of public improvements requirements. Calcasieu
Parish standard specifications shall prevail.
24. Contractor shall maintain at least one access to all affected business. If
necessary, multiphase construction shall be utilized.
10. Contractor shall coordinate location of all proposed utilities with UPRR to
assure accuracy of utility connections and compliance with local codes.
11. Any existing conditions found to be a variance with these drawings must be
immediately reported to the Engineer.
12. Contractor shall maintain and clean to the satisfaction of the Engineer, all
access and service roads used during construction.
13. Contractor shall perform all construction in such a manner as to protect
adjacent existing buildings, and other site elements which are to remain in
service.
14. Contractor shall provide As-built Drawings for all improvements.
1.
UPRR standard plans and trackworks
2.
Calcasieu Parish Engineering and Public Works Engineering Department
3.
Louisiana Department of Transportation Roadway Standards
TRAFFIC NOTES
1.
All barricades, warning signs, lights, devices, etc. for the guidance of
vehicle traffic and pedestrians must conform to the installation shown in the
Manual on Uniform Traffic Control Devices (MUTCD), current edition.
2.
Contractor shall make twice daily inspections of barricades and flashing
lights to ensure proper placement and functioning of warning devices.
3.
SURVEY NOTES
1.
Railroad stationing for project profiles and alignments is based on stations
established for chord definition spiraled curves at the centerline of the
existing UPRR Main Line unless otherwise noted.
2.
The contractor is responsible for the preservation of all survey control
monuments. In the event monuments are damaged or destroyed by the contractor,
the Engineer will replace the monument solely at the contractor's expense.
PHONE NUMBER
Grade crossings closed to traffic during construction shall be barricaded in
accordance with the MUTCD.
4.
At all grade crossings, all grade crossing warning signs (crossbuck) shall
temporarily be relocated during construction and reset after the grade
crossings construction is completed to a point adjacent to the roadway and 15
feet from the centerline of the near track as stated in the MUTCD except where
automatic grade crossing warning signals/gates exisit. All automatic warning
devices are the responsibility of UPRR. At no time shall a crossing be left
open without proper warning signs in place.
5.
Contractor shall submit traffic control plans to Louisiana Traffic
Department for approval at least 2 weeks prior to each road closure. Plans
shall be 11" x 17" engineered drawings, sealed by a professional engineer from
the State of Louisiana.
6.
The contractor is responsible for the prompt replacememt and/or repair of
all traffic control devices and appurtenances damaged or disturbed due to
construction.
GENERAL
(800) 336-9193
UPRR CALL BEFORE YOU DIG
(888) 258-0808
CALL BEFORE YOU DIG (NATIONAL DIRECTORY)
(888) 877-7267
UPRR Response Management Communications Center (RMCC)
DATUM
HORIZONTAL
VERTICAL
NAD (1983) STATE PLANE COORDINATE
SYSTEM, LOUISIANA SOUTH (1702)
NAVD 88
DRAWN BY:
Office of Assistant Vice President
Engineering Design/Construction
HRD
CHECKED BY:
9/6/201
3
MJK
Default
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\G003.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
DESIGN CRITERIA
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
DATE:
09/06/13
LOCATION & DESCRIPTION:
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET NUMBER
SHEET TITLE:
G 003 of006
GENERAL NOTES AND PROJECT CONTACTS
X:\20100S\20152.03\Eng_Docs\Sheets\G003.dgn
UTILITIES
ABBREVIATIONS
STRUCTURES
Ac.
Acres
Bldg.
Building
Ave.
Avenue
Br.
Bridge
Blvd.
Boulevard
CB
Catch Basin
Bldg.
Building
CPT
Concrete Pile Trestle - Ballast Deck
BNSF
BNSF Railway
CIP
Cast Iron Pipe
C.Y.
Cubic Yards
CMP
Corrugated Metal Pipe
Conc.
Concrete
CMPA
Corrugated Metal Pipe Arch
CSP
Corrugated Steel Pipe
Fiber Optic Cable
Degree (s)
Dia.
Diameter
Culv.
Culvert
Dr.
Drive
DI
Drop Inlet
Dwg.
Drawing
DPGBD
Deck Plate Girder - Ballast Deck
E
East
DPGOD
Deck Plate Girder - Open Deck
Elev.
Elevation
EBW
East Backwall
Exist.
Existing
F.L.
Flowline
'
Foot, Feet or Minute (s)
F.F.
Finished Floor
F.S.
Finished Surface
GIP
Galvanized Iron Pipe
Horiz.
Horizontal
Hdwl
Headwall
"
Inch, Inches or Second (s)
NBW
North Backwall
Inv.
Invert
PSCT
Prestressed Concrete Trestle
Lt.
Left
RCA
Reinforced Concrete Arch
L
Length
RCB
Reinforced Concrete Box
L.F.
Lineal Feet
RCP
Reinforced Concrete Pipe
Max.
Maximum
SBW
South Backwall
Min.
Minimum
SSP
Smooth Steel Pipe
N
North
SPTBD Steel Pile Trestle - Ballast Deck
NTS
Not to Scale
SPTOD Steel Pile Trestle - Open Deck
No.
Number
SPP
OH
Overhead
TPGBD Through Plate Girder - Ballast Deck
Prop.
Proposed
TPGOD
Through Plate Girder - Open Deck
RR
Railroad
TPTBD
Timber Pile Trestle - Ballast Deck
Rwy
Railway
TPTOD
Timber Pile Trestle - Open Deck
R/W
Right of Way
TTBD
Through Truss - Ballast Deck
Rt.
Right
TTOD
Through Truss - Open Deck
S
South
TWB
Treated Wood Box
S.F.
Square Feet
VCP
Vitrified Clay Pipe
Sta.
Station
Viad.
Viaduct
Std.
Standard
WBW
West Backwall
St.
Street
WIP
Wrought Iron Pipe
Twp.
Township
Typ.
Typical
UG
Underground
UPRR
Union Pacific Railroad
ATR
Above Top of Rail
V
Velocity
Align.
Alignment
Wt.
Weight
BBR
Below Base of Rail
W
West
Cntrs.
Centers
X-ing
Crossing
CWR
Continuous Welded Rail
DSPD
Double Switch Point Derail
EOT
End of Track
HH
Head Hardened
Jtd.
Jointed Rail
LH
Left Hand
ML
Main Line
MM
Mile Marker
MP
Mile Post
NSC
Not Sufficient Clearance
Automatic Block Signal
ATC
Automatic Train Control
CTC
Centralized Traffic Control
DED
Dragging Equipment Detector
DTC
Direct Traffic Control
ELTO
Electric Lock Turnout
HBD
Hot Box Detector
HTTO
Hand Throw Turnout
HWD
High Wide Dectector
POTO
Power Operated Turnout
TWC
Track Warrant Control
WILD
Wheel Impact Load Dectector
Overhead Power Line
OTM
Other Track Material
PCC
Point of Compound Curve
PC
Point of Curve
PCS
Point of Curve to Spiral
POC
Point on Curve
PF
1/2" Point of Frog
PI
Point of Intersection
PITO
Point of Intersection of Turnout
PS
Point of Spiral
PSC
Point of Spiral to Curve
POS
Point on Spiral
PT
Point of Tangent
POT
Point on Tangent
Pt. Sw.
Point of Switch
PVC
Point of Vertical Curve
PVI
Point of Vertical Intersection
PVT
Point of Vertical Tangent
RH
Right Hand
SH
Second Hand
SSPD
Single Switch Point Derail
TC
Track Centers
T.F.
Track Feet
Trk.
Track
UXO
Universal Cross-Over
X-Over
Cross-Over
Stop
Crossbuck Sign
Yard Limit
Flashing Light Warning Device
1 Mile to Yard Limit
Flashing Light Warning Device
Whistle Post
Sanitary Sewer
Overhead Signal Line
with Gate
Underground Signal Line
Cantilever Flashing
Flanger
Light Warning Device
Station
Cantilever Flashing
Reduce Speed
Steam Line
Storm Sewer
Light Signal with Gate
Resume Speed
Telephone
Underground Electric
General Purpose
SIGNAL
Water Main
Absolute Signal
FENCES
Underground Wire
Under Drain
V.
Valve
M.H.
Signal Bridge
Barbed Wire
Cantilever Signal
Chain Link
Snow / Sand
Manhole
ACS or CTC Signal
C.B.
Cattle Guard
Catch Basin
Dwarf Signal
F.H.
Fire Hydrant
ROADS
Begin CTC
Junction Box
Paved Road
Electric Meter
E
Microwave Tower
Unimproved Road
Gas Meter
G
AEI
AEI
80
Interstate Highway
20
Federal Highway
58
State Highway
C3
County Highway
Water Meter
W
M.W.
BB
Battery Box
Monitoring Well
Dragging Equipment Detector
Pump
GEN.
TRACK
Generator
Hot Box Detector
Existing Mainline
Existing Siding
or Spur
OTHER
STRUCTURES
Proposed
Culvert
Wetlands
Culvert with Headwalls
River or Lake
Double Culvert
Embankment
Railroad Bridge
Flow Line
Highway Overpass
Milepost
Highway Underpass
Milemarker
Remove
Shift
Relay
Future
Foreign Railroad or Industry
In Buildings or
Under Structures
Turnout
Wheel Stop
Bumping Post
15
Tunnel
Control Point
Earthen Bumper
56'
Building
Inert Retarder
1
Revision Number
52'
Dowty Retarder
FP
Revision Cloud
Flag Pole
Derail
Switch Point Derail
or Double Switch Point Derail
CONSTRUCTION
LIGHTING
Note
Light Pole
PROPERTY
Light Tower
Note
Note (Work by Contractor)
Note (Work by Others)
Section Line
Cut Lines
Section Number
Center Section Line
Fill Lines
Parcel or Easement Line
Section Sheet No.
DRAWN BY:
Right of Way
9/6/201
3
Section Description
Default
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\G004.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
ABS
ROAD CROSSING WARNING DEVICES
Gas Pipeline
PUMP
TRACK
SIGNAL
Color table:UPRR.
tbl
Structural Plate Pipe
SIGNS
SYMBOLS
Compressed Air
MISCELLANEOUS
CHECKED BY:
Former Right of Way
Scale
Right of Way to be Acquired
Section From Sheet No.
MJK
Alfred Benesch & Company
4633 Washington Road
Foreign Right of Way
Office of Assistant Vice President
Engineering Design/Construction
HRD
Section Number
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
DATE:
09/06/13
LOCATION & DESCRIPTION:
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET NUMBER
SHEET TITLE:
G 004 of006
ABBREVIATIONS & LEGEND
X:\20100S\20152.03\Eng_Docs\Sheets\G004.dgn
MAIN
TAN PI
s
PI
S
T
T
S
T
IN
O
s
s
U
T
L
PSC
s
T
T
L
PCS
FIGURE A
FIGURE B
CIRCULAR CURVES
WITH SPIRAL TRANSITION
SIMPLE CIRCULAR CURVE
DESCRIPION
s - SPIRAL ANGLE =
637,290.12
2,665,117.59
14.42
5/8" REBAR
CP-51
637,256.09
2,665,293.97
14.50
5/8" REBAR
CP-52
637,247.70
2,665,690.74
12.75
5/8" REBAR
Y
FIGURE C
SPIRAL TRANSITION CURVE
SPIRAL TRANSITION CURVE DATA:
THE SPIRAL USED IS DEFINED BY THE TALBOT SPIRAL.
R = RADIUS OF CIRCULAR CURVE
2
AL
2
LS
= CENTRAL ANGLE OF CIRCULAR CURVE
- CENTRAL ANGLE OF CIRCULAR CURVE = - 2
CP-50
R
X
- TOTAL INTERSECTION ANGLE
ELEVATION
s
SPI
CONTROL
EASTING
ST
S
L
PS
LT
CONTROL POINTS
NORTHING
t
o
R
R
PT
G
IN G
S
A IN
E N
R O
C TI
IN A
T
S
POINT
NO.
PSC
G
IN G
S
A IN
E N
R IO
C T
IN TA
S
s
PS
PT
R
s
PC
s
T = R TAN
=
s =
LENGTH OF SPIRAL (TS TO PSC)
2
AL
2
2
Dc- DEGREE OF CURVE
A - RATE OF CHANGE OF DEGREE OF CURVE PER 100-ft. OF LENGTH =
637,246.57
2,666,140.29
13.14
T - TANGENT LENGTH OF CIRCULAR CURVE = R TAN
L - LENGTH OF CIRCULAR CURVE =
5/8" REBAR
L =
Dc
x 100
-1
(50/R) = DEGREE OF CURVE
Dc = 2 SIN
(CHORD DEFINITION)
R - RADIUS OF CIRCULAR CURVE
CP-53
Dc
L
Dc
637,284.38
2,666,737.44
2,667,075.05
12.97
12.66
5/8" REBAR
5/8" REBAR
2 5
100 L - 0.000762A L
1
1
Y
=
3
3 7
0.291AL - 0.00000158A L
1
1
o
=
3
0.0727AL
1
t
=
2 5
50L - 0.000127A L
1
1
ST
=
x 100
Y
PSC - SPIRAL TO CURVE
SIN
s
PCS - CURVE TO SPIRAL
Y
LT
=
X TAN
PT - SPIRAL TO TANGENT
CP-56
637,237.56
2,667,781.86
11.80
5/8" REBAR
CP-57
637,255.97
2,668,655.11
11.31
5/8" REBAR
Dc
MAIN TAN PI - POINT OF INTERSECTION OF MAIN TANGENTS
(TS OUT)
- TANGENT LENGTH OF COMPLETE CURVE = (R+o) TAN + t
2
537,217.36
2,669,391.43
12.13
5/8" REBAR
CP-59
637,209.67
2,670,101.44
11.42
5/8" REBAR
CP-60
637,202.11
2,671,010.81
11.59
5/8" REBAR
CP-61
637,221.70
2,671,720.06
12.14
5/8" REBAR
CP-62
637,215.28
2,672,246.37
11.91
5/8" REBAR
CP-63
637,161.02
2,673,242.53
12.47
5/8" REBAR
B1
637,109.32
2,666,677.26
6.51
5/8" REBAR
B2
637,082.34
2,666,373.17
11.24
MAG NAIL
=
2 SIN
(50/R) =
DEGREE OF CURVE (CHORD DEFINITION)
L - TOTAL NO. OF STATIONS IN SPIRAL
1
SPI - SPIRAL POINT OF INTERSECTION
(WHEN SPIRALS OF EQUAL LENGTH
CP-58
s
-1
(TS IN)
ARE USED ON BOTH SIDES OF
NOTE: Dc,
CIRCULAR CURVE, SEE FIGURE C.
s,
, AND
ARE IN DEGREES.
ALL OTHERS DIMENSIONS ARE FEET.
FOR o AND t ).
DRAWN BY:
Office of Assistant Vice President
Engineering Design/Construction
HRD
CHECKED BY:
9/6/201
3
MJK
Default
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\G005.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
CP-55
637,272.60
=
2
PS - TANGENT TO SPIRAL
CP-54
X
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
DATE:
09/06/13
LOCATION & DESCRIPTION:
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET NUMBER
SHEET TITLE:
G 005 of006
CONTROL POINTS AND GEOMETRY
X:\20100S\20152.03\Eng_Docs\Sheets\G005.dgn
PROPOSED CURVE DATA
CURVE NO. DESCRIPTION
C-1
C-1
SPIRAL OUT
CURVE
3846'47"
DESIGN
DEGREE
1730'00"
115.68'
LENGTH
SPEED
ELEVATION
PC/TS/SC
328.68'
221.60'
30 MPH
TBD
STA 792+68.87
N 637,171.96
STA 793+84.55
N 637,249.33
STA 794+90.46
N 637,225.80
E 2,665,238.38
E 2,665,324.37
E 2,665.439.87
STA 795+05.14
STA 795+34.46
N 637,256.62
N 637,256.29
E 2,665,454.52
E 2,665,483.86
STA 865+10.62
N 637,179.33
STA 865+74.14
N 637,178.63
STA 866+37.61
N 637,182.15
E 2,672,459.59
E 2,672,523.11
E 2,672,586.54
44.00'
SHORT 14.67'
300'00"
63.53'
SUPER
RADIUS
LONG 29.34'
350'06"
348'35"
TANGENT
1910.08'
127.01'
30 MPH
3/4"
PI
PT/CS/ST
TRACK
SIDING
SIDING
SIDING
DRAWN BY:
- PRELIMINARY 9/6/201
3
NOT FOR CONSTRUCTION
Office of Assistant Vice President
Engineering Design/Construction
HRD
CHECKED BY:
MJK
Default
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\G006.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
C-2
CURVE
DELTA/
SPRIAL ANGLE
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
DATE:
09/06/13
LOCATION & DESCRIPTION:
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET NUMBER
SHEET TITLE:
G 006 of006
CURVE DATA
X:\20100S\20152.03\Eng_Docs\Sheets\G006.dgn
0
.
2
7
%
30
EL=15.
14
PVT=801+50.
00
EL=15.
29
PVI
=800+75.
00
EL=15.
33
PVC=800+00.
00
PT SW NO 10
EL 15.
36
PT SW NO 15
EL=15.
47
PVT=797+60.
00
EL=15.
57
EL 15.
71
PVI
=795+85.
00
PT SW NO 15
EL=16.
05
PVC=794+10.
00
20
EL=16.
44
PVI
=792+68.
87
30
20
-0.06%
0
.
2
0
%
10
10
Sag
EXISTING MAIN TRACK
TOP OF RAIL
PROPOSED SIDING
Crest
TRACK TOP OF RAIL
L=350
L=150
V/L=0.06
V/L=-0.09
14.
57
14.
65
1804+00
14.
84
1803+00
14.
75
14.
94
15.
04
1802+00
15.
23
15.
06
15.
10
1801+00
15.
33
1800+00
15.
39
TO (X) KCS (A)
IOWA JCT
TT EAST
1800+00
15.
24
M P 222.
71
PT SW .NO 10 RHPOTO
STA 1799+37
M P 222.
71
15.
26
POTO SPRG FROG
PT SW NO.15 RH
UPRR ROW
STA 1799+37.
79
MOUND
M P 222.
77
CONSTRUCT SIGNAL
PT SW NO.15 RH
MP 222.78
POTO SPRG FROG
1795+00
STA 1795+14
STA 1795+58.
91
TO (X) KCS (M)
DAWES
TT WEST
1799+00
15.
45
1798+00
15.
52
15.
50
15.
57
1797+00
15.
64
1796+00
15.
83
15.
66
15.
66
1795+00
16.
08
1794+00
16.
35
2
2
3
15.
69
1793+00
15.
93
1792+00
EX M AI
N T/
R
0
0
2
2
2
EXISTING GROUND
PR SI
DI
NG T/
R
EXISTING WYE TRACK
TOP OF RAIL
CONSTRUCT 150 TF 136#,
NEW CWR, WOOD TIES
SHIFT 807 TF
50% TIE RENEWAL
REMOVE 150 TF
20 '
100 '
SHIFT 475 TF
50% TIE RENEWAL
45'
60 '
L
A
Y
F
A
Y
E
T
T
ES
UBMA
I
NT
RA
CKWOODT
I
E1
3
6
#4
0MP
H
CP-51
SIDING TRACK WOOD TIE 136# 30 MPH
CP-52
CP-53
N
9/6/201
3
R = 328.68'
D = 1730'00"
EX CURVE
R = 328.68'
D = 1730'00"
REMOVE CULVERT
ACQUIRE R.O.W.
(2.30 AC.)
40"CM P
1801+32
M P 222.
65
STRAIGHT SIDE
REMOVE 360 TF
15'
SPRG FROG 136#, WOOD TIES,
CURVE 1
DELTA = 3846'47"
TBD SE = XX MPH
Default
45'
INSTALL NO 15 RHPO X-OVER
40"CM P
1799+20
M P 222.
71
PT CVE 1
795+34.
46
PCS CVE 1
46
794+90.
1
E
V .87
C 8
C +6
P 2
9
7
40"CM P
1793+66
M P 222.
81
UPRR ROW
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\P001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
SIGNAL HOUSE
REMOVE SCALE
REMOVE CULVERT
100
Office of Assistant Vice President
Engineering Design/Construction
HRD
MJK
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
200
SCALE IN FEET
CHECKED BY:
Alfred Benesch & Company
100
B2
DRAWN BY:
- PRELIMINARY NOT FOR CONSTRUCTION
0
DATE:
09/06/13
LOCATION & DESCRIPTION:
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET NUMBER
SHEET TITLE:
P001of007
TRACK PLAN & PROFILE
X:\20100S\20152.03\Eng_Docs\Sheets\P001.dgn
30
PT SW NO 10
EL=14.
28
PVT=807+75.
00
EL=14.
25
PVI
=806+00.
00
20
EL=14.
60
PVC=804+25.
00
30
20
EXISTING MAIN TRACK TOP OF RAIL
0.02%
EXISTING GROUND
10
10
PROPOSED SIDING
Sag
TRACK TOP OF RAIL
L=350
TO (X) KCS (M)
2
2
2
14.
44
14.
42
1816+00
14.
40
14.
36
14.
42
1815+00
14.
39
1814+00
14.
37
1813+00
14.
34
14.
35
1812+00
14.
32
14.
34
14.
30
14.
39
1811+00
14.
32
1810+00
14.
30
1809+00
14.
32
14.
29
1808+00
14.
15
14.
29
14.
29
1807+00
14.
35
14.
37
TO (X) KCS (A)
IOWA JCT
TT EAST
1815+00
1805+00
PT SW .NO 10 LHPOTO
STA 1808+00
M P 222.
53
DAWES
TT WEST
1810+00
14.
48
2
2
3
1806+00
14.
47
1805+00
14.
65
14.
57
1804+00
EX M AI
N T/
R
0
0
PR SI
DI
NG T/
R
V/L=0.06
SHIFT 877 TF 50% TIE RENEWAL
100 '
CP-54
REMOVE 73 TF
RY
T
NDUS
I
K
RAC
T
CP-55
60 '
MAIN TRACK 136#
SIDING TRACK 136#
N
20 '
15'
6,525 TF = CLEAR DISTANCE
100
B1
BRI
DGE TSGOD72
STA 1807+34
M P 222.
54
9/6/201
3
GAS LI
NE
STA 1804+92
M P 222.
59
UPRR ROW
Default
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\P002.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
UPRR ROW
0
100
200
CONSTRUCT 73 TF 136#, NEW CWR, WOOD TIES
SCALE IN FEET
DRAWN BY:
- PRELIMINARY -
MJK
NOT FOR CONSTRUCTION
Office of Assistant Vice President
Engineering Design/Construction
HRD
CHECKED BY:
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
DATE:
09/06/13
LOCATION & DESCRIPTION:
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET NUMBER
SHEET TITLE:
P002 of007
TRACK PLAN & PROFILE
X:\20100S\20152.03\Eng_Docs\Sheets\P002.dgn
30
EL=14.
49
PVT=819+49.
87
EL=14.
47
PVI
=818+99.
87
20
EL=14.
46
PVC=818+49.
87
30
PROPOSED SIDING
TRACK TOP OF RAIL
EXISTING MAIN
TRACK TOP OF RAIL
20
0.04%
EXISTING GROUND
10
10
Sag
L=100
REMOVE 116 TF
2
2
2
14.
83
14.
89
OH POW RERLI
NE
STA 1827+96
M P 222.
15
1825+00
1820+00
TO (X) KCS (M)
DAWES
TT WEST
1828+00
14.
79
14.
75
14.
69
1827+00
14.
75
1826+00
14.
71
14.
57
14.
45
1825+00
14.
67
1824+00
14.
63
1823+00
14.
41
14.
59
1822+00
14.
39
14.
55
14.
36
1821+00
14.
51
14.
38
14.
40
1820+00
14.
47
1819+00
14.
45
1818+00
14.
42
14.
54
2
2
3
14.
44
1817+00
14.
42
14.
44
1816+00
EX M AI
N T/
R
0
0
PR SI
DI
NG T/
R
V/L=0.02
TO (X) KCS (A)
IOWA JCT
TT EAST
CONSTRUCT 120' TF 136#, NEW CWR, WOOD TIES
UPPR ROW
100 '
REMOVE SIGNAL
CP-57
MAIN TRACK 136#
20'
UPPR ROW
N
REMOVE SIGNALS
15'
REMOVE SIGNAL BUNGALOW
100
PT SW NO 10 LHHTTO
STA 1818+86
M P 222.
32
BEGI
N CONT W ORK
END UPRR W ORK
STA 1816+50
9/6/201
3
Default
REMOVE FOOTBRIDGE
60 '
SIDING TRACK 136#
CP-56
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\P003.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
REMOVE 10 LHHTO
0
CONSTRUCT 5,029 TF 136# SH CWR WOOD TIES
MJK
NOT FOR CONSTRUCTION
Office of Assistant Vice President
Engineering Design/Construction
HRD
CHECKED BY:
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
200
SCALE IN FEET
DRAWN BY:
- PRELIMINARY -
100
DATE:
09/06/13
LOCATION & DESCRIPTION:
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET NUMBER
SHEET TITLE:
P003 of007
TRACK PLAN & PROFILE
X:\20100S\20152.03\Eng_Docs\Sheets\P003.dgn
30
EL=14.
86
PVT=829+50.
00
EL=14.
87
PVI
=829+00.
00
20
EL=14.
85
PVC=828+50.
00
30
PROPOSED SIDING
EXISTING MAIN
TRACK TOP OF RAIL
20
TRACK TOP OF RAIL
-0.02%
EXISTING GROUND
10
10
Crest
L=100
100 '
2
2
1
14.
73
1840+00
14.
64
1840+00
14.
66
14.
67
1839+00
2
2
2
14.
80
14.
68
1838+00
14.
70
14.
91
14.
72
M M 222.
00
14.
70
14.
74
TO (X) KCS (A)
IOWA JCT
TT EAST
1836+99
14.
92
1836+01.
01
DAWES
TT WEST
1837+00
MAIN TRACK 136#
SIDING TRACK 136#
CP-58
15'
20'
60 '
UPRR ROW
N
100
0
100
200
SCALE IN FEET
DRAWN BY:
- PRELIMINARY 9/6/201
3
NOT FOR CONSTRUCTION
Office of Assistant Vice President
Engineering Design/Construction
HRD
CHECKED BY:
MJK
Default
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\P004.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
1836+00
1835+00
TO (X) KCS (M)
UPRR ROW
Color table:UPRR.
tbl
1835+00
14.
76
1834+00
15.
02
15.
03
14.
78
1833+00
14.
80
1832+00
14.
99
14.
82
14.
94
14.
86
1830+00
2
2
3
1831+00
14.
85
1830+00
14.
86
1829+00
14.
90
14.
83
14.
89
1828+00
EX M AI
N T/
R
0
0
PR SI
DI
NG T/
R
V/L=-0.06
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
DATE:
09/06/13
LOCATION & DESCRIPTION:
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET NUMBER
SHEET TITLE:
P004 of007
TRACK PLAN & PROFILE
X:\20100S\20152.03\Eng_Docs\Sheets\P004.dgn
30
EL=14.
87
PVC=851+00.
00
EL=15.
01
PVT=850+00.
00
EL=15.
23
PVI
=848+50.
00
EL=14.
99
PVC=847+00.
00
EL=14.
79
PVT=845+75.
00
EL=14.
55
PVI
=844+25.
00
20
EL=14.
58
PVC=842+75.
00
30
20
0
.
1
5
%
%
6
1
.
0
10
10
Sag
Crest
Sag
L=300
L=300
L=250
V/L=0.06
V/L=-0.10
TRACK TOP OF RAIL
DAWES
TT WEST
14.
63
14.
75
1852+00
14.
87
14.
77
15.
01
14.
69
1851+00
TO (X) KCS (A)
1850+00
TO (X) KCS (M)
1850+00
15.
11
15.
45
14.
91
1849+00
15.
10
1848+00
14.
99
1847+00
15.
20
14.
83
14.
76
14.
54
1846+00
1845+00
14.
69
1845+00
14.
60
1844+00
14.
53
14.
58
1843+00
EX M AI
N T/
R
0
14.
50
14.
50
14.
59
1842+00
14.
62
1841+00
2
2
2
14.
64
1840+00
14.
69
0
14.
73
V/L=0.06 V/L=0.06
2
2
1
PROPOSED SIDING
PR SI
DI
NG T/
R
EXISTING GROUND
EXISTING MAIN
TRACK TOP OF RAIL
IOWA JCT
TT EAST
100 '
MAIN TRACK 136#
SIDING TRACK 136#
CP-59
60 '
CP-60
20'
UPRR ROW
GAS LI
NE
STA 1851+33
M P 221.
72
15'
N
100
0
100
200
SCALE IN FEET
DRAWN BY:
- PRELIMINARY 9/6/201
3
NOT FOR CONSTRUCTION
Office of Assistant Vice President
Engineering Design/Construction
HRD
CHECKED BY:
MJK
Default
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\P005.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
UPRR ROW
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
DATE:
09/06/13
LOCATION & DESCRIPTION:
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET NUMBER
SHEET TITLE:
P005 of007
TRACK PLAN & PROFILE
X:\20100S\20152.03\Eng_Docs\Sheets\P005.dgn
EXISTING MAIN
TRACK TOP OF RAIL
EL=14.
69
PVC=864+00.
00
EL=14.
69
PVT=853+50.
00
20
EL=14.
69
PVI
=852+25.
00
30
30
20
0.00%
10
10
PROPOSED SIDING
EXISTING GROUND
Sag
TRACK TOP OF RAIL
L=250
2
2
1
14.
27
14.
69
1864+00
14.
69
1863+00
14.
60
14.
46
14.
69
1862+00
14.
69
1861+00
14.
55
14.
69
14.
53
14.
69
14.
74
14.
69
14.
61
1860+00
TO (X) KCS (A)
IOWA JCT
TT EAST
STA 1861+32 - STA 1863+52
50 '
100 '
JACK & BORE 36" SSP CUVERT - 220 LF
CP-61
CP-62
MAIN TRACK 136#
SIDING TRACK 136#
15'
FI
BER OPTI
C LI
NE
STA 1861+37
M P 221.
53
OH POW ERLI
NE
STA 1858+28
M P 221.
59
20'
60 '
N
OH POW ERLI
NE
STA 1857+84
M P 221.
60
9/6/201
3
Default
15'
UPRR ROW
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\P006.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
UPRR ROW
Color table:UPRR.
tbl
1859+00
1857+34.
55
DAWES
TT WEST
1858+00
1860+00
1855+00
TO (X) KCS (M)
1857+00
51
M M 221.
50 14.
14.
69
14.
69
1856+00
14.
46
14.
60
14.
69
1855+00
14.
69
14.
79
1854+00
14.
69
14.
70
14.
75
1853+00
2
2
2
14.
63
1852+00
EX M AI
N T/
R
0
0
PR SI
DI
NG T/
R
V/L=0.06
V/L=0.06
EX BUILDING
ACQUIRE R.O.W.
100
100
200
SCALE IN FEET
DRAWN BY:
- PRELIMINARY -
Office of Assistant Vice President
Engineering Design/Construction
HRD
CHECKED BY:
MJK
NOT FOR CONSTRUCTION
0
(0.32 AC.)
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
DATE:
09/06/13
LOCATION & DESCRIPTION:
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET NUMBER
SHEET TITLE:
P006 of007
TRACK PLAN & PROFILE
X:\20100S\20152.03\Eng_Docs\Sheets\P006.dgn
LA 378
EL = 13.
20
EL = 13.
72
PT SW NO 15
PVI
=868+04.
02
EL=14.
00
30
EL=14.
38
PVT=866+50.
00
20
EL=14.
69
PVI
=865+25.
00
EL=14.
69
PVC=864+00.
00
30
EXISTING MAIN
TRACK TOP OF RAIL
20
0
.
2
5
%
10
10
EXISTING GROUND
Crest
L=250
2
2
1
12.
70
1876+00
12.
77
1875+00
12.
90
1874+00
13.
04
1875+00
TO (X) KCS (A)
IOWA JCT
TT EAST
BRI
DGE PCB60
STA 1875+00
M P 221.
22
13.
17
1873+00
PUBLI
C CROSSI
NG
SAM PSON ST
1872+54
M P 221.
25
DOT NO.76296 1K
13.
33
1870+35.
11
UPRR ROW
50 '
300'
100 '
1870+00
M P 221.
37
1872+00
60 '
5'
STA 1869+14
SIGNAL MOUND
PT SW NO 15 LHPOTO
CONSTRUCT
1871+00
OVERHEAD GAS LI
NE
STA 1870+98
M P 221.
27
M M 221.
25
13.
70
1870+00
13.
49
1869+00
14.
01
14.
07
14.
26
14.
29
DAWES
TT WEST
BEGI
N UPRR W ORK
TO (X) KCS (M)
END CONT.W ORK
FROG 136#, WOOD TIES, CURVE SIDE
STA 1866+78
1865+00
INSTALL NO. 15 LHPO TURNOUT SPRG
MP 221.46
45'
MAIN TRACK 136#
SIDING TRACK 136#
R = 1910.08'
D = 30'00"
3/4" = 30MPH
100 '
N
UPRR ROW
CONSTRUCT 56 TF 136#,
CWR, WOOD TIES
15'
PT CVE 2
61
866+37.
PC CVE 2
865+10.
62
CURVE 1
DELTA = 345'54"
I-10 RAMPS
STA 1869+59
MP 221.36
100
9/6/201
3
0
100
200
SCALE IN FEET
CONSTRUCT
SIGNAL MOUND
DRAWN BY:
- PRELIMINARY NOT FOR CONSTRUCTION
Office of Assistant Vice President
Engineering Design/Construction
HRD
CHECKED BY:
MJK
Default
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\P007.
dgn
CP-63
LA 378
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
1868+00
REMOVE 180 TF
STA 1865+05
Color table:UPRR.
tbl
1867+00
14.
49
14.
41
14.
40
2
2
2
1866+00
14.
64
1865+00
14.
69
14.
27
1864+00
EX M AI
N T/
R
0
0
PR SI
DI
NG T/
R
V/L=-0.10
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
DATE:
09/06/13
LOCATION & DESCRIPTION:
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET NUMBER
SHEET TITLE:
P007 of007
TRACK PLAN & PROFILE
X:\20100S\20152.03\Eng_Docs\Sheets\P007.dgn
C
L
C
L
EXISTING MAIN TRACK
PROPOSED SIDING TRACK
20' AND VARIES
26.5' TYP
3'& VAR.
10'
10'
ACCESS PAD
9'
1'
3
:
1
10' & VARIES
3
:
1
2%
3.
38'@ CL
SUBEXCAVATION
6" AND VARIES
(SEE TABLE 1)
12" BALLAST
1
2:
2:
1
6" MIN TOPSOIL
SEED & MULCH
12" SUBBALLAST
LIMITS OF TOPSOIL EXCAVATION
CONSTRUCT SIDING TRACK
C
L
EXISTING MAIN
TRACK
STA. 1816+50 TO STA. STA 1869+14
C
C
L
L
EXISTING SIDINGPROPOSED SIDING
TRACK
TRACK
20'
26.5' TYP
10'
3'& VAR.
16' AND VARIES
10'
ACCESS PAD
1'
10' & VARIES
3
:
1
2%
12" BALLAST
1
2:
2:
1
12" SUBBALLAST
6" MIN TOPSOIL
SEED & MULCH
LIMITS OF TOPSOIL EXCAVATION
SHIFTING SIDING TRACK
STA. 1794+69 TO STA. STA 1816+50
DRAWN BY:
- PRELIMINARY 9/6/201
3
NOT FOR CONSTRUCTION
Office of Assistant Vice President
Engineering Design/Construction
HRD
CHECKED BY:
MJK
Default
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\T001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
3
:
1
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
DATE:
09/06/13
LOCATION & DESCRIPTION:
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET NUMBER
SHEET TITLE:
T001of002
TYPICAL SECTIONS
X:\20100S\20152.03\Eng_Docs\Sheets\T001.dgn
C
L
EXISTING
GRANULAR
SOILS
PLACE DRAIN
BELOW EXISTING
GRANULAR SOILS
12"M I
N
EXISTING
COHESIVE
SOILS
2
% MI
N
6" TRACK SUBDRAIN
SPACED 25' ON CENTER
AS DIRECTED BY THE ENGINEER
TRANSVERSE DRAINS
TABLE 1
OFFSET
NOTE
BORING
STATION
OFFSET
NOTE
6"TYP
STATION
1:1 MAX SLOPE
BENCHING DETAIL
NOTE: SEE GEOTECHNICAL ENGINEERING REPORT FOR MORE INFORMATION
a
GRANULAR MATERIAL IN EMBANKMENT MIGHT REQUIRE INSTALLATION OF TRANSVERSE
DRAINS THRU NEW EMBANKMENT CONSTRUCTED OF COHESIVE FILL MATERIALS.
b
CULVERT EXTENSION OR NEW LOCATION. SEE RECOMMENDATION 4.
c
DEPTH OF EXCAVATION SHOULD EXTEND 0.5 FEET BELOW PROPOSED
FINISHED TRACK SUBGRADE ELEVATION.
d
EXCAVATE TO 1.0 FT. BELOW FINISHED SUBGRADE, REWORK RESULTANT
UPPER 6 INCHES & REPLACE W/ APPROVED FILL MATERIAL.
e
LOCATION THAT MIGHT REQUIRE SUBGRADE STABILIZATION OR DEWATERING
9/6/201
3
DURING AND FOLLOWING RAINY SEASONS. SEE RECOMMENDATION 5.
Default
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\T002.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
BORING
f
OVER-EXCAVATE FOR TRACK SUBGRADE ELASTIC UNIFORMITY.
SEE RECOMMENDATION 3.
DRAWN BY:
- PRELIMINARY -
MJK
NOT FOR CONSTRUCTION
Office of Assistant Vice President
Engineering Design/Construction
HRD
CHECKED BY:
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
DATE:
09/06/13
LOCATION & DESCRIPTION:
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET NUMBER
SHEET TITLE:
T002 of002
TYPICAL SECTIONS
X:\20100S\20152.03\Eng_Docs\Sheets\T002.dgn
9/6/201
3
Default
1794+69
14.
69
15.
14
15.
12
14.
99
14.
90
14.
71
14.
13
14.
10
13.
30
13.
11
13.
55
13.
89
11.
04
11.
42
12.
21
12.
07
11.
68
9.
54
8.
44
10.
44
10.
99
11.
55
12.
45
13.
88
14.
01
14.
04
16.
93
19.
54
20.
34
27.
73
27.
94
28.
51
31.
03
31.
12
39.
33
41.
34
46.
33
52.
58
66.
34
100.
00
100.
00
84.
44
75.
38
55.
02
46.
32
27.
07
19.
86
16.
07
13.
59
9.
46
8.
74
8.
63
NOT FOR CONSTRUCTION
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
1794+94
10
25
20
20
15
15
15
15
10
10
10
10
5
5
0
0
-5
Fi
ber
21.
22 Ex.Tr
ack
15.
62 T/
R
20
30
40
DATE:
MJK
09/06/13
X001of 027
56.
79 11.
75
14.
94
14.
99
14.
95
14.
85
14.
81
14.
64
4.
47
17.
09
19.
35
25.
03
25.
24
26.
06
50
60
DRAWN BY:
CHECKED BY:
HRD
11.
41
100.
00
60
11.
09
50
71.
02
13.
98
14.
94
4.
43
29.
71
14.
94
4.
39
14.
02
14.
94
4.
52
14.
07
14.
94
4.
53
29.
36
14.
83
5.
56
29.
09
14.
01
14.
82
12.
36
5.
58
12.
35
13.
49
8.
76
12.
29
13.
55
8.
79
48.
51
14.
93
10.
95
40
R /W
R /W
46.
50 11.
95
31.
22 12.
26
10.
00 12.
08
20.
92 11.
86
27.
25 8.
69
11.
60
71.
61
65.
48
30
11.
41
25
20.
98 Pr
op.Tr
ack
15.
84 T/
R
38.
39 9.
26
37.
25 8.
69
12.
15
84.
60
20
100.
00
0
11.
04
-10
66.
85
-20
12.
98
-30
14.
04
-40
39.
19
Area6.10 Fill
-50
29.
49
Volume2.84 Fill
-60
14.
38
-70
1795+00
14.
65
Area47.32 Cut
10
27.
69
-80
0
26.
33
-90
-10
14.
83
Volume20.31 Cut
-20
14.
88
-100
-30
25.
53
-20
-40
25.
35
-15
Area0.99 Fill
-50
15.
02
-15
Volume0.79 Fill
-60
15.
00
100
-10
-70
18.
32
90
-10
Area64.47 Cut
17.
35
-15
-5
-80
14.
93
30
0.
00 Ex.Tr
ack
15.
66 T/
R
45
-90
16.
81
30
Mass Haul0.00 C.Y.
Volume12.42 Cut
14.
64
80
100
12.
29
-100
6.
88
70
90
100.
00
-20
14.
94
60
80
35
30
30
25
25
20
20
15
15
15
15
10
10
10
10
5
5
0
0
-5
Fi
ber
22.
26 Ex.Tr
ack
15.
66 T/
R
Fi
ber
20.
89 Ex.Tr
ack
15.
60 T/
R
0.
00 Ex.Tr
ack
15.
66 T/
R
R /W
20.
69 Pr
op.Tr
ack
15.
83 T/
R
R /W
R /W
R /W
R /W
21.
97 Pr
op.Tr
ack
15.
87 T/
R
35
R /W
40
40
0.
00 Ex.Tr
ack
15.
66 T/
R
-20
R /W
58.
94
70
-15
14.
93
50
11.
41
11.
17
57.
90
60
-15
14.
94
40
100.
00
11.
12
10.
96
56.
99
50
R /W
63.
03 11.
73
14.
07
13.
79
33.
04
40
-10
4.
43
30
30.
08
30
-10
3.
93
35
R /W
14.
84
-20
-5
4.
52
20
14.
30
14.
94
26.
37
26.
73
5
14.
82
10
14.
68
15.
00
20
29.
06
15.
08
22.
83
10
27.
22
14.
39
18.
28
0
40.
00 12.
19
33.
63 12.
31
14.
24
13.
89
25
Fi
ber
14.
16
12.
96
30
14.
83
25
35
23.
34 Pr
op.Tr
ack
15.
90 T/
R
14.
08
12.
48
35
45
Mass Haul15.10 C.Y.
5.
51
30
40
23.
63 Ex.Tr
ack
15.
70 T/
R
14.
94
14.
92
2.
76
4.
44
14.
92
4.
52
1794+81
11.
48
14.
83
5.
37
40
5.
56
0
14.
21
-10
10.
44
-10
14.
91
-5
14.
94
0
4.
44
5
14.
91
35
40
0.
00 Ex.Tr
ack
15.
66 T/
R
14.
12
14.
80
8.
21
-10
1.
68
-20
5.
57
12.
71
14.
02
10.
55
19.
63
-20
4.
52
-30
13.
50
8.
81
30.
41
-15
14.
77
-40
8.
63
8.
65
31.
77
-10
14.
84
Area0.00 Fill
-50
14.
20
Volume0.00 Fill
-60
-30
13.
71
9.
20
-5
5.
57
-70
-40
7.
82
Area36.62 Cut
-50
11.
43
8.
95
41.
37
39.
00
0
5.
24
Volume0.00 Cut
-60
14.
02
-80
-70
13.
15
11.
97
18.
02
11.
34
78.
53
Area5.71 Fill
8.
53
10.
99
26.
17
-90
-80
13.
24
11.
27
29.
88
11.
86
83.
43
-90
12.
41
10.
56
36.
57
11.
92
11.
88
84.
11
Area37.06 Cut
Volume1.27 Fill
12.
95
12.
59
68.
10
-100
88.
26
12.
09
100.
00
Volume16.37 Cut
13.
81
11.
72
88.
33
40
45
R /W
-100
15.
30
12.
13
20
12.
16
45
97.
62
20
100.
00
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
45
Mass Haul44.21 C.Y.
40
35
30
25
70
70
20
5
0
-5
-10
-15
80
80
90
90
100
-20
Mass Haul32.57 C.Y.
45
40
35
30
25
20
5
0
-5
-10
-15
100
-20
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1794+69 TO STA.1795+00
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
33.
34 8.
77
63.
93 11.
58
47.
19 11.
92
30.
89 12.
25
10.
00 12.
08
22.
96 11.
82
29.
17 8.
71
39.
17 8.
71
40.
91 9.
58
49.
65 11.
94
43.
12 12.
07
32.
26 12.
29
10.
00 12.
08
16.
50 11.
95
23.
10 8.
65
33.
10 8.
65
9/6/201
3
Default
12.
23
11.
72
11.
41
9.
14
11.
90
12.
35
12.
45
13.
99
14.
76
72.
80
68.
50
50.
68
24.
25
13.
59
13.
14
8.
68
5.
70
11.
41
13.
38
13.
32
13.
02
12.
50
11.
07
9.
98
10.
93
12.
38
13.
02
13.
91
14.
35
14.
77
14.
83
14.
93
14.
93
14.
92
14.
90
14.
93
100.
00
99.
79
99.
01
80.
20
62.
52
52.
40
47.
58
13.
81
10.
77
8.
21
6.
49
5.
61
5.
05
4.
53
0.
30
4.
47
8.
51
15.
34
-15
-15
-20
-20
-100
-90
-80
NOT FOR CONSTRUCTION
Volume73.26 Cut
Area78.62 Cut
-70
Volume0.04 Fill
Area0.05 Fill
-60
-50
-40
-30
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
-20
-10
12.
01
12.
42
12.
44
12.
42
12.
43
15.
89
14.
64
14.
21
14.
10
14.
06
0
1795+46
10
14.
92
14.
89
14.
85
14.
85
14.
85
14.
68
14.
44
14.
43
14.
43
14.
39
13.
44
13.
39
12.
28
12.
16
11.
82
4.
51
4.
51
13.
26
13.
29
13.
30
21.
34
22.
06
22.
08
22.
08
22.
17
24.
45
25.
03
39.
40
45.
91
100.
00
14.
92
4.
55
14.
71
5.
68
14.
71
14.
20
6.
73
14.
74
13.
80
7.
56
5.
50
13.
80
7.
56
5.
67
13.
67
13.
80
7.
57
1796+00
8.
17
10
20
30
20
40
30
40
DATE:
MJK
09/06/13
X002of 027
50
50
60
25
25
20
20
15
15
15
15
10
10
10
10
60
DRAWN BY:
CHECKED BY:
HRD
R /W
9.
79
44.
39
0
R /W
12.
59
66.
23
-10
46.
50 11.
83
29.
35 12.
17
13.
48
68.
48
-20
Fi
ber
30
20.
00 Pr
op.Tr
ack
15.
74 T/
R
10.
00 12.
04
13.
75
69.
54
-30
16.
50 11.
91
13.
93
70.
10
8.
58
14.
25
71.
35
33.
19
14.
35
71.
84
-40
22.
58 8.
87
32.
58 8.
87
37.
56 11.
36
14.
47
14.
46
81.
04
14.
22
14.
40
81.
72
81.
89
14.
14
82.
66
82.
39
14.
01
14.
09
13.
36
82.
98
13.
05
86.
57
Area0.00 Fill
-50
70
70
80
80
90
90
11.
45
-10
Volume0.05 Fill
-60
11.
46
-10
-70
98.
84
-5
Area11.76 Cut
100.
00
-5
-80
13.
12
0
-90
13.
75
0
Volume90.38 Cut
33.
90
5
83.
45
-100
27.
10
5
89.
76
100
12.
09
Fi
ber
17.
54 Ex.Tr
ack
15.
35 T/
R
0.
00 Ex.Tr
ack
15.
57 T/
R
-20
100.
00
-20
R /W
11.
41
-15
14.
21
100
-15
14.
54
90
-10
26.
02
-20
-10
14.
66
5
-5
19.
35 Ex.Tr
ack
15.
49 T/
R
30
Mass Haul60.62 C.Y.
-5
23.
67
80
90
0
24.
23
70
100.
00
80
0
14.
77
60
70
5
23.
33
50
60
11.
25
50
85.
84
-20
5
14.
85
40
71.
11 11.
42
12.
78
40
R /W
64.
04
13.
61
31.
42
Fi
ber
5
0.
00 Ex.Tr
ack
15.
62 T/
R
35
R /W
46.
98 11.
91
14.
11
13.
90
14.
60
25.
23
20.
18 Ex.Tr
ack
15.
55 T/
R
0.
00 Ex.Tr
ack
15.
64 T/
R
40
35
35
30
30
25
25
20
20
15
15
15
15
10
10
10
10
R /W
R /W
20.
00 Pr
op.Tr
ack
15.
64 T/
R
R /W
R /W
R /W
20.
22 Pr
op.Tr
ack
15.
78 T/
R
R /W
40
Mass Haul106.11 C.Y.
19.
66
30
100.
00
20
28.
33
14.
76
24.
40
30
11.
13
10
27.
84
14.
82
24.
25
20
75.
25
13.
99
29.
07
25
Fi
ber
30.
68 12.
23
14.
92
14.
85
14.
93
14.
96
14.
94
2.
52
4.
45
22.
61
14.
94
10
13.
91
14.
04
28.
93
30
40
35
20.
48 Pr
op.Tr
ack
15.
82 T/
R
14.
89
4.
77
4.
53
25
13.
67
14.
63
0
6.
32
14.
80
5.
59
0
16.
29
14.
61
30
39.
00
14.
83
20.
68 Ex.Tr
ack
15.
58 T/
R
13.
96
1795+21
5.
99
35
29.
93
14.
84
24.
81
25.
82
1795+06
24.
85
-10
14.
85
-20
24.
37
-30
14.
98
-40
16.
86
Area0.03 Fill
-50
14.
93
Volume0.11 Fill
-60
5.
00
-15
14.
94
-10
14.
94
-5
0.
00 Ex.Tr
ack
15.
65 T/
R
0
4.
43
-70
-10
3.
86
Area84.22 Cut
-20
14.
82
-80
-30
14.
94
Volume16.52 Cut
-40
8.
50
Area0.03 Fill
-50
12.
37
Volume0.02 Fill
-60
12.
66
10.
91
47.
54
-15
14.
93
-90
-70
13.
67
10.
02
56.
12
Area79.62 Cut
12.
25
10.
76
61.
90
-80
10.
00 12.
07
12.
39
84.
56
-10
4.
52
-100
-90
25.
00 11.
77
12.
44
85.
13
Volume45.51 Cut
31.
08 8.
74
12.
45
85.
58
-100
41.
08 8.
74
43.
41 9.
90
12.
72
100.
00
-5
5.
57
35
40
R /W
0
4.
60
20
84.
76
40
12.
37
20
100.
00
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
Mass Haul269.66 C.Y.
40
35
30
25
20
5
0
-5
-10
-15
100
-20
Mass Haul179.33 C.Y.
40
35
30
25
20
5
0
-5
-10
-15
100
-20
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1795+06 TO STA.1796+00
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
45.
39 11.
01
46.
50 11.
73
27.
54 12.
11
46.
72 11.
87
30.
18 12.
21
10.
00 12.
06
25.
00 11.
76
30.
95 8.
79
40.
95 8.
79
9/6/201
3
Default
11.
84
11.
64
10.
33
11.
16
12.
53
11.
99
14.
00
14.
08
14.
08
14.
16
13.
13
13.
13
13.
12
13.
12
86.
28
83.
34
54.
30
46.
36
45.
33
37.
87
37.
59
37.
37
29.
45
12.
44
12.
23
12.
15
12.
14
NOT FOR CONSTRUCTION
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
1799+00
DATE:
MJK
09/06/13
X003of 027
40
50
R /W
R /W
66.
16 10.
31
62.
50 8.
48
14.
30
14.
35
14.
35
14.
38
14.
38
14.
38
4.
69
4.
47
4.
47
4.
47
4.
51
4.
53
60
70
DRAWN BY:
CHECKED BY:
HRD
80
11.
38
22.
51
80
11.
14
12.
62
12.
60
22.
33
70
97.
70
13.
40
60
93.
16
13.
41
13.
40
19.
42
20.
31
19.
41
20.
27
13.
90
11.
57
20.
28
13.
91
13.
92
13.
90
11.
55
50
11.
63
10.
10
60.
47
30
52.
50 8.
48
14.
15
6.
56
40
100.
00
10.
19
59.
99
20
46.
50 11.
48
25.
48 11.
90
14.
06
7.
56
30
11.
29
9.
94
49.
86
Fi
ber
20.
00 Pr
op.Tr
ack
15.
39 T/
R
7.
87
20
93.
39
12.
21
44.
45
10
13.
06
0
23.
38
15.
48 Ex.Tr
ack
14.
81 T/
R
10.
32
1800+00
13.
82
-10
10
13.
40
-20
0
22.
53
-30
-10
20.
70
Area0.12 Fill
-40
14.
08
Volume81.89 Fill
-50
14.
09
-60
20.
37
-70
20.
38
Area39.09 Cut
14.
15
-80
20.
27
-90
14.
20
Volume85.65 Cut
11.
59
-100
14.
14
-20
14.
14
-15
0.
00 Ex.Tr
ack
15.
24 T/
R
-15
11.
40
100
-10
14.
43
90
-10
4.
81
-15
-5
11.
33
-5
14.
54
0
5.
91
0
14.
54
5
-20
5.
98
5
-30
14.
54
10
-40
5.
98
10
-50
14.
52
10
14.
07
15
-60
6.
01
15
Area0.00 Fill
13.
89
15
Volume0.23 Fill
13.
69
20
-70
7.
56
20
Area72.84 Cut
8.
43
25
-80
10.
11
40
-90
12.
03
25
Mass Haul341.92 C.Y.
Volume207.27 Cut
11.
03
80
100
58.
41
11.
63
100.
00
-100
22.
42
70
90
63.
04
11.
73
91.
65
-20
25.
35
60
80
R /W
R /W
20.
00 Pr
op.Tr
ack
15.
45 T/
R
35
35
30
30
25
25
20
20
15
15
15
10
10
10
5
5
0
0
-5
Fi
ber
15.
31 Ex.Tr
ack
14.
55 T/
R
R /W
R /W
20.
00 Pr
op.Tr
ack
15.
33 T/
R
R /W
40
0.
00 Ex.Tr
ack
15.
10 T/
R
-20
7.
96
50
70
-15
34.
49
9.
65
64.
92
40
60
-15
7.
31
10.
38
66.
59
30
50
-10
9.
94
7.
70
43.
29
40
-10
90.
62
7.
99
39.
59
-20
-5
10.
49
10.
94
37.
35
Fi
ber
5
100.
00
12.
73
10
R /W
13.
24
26.
24
30
R /W
13.
78
15.
36 Ex.Tr
ack
15.
08 T/
R
15
7.
32
10.
74
81.
00
30
R /W
46.
50 11.
61
14.
06
19.
81
23.
31
14.
35
11.
09
21.
93
14.
53
11.
08
20.
90
14.
53
5.
08
40
55.
19
11.
01
100.
00
30
Fi
ber
14.
48
5.
11
14.
35
14.
58
5.
15
0.
00 Ex.Tr
ack
15.
26 T/
R
Mass Haul324.02 C.Y.
56.
78
11.
98
20
100.
00
10
13.
09
0
42.
87
-10
13.
41
-10
13.
26
-5
20
26.
67
0
14.
01
5
10
14.
35
14.
58
5.
18
0
19.
83
14.
58
5.
96
-10
19.
83
14.
75
6.
07
-15
23.
86
26.
28 12.
01
14.
61
14.
73
6.
50
14.
62
1798+00
6.
64
-10
21.
61
14.
47
20.
30
14.
60
7.
49
-5
14.
47
14.
54
14.
99
25
35
20.
00 Pr
op.Tr
ack
15.
52 T/
R
14.
58
7.
96
0
16.
28 Ex.Tr
ack
15.
17 T/
R
14.
43
14.
80
25
14.
16
14.
58
12.
28
12.
85
25.
30
30
21.
26
14.
58
12.
28
30
35
0.
00 Ex.Tr
ack
15.
50 T/
R
10.
70
39.
42
R /W
35
20.
30
14.
82
1797+00
3.
97
-20
14.
82
-30
14.
82
-40
4.
02
Area0.00 Fill
-50
1.
45
Volume0.00 Fill
-60
-20
14.
82
-70
-30
14.
85
Area27.27 Cut
-40
4.
03
Volume72.27 Cut
-50
7.
15
-80
-60
13.
70
-90
-70
8.
01
8.
47
58.
85
Area44.10 Fill
8.
02
11.
53
66.
13
-80
10.
48
-100
-90
56.
73
11.
19
95.
04
Area7.16 Cut
Volume81.66 Fill
57.
81
11.
16
100.
00
Volume63.76 Cut
13.
14
35
40
R /W
-100
12.
09
20
11.
79
40
97.
67
20
100.
00
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
68.
95 11.
64
62.
50 8.
42
52.
50 8.
42
46.
50 11.
42
25.
31 11.
84
64.
34 9.
46
62.
50 8.
54
52.
50 8.
54
46.
50 11.
54
25.
36 11.
96
Mass Haul534.82 C.Y.
40
35
30
25
20
5
0
-5
-10
-15
90
100
-20
Mass Haul327.78 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
90
100
-20
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1797+00 TO STA.1800+00
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
9/6/201
3
Default
9.
73
10.
08
7.
81
13.
74
14.
09
14.
16
14.
19
14.
34
14.
35
14.
35
14.
38
14.
35
13.
90
13.
89
13.
89
13.
40
13.
40
13.
37
12.
62
11.
91
11.
27
11.
37
8.
65
8.
54
9.
54
9.
63
9.
52
9.
52
6.
59
62.
47
58.
18
9.
54
6.
78
6.
50
6.
41
4.
49
4.
46
4.
23
4.
50
4.
74
11.
53
19.
10
19.
43
20.
25
20.
27
20.
34
22.
34
64.
55
95.
66
97.
58
100.
00
98.
11
58.
12
54.
34
53.
24
52.
12
37.
53
1800+03
NOT FOR CONSTRUCTION
Area68.47 Fill
-50
-40
-30
-20
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
-10
0
10
1801+00
20
30
40
DATE:
MJK
09/06/13
X004of 027
25
25
20
20
15
15
15
10
10
10
5
5
5
0
0
0
-5
Fi
ber
15.
28 Ex.Tr
ack
14.
27 T/
R
50
R /W
R /W
20.
00 Pr
op.Tr
ack
15.
23 T/
R
63.
45 8.
79
62.
50 8.
32
52.
50 8.
32
46.
50 11.
32
25.
28 11.
74
13.
08
12.
59
21.
11
22.
40
9.
10
9.
71
8.
50
8.
54
6.
45
10.
02
11.
45
12.
83
13.
18
74.
21
62.
48
50.
45
40.
03
23.
14
13.
99
9.
52
8.
65
10.
88
100.
00
10.
83
97.
53
100.
00
10.
73
13.
36
20.
25
88.
79
13.
45
20.
04
11.
75
13.
76
19.
51
72.
58
13.
80
16.
28
60
70
DRAWN BY:
CHECKED BY:
HRD
80
9.
15
80
100.
00
70
8.
99
60
87.
62
8.
67
7.
78
44.
85
59.
19
12.
02
38.
02
10.
61
12.
02
52.
35
13.
51
13.
48
30.
47
13.
71
11.
43
19.
68
14.
10
7.
32
16.
83
14.
32
14.
10
3.
20
14.
23
14.
35
4.
48
6.
80
14.
36
5.
34
5.
75
14.
08
5.
47
4.
46
13.
91
14.
03
5.
84
50
90
90
9.
22
Volume91.30 Fill
-60
40
9.
18
-70
30
97.
66
Area5.81 Cut
20
100.
00
-80
1801+15
8.
77
-90
10
8.
83
Volume110.91 Cut
0
61.
40
-100
-10
60.
35
-25
-20
7.
37
-20
-30
58.
09
-20
-40
4.
05
30
0.
00 Ex.Tr
ack
15.
06 T/
R
-15
Area20.56 Fill
-50
49.
29
100
-15
Volume24.73 Fill
-60
9.
33
90
-10
-70
11.
04
80
-10
Area21.17 Cut
11.
05
70
-5
-80
40.
79
30
R /W
40
-90
37.
86
60
100
Volume7.49 Cut
37.
80
35
R /W
69.
29 11.
81
13.
80
11.
40
-100
13.
50
50
62.
50 8.
42
14.
37
14.
10
-20
13.
55
40
Fi
ber
15.
30 Ex.Tr
ack
14.
47 T/
R
Fi
ber
15.
29 Ex.Tr
ack
14.
28 T/
R
0.
00 Ex.Tr
ack
15.
04 T/
R
-20
14.
72
30
-15
19.
66
20
-15
13.
68
10
-10
11.
32
0
-10
14.
32
-20
-5
4.
65
5
35
Mass Haul543.18 C.Y.
R /W
R /W
20.
00 Pr
op.Tr
ack
15.
31 T/
R
R /W
R /W
20.
00 Pr
op.Tr
ack
15.
20 T/
R
R /W
-5
14.
32
-10
90
0
14.
34
-20
80
0
4.
64
-15
70
5
14.
34
-10
60
5
4.
45
-5
50
10
4.
38
25
40
10
14.
37
30
30
15
4.
48
-30
1800+28
20
15
14.
04
0
10
20
5.
47
-40
0
20
14.
04
Area0.00 Fill
-50
-10
25
5.
49
Volume0.00 Fill
-60
-20
25
13.
19
-70
-30
7.
03
-20
30
8.
76
Area77.67 Cut
-40
4.
49
0.
00 Ex.Tr
ack
15.
09 T/
R
-15
30
13.
18
Volume8.36 Cut
-50
14.
35
-60
14.
36
5
35
8.
81
-80
-70
14.
26
Area0.00 Fill
2.
01
10
35
11.
21
-90
-80
4.
47
40
11.
50
-100
-90
4.
74
Area77.37 Cut
Volume0.00 Fill
14.
15
Volume71.78 Cut
6.
18
-10
R /W
13.
91
7.
08
-5
52.
50 8.
42
13.
09
10.
01
25
46.
50 11.
42
9.
46
39.
11
30
Fi
ber
25.
31 11.
84
7.
36
56.
33
-100
20.
00 Pr
op.Tr
ack
15.
33 T/
R
8.
16
57.
85
0
15.
31 Ex.Tr
ack
14.
54 T/
R
8.
04
66.
88
R /W
35
40
14.
30
35
40
0.
00 Ex.Tr
ack
15.
10 T/
R
9.
97
100.
00
Mass Haul614.96 C.Y.
15.
69
20
88.
01
40
R /W
15
10.
43
20
100.
00
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
63.
35 8.
72
62.
50 8.
29
52.
50 8.
29
46.
50 11.
29
25.
29 11.
72
69.
31 11.
81
62.
50 8.
40
52.
50 8.
40
46.
50 11.
40
25.
30 11.
82
Mass Haul617.33 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
100
-20
Mass Haul634.57 C.Y.
40
35
30
25
20
15
10
-5
-10
-15
-20
100
-25
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1800+03 TO STA.1801+15
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
9/6/201
3
Default
14.
30
14.
29
13.
96
13.
82
13.
81
13.
79
13.
74
13.
63
13.
71
13.
60
13.
45
13.
44
13.
44
11.
45
8.
48
8.
58
8.
87
8.
47
7.
99
7.
93
5.
94
5.
41
5.
22
5.
11
8.
95
10.
14
10.
78
11.
43
17.
07
20.
25
22.
87
24.
92
25.
72
32.
37
37.
80
43.
93
54.
38
63.
02
85.
80
100.
00
100.
00
94.
03
87.
91
84.
07
57.
17
53.
03
NOT FOR CONSTRUCTION
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
-10
0
10
1802+00
20
30
40
DATE:
MJK
09/06/13
X005of 027
50
Fi
ber
60
DRAWN BY:
CHECKED BY:
HRD
R /W
R /W
20.
00 Pr
op.Tr
ack
15.
04 T/
R
66.
46 10.
11
62.
50 8.
13
52.
50 8.
13
46.
50 11.
13
25.
35 11.
55
63.
21 8.
58
62.
50 8.
23
52.
50 8.
23
13.
47
13.
72
13.
24
8.
61
8.
45
8.
40
8.
40
8.
41
8.
36
19.
73
20.
53
34.
79
51.
67
52.
14
52.
32
52.
47
52.
86
54.
68
10.
01
10.
02
10.
04
12.
68
12.
69
13.
78
13.
78
13.
78
14.
05
14.
04
14.
04
13.
94
13.
50
13.
50
8.
36
8.
35
5.
17
5.
17
5.
17
4.
44
4.
44
4.
46
5.
68
10.
88
10.
97
3.
90
26.
66
13.
82
4.
07
41.
88
13.
92
4.
07
51.
26
13.
85
4.
31
2.
96
83.
28
4.
36
94.
70
88.
54
4.
64
100.
00
7.
50
13.
49
19.
58
100.
00
13.
49
19.
29
5.
10
5.
05
5.
05
39.
92
47.
02
51.
52
5.
09
10.
87
100.
00
11.
18
30.
19
5.
05
11.
25
29.
21
29.
56
68.
62
12.
77
12.
73
24.
52
12.
77
24.
52
24.
64
13.
51
13.
48
19.
71
20.
24
70
70
80
80
90
90
7.
25
-20
60
7.
26
-30
50
99.
87
-40
40
100.
00
Area0.00 Fill
-50
11.
68
Volume3.74 Fill
-60
48.
08
-70
13.
01
Area59.36 Cut
12.
49
-80
12.
48
-90
22.
32
Volume54.81 Cut
23.
83
-100
30
23.
23
-20
13.
27
-20
13.
16
-15
21.
86
-15
20
21.
08
-10
13.
27
-10
13.
48
-5
13.
54
-5
21.
07
0
19.
59
0
1803+00
14.
36
5
10
13.
67
5
0
11.
08
10
-10
14.
23
10
-20
4.
57
15
-30
15.
35 Ex.Tr
ack
14.
34 T/
R
15
-40
14.
23
20
Area104.65 Fill
-50
4.
56
20
R /W
25
Volume193.80 Fill
-60
14.
23
100
25
-70
14.
23
90
30
Area2.19 Cut
14.
30
80
30
-80
4.
51
-20
35
-90
4.
53
5
40
35
Volume113.97 Cut
4.
47
10
40
0.
00 Ex.Tr
ack
14.
94 T/
R
R /W
R /W
Mass Haul640.15 C.Y.
-100
14.
30
70
100
4.
47
60
90
13.
95
50
80
5.
39
40
70
Fi
ber
15.
33 Ex.Tr
ack
14.
32 T/
R
30
30
25
25
20
20
15
15
10
10
5
5
5
0
0
0
-5
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
84 T/
R
35
R /W
35
15.
32 Ex.Tr
ack
14.
11 T/
R
Fi
ber
R /W
R /W
20.
00 Pr
op.Tr
ack
15.
11 T/
R
40
0.
00 Ex.Tr
ack
14.
75 T/
R
-25
13.
10
30
60
-20
13.
10
20
50
-20
11.
75
10
40
-15
8.
02
25
30
-15
8.
03
30
46.
50 11.
23
25.
32 11.
65
13.
81
11.
27
14.
27
20
-10
11.
41
1801+50
13.
85
10
-10
10.
78
0
13.
90
-20
-5
13.
84
-10
9.
67
0
10.
81
5
10.
62
-15
14.
28
10
10.
76
-10
4.
50
0.
00 Ex.Tr
ack
14.
98 T/
R
25
10.
75
-5
1.
34
-10
14.
21
-15
14.
32
13.
98
-10
4.
47
13.
43
30
14.
91
-20
1801+65
5.
42
-20
7.
12
-5
4.
83
35
Fi
ber
35
20.
00 Pr
op.Tr
ack
15.
14 T/
R
8.
29
0
15.
32 Ex.Tr
ack
14.
30 T/
R
11.
62
13.
13
12.
07
40
13.
87
0
0.
00 Ex.Tr
ack
15.
00 T/
R
11.
06
13.
90
R /W
Mass Haul655.16 C.Y.
13.
93
-30
4.
49
-40
0.
03
Area1.10 Fill
-50
14.
34
Volume14.04 Fill
-60
4.
48
-70
14.
17
Area35.69 Cut
14.
00
Volume36.85 Cut
-30
4.
98
7.
35
37.
58
Area5.77 Fill
-40
5.
44
5.
84
48.
06
Volume1.91 Fill
-50
13.
58
6.
34
44.
83
-80
-60
6.
74
6.
12
45.
87
6.
28
66.
15
-70
13.
15
6.
25
46.
52
6.
37
78.
82
Area25.21 Cut
8.
40
6.
24
49.
74
-90
-80
11.
17
6.
73
69.
99
8.
81
7.
78
89.
02
-90
11.
98
6.
78
76.
57
-100
92.
20
8.
86
96.
75
Volume16.92 Cut
11.
31
8.
56
8.
66
100.
00
-100
13.
93
9.
19
91.
42
89.
49
15
R /W
20
9.
22
40
8.
85
15
94.
17
20
100.
00
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
58.
26 5.
05
46.
50 10.
93
25.
32 11.
36
62.
52 8.
21
62.
50 8.
20
52.
50 8.
20
46.
50 11.
20
25.
33 11.
62
Mass Haul626.40 C.Y.
40
35
30
25
20
15
10
-5
-10
-15
-20
100
-25
Mass Haul706.23 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
100
-20
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1801+50 TO STA.1803+00
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
9/6/201
3
Default
13.
91
13.
91
13.
25
13.
62
13.
62
13.
31
13.
31
12.
29
12.
28
12.
27
11.
26
6.
80
4.
04
4.
01
4.
12
0.
61
0.
78
0.
82
11.
56
11.
56
11.
56
12.
67
4.
43
4.
47
11.
42
19.
35
19.
44
20.
93
20.
93
24.
79
24.
81
24.
84
29.
81
38.
98
43.
64
47.
05
100.
00
100.
00
83.
91
49.
24
14.
55
14.
55
14.
54
7.
75
1804+00
NOT FOR CONSTRUCTION
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
-10
0
10
1806+00
Fi
ber
20
25
25
20
20
15
15
10
10
5
5
5
0
0
0
0
-5
-5
30
40
DATE:
MJK
09/06/13
X006of 027
60.
60 3.
38
12.
63
13.
36
13.
47
12.
65
12.
62
10.
71
7.
22
9.
78
3.
33
4.
37
24.
23
24.
37
27.
13
31.
97
50
60
DRAWN BY:
CHECKED BY:
HRD
70
1.
80
70
100.
00
39.
70
60
0.
67
0.
24
32.
10
50
81.
72
7.
17
7.
15
32.
06
40
R /W
R /W
46.
50 10.
44
25.
27 10.
86
7.
30
5.
86
20.
54
12.
08
3.
90
24.
80
10.
75
2.
56
25.
52
12.
92
0.
34
28.
54
30
3.
40
-20
20
100.
00
-30
6.
91
-40
3.
38
Area114.91 Fill
-50
44.
78
Volume425.03 Fill
-60
11.
03
-70
37.
52
Area3.29 Cut
29.
58
-80
11.
75
-90
26.
57
Volume12.70 Cut
11.
76
-100
1807+00
13.
53
-30
10
26.
50
-25
0
21.
49
-25
-10
13.
55
-20
-20
13.
78
-20
-30
21.
44
-15
-40
19.
35
-15
Area12.94 Fill
-50
13.
78
-10
Volume236.75 Fill
-60
13.
79
100
-10
-70
19.
34
-25
-5
Area0.00 Cut
11.
43
30
20.
00 Pr
op.Tr
ack
14.
35 T/
R
40
-80
15.
27 Ex.Tr
ack
14.
44 T/
R
30
Mass Haul242.95 C.Y.
-90
13.
79
90
100
Volume6.09 Cut
13.
79
80
90
0.
21
Fi
ber
16.
00 Ex.Tr
ack
14.
29 T/
R
0.
00 Ex.Tr
ack
14.
29 T/
R
Fi
ber
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
47 T/
R
30
35
25
30
20
25
15
20
10
15
5
10
0
0
-5
R /W
R /W
62.
22 2.
70
46.
50 10.
56
25.
31 10.
98
20.
00 Pr
op.Tr
ack
14.
29 T/
R
40
R /W
35
11.
36
70
80
58.
38
-100
13.
75
60
70
1.
57
-25
1.
60
-25
97.
36
-30
100.
00
-20
R /W
1.
99
30.
44
100.
00
11.
31
11.
06
29.
96
-25
4.
47
50
1.
59
11.
36
29.
77
-15
11.
29
40
87.
69
11.
82
26.
30
-20
13.
75
30
60
R /W
11.
83
26.
20
-10
13.
76
15
3.
09
11.
83
26.
19
-15
4.
45
20
50
3.
08
13.
73
21.
54
-5
4.
48
10
40
53.
35
13.
73
21.
53
-10
0.
00 Ex.Tr
ack
14.
37 T/
R
20
30
46.
84
13.
75
19.
36
20
59.
90 4.
04
13.
97
0
13.
44
25
35
R /W
13.
97
11.
44
0
13.
44
0
11.
44
-5
5.
19
-10
10
46.
50 10.
74
25.
19 11.
16
15
5.
19
-20
13.
96
5
15.
31 Ex.Tr
ack
14.
39 T/
R
20
12.
67
-15
13.
73
13.
82
5
0.
00 Ex.Tr
ack
14.
48 T/
R
25
12.
67
-10
6.
02
13.
52
5.
71
4.
44
0
11.
30
13.
52
5.
73
-10
13.
82
13.
52
5.
73
-20
13.
83
13.
32
6.
67
-15
4.
52
12.
45
9.
95
-10
4.
36
12.
37
1805+00
11.
05
30
Fi
ber
30
35
20.
00 Pr
op.Tr
ack
14.
65 T/
R
11.
06
-5
15.
19 Ex.Tr
ack
13.
96 T/
R
9.
60
12.
36
16.
10
35
7.
74
-5
0.
00 Ex.Tr
ack
14.
57 T/
R
9.
01
9.
14
8.
41
18.
32
16.
95
2.
76
29.
05
17.
47
3.
72
49.
85
R /W
Mass Haul-156.38 C.Y.
7.
75
-20
13.
93
-30
13.
93
-40
4.
46
Area107.47 Fill
-50
4.
49
Volume392.82 Fill
-60
-20
13.
93
-70
-30
4.
50
Area2.87 Cut
-40
13.
79
-80
-50
12.
40
Volume9.37 Cut
-60
12.
40
8.
79
16.
35
-90
-70
8.
87
8.
71
16.
68
0.
51
60.
22
Area114.61 Fill
5.
55
8.
70
16.
84
-100
-80
8.
86
3.
90
55.
28
0.
03
70.
60
-90
8.
81
1.
39
74.
83
Area3.57 Cut
Volume411.26 Fill
11.
07
1.
38
75.
39
0.
35
100.
00
Volume11.93 Cut
11.
62
1.
38
75.
78
35
40
R /W
-100
16.
32
1.
31
10
1.
26
40
94.
89
10
100.
00
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
40
Mass Haul-799.37 C.Y.
40
35
30
25
20
15
10
5
-10
-15
-20
-25
80
80
90
90
100
-30
Mass Haul-568.71 C.Y.
40
35
30
25
20
15
10
5
-10
-15
-20
-25
100
-30
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1804+00 TO STA.1807+00
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
9/6/201
3
Default
0.
23
3.
54
4.
06
10.
69
11.
13
10.
81
55.
94
48.
27
26.
54
14.
78
13.
73
10.
43
NOT FOR CONSTRUCTION
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
1809+00
13.
42
3.
30
19.
85
47.
36
Fi
ber
20
20
25
15
20
10
15
5
10
0
0
5
5
-5
-5
0
0
30
DATE:
MJK
09/06/13
X007of 027
40
59.
95 3.
67
13.
26
13.
26
13.
67
13.
67
13.
67
13.
67
13.
67
13.
67
13.
67
13.
67
13.
67
13.
67
13.
70
13.
70
13.
70
13.
80
13.
43
13.
43
13.
43
13.
42
20.
46
19.
47
19.
16
13.
83
11.
36
11.
33
11.
28
5.
06
4.
34
4.
33
4.
33
4.
53
4.
53
4.
53
7.
07
11.
99
12.
00
12.
00
19.
98
50
2.
81
3.
13
5.
56
100.
00
3.
32
47.
67
58.
84
10.
93
29.
46
49.
55
11.
16
28.
55
40
50
60
60
DRAWN BY:
CHECKED BY:
HRD
R /W
R /W
46.
50 10.
39
25.
69 10.
81
13.
26
20.
48
30
4.
85
13.
44
19.
79
13.
25
20.
49
20
100.
00
13.
44
10
13.
45
0
11.
81
13.
24
20.
53
10
19.
77
30
20.
00 Pr
op.Tr
ack
14.
30 T/
R
11.
75
25.
47
20.
56
1810+00
13.
45
15.
69 Ex.Tr
ack
14.
10 T/
R
0.
00 Ex.Tr
ack
14.
32 T/
R
5.
71
3.
47
64.
01
6.
36
8.
73
0
11.
79
-10
13.
40
-20
8.
21
-30
13.
57
-40
13.
40
Area113.74 Fill
-50
13.
60
Volume401.95 Fill
-60
-10
8.
21
-70
-20
4.
69
Area0.30 Cut
-30
3.
03
-80
-40
13.
60
Volume1.30 Cut
38.
11
9.
08
Area108.76 Fill
-50
39.
53
9.
30
88.
71
4.
95
100.
00
85.
66
4.
38
54.
47
86.
86
4.
09
9.
29
5.
28
44.
87
100.
00
13.
57
41.
64
Volume412.03 Fill
-60
4.
72
-90
-70
13.
75
25
R /W
13.
58
19.
69
Area2.34 Cut
7.
50
-100
-80
13.
75
-25
-90
11.
32
-30
Volume4.90 Cut
13.
07
35
R /W
13.
58
13.
34
8.
53
11.
82
13.
46
5.
56
13.
34
13.
50
4.
85
8.
57
13.
50
3.
28
11.
71
13.
47
13.
82
-100
12.
38
-20
13.
02
-25
12.
41
-15
12.
92
100
-20
12.
61
90
-10
12.
85
80
-15
12.
84
70
-5
11.
64
-30
-10
19.
49
40
30
R /W
Mass Haul-799.37 C.Y.
11.
20
60
90
20.
48
50
80
25
30
20
25
15
20
10
15
5
5
10
0
0
5
5
-5
0
0
Fi
ber
Fi
ber
15.
77 Ex.Tr
ack
14.
08 T/
R
0.
00 Ex.Tr
ack
14.
39 T/
R
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
32 T/
R
R /W
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
29 T/
R
35
15.
63 Ex.Tr
ack
14.
23 T/
R
-20
4.
58
40
70
-25
34.
49
15
60
-15
1.
53
30
50
-20
1.
14
20
40
-10
70.
84
10
30
-15
1.
88
0
20
-5
78.
22
20
13.
56
10
Fi
ber
25
0.
37
0
5.
08
5.
50
-25
-10
75.
14
4.
78
100.
00
-10
13.
11
-10
14.
00
-20
5.
74
40
30
0.
00 Ex.Tr
ack
14.
15 T/
R
-15
6.
38
13.
87
13.
90
-10
5.
12
4.
60
85.
25
-25
13.
95
15
89.
21
4.
28
41.
08
-20
6.
53
20
6.
51
13.
11
24.
80
-15
8.
23
1808+00
10.
89
25
5.
97
13.
16
24.
69
30
20.
00 Pr
op.Tr
ack
14.
28 T/
R
12.
10
14.
52
-5
16.
00 Ex.Tr
ack
14.
19 T/
R
12.
34
15.
59
30
35
R /W
58.
40 4.
43
46.
50 10.
38
25.
63 10.
79
60.
83 3.
24
46.
50 10.
41
25.
77 10.
82
Mass Haul-850.29 C.Y.
96.
39
13.
18
24.
53
-10
0.
00 Ex.Tr
ack
14.
19 T/
R
11.
82
12.
35
17.
06
10.
14
17.
24
17.
74
4.
62
35
100.
00
13.
29
20.
56
1807+73
13.
66
-20
13.
60
-30
6.
89
-40
5.
04
Area1.40 Fill
-50
13.
60
Volume0.00 Fill
-60
3.
25
-70
-20
13.
50
Area2.47 Cut
-30
7.
23
Volume0.00 Cut
-40
6.
52
3.
35
30.
22
27.
53
Area103.31 Fill
-50
7.
26
2.
64
38.
64
Volume52.36 Fill
-60
13.
44
-80
-70
22.
81
0.
86
77.
78
Area0.40 Cut
24.
59
1.
57
1.
34
-80
8.
01
-90
79.
42
Volume1.43 Cut
13.
25
-100
-90
80.
90
0.
98
100.
00
-100
9.
34
5
0.
47
10
90.
16
35
35
R /W
40
0.
78
10
100.
00
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
40
Mass Haul-1658.08 C.Y.
40
35
30
25
20
70
70
15
10
-5
-10
-15
100
-25
-20
80
80
90
90
100
-25
40
Mass Haul-1250.95 C.Y.
40
35
30
25
20
15
10
-5
-10
-15
-20
100
-25
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1807+73 TO STA.1810+00
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
9/6/201
3
Default
10.
01
6.
52
5.
80
6.
05
9.
43
11.
49
12.
57
13.
00
13.
15
13.
40
13.
38
13.
33
13.
00
12.
88
12.
02
11.
82
55.
90
52.
96
50.
29
42.
85
39.
18
35.
80
34.
56
34.
26
33.
95
32.
07
24.
78
24.
21
23.
84
20.
42
19.
58
12.
89
12.
89
10.
68
9.
27
4.
51
5.
93
6.
31
20.
10
20.
11
28.
68
32.
04
49.
47
90.
55
100.
00
Area5.49 Cut
NOT FOR CONSTRUCTION
-70
Volume281.02 Fill
Area73.26 Fill
-60
-50
-40
-30
-20
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
-10
0
10
1813+00
Fi
ber
16.
28 Ex.Tr
ack
13.
36 T/
R
20
30
40
DATE:
MJK
09/06/13
X008of 027
55.
33 6.
05
46.
50 10.
46
26.
28 10.
86
12.
84
11.
20
8.
40
5.
17
20.
19
29.
09
33.
73
45.
71
7.
77
7.
15
7.
18
8.
37
13.
73
13.
73
13.
73
13.
73
13.
75
91.
94
29.
32
4.
48
4.
47
4.
46
4.
45
4.
32
7.
77
97.
87
93.
59
8.
13
99.
73
97.
85
8.
19
100.
00
50
60
DRAWN BY:
CHECKED BY:
HRD
70
12.
73
12.
72
11.
68
8.
39
5.
40
20.
49
20.
55
30.
46
35.
90
44.
25
80
80
90
90
7.
71
12.
74
12.
54
70
7.
69
12.
74
12.
50
60
99.
62
12.
74
50
100.
00
12.
64
12.
64
9.
01
9.
03
5.
77
12.
49
13.
72
13.
55
4.
56
40
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
37 T/
R
R /W
12.
84
20.
18
8.
41
12.
84
20.
18
100.
00
12.
85
12.
20
30
7.
75
-80
20
100.
00
-90
5.
64
Volume14.06 Cut
5.
54
-100
44.
71
-20
41.
54
-25
5.
47
-15
40.
53
-20
5.
53
-10
40.
33
-15
11.
94
-5
0.
00 Ex.Tr
ack
14.
34 T/
R
-10
29.
70
0
12.
00
-5
1814+00
29.
35
5
10
12.
70
0
0
20.
44
0
-10
12.
70
10
-20
20.
35
5
-30
12.
71
5
-40
12.
84
15
Area69.79 Fill
-50
8.
13
10
Volume264.90 Fill
-60
12.
46
20
-70
13.
43
15
Area4.89 Cut
13.
43
25
-80
6.
31
20
-90
6.
36
30
Volume19.22 Cut
13.
43
25
R /W
57.
75 4.
80
46.
50 10.
43
25.
89 10.
84
12.
90
-100
13.
69
100
Fi
ber
16.
09 Ex.Tr
ack
13.
50 T/
R
Fi
ber
16.
44 Ex.Tr
ack
13.
39 T/
R
0.
00 Ex.Tr
ack
14.
42 T/
R
-15
6.
30
90
-20
4.
49
80
-10
13.
66
70
-15
4.
41
60
-5
13.
66
50
-10
13.
63
40
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
35 T/
R
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
39 T/
R
R /W
0
4.
47
-25
-5
4.
97
35
R /W
Mass Haul-2006.50 C.Y.
5
8.
64
30
90
0
31.
02
20
80
10
8.
65
10
70
5
31.
41
Fi
ber
15
60
15
8.
67
10
50
10
8.
66
0
40
20
31.
95
-10
30
15
32.
43
-20
20
25
8.
68
12.
89
-15
10
20
8.
70
12.
90
12.
11
20.
08
-10
12.
99
-20
30
32.
84
13.
55
7.
15
-5
11.
90
1812+00
11.
33
0
13.
67
-10
13.
84
-15
6.
30
-10
4.
68
5
25
33.
96
13.
55
7.
14
13.
67
4.
68
-5
0.
00 Ex.Tr
ack
14.
32 T/
R
10
35
8.
61
13.
55
7.
14
13.
67
15
40
30
87.
17
13.
64
4.
43
25
40
20.
00 Pr
op.Tr
ack
14.
34 T/
R
13.
64
4.
67
25
35
8.
97
13.
60
4.
53
13.
63
4.
27
0
15.
89 Ex.Tr
ack
13.
55 T/
R
13.
63
4.
41
30
8.
76
13.
60
4.
56
13.
63
4.
47
4.
43
55.
83 5.
78
46.
50 10.
44
26.
09 10.
85
55.
70 5.
87
46.
50 10.
48
26.
44 10.
88
Mass Haul-2299.32 C.Y.
94.
56
13.
60
30
30
0.
00 Ex.Tr
ack
14.
30 T/
R
9.
47
10.
77
9.
33
11.
27
51.
92
50.
00
45.
12
12.
16
55.
40
45.
58
12.
61
12.
43
12.
65
64.
94
55.
87
12.
66
56.
14
12.
11
12.
66
R /W
35
100.
00
13.
60
1811+00
4.
60
-20
13.
60
-30
4.
62
-40
-20
4.
66
Area82.39 Fill
-50
-30
13.
60
Volume353.97 Fill
-60
-40
4.
75
-70
-50
13.
59
Area0.66 Cut
-60
5.
23
Volume5.55 Cut
65.
82
12.
11
Area78.49 Fill
65.
87
12.
07
66.
47
Volume297.92 Fill
66.
46
11.
12
-70
13.
39
-80
12.
24
Area2.10 Cut
6.
26
-90
66.
63
12.
02
77.
21
-80
71.
73
12.
31
86.
08
Volume5.10 Cut
11.
85
-100
-90
71.
93
11.
08
100.
00
-100
18.
17
20
77.
69
35
35
R /W
40
11.
34
20
100.
00
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
40
Mass Haul-2811.96 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
100
-20
-15
100
-20
40
Mass Haul-2566.28 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
100
-20
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1811+00 TO STA.1814+00
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
9/6/201
3
Default
1815+00
NOT FOR CONSTRUCTION
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
0
10
20
30
DATE:
MJK
09/06/13
X009of 027
40
50
60
DRAWN BY:
CHECKED BY:
HRD
70
80
90
9.
81
80
9.
68
70
96.
62
60
100.
00
50
64.
31 8.
42
40
62.
50 7.
52
7.
46
39.
60
7.
47
39.
39
7.
47
10.
75
26.
88
7.
45
13.
24
17.
64
39.
48
13.
24
30
39.
46
13.
25
9.
66
17.
45
12.
94
4.
92
7.
37
13.
67
4.
51
12.
93
13.
87
4.
50
7.
31
13.
87
4.
44
13.
59
13.
87
4.
41
5.
38
13.
22
13.
86
7.
54
20
R /W
R /W
11.
01
18.
29
10
52.
50 7.
52
9.
99
1817+00
46.
50 10.
52
9.
83
36.
17
0
10.
05
-10
Fi
ber
20.
00 Pr
op.Tr
ack
14.
43 T/
R
10.
00 11.
25
9.
80
-10
100.
00
8.
99
1816+50
72.
62
-20
6.
90
-30
41.
75
-40
12.
51
Area33.07 Fill
-50
13.
24
Volume63.18 Fill
-60
36.
26
-70
21.
19
Area60.70 Cut
13.
25
-80
20.
58
-90
13.
25
Volume68.55 Cut
13.
26
-100
20.
09
-20
19.
93
-20
13.
26
-15
19.
86
-15
13.
27
-10
13.
27
-10
11.
91
-5
11.
94
-5
13.
11
0
8.
41
0
13.
11
5
13.
59
5
-20
8.
38
10
-30
13.
69
10
-40
5.
52
15
Area49.77 Fill
-50
5.
32
15
0.
00 Ex.Tr
ack
14.
49 T/
R
20
Volume76.70 Fill
-60
13.
83
20
-70
13.
84
25
Area32.11 Cut
4.
48
25
-80
0.
01
30
-90
13.
84
30
Volume85.94 Cut
4.
42
35
12.
35
40
35
11.
68
40
39.
07
-100
37.
38
100
8.
39
Fi
ber
0.
00 Ex.Tr
ack
14.
54 T/
R
-20
70.
81
-20
8.
81
-15
7.
60
-15
88.
62
-10
94.
26
-10
8.
84
-5
9.
04
-5
9.
26
0
97.
01
0
94.
39
5
11.
76
100
5
21.
47
90
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
42 T/
R
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
44 T/
R
R /W
10
9.
44
80
10
35.
24
-20
15
8.
47
5
15
60.
97
10
20
7.
28
Mass Haul-3027.74 C.Y.
20
7.
89
70
90
25
87.
79
60
80
25
100.
00
70
30
90.
63
50
60
30
R /W
10.
14
-20
35
8.
97
9.
19
100.
00
100.
00
Fi
ber
5
40
35
8.
69
8.
77
100.
00
50
R /W
R /W
39.
97
6.
36
11.
02
10.
50
37.
67
44.
03
13.
03
25.
44
40
55.
92 5.
78
46.
50 10.
49
13.
10
20.
76
10
40
94.
82
6.
41
65.
33
Fi
ber
13.
10
20.
65
16.
37 Ex.Tr
ack
13.
76 T/
R
Mass Haul-3163.75 C.Y.
98.
52
5.
32
40
5.
43
30
50.
74
13.
11
13.
10
12.
62
30
48.
06
20
11.
37
10
11.
34
25
31.
21
30
20.
53
20
31.
16
26.
58 10.
89
13.
11
12.
54
10
12.
87
13.
03
9.
06
25
11.
38
13.
51
13.
03
9.
06
30
31.
08
12.
87
35
20.
00 Pr
op.Tr
ack
14.
40 T/
R
13.
51
6.
12
6.
13
13.
51
6.
12
0.
00 Ex.Tr
ack
14.
44 T/
R
R /W
35
20.
60
12.
88
0
12.
61
-10
20.
50
-15
13.
17
-10
10.
06
-5
16.
58 Ex.Tr
ack
13.
53 T/
R
13.
79
0
13.
17
13.
79
3.
71
4.
46
-10
10.
03
13.
81
-15
13.
61
13.
61
-20
13.
82
-10
13.
60
-30
4.
44
1816+00
4.
46
-5
6.
47
0
0.
00 Ex.Tr
ack
14.
36 T/
R
13.
81
4.
49
0
6.
49
-40
6.
46
Area55.98 Fill
-50
13.
70
Volume232.91 Fill
-60
4.
40
-70
13.
70
Area4.36 Cut
-20
4.
49
-80
-30
13.
70
Volume17.13 Cut
-40
4.
56
Area35.17 Fill
-50
10.
73
Volume168.79 Fill
-60
17.
47
-90
-70
8.
34
9.
00
32.
99
Area13.33 Cut
27.
93
6.
97
6.
99
6.
98
87.
00
86.
50
8.
53
95.
25
-80
8.
12
-100
86.
95
8.
54
95.
36
-90
8.
16
6.
98
89.
44
9.
25
100.
00
Volume32.77 Cut
28.
77
6.
99
89.
48
R /W
-100
30.
86
8.
22
15
8.
22
20
8.
63
40
97.
32
15
97.
28
20
100.
00
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
Mass Haul-3149.14 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
90
100
-20
Mass Haul-3158.38 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
100
-20
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1815+00 TO STA.1817+00
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
64.
28 8.
42
62.
50 7.
53
52.
50 7.
53
46.
50 10.
53
10.
00 11.
26
62.
72 7.
62
62.
50 7.
51
52.
50 7.
51
46.
50 10.
51
26.
37 10.
91
9/6/201
3
Default
1818+00
NOT FOR CONSTRUCTION
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
1820+00
8.
45
41.
30
Fi
ber
30
DATE:
MJK
09/06/13
X010of 027
40
50
65.
86 9.
28
62.
50 7.
60
10.
35
15.
88
15.
88
60
DRAWN BY:
CHECKED BY:
HRD
70
13.
68
12.
89
11.
45
11.
44
11.
43
10.
23
9.
04
8.
52
5.
83
9.
27
14.
32
14.
38
14.
38
16.
92
27.
97
33.
22
10.
09
13.
69
5.
79
100.
00
13.
66
4.
43
9.
17
13.
66
4.
43
60
75.
22
13.
72
13.
66
13.
47
5.
57
5.
56
4.
36
13.
47
9.
18
4.
53
12.
61
12.
82
10.
35
50
R /W
R /W
10.
35
15.
88
40
52.
50 7.
60
46.
50 10.
60
10.
35
17.
60
30
10.
43
8.
35
38.
96
20.
00 Pr
op.Tr
ack
14.
51 T/
R
10.
00 11.
33
9.
18
10.
16
20.
89
20
100.
00
8.
37
38.
65
20
10.
70
10
17.
12
0
11.
02
-10
10.
73
-20
11.
03
-30
16.
22
-40
17.
06
Area52.05 Fill
-50
16.
20
Volume247.30 Fill
-60
1821+00
12.
99
-70
10
13.
78
Area22.23 Cut
0
9.
51
-80
-10
5.
52
-90
13.
71
Volume49.59 Cut
13.
79
-100
5.
49
-20
4.
35
-20
13.
71
-15
13.
71
-15
4.
34
-10
3.
84
-10
13.
74
-5
13.
74
-5
4.
60
0
4.
60
0
0.
00 Ex.Tr
ack
14.
38 T/
R
5
13.
67
5
-20
6.
29
10
-30
13.
67
10
-40
6.
30
15
12.
94
15
11.
26
20
12.
93
20
Area61.04 Fill
-50
10.
89
25
Volume209.43 Fill
-60
11.
27
25
-70
16.
69
30
Area19.00 Cut
9.
83
30
-80
9.
78
35
-90
19.
97
40
35
Volume76.37 Cut
19.
74
40
8.
42
-100
27.
31
100
8.
33
Fi
ber
0.
00 Ex.Tr
ack
14.
36 T/
R
-20
32.
20
-20
7.
39
-15
81.
21
-15
7.
41
-10
7.
22
-10
89.
13
-5
90.
19
-5
8.
57
0
8.
73
0
9.
23
5
96.
61
5
95.
55
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
55 T/
R
R /W
10
100.
00
10
R /W
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
47 T/
R
15
8.
31
100
15
8.
33
90
20
32.
35
-20
20
33.
33
5
25
7.
21
10
25
8.
22
Mass Haul-3204.01 C.Y.
30
94.
51
80
90
30
88.
90
70
9.
66
-20
35
8.
51
60
80
100.
00
Fi
ber
5
40
35
8.
42
9.
13
50
70
8.
93
60
89.
09
7.
11
8.
47
47.
53
9.
42
21.
32
30.
08
50
R /W
R /W
54.
33 6.
63
46.
50 10.
54
11.
28
10
40
95.
09
Fi
ber
12.
21
11.
29
12.
21
11.
47
15.
72
12.
21
11.
47
11.
47
13.
72
15.
73
13.
72
7.
50
Mass Haul-3368.66 C.Y.
95.
76
100.
00
40
9.
17
30
100.
00
20
6.
71
10
6.
44
0
40
50.
84
-10
7.
17
25
7.
09
30
30
43.
24
-15
20
39.
88
-10
10
39.
20
-5
7.
50
1819+00
13.
68
0
4.
43
-10
12.
09
13.
81
4.
50
0.
00 Ex.Tr
ack
14.
40 T/
R
-15
29.
80
13.
81
4.
54
-10
13.
41
13.
66
23.
03
13.
86
6.
48
-5
13.
52
13.
88
20.
58
35
20.
00 Pr
op.Tr
ack
14.
45 T/
R
13.
86
6.
48
0
13.
45
13.
58
18.
79
12.
30
9.
74
25
26.
74
12.
56
14.
74
10.
00 11.
27
12.
30
9.
75
30
26.
63
13.
33
10.
35
0
0.
00 Ex.Tr
ack
14.
42 T/
R
11.
51
9.
57
23.
34
11.
52
8.
99
28.
23
11.
53
8.
69
36.
44
R /W
35
26.
16
13.
67
7.
61
-20
13.
71
-30
13.
71
-40
4.
07
Area56.22 Fill
-50
3.
95
Volume196.29 Fill
-60
13.
71
-70
13.
74
Area44.26 Cut
-20
3.
94
-80
-30
4.
38
Volume141.42 Cut
-40
13.
61
7.
74
91.
65
Area81.49 Fill
-50
13.
57
7.
74
91.
72
Volume255.02 Fill
-60
13.
74
-90
-70
13.
64
7.
74
91.
73
Area4.54 Cut
4.
40
-100
-80
13.
71
13.
70
4.
67
9.
14
95.
73
-90
13.
73
9.
16
38.
82
9.
49
98.
46
Volume90.37 Cut
4.
47
8.
46
80.
29
9.
68
100.
00
-100
4.
57
9.
04
90.
77
15
R /W
20
9.
27
40
9.
05
15
94.
05
20
100.
00
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
Mass Haul-3699.42 C.Y.
40
35
30
25
70
20
15
10
5
0
-5
-10
-15
80
80
90
90
100
-20
Mass Haul-3566.36 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
100
-20
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1818+00 TO STA.1821+00
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
65.
26 9.
02
62.
50 7.
64
52.
50 7.
64
46.
50 10.
64
10.
00 11.
37
62.
94 7.
78
62.
50 7.
56
52.
50 7.
56
46.
50 10.
56
10.
00 11.
29
9/6/201
3
Default
12.
64
12.
64
13.
36
13.
36
13.
75
13.
73
13.
73
13.
73
13.
55
13.
55
8.
08
8.
05
5.
65
5.
65
4.
38
4.
61
4.
61
4.
61
5.
68
5.
68
7.
73
NOT FOR CONSTRUCTION
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
1824+00
30
40
DATE:
MJK
09/06/13
X011of 027
Fi
ber
50
60
DRAWN BY:
CHECKED BY:
HRD
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
67 T/
R
69.
19 11.
10
62.
50 7.
76
52.
50 7.
76
46.
50 10.
76
10.
00 11.
49
8.
23
10.
13
10.
13
10.
14
14.
39
14.
38
14.
37
70
8.
67
9.
28
100.
00
9.
62
70
80.
93
8.
57
8.
09
9.
98
40.
52
10.
32
23.
65
45.
94
10.
44
31.
68
10.
44
16.
27
17.
25
13.
87
5.
87
16.
29
13.
88
5.
85
12.
47
13.
88
5.
84
10.
46
13.
93
4.
60
9.
64
13.
88
4.
33
16.
22
13.
72
13.
72
5.
56
13.
88
12.
60
8.
58
4.
41
12.
59
8.
60
5.
55
11.
14
12.
00
60
80
80
9.
65
20
50
9.
80
10
40
95.
45
0
30
100.
00
-10
11.
88
-20
53.
56
-30
12.
07
-40
46.
39
Area38.36 Fill
-50
9.
04
Volume142.47 Fill
-60
9.
98
-70
18.
07
Area72.28 Cut
35.
63
-80
10.
00
-90
17.
96
Volume217.57 Cut
10.
01
-100
10.
00
-20
17.
87
-20
20
17.
86
-15
10.
80
-15
11.
79
-10
12.
66
-10
8.
80
-5
15.
36
-5
10
11.
88
0
13.
67
0
13.
58
5
5.
90
5
1825+00
13.
67
10
0
5.
62
10
-10
5.
40
15
-20
13.
71
15
-30
13.
69
20
-40
4.
59
20
Area62.05 Fill
-50
0.
85
25
Volume185.94 Fill
-60
13.
73
25
-70
13.
73
30
Area20.94 Cut
4.
38
30
-80
4.
38
35
-90
13.
77
40
35
0.
00 Ex.Tr
ack
14.
45 T/
R
40
Volume172.62 Cut
10.
13
-100
14.
40
100
20.
79
Fi
ber
0.
00 Ex.Tr
ack
14.
57 T/
R
-20
7.
26
-20
7.
26
-15
84.
63
-15
8.
38
-10
86.
57
-10
8.
39
-5
92.
47
-5
92.
40
0
9.
15
0
100.
00
Fi
ber
5
R /W
8.
88
10.
45
36.
74
9.
68
9.
33
31.
19
100.
00
9.
86
22.
55
10.
52
11.
30
15.
01
17.
22
10.
36
11.
30
15.
00
79.
40
11.
30
14.
99
5
13.
83
100
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
63 T/
R
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
71 T/
R
R /W
10
4.
92
90
10
5.
86
80
15
13.
83
-20
15
5.
86
5
20
12.
51
10
20
8.
95
Mass Haul-3853.83 C.Y.
25
12.
51
7.
69
25.
62
22.
98
70
90
25
12.
43
7.
44
90.
56
60
80
30
9.
21
7.
48
90.
77
50
70
30
8.
95
8.
49
95.
06
40
60
76.
16
12.
52
-20
35
7.
81
8.
52
30
50
65.
86 9.
36
13.
58
6.
02
9.
14
5
40
35
10.
41
8.
80
99.
71
95.
44
20
40
62.
50 7.
68
13.
59
6.
00
30
R /W
R /W
13.
59
6.
00
10
40
15.
61
9.
71
100.
00
Fi
ber
13.
74
4.
53
20
52.
50 7.
68
46.
50 10.
68
13.
74
4.
46
0.
00 Ex.Tr
ack
14.
41 T/
R
Mass Haul-3918.11 C.Y.
22.
71
9.
90
94.
39
1822+00
8.
83
10
37.
54
0
8.
67
-10
27.
32
-15
9.
72
-10
16.
73
25
9.
74
30
16.
55
-5
10
9.
76
13.
64
4.
47
0
16.
51
13.
55
-10
11.
59
13.
55
5.
59
-15
14.
31
13.
54
5.
60
-10
11.
85
12.
59
-5
14.
00
-20
1823+00
5.
61
-20
9.
49
0
12.
72
12.
59
9.
50
25
12.
45
35
20.
00 Pr
op.Tr
ack
14.
59 T/
R
10.
00 11.
41
11.
25
14.
75
30
9.
91
0
0.
00 Ex.Tr
ack
14.
39 T/
R
11.
25
14.
75
R /W
35
8.
08
-30
12.
63
-40
8.
10
Area64.57 Fill
-50
10.
66
Volume232.61 Fill
-60
10.
54
-70
10.
53
Area23.22 Cut
14.
70
-80
-30
15.
40
Volume78.20 Cut
-40
8.
12
Area38.57 Fill
-50
11.
24
Volume191.00 Fill
-60
15.
48
-90
-70
22.
62
Area45.21 Cut
14.
78
7.
17
89.
98
-80
8.
51
8.
44
26.
16
8.
41
7.
15
90.
69
-90
8.
55
6.
47
90.
05
-100
95.
93
8.
42
95.
96
Volume126.73 Cut
22.
13
6.
51
90.
24
8.
97
100.
00
-100
22.
45
8.
32
95.
49
15
R /W
20
9.
21
40
8.
34
15
95.
64
20
100.
00
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
Mass Haul-3856.32 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
90
100
-20
Mass Haul-3843.00 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
90
100
-20
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1822+00 TO STA.1825+00
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
65.
10 9.
10
62.
50 7.
80
52.
50 7.
80
46.
50 10.
80
10.
00 11.
53
68.
08 10.
51
62.
50 7.
72
52.
50 7.
72
46.
50 10.
72
10.
00 11.
45
9/6/201
3
Default
12.
82
11.
23
10.
64
10.
64
10.
64
10.
22
8.
83
14.
61
16.
40
16.
41
16.
43
24.
34
8.
57
8.
57
83.
15
82.
99
NOT FOR CONSTRUCTION
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
1828+00
10
20
30
DATE:
MJK
09/06/13
X012of 027
14.
18
14.
18
14.
25
5.
27
5.
27
4.
63
8.
13
34.
63
40
50
60
DRAWN BY:
CHECKED BY:
HRD
70
80
90
90
9.
88
80
9.
75
70
98.
97
60
100.
00
6.
79
8.
59
28.
78
39.
64
12.
27
11.
49
16.
43
12.
28
13.
08
12.
30
12.
96
8.
27
13.
04
14.
09
4.
99
12.
95
14.
09
4.
98
8.
30
14.
25
4.
33
12.
98
14.
25
4.
26
50
R /W
R /W
12.
76
8.
44
40
53.
48 7.
43
46.
50 10.
92
12.
76
8.
45
30
8.
65
Fi
ber
20.
00 Pr
op.Tr
ack
14.
83 T/
R
10.
00 11.
65
11.
41
12.
76
8.
46
11.
39
20
100.
00
0
7.
25
-10
46.
63
-20
6.
91
-30
39.
85
-40
9.
60
Area84.91 Fill
-50
29.
77
Volume309.35 Fill
-60
10.
54
-70
17.
99
Area2.37 Cut
10.
71
-80
17.
30
-90
10.
75
Volume7.24 Cut
11.
74
-100
12.
90
-20
8.
49
-20
17.
11
-15
14.
15
-15
1829+00
12.
91
-10
10
13.
90
-10
0
8.
44
-5
-10
5.
83
-5
13.
90
0
5.
82
0
14.
26
5
4.
43
5
14.
26
10
14.
24
10
-20
4.
43
15
-30
4.
48
15
0.
00 Ex.Tr
ack
14.
89 T/
R
20
-40
14.
24
20
Area93.49 Fill
-50
14.
24
25
Volume330.36 Fill
-60
13.
84
25
-70
4.
49
30
Area3.62 Cut
4.
49
30
-80
5.
43
35
-90
13.
84
40
35
Volume11.10 Cut
12.
79
-100
5.
43
40
12.
85
100
8.
86
Fi
ber
0.
00 Ex.Tr
ack
14.
90 T/
R
-20
25.
50
-20
8.
66
-15
50.
56
-15
8.
45
-10
8.
59
-10
79.
27
-5
8.
88
-5
83.
96
0
10.
24
0
86.
44
5
87.
24
5
10.
21
R /W
R /W
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
86 T/
R
R /W
10
100.
00
7.
57
Fi
ber
20.
00 Pr
op.Tr
ack
14.
79 T/
R
10
11.
51
100
15
12.
79
90
15
8.
61
80
20
13.
60
-20
20
9.
16
5
25
11.
50
10
25
13.
63
Mass Haul-4060.88 C.Y.
30
21.
48
70
90
30
9.
01
9.
18
60
80
7.
66
70
97.
15
60
100.
00
-20
35
9.
02
9.
23
88.
31
88.
28
9.
84
5
40
35
R /W
10.
16
29.
23
7.
02
10.
65
23.
16
8.
37
11.
26
16.
87
42.
44
11.
26
15.
26
34.
75
12.
49
9.
46
15.
25
10
40
23.
61
10.
16
100.
00
R /W
R /W
53.
39 7.
39
46.
50 10.
84
13.
87
5.
73
12.
49
13.
87
5.
73
Mass Haul-4338.58 C.Y.
22.
20
8.
81
100.
00
50
7.
34
40
51.
68
30
7.
17
20
50
7.
15
10
40
45.
81
25
30
45.
29
Fi
ber
30
9.
46
13.
87
5.
73
20
9.
97
12.
84
8.
72
14.
01
14.
06
10
7.
14
13.
98
5.
62
0
4.
45
1827+00
4.
49
0
7.
15
14.
00
5.
57
14.
01
4.
51
25
45.
21
14.
02
4.
39
35
20.
00 Pr
op.Tr
ack
14.
75 T/
R
14.
01
4.
52
30
45.
07
14.
02
10.
00 11.
57
0.
00 Ex.Tr
ack
14.
75 T/
R
R /W
35
29.
12
14.
02
1826+00
4.
39
-10
4.
36
-15
13.
95
-10
4.
59
-5
13.
61
13.
89
-10
13.
62
13.
88
5.
61
5.
59
-15
13.
95
12.
74
9.
09
-10
4.
59
0
0.
00 Ex.Tr
ack
14.
69 T/
R
-5
5.
45
12.
46
11.
61
12.
72
9.
15
11.
60
12.
58
12.
55
8.
88
0
5.
50
12.
45
-20
8.
13
-30
8.
20
-40
11.
02
Area71.05 Fill
-50
11.
38
Volume246.48 Fill
-60
11.
93
-70
-20
13.
20
Area1.70 Cut
10.
81
-80
-30
10.
63
Volume41.92 Cut
-40
11.
57
8.
16
Area82.14 Fill
-50
12.
70
8.
14
88.
02
86.
09
Volume283.69 Fill
-60
13.
63
-90
-70
20.
53
8.
16
88.
18
Area1.54 Cut
14.
14
-100
-80
8.
71
8.
69
20.
78
8.
85
93.
55
-90
8.
79
7.
52
88.
97
8.
89
93.
97
Volume5.99 Cut
18.
91
7.
58
89.
47
9.
30
100.
00
-100
18.
70
8.
50
93.
76
15
R /W
20
9.
41
40
8.
55
15
94.
44
20
100.
00
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
Mass Haul-4959.96 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
100
-20
Mass Haul-4640.70 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
100
-20
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1826+00 TO STA.1829+00
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
53.
44 7.
48
46.
50 10.
95
10.
00 11.
68
53.
98 7.
14
46.
50 10.
88
10.
00 11.
61
9/6/201
3
Default
14.
29
4.
41
NOT FOR CONSTRUCTION
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
8.
96
36.
71
0
10
Fi
ber
20
30
40
DATE:
MJK
09/06/13
X013of 027
50
60
DRAWN BY:
CHECKED BY:
HRD
70
10.
66
100.
00
8.
31
70
9.
92
9.
62
35.
78
60
81.
78
11.
23
27.
18
50
66.
88 10.
08
62.
50 7.
89
12.
14
19.
10
40
R /W
R /W
12.
14
14.
15
5.
73
15.
07
14.
23
5.
16
12.
14
14.
33
4.
53
15.
06
14.
34
4.
32
15.
05
14.
34
4.
36
13.
01
14.
13
5.
47
13.
00
14.
13
5.
47
8.
67
14.
13
5.
48
8.
64
13.
06
8.
37
30
52.
50 7.
89
46.
50 10.
89
14.
21
14.
18
1833+00
20
80
80
11.
04
8.
71
33.
94
-10
10
100.
00
8.
89
33.
17
10.
92
10.
93
14.
21
0
11.
10
11.
92
17.
93
20.
00 Pr
op.Tr
ack
14.
80 T/
R
10.
00 11.
62
10.
91
10.
92
14.
26
8.
06
25.
15
-10
93.
99
11.
94
1832+00
17.
80
-20
12.
23
-30
12.
25
-40
12.
25
Area42.94 Fill
-50
13.
42
Volume191.09 Fill
-60
13.
75
-70
13.
45
Area31.68 Cut
13.
01
-80
13.
99
-90
8.
15
Volume113.77 Cut
14.
00
-100
5.
61
-20
5.
63
-20
14.
33
-15
4.
61
-15
14.
38
-10
14.
35
-10
4.
47
-5
14.
35
-5
4.
48
0
4.
49
0
0.
00 Ex.Tr
ack
14.
99 T/
R
5
14.
32
5
13.
02
10
14.
03
10
-20
5.
41
15
-30
7.
61
15
-40
4.
58
20
Area57.60 Fill
-50
12.
97
20
Volume186.20 Fill
-60
13.
00
25
-70
7.
65
25
Area20.65 Cut
7.
73
30
-80
11.
31
30
-90
11.
83
35
Volume96.91 Cut
14.
64
40
35
7.
06
-100
15.
29
40
7.
05
100
88.
76
Fi
ber
0.
00 Ex.Tr
ack
15.
03 T/
R
-20
8.
73
-20
8.
78
-15
93.
21
-15
93.
31
-10
90.
82
-10
8.
81
10.
78
100.
00
-5
10.
24
10.
99
-5
99.
51
11.
18
71.
91
75.
09
0
93.
44
10.
35
66.
75
0
R /W
67.
27 10.
32
62.
50 7.
94
Fi
ber
5
9.
02
100
5
9.
23
90
R /W
R /W
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
78 T/
R
R /W
10
26.
35
80
10
8.
97
-20
15
27.
34
5
15
30.
74
10
20
8.
26
Mass Haul-5235.61 C.Y.
20
70.
53
70
90
25
7.
92
10.
07
100.
00
60
80
25
87.
73
10.
51
100.
00
50
70
30
9.
32
10.
60
89.
87
40
60
R /W
R /W
7.
70
50
30
7.
98
11.
41
75.
76
Fi
ber
10.
57
36.
74
40
52.
50 7.
94
12.
10
24.
50
-20
35
9.
26
6.
99
41.
36
46.
50 10.
94
16.
84
5
40
35
87.
81
6.
71
39.
65
12.
34
15.
09
10
40
90.
77
6.
68
39.
29
12.
34
15.
09
20.
00 Pr
op.Tr
ack
14.
82 T/
R
Mass Haul-5401.32 C.Y.
90.
50
12.
27
30
12.
25
12.
57
12.
34
15.
08
13.
02
8.
30
30
15.
57
20
12.
80
20
15.
48
12.
27
10
15.
46
25
12.
51
30
12.
63
13.
02
10
13.
95
13.
02
8.
30
25
12.
78
14.
10
5.
52
8.
29
14.
27
4.
31
0.
00 Ex.Tr
ack
14.
94 T/
R
30
9.
45
35
20.
00 Pr
op.Tr
ack
14.
85 T/
R
14.
27
4.
37
14.
32
14.
17
14.
10
14.
07
4.
87
R /W
35
13.
22
12.
83
1830+00
13.
98
0
13.
98
-10
8.
14
-15
5.
49
-10
5.
48
-5
5.
52
12.
93
5.
41
0
4.
51
12.
93
8.
38
-10
14.
20
-20
1831+00
8.
39
-20
4.
85
10.
00 11.
67
12.
49
10.
72
-15
14.
31
11.
70
14.
88
-10
14.
36
11.
70
14.
88
-5
4.
39
0
0.
00 Ex.Tr
ack
14.
86 T/
R
11.
68
14.
95
0
2.
03
-30
14.
29
-40
4.
41
Area81.24 Fill
-50
14.
10
Volume323.56 Fill
-60
5.
60
-70
12.
58
Area22.25 Cut
9.
97
-80
-30
12.
57
Volume47.91 Cut
-40
9.
99
8.
86
28.
04
Area60.25 Fill
-50
11.
39
8.
24
73.
53
Volume262.01 Fill
-60
14.
82
-90
-70
11.
38
8.
76
8.
19
76.
59
Area29.75 Cut
14.
87
8.
70
28.
91
28.
63
8.
26
76.
75
-80
10.
61
8.
61
40.
66
-100
-90
11.
43
8.
33
75.
90
9.
26
89.
81
Volume96.30 Cut
15.
19
8.
58
84.
27
10.
15
100.
00
-100
18.
95
8.
64
85.
13
15
R /W
20
10.
24
40
10.
24
15
100.
00
20
100.
00
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
Mass Haul-5567.92 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
90
100
-20
Mass Haul-5478.64 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
90
100
-20
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1830+00 TO STA.1833+00
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
65.
45 9.
35
62.
50 7.
87
52.
50 7.
87
46.
50 10.
87
10.
00 11.
60
67.
65 10.
49
62.
50 7.
91
52.
50 7.
91
46.
50 10.
91
10.
00 11.
64
9/6/201
3
Default
8.
62
6.
76
6.
75
6.
83
6.
99
7.
01
7.
05
11.
37
11.
37
13.
85
90.
85
69.
39
23.
96
22.
94
22.
77
14.
50
14.
49
5.
39
1834+00
13.
98
13.
17
13.
17
11.
99
11.
66
10.
51
7.
82
7.
81
7.
81
10.
39
9.
75
9.
05
9.
05
9.
04
7.
61
7.
62
7.
80
11.
51
11.
53
11.
55
11.
56
11.
82
11.
92
13.
86
13.
87
14.
14
14.
14
14.
14
14.
20
14.
20
13.
89
13.
52
13.
52
13.
52
11.
65
11.
65
11.
01
10.
31
9.
11
6.
51
9.
11
15.
84
16.
81
20.
13
37.
73
37.
79
38.
13
100.
00
99.
93
95.
57
95.
54
95.
52
92.
97
92.
47
25.
54
13.
03
13.
00
12.
93
12.
87
11.
89
11.
86
5.
78
5.
72
4.
31
4.
31
4.
31
4.
54
4.
54
6.
36
9.
69
9.
69
9.
70
15.
35
15.
36
18.
19
23.
35
28.
85
20
30
40
50
60
70
80
Mass Haul-5737.31 C.Y.
10
5
-20
90
100
40
40
35
35
30
30
25
25
20
20
15
15
10
10
5
5
0
0
-5
-5
-10
-10
-15
-15
-20
-20
-100
-90
-80
NOT FOR CONSTRUCTION
Volume98.41 Cut
Area22.61 Cut
-70
Volume171.82 Fill
Area47.80 Fill
-60
-50
-40
-30
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
-20
-10
0
1836+00
10
20
30
DATE:
MJK
09/06/13
X014of 027
100.
00
10.
27
8.
99
40
50
40
60
50
60
DRAWN BY:
CHECKED BY:
HRD
R /W
8.
99
29.
79
30
65.
18 9.
15
11.
41
11.
40
28.
04
11.
41
16.
85
16.
95
12.
54
20
16.
88
13.
44
13.
46
9.
77
9.
83
14.
55
14.
23
14.
56
5.
79
1837+00
5.
77
10
62.
50 7.
81
14.
56
5.
76
0
52.
50 7.
81
14.
30
-10
46.
50 10.
81
14.
26
-20
R /W
20.
00 Pr
op.Tr
ack
14.
72 T/
R
10.
00 11.
54
14.
26
4.
32
-30
4.
62
-40
14.
26
Area48.09 Fill
-50
4.
68
Volume177.56 Fill
-60
13.
96
-70
4.
68
Area30.76 Cut
13.
95
-80
6.
22
-90
6.
26
Volume98.82 Cut
8.
48
-100
11.
88
100
13.
32
Fi
ber
0.
00 Ex.Tr
ack
14.
91 T/
R
-20
8.
48
-20
24.
19
-15
8.
44
-15
24.
20
-10
8.
44
-10
24.
31
-5
24.
87
-5
8.
25
0
35.
58
0
7.
31
5
8.
63
5
90.
71
10
94.
32
10
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
70 T/
R
R /W
15
8.
69
15
10.
11
20
10.
11
R /W
R /W
20
94.
42
Fi
ber
20.
00 Pr
op.Tr
ack
14.
74 T/
R
25
99.
98
90
25
100.
00
10.
62
100.
00
9.
21
80
10.
23
10.
61
29.
37
70
90.
61
10.
62
19.
13
60
30
R /W
64.
63 8.
92
62.
50 7.
85
10.
62
19.
07
50
R /W
R /W
12.
20
19.
06
40
52.
50 7.
85
46.
50 10.
85
13.
04
30
30
70
70
9.
50
10
13.
04
-20
35
Fi
ber
25
8.
67
5
40
35
0.
00 Ex.Tr
ack
14.
70 T/
R
30
8.
69
10
40
100.
00
0
20
14.
35
10
14.
21
14.
35
0
13.
04
14.
35
4.
38
25
8.
66
14.
25
4.
38
30
5.
45
14.
25
4.
51
4.
49
Mass Haul-5865.04 C.Y.
9.
17
Fi
ber
35
20.
00 Pr
op.Tr
ack
14.
76 T/
R
10.
00 11.
58
0.
00 Ex.Tr
ack
14.
92 T/
R
R /W
35
87.
09
-10
9.
12
-15
14.
17
-10
5.
92
-5
14.
31
14.
25
4.
52
-10
14.
17
11.
81
14.
09
5.
66
-15
14.
17
0
0.
00 Ex.Tr
ack
15.
02 T/
R
11.
81
12.
60
9.
99
-10
5.
92
-20
1835+00
12.
26
-5
5.
92
-30
11.
81
0
4.
67
-40
14.
31
Area69.68 Fill
-50
4.
66
Volume235.71 Fill
-60
14.
33
-70
4.
33
Area15.16 Cut
-20
14.
05
-80
-30
4.
94
Volume66.32 Cut
-40
12.
27
27.
01
Area44.99 Fill
-50
12.
27
7.
21
27.
12
Volume212.35 Fill
-60
13.
85
-90
-70
10.
17
7.
17
53.
97
Area30.54 Cut
11.
70
7.
06
92.
07
-80
17.
21
6.
91
92.
12
-90
12.
59
6.
94
95.
11
Volume84.63 Cut
5.
38
-100
90.
87
9.
72
8.
63
100.
00
-100
94.
59
15
R /W
20
8.
63
40
9.
93
15
99.
82
20
94.
65
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
Mass Haul-6017.19 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
80
90
80
90
100
-20
Mass Haul-5938.45 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
100
-20
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1834+00 TO STA.1837+00
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
66.
23 9.
65
62.
50 7.
79
52.
50 7.
79
46.
50 10.
79
10.
00 11.
52
66.
50 9.
83
62.
50 7.
83
52.
50 7.
83
46.
50 10.
83
10.
00 11.
56
9/6/201
3
Default
10.
56
10.
33
8.
37
8.
16
8.
34
8.
04
12.
33
12.
34
12.
36
14.
28
14.
28
14.
40
14.
76
14.
23
14.
23
14.
23
13.
97
93.
52
92.
61
89.
42
88.
84
78.
15
25.
63
13.
49
13.
45
13.
42
5.
63
5.
63
5.
37
4.
55
4.
51
4.
53
4.
54
6.
13
-80
Area12.33 Cut
NOT FOR CONSTRUCTION
-70
Volume335.30 Fill
Area84.84 Fill
-60
-50
-40
-30
-20
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
-10
0
10
1840+00
Fi
ber
20
30
40
DATE:
MJK
09/06/13
X015of 027
50
64.
44 8.
69
8.
07
8.
14
8.
03
8.
80
12.
29
13.
97
81.
30
33.
24
22.
91
20.
68
11.
30
5.
47
8.
40
27.
20
9.
79
8.
39
26.
70
100.
00
8.
37
8.
38
26.
32
26.
48
9.
97
8.
39
10.
20
16.
99
8.
40
10.
20
16.
99
26.
25
11.
09
26.
19
11.
09
14.
92
18.
18
13.
03
14.
92
14.
07
4.
57
10.
96
14.
07
4.
56
13.
71
14.
07
4.
52
13.
70
13.
98
4.
31
6.
15
13.
98
4.
31
6.
12
13.
98
5.
43
50
62.
50 7.
73
52.
50 7.
73
46.
50 10.
73
8.
04
40
60
60
DRAWN BY:
CHECKED BY:
HRD
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
64 T/
R
10.
00 11.
46
10.
04
94.
87
91.
00
30
9.
38
-90
20
100.
00
Volume42.01 Cut
7.
96
-100
26.
40
-20
8.
83
-20
22.
28
-15
9.
74
-15
10.
53
-10
10.
53
-10
15.
87
-5
17.
63
-5
15.
86
0
1841+00
12.
76
0
10
12.
76
5
0
10.
22
5
-10
10.
22
10
-20
12.
76
10
-30
10.
22
15
-40
13.
77
15
Area70.00 Fill
-50
13.
77
20
Volume286.74 Fill
-60
14.
06
20
-70
5.
51
25
Area20.36 Cut
4.
31
25
-80
5.
50
30
0.
00 Ex.Tr
ack
14.
73 T/
R
30
-90
14.
05
35
Volume60.55 Cut
14.
05
40
35
10.
81
-100
4.
62
40
10.
08
100
10.
09
Fi
ber
0.
00 Ex.Tr
ack
14.
69 T/
R
-20
95.
07
-20
94.
96
-15
99.
84
Fi
ber
-15
4.
64
30.
50
-10
13.
81
7.
57
7.
66
26.
77
-10
13.
81
9.
28
18.
61
-5
5.
51
100
-5
5.
51
90
0
12.
65
80
0
12.
65
70
5
11.
05
60
5
11.
06
-20
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
66 T/
R
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
62 T/
R
R /W
10
12.
64
5
10
11.
09
10
15
7.
82
Mass Haul-6136.51 C.Y.
15
25.
09
50
90
20
8.
53
40
80
20
90.
01
15
70
25
8.
53
30
60
25
9.
53
20
50
30
91.
18
10
40
30
94.
89
9.
30
18.
52
-20
35
R /W
9.
33
18.
45
5
40
35
9.
57
25
9.
59
10.
53
15.
39
10
40
9.
56
10.
82
99.
81
30
30
100.
00
12.
96
10.
19
20
R /W
12.
98
15
65.
48 9.
26
13.
95
13.
95
5.
85
10.
14
10
62.
50 7.
77
13.
95
5.
83
0.
00 Ex.Tr
ack
14.
67 T/
R
25
R /W
14.
09
30
52.
50 7.
77
46.
50 10.
77
14.
06
5.
84
14.
06
4.
25
Mass Haul-6382.77 C.Y.
94.
95
10.
20
100.
00
Fi
ber
35
20.
00 Pr
op.Tr
ack
14.
68 T/
R
10.
00 11.
50
14.
06
R /W
35
95.
03
9.
68
1838+00
81.
98
0
8.
29
-10
27.
38
-20
9.
13
-30
10.
36
-40
17.
67
-15
23.
34
-10
12.
46
-5
12.
48
Area69.93 Fill
-50
1839+00
13.
82
Volume218.55 Fill
-60
0
13.
86
-70
-10
13.
81
Area22.82 Cut
-20
13.
60
-80
-30
4.
62
-15
13.
60
Volume99.23 Cut
-40
4.
58
Area96.22 Fill
-50
13.
53
Volume307.69 Fill
-60
6.
27
-10
7.
31
-90
-70
4.
63
Area10.35 Cut
10.
62
7.
71
26.
70
-80
13.
53
7.
63
26.
93
-90
6.
30
7.
64
28.
40
Volume61.44 Cut
14.
94
9.
72
7.
70
94.
12
-5
8.
84
-100
87.
13
9.
76
99.
68
-100
93.
98
10.
57
10.
56
99.
73
0
8.
83
0
0.
00 Ex.Tr
ack
14.
80 T/
R
20
R /W
40
11.
41
20
99.
79
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
Mass Haul-6902.24 C.Y.
40
35
30
25
70
70
20
15
10
5
0
-5
-10
-15
80
80
90
90
100
-20
Mass Haul-6676.05 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
100
-20
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1838+00 TO STA.1841+00
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
65.
34 9.
13
62.
50 7.
71
52.
50 7.
71
46.
50 10.
71
10.
00 11.
44
64.
20 8.
60
62.
50 7.
75
52.
50 7.
75
46.
50 10.
75
10.
00 11.
48
9/6/201
3
Default
13.
89
13.
88
13.
86
13.
85
4.
69
0.
86
4.
19
4.
39
NOT FOR CONSTRUCTION
-20
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
-10
0
10
1844+00
20
30
40
DATE:
MJK
09/06/13
X016of 027
Fi
ber
50
60
DRAWN BY:
CHECKED BY:
HRD
66.
68 9.
78
62.
50 7.
69
52.
50 7.
69
46.
50 10.
69
8.
29
8.
22
8.
27
9.
29
28.
79
30.
83
46.
18
86.
12
9.
86
10.
35
8.
35
28.
58
64.
18
11.
47
11.
68
13.
86
11.
03
12.
44
10.
22
28.
35
12.
45
10.
18
16.
71
13.
65
14.
47
13.
66
13.
84
4.
42
13.
84
13.
77
4.
37
6.
46
13.
77
4.
43
6.
43
13.
77
4.
44
4.
43
13.
47
13.
48
5.
51
5.
46
60
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
60 T/
R
10.
00 11.
42
9.
87
10.
45
8.
44
22.
35
12.
83
8.
24
23.
00
10.
31
8.
25
26.
20
15.
41
10.
16
13.
72
9.
05
10.
16
50
70
70
10.
59
-30
40
10.
68
-40
30
87.
22
Area63.54 Fill
-50
20
91.
28
Volume231.46 Fill
-60
10.
28
-70
80.
32
Area27.32 Cut
9.
43
-80
56.
99
-90
8.
26
Volume103.88 Cut
28.
15
-100
9.
70
-20
10.
75
-20
21.
96
-15
15.
90
-15
13.
72
-10
12.
68
-10
1845+00
12.
69
-5
10
6.
33
-5
0
10.
92
0
-10
10.
95
0
13.
72
5
6.
33
5
13.
81
10
14.
04
10
-20
14.
04
15
-30
5.
81
15
-40
4.
41
20
Area61.18 Fill
-50
4.
43
20
0.
00 Ex.Tr
ack
14.
53 T/
R
25
Volume230.98 Fill
-60
13.
79
25
-70
13.
53
30
Area33.93 Cut
4.
58
30
-80
5.
74
35
-90
12.
12
40
35
Volume113.42 Cut
13.
53
40
85.
98
-100
86.
14
100
8.
73
Fi
ber
0.
00 Ex.Tr
ack
14.
54 T/
R
-20
86.
25
-20
9.
15
-15
89.
22
-15
86.
29
-10
10.
65
-10
99.
81
11.
32
11.
38
97.
70
100.
00
-5
R /W
67.
09 9.
98
Fi
ber
-5
12.
10
100
0
5.
75
90
0
11.
47
80
5
11.
43
-20
5
12.
10
5
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
58 T/
R
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
69 T/
R
R /W
10
11.
49
10
10
12.
09
Mass Haul-7048.94 C.Y.
15
11.
53
70
90
15
9.
89
60
80
20
18.
39
50
70
20
8.
20
40
60
25
22.
92
10.
10
30
50
25
9.
45
10.
86
99.
91
94.
58
20
40
62.
50 7.
68
30
R /W
R /W
-20
30
55.
61
10.
83
100.
00
Fi
ber
8.
30
27.
52
5
30
10.
47
9.
85
62.
15
10
9.
51
11.
18
15.
07
20
57.
52
11.
20
14.
99
10
52.
50 7.
68
46.
50 10.
68
12.
91
9.
40
10
35
88.
29
8.
94
12.
92
9.
38
25
40
35
9.
22
8.
33
41.
96
12.
92
9.
36
30
40
9.
89
9.
78
20.
62
26.
88
13.
60
0.
00 Ex.Tr
ack
14.
50 T/
R
Mass Haul-7164.22 C.Y.
88.
42
11.
44
14.
79
13.
96
5.
64
13.
96
4.
39
4.
39
13.
92
R /W
35
88.
35
11.
45
14.
76
1842+00
11.
45
0
14.
75
-10
11.
45
-15
12.
95
25
10.
27
30
14.
75
-10
13.
96
0
12.
96
-5
4.
35
1843+00
4.
61
-10
10.
26
35
20.
00 Pr
op.Tr
ack
14.
59 T/
R
13.
92
4.
62
-15
12.
96
10.
00 11.
41
13.
65
5.
90
-10
13.
79
0
0.
00 Ex.Tr
ack
14.
50 T/
R
-5
5.
64
-20
11.
62
-20
13.
64
11.
60
0
10.
24
-30
13.
89
-40
4.
69
Area61.15 Fill
-50
13.
52
Volume242.87 Fill
-60
13.
52
-70
5.
71
Area31.57 Cut
5.
72
-80
-30
12.
47
Volume96.17 Cut
-40
5.
92
Area61.45 Fill
-50
13.
48
13.
53
Volume227.03 Fill
-60
9.
88
-90
-70
12.
47
22.
80
Area28.77 Cut
9.
89
8.
16
90.
13
-80
8.
11
10.
73
90.
35
-90
9.
65
9.
27
53.
06
10.
74
90.
35
Volume111.75 Cut
18.
54
7.
33
86.
68
9.
72
10.
73
90.
46
11.
07
11.
06
99.
91
99.
84
-100
22.
69
10.
21
10.
27
92.
51
-100
92.
51
15
R /W
20
10.
28
40
11.
06
15
93.
02
20
99.
86
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
Mass Haul-7409.36 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
80
90
80
90
100
-20
Mass Haul-7291.81 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
100
-20
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1842+00 TO STA.1845+00
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
67.
50 10.
28
62.
50 7.
78
52.
50 7.
78
46.
50 10.
78
10.
00 11.
51
67.
04 9.
94
62.
50 7.
67
52.
50 7.
67
46.
50 10.
67
10.
00 11.
40
9/6/201
3
Default
8.
27
8.
19
8.
17
8.
22
8.
00
11.
85
11.
86
85.
17
84.
47
79.
36
74.
48
24.
18
12.
07
12.
04
13.
96
13.
95
13.
02
13.
01
11.
55
11.
51
9.
78
8.
08
9.
14
9.
08
9.
09
8.
25
8.
24
8.
23
7.
26
7.
26
7.
84
12.
34
12.
34
12.
37
5.
73
5.
74
9.
46
9.
48
14.
73
14.
92
21.
39
27.
40
79.
94
82.
90
99.
43
94.
90
94.
80
94.
67
86.
50
85.
24
25.
30
12.
05
12.
01
11.
93
1846+00
14.
12
0
0
-5
-5
-10
-10
-15
-15
-20
-20
-100
Volume12.99 Cut
-90
-80
Area0.46 Cut
NOT FOR CONSTRUCTION
-70
Volume381.95 Fill
Area110.82 Fill
-60
-50
-40
-30
-20
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
-10
0
10
1848+00
20
30
40
DATE:
MJK
09/06/13
X017of 027
8.
85
7.
70
7.
68
7.
68
18.
79
18.
94
23.
34
23.
51
24.
73
8.
57
8.
90
16.
34
97.
61
11.
67
10.
65
14.
86
13.
48
13.
51
9.
39
14.
95
9.
31
15.
37
6.
27
15.
26
3.
01
4.
36
15.
37
14.
63
4.
40
15.
24
14.
63
4.
43
5.
65
14.
63
4.
43
4.
36
14.
26
5.
60
40
53.
03 7.
92
46.
50 11.
19
11.
59
12.
66
30
50
60
50
60
DRAWN BY:
CHECKED BY:
HRD
R /W
R /W
20.
00 Pr
op.Tr
ack
15.
10 T/
R
10.
00 11.
92
11.
01
11.
58
12.
70
10.
92
14.
92
14.
18
7.
92
7.
96
27.
10
8.
00
7.
73
24.
77
7.
73
83.
99
25.
20
7.
73
84.
33
1849+00
20
70
70
80
80
8.
37
5
10
100.
00
5
0
8.
11
10
-10
79.
21
10
-20
Fi
ber
15
-30
7.
87
15
-40
55.
90
20
Area115.67 Fill
-50
8.
14
20
Volume419.43 Fill
-60
41.
76
25
-70
7.
80
25
Area2.93 Cut
24.
63
30
-80
9.
45
30
-90
10.
66
35
Volume6.27 Cut
18.
78
40
35
8.
20
-100
15.
36
40
84.
34
100
92.
39
Fi
ber
0.
00 Ex.Tr
ack
15.
45 T/
R
-20
8.
88
-20
8.
88
-15
98.
95
8.
19
100.
00
Fi
ber
-15
98.
98
8.
09
89.
63
8.
64
7.
94
26.
01
60.
85
11.
28
14.
19
-10
R /W
64.
31 8.
82
62.
50 7.
92
11.
29
14.
15
-10
12.
51
100
-5
12.
02
90
-5
11.
31
80
0
12.
51
-20
0
9.
84
5
5
9.
84
10
5
14.
26
R /W
R /W
Mass Haul-7586.24 C.Y.
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
99 T/
R
R /W
R /W
R /W
20.
00 Pr
op.Tr
ack
15.
11 T/
R
10
5.
59
70
90
10
14.
27
60
80
15
14.
27
50
70
15
4.
51
40
60
20
14.
27
30
50
20
4.
50
20
40
52.
50 7.
92
12.
81
12.
43
30
25
4.
49
10
13.
96
20
25
14.
58
25
9.
75
-20
30
0.
00 Ex.Tr
ack
14.
91 T/
R
30
6.
83
10
10.
85
5
30
4.
43
0
14.
38
10
35
14.
35
-10
14.
68
25
35
5.
77
-15
5.
75
30
40
14.
35
-10
14.
68
0
4.
39
0.
00 Ex.Tr
ack
15.
20 T/
R
45
14.
33
-5
4.
39
1847+00
14.
51
-10
14.
68
-15
4.
38
-10
4.
51
-5
46.
50 10.
92
14.
10
5.
70
0
Fi
ber
35
20.
00 Pr
op.Tr
ack
14.
83 T/
R
10.
00 11.
65
14.
10
5.
70
35
40
5.
77
0
0.
00 Ex.Tr
ack
14.
76 T/
R
11.
11
14.
10
5.
71
10.
31
10.
52
15.
51
13.
13
14.
16
R /W
Mass Haul-7877.22 C.Y.
5.
83
-20
14.
12
-30
4.
55
-40
14.
12
Area80.02 Fill
-50
4.
54
Volume261.48 Fill
-60
4.
53
-70
14.
10
Area11.76 Cut
-20
4.
41
-80
-30
14.
10
Volume84.61 Cut
-40
13.
49
7.
77
Area95.43 Fill
-50
4.
41
7.
76
26.
71
25.
33
Volume324.90 Fill
-60
5.
84
-90
-70
7.
87
7.
30
84.
50
Area6.56 Cut
13.
49
-100
-80
8.
30
8.
08
92.
22
91.
39
-90
21.
50
8.
18
92.
68
Volume33.92 Cut
25.
03
9.
11
8.
26
99.
45
-100
5.
85
15
R /W
20
9.
51
40
9.
43
15
98.
85
20
99.
44
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
52.
85 8.
02
46.
50 11.
20
10.
00 11.
93
63.
52 8.
59
62.
50 8.
08
52.
50 8.
08
46.
50 11.
08
10.
00 11.
81
Mass Haul-8659.34 C.Y.
45
40
35
30
25
20
15
10
5
0
-5
-10
-15
90
90
100
-20
Mass Haul-8246.18 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
100
-20
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1846+00 TO STA.1849+00
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
9/6/201
3
Default
9.
47
8.
08
11.
01
11.
01
11.
01
11.
01
13.
49
13.
99
13.
99
13.
99
14.
04
13.
92
13.
92
27.
24
13.
07
13.
06
13.
06
13.
05
5.
72
4.
42
4.
42
4.
39
4.
50
5.
67
5.
68
1850+00
8.
66
9.
80
9.
80
9.
65
12.
07
12.
29
12.
30
98.
75
98.
40
90.
06
18.
03
11.
24
11.
21
10
5
5
0
0
-5
-5
-10
-10
-15
-15
-20
-20
-100
Volume49.99 Cut
-90
-80
Area14.57 Cut
NOT FOR CONSTRUCTION
-70
Volume231.39 Fill
Area62.24 Fill
-60
-50
-40
-30
-20
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
-10
0
1852+00
10
20
30
DATE:
MJK
09/06/13
X018of 027
40
50
60
DRAWN BY:
CHECKED BY:
HRD
70
80
12.
76
12.
75
9.
79
9.
77
8.
74
10.
32
10.
36
16.
54
16.
62
28.
25
8.
78
13.
90
5.
59
70
100.
00
13.
90
5.
58
60
8.
73
13.
90
5.
57
50
83.
96
14.
04
4.
34
40
R /W
14.
02
4.
48
30
64.
62 8.
90
14.
02
4.
49
20
62.
50 7.
84
13.
74
6.
33
10
52.
50 7.
84
13.
74
6.
33
1853+00
46.
50 10.
84
10.
01
0
R /W
20.
00 Pr
op.Tr
ack
14.
75 T/
R
10.
01
13.
74
6.
33
-10
80
8.
70
10
-20
95.
06
15
-30
8.
90
15
-40
75.
71
20
Area71.14 Fill
-50
Fi
ber
20
Volume247.00 Fill
-60
8.
91
25
-70
9.
42
25
Area13.45 Cut
28.
69
30
-80
22.
88
30
-90
11.
13
35
Volume51.88 Cut
15.
24
40
35
14.
98
-100
11.
13
40
15.
10
100
8.
90
Fi
ber
0.
00 Ex.Tr
ack
14.
70 T/
R
-20
87.
70
-20
9.
69
-15
9.
69
-15
98.
70
-10
98.
74
Fi
ber
-10
12.
49
9.
08
29.
24
-5
9.
88
9.
08
29.
05
-5
15.
24
9.
08
28.
94
0
12.
49
9.
08
28.
93
0
9.
87
10.
00 11.
57
9.
08
28.
91
5
13.
74
100
5
6.
12
90
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
87 T/
R
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
69 T/
R
R /W
10
13.
99
80
10
13.
99
-20
15
4.
54
5
15
4.
54
10
20
0.
00 Ex.Tr
ack
14.
63 T/
R
Mass Haul-9036.04 C.Y.
20
13.
99
70
90
25
4.
52
60
80
25
R /W
9.
08
28.
90
8.
63
9.
08
28.
90
70
30
13.
99
50
60
30
4.
41
40
86.
87
10.
31
18.
23
-20
35
13.
99
30
50
63.
11 8.
41
10.
63
17.
03
5
40
35
13.
95
20
40
62.
50 8.
10
11.
31
30
R /W
R /W
12.
70
9.
97
0.
00 Ex.Tr
ack
14.
77 T/
R
10
40
4.
42
Fi
ber
12.
70
9.
96
14.
56
12.
70
9.
95
14.
12
4.
38
14.
12
14.
12
13.
96
14.
09
4.
34
5.
72
13.
90
4.
60
4.
38
13.
90
20
52.
50 8.
10
46.
50 11.
10
10.
00 11.
83
13.
89
Mass Haul-9297.09 C.Y.
5.
65
10
86.
00
0
8.
41
-10
65.
63
-20
8.
38
-15
26.
38
-10
9.
01
25
20.
93
30
20.
00 Pr
op.Tr
ack
15.
01 T/
R
35
9.
58
-30
1851+00
10.
97
-5
0.
00 Ex.Tr
ack
14.
69 T/
R
0
10
18.
72
-40
0
10.
97
Area94.19 Fill
-50
-10
14.
31
Volume388.64 Fill
-60
-20
5.
48
-15
14.
29
-70
-30
5.
49
-10
13.
91
Area3.52 Cut
11.
48
-5
10.
98
-80
5.
51
25
12.
39
Volume11.93 Cut
-40
12.
86
Area62.72 Fill
-50
9.
64
Volume290.57 Fill
-60
18.
94
30
9.
64
-90
-70
8.
37
Area12.42 Cut
29.
02
R /W
35
14.
27
-100
-80
8.
31
8.
69
56.
03
-90
8.
25
9.
20
84.
37
Volume29.52 Cut
29.
57
10.
02
98.
41
-100
31.
70
10.
04
99.
05
0
5.
70
9.
53
85.
67
81.
70
15
R /W
20
10.
39
40
10.
46
15
97.
74
20
98.
79
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
Mass Haul-9673.62 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
90
100
-20
Mass Haul-9478.50 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
90
100
-20
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1850+00 TO STA.1853+00
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
64.
40 8.
73
62.
50 7.
78
52.
50 7.
78
46.
50 10.
78
10.
00 11.
51
64.
20 8.
81
62.
50 7.
96
52.
50 7.
96
46.
50 10.
96
10.
00 11.
69
9/6/201
3
Default
8.
18
9.
76
12.
05
12.
05
12.
06
92.
02
59.
38
11.
96
11.
95
11.
94
1854+00
NOT FOR CONSTRUCTION
-70
Volume263.83 Fill
Area63.18 Fill
-60
-50
-40
-30
-20
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
-10
0
10
1856+00
20
30
DATE:
MJK
09/06/13
X019of 027
40
Fi
ber
50
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
69 T/
R
64.
16 8.
60
62.
50 7.
78
52.
50 7.
78
46.
50 10.
78
10.
00 11.
51
11.
57
10.
04
27.
33
13.
10
8.
89
7.
68
8.
85
38.
72
34.
35
12.
84
9.
17
9.
20
9.
13
9.
49
8.
45
8.
45
8.
45
8.
45
23.
81
48.
22
48.
23
48.
24
48.
28
100.
00
9.
65
8.
37
11.
28
15.
43
62.
53
12.
51
12.
49
9.
84
13.
58
9.
78
13.
59
4.
48
13.
88
13.
88
4.
39
6.
13
13.
84
4.
45
6.
10
13.
84
4.
46
4.
49
13.
12
13.
84
7.
63
50
60
70
60
DRAWN BY:
CHECKED BY:
HRD
70
80
80
8.
95
Area10.41 Cut
40
100.
00
-80
30
8.
80
-90
20
92.
94
Volume41.64 Cut
8.
43
-100
37.
84
-20
10.
59
-20
10.
59
-15
16.
16
-15
16.
14
-10
12.
37
-10
10.
59
-5
1857+00
10.
59
-5
10
9.
94
0
0
16.
14
0
-10
16.
13
5
12.
38
5
9.
92
10
13.
56
10
-20
13.
56
15
-30
6.
07
15
-40
13.
88
20
Area58.53 Fill
-50
4.
42
20
Volume225.40 Fill
-60
6.
06
25
-70
13.
88
25
Area9.31 Cut
4.
37
30
0.
00 Ex.Tr
ack
14.
46 T/
R
30
-80
13.
79
35
-90
13.
65
40
35
Volume36.52 Cut
57.
47
-100
4.
49
40
9.
15
100
58.
51
Fi
ber
0.
00 Ex.Tr
ack
14.
51 T/
R
-20
58.
25
-20
9.
14
-15
58.
81
-15
59.
12
-10
9.
32
-10
9.
38
-5
86.
73
-5
88.
76
0
9.
67
0
98.
95
8.
98
Fi
ber
5
13.
65
100
5
6.
93
90
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
69 T/
R
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
69 T/
R
R /W
10
6.
95
80
10
12.
04
-20
15
12.
04
5
15
12.
03
10
20
11.
57
Mass Haul-9899.86 C.Y.
20
11.
55
70
90
25
11.
73
60
80
25
19.
51
9.
03
89.
35
50
70
30
R /W
100.
00
60
30
11.
66
9.
42
98.
57
40
50
64.
14 8.
59
-20
35
9.
01
8.
88
100.
00
30
62.
50 7.
78
40
R /W
R /W
5
40
35
8.
97
8.
65
79.
57
Fi
ber
8.
40
30
52.
50 7.
78
46.
50 10.
78
8.
41
8.
40
8.
83
24.
02
28.
12
9.
70
16.
70
10
40
87.
21
8.
56
55.
59
20
27.
45
9.
82
20
27.
30
12.
41
12.
40
13.
73
5.
85
16.
33
13.
73
5.
84
0.
00 Ex.Tr
ack
14.
60 T/
R
Mass Haul-10143.73 C.Y.
89.
12
8.
57
10
27.
83
0
9.
09
25
10.
22
30
10.
98
13.
73
5.
83
10
10.
95
13.
94
4.
58
0
12.
86
35
20.
00 Pr
op.Tr
ack
14.
69 T/
R
13.
93
4.
38
25
9.
05
12.
86
13.
93
4.
43
30
21.
97
12.
86
9.
04
10.
00 11.
51
13.
55
R /W
35
16.
19
13.
95
6.
07
-10
9.
04
-15
13.
95
-10
6.
06
-5
13.
95
11.
01
13.
55
6.
39
-10
6.
06
-20
1855+00
6.
39
-15
14.
22
0
0.
00 Ex.Tr
ack
14.
79 T/
R
11.
00
13.
58
-10
14.
25
-30
10.
58
-5
4.
41
-40
13.
60
0
1.
86
Area75.15 Fill
-50
14.
13
Volume270.92 Fill
-60
14.
13
-70
-20
4.
42
Area10.68 Cut
-30
4.
43
Volume44.67 Cut
-40
14.
38
Area79.29 Fill
-50
7.
42
Volume286.00 Fill
-60
13.
92
-80
-70
10.
53
Area12.07 Cut
6.
12
-90
-80
14.
68
7.
34
23.
86
-90
21.
84
8.
71
8.
69
90.
13
8.
71
91.
17
Volume42.13 Cut
13.
92
-100
91.
16
9.
51
98.
83
-100
6.
13
15
R /W
20
8.
99
40
8.
99
15
98.
57
20
98.
50
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
Mass Haul-10554.80 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
90
100
-20
Mass Haul-10365.92 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
90
100
-20
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1854+00 TO STA.1857+00
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
63.
77 8.
41
62.
50 7.
78
52.
50 7.
78
46.
50 10.
78
10.
00 11.
51
64.
34 8.
70
62.
50 7.
78
52.
50 7.
78
46.
50 10.
78
10.
00 11.
51
9/6/201
3
Default
7.
98
8.
76
11.
80
11.
86
13.
39
13.
39
13.
86
13.
86
13.
89
13.
90
13.
90
13.
70
13.
70
12.
53
10.
95
10.
94
10.
94
9.
95
10.
89
33.
36
28.
07
12.
86
12.
58
7.
26
7.
25
4.
62
4.
62
1.
50
4.
34
4.
34
6.
04
6.
04
9.
29
14.
60
14.
62
14.
63
34.
79
55.
19
80
5
-20
90
100
40
40
35
35
30
30
25
25
20
20
15
15
10
10
5
5
0
0
-5
-5
-10
-10
-15
-15
-20
-20
-100
-90
-80
NOT FOR CONSTRUCTION
Volume184.21 Cut
Area50.87 Cut
-70
Volume108.51 Fill
Area23.82 Fill
-60
-50
-40
-30
-20
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
-10
0
10
1860+00
20
30
40
DATE:
MJK
09/06/13
X020of 027
50
60
DRAWN BY:
CHECKED BY:
HRD
70
11.
65
11.
60
94.
42
60
75.
02
50
68.
98 11.
02
40
62.
50 7.
78
9.
05
41.
98
30
R /W
R /W
10.
08
23.
66
20
52.
50 7.
78
46.
50 10.
78
9.
87
9.
85
10.
82
10
18.
74
12.
68
15.
68
0
18.
28
12.
69
10.
47
1861+00
10.
50
-10
12.
70
-20
10.
46
-30
13.
91
-40
13.
59
Area46.37 Fill
-50
13.
59
Volume129.98 Fill
-60
4.
42
-70
6.
16
Area41.37 Cut
6.
15
-80
20.
00 Pr
op.Tr
ack
14.
69 T/
R
10.
00 11.
51
-90
13.
91
Volume170.81 Cut
13.
87
-100
4.
39
100
13.
87
Fi
ber
0.
00 Ex.Tr
ack
14.
55 T/
R
-20
13.
50
-20
4.
57
-15
13.
49
-15
4.
59
-10
6.
56
-10
6.
60
-5
9.
42
-5
11.
07
0
14.
93
0
9.
36
5
21.
62
5
21.
95
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
69 T/
R
10
7.
70
10
R /W
15
33.
26
R /W
R /W
15
9.
42
Fi
ber
20.
00 Pr
op.Tr
ack
14.
69 T/
R
20
Fi
ber
10
20
0.
00 Ex.Tr
ack
14.
53 T/
R
Mass Haul-10588.99 C.Y.
25
45.
93
90
25
70
80
80
11.
18
70
80
30
9.
44
10.
94
100.
00
70
30
46.
04
11.
19
10.
22
-20
35
99.
26
60
70.
79
51.
01
5
40
35
R /W
8.
57
39.
75
60
67.
64 10.
35
10.
12
28.
79
10.
01
11.
69
16.
55
10.
17
11.
98
14.
29
50.
14
12.
41
48.
35
12.
84
9.
56
11.
95
10
40
11.
21
50
62.
50 7.
78
14.
01
50
R /W
R /W
52.
50 7.
78
46.
50 10.
78
14.
10
5.
98
0.
00 Ex.Tr
ack
14.
74 T/
R
Mass Haul-10506.42 C.Y.
89.
24
40
8.
79
30
39.
28
20
9.
73
10
46.
02
20
10.
77
25
40
10.
79
Fi
ber
30
30
97.
47
0
20
100.
00
12.
38
14.
30
14.
10
4.
47
10
9.
23
12.
38
14.
21
14.
10
4.
41
4.
46
0
14.
00
14.
05
20
5.
99
13.
69
4.
50
25
10.
13
12.
39
14.
18
35
20.
00 Pr
op.Tr
ack
14.
69 T/
R
13.
69
6.
08
30
49.
21
12.
61
10.
00 11.
51
13.
69
6.
09
1859+00
6.
12
R /W
35
52.
93
12.
61
1858+00
12.
94
-10
9.
18
-20
9.
18
-15
8.
25
-10
13.
75
-5
6.
00
-30
-10
13.
97
-40
-20
13.
75
12.
63
11.
45
-15
14.
06
12.
58
11.
75
-10
4.
47
8.
37
-5
6.
00
0
0.
00 Ex.Tr
ack
14.
61 T/
R
8.
48
35.
32
0
4.
42
Area14.13 Fill
-50
13.
97
Volume134.57 Fill
-60
4.
45
-70
-30
13.
97
Area44.90 Cut
-40
4.
46
-80
-50
13.
67
Volume100.39 Cut
32.
73
Area34.78 Fill
9.
96
Volume90.59 Fill
-60
5.
89
-90
-70
45.
91
Area48.60 Cut
13.
01
9.
13
36.
99
-100
-80
13.
10
10.
70
68.
39
-90
13.
10
10.
64
70.
85
Volume173.16 Cut
9.
99
9.
93
91.
55
R /W
-100
10.
04
10.
14
15
10.
49
10.
45
15
95.
64
40
99.
45
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
Mass Haul-10389.88 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
90
90
100
-20
Mass Haul-10430.72 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
100
-20
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1858+00 TO STA.1861+00
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
69.
36 11.
21
62.
50 7.
78
52.
50 7.
78
46.
50 10.
78
10.
00 11.
51
69.
16 11.
11
62.
50 7.
78
52.
50 7.
78
46.
50 10.
78
10.
00 11.
51
9/6/201
3
Default
11.
54
13.
27
6.
78
10.
00
9.
26
9.
02
8.
08
7.
88
9.
17
11.
66
11.
70
7.
08
7.
00
7.
15
11.
68
12.
01
13.
73
20.
23
23.
08
32.
19
36.
16
56.
96
82.
60
93.
49
45.
28
44.
62
32.
92
15.
25
13.
94
6.
24
NOT FOR CONSTRUCTION
-40
-30
-20
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
-10
0
10
1863+00
20
30
40
DATE:
MJK
09/06/13
X021of 027
50
Fi
ber
R /W
48.
46 9.
80
46.
50 10.
78
10.
00 11.
51
12.
07
12.
60
13.
47
13.
61
6.
58
5.
75
11.
36
10.
36
8.
65
6.
78
6.
39
6.
44
6.
38
15.
71
19.
77
24.
78
26.
42
27.
77
29.
86
11.
39
11.
45
11.
30
11.
17
65.
42
74.
17
88.
61
100.
00
9.
95
12.
28
10.
22
12.
89
47.
30
13.
01
5.
24
13.
62
13.
78
4.
44
8.
15
13.
86
0.
06
6.
30
13.
81
13.
88
4.
54
70
60
DRAWN BY:
CHECKED BY:
HRD
70
80
80
11.
30
Area95.47 Fill
-50
60
100.
00
Volume341.57 Fill
-60
50
11.
21
-70
40
94.
45
Area1.40 Cut
11.
37
-80
81.
72
-90
11.
49
Volume4.55 Cut
68.
35
-100
11.
43
-20
59.
33
-20
11.
23
-15
50.
92
-15
11.
21
-10
30
50.
87
-10
1863+50
20
8.
05
-5
10
10.
65
-5
0
50.
66
0
-10
43.
95
0
7.
95
5
33.
67
5
6.
93
10
27.
32
10
6.
86
15
-20
25.
84
15
-30
7.
13
20
-40
10.
34
20
Area99.02 Fill
-50
24.
73
25
Volume180.08 Fill
-60
16.
16
25
-70
10.
35
30
Area49.43 Cut
16.
11
30
20.
00 Pr
op.Tr
ack
14.
69 T/
R
35
-80
12.
20
40
35
-90
12.
20
40
Volume47.07 Cut
10.
46
-100
13.
00
100
9.
36
Fi
ber
0.
00 Ex.Tr
ack
14.
44 T/
R
-20
21.
94
-20
7.
03
-15
6.
96
-15
31.
04
-10
36.
63
-10
8.
09
-5
45.
56
11.
37
89.
25
Fi
ber
-5
R /W
11.
37
88.
60
35.
36
11.
63
8.
02
7.
35
26.
06
65.
39
7.
82
24.
82
11.
61
7.
82
24.
77
0
10.
77
100
0
10.
76
90
5
13.
65
80
5
6.
65
70
R /W
20.
00 Pr
op.Tr
ack
14.
69 T/
R
20.
00 Pr
op.Tr
ack
14.
69 T/
R
R /W
R /W
R /W
10
13.
66
-20
10
6.
62
5
15
13.
98
10
15
0.
00 Ex.Tr
ack
14.
60 T/
R
R /W
Mass Haul-10436.75 C.Y.
20
13.
98
60
90
20
4.
49
50
80
25
4.
48
40
70
25
13.
98
30
60
30
4.
44
20
50
30
14.
03
10
11.
51
7.
83
24.
73
-20
35
4.
54
20
40
64.
80
7.
93
24.
46
5
40
35
14.
02
25
30
61.
96
10.
33
15.
35
10
40
13.
73
30
R /W
10.
39
15.
14
20
10.
45
10.
39
10
50.
37
10.
98
13.
62
15.
14
20
9.
88
12.
08
10.
79
25
50.
24
12.
08
0.
00 Ex.Tr
ack
14.
46 T/
R
30
50.
52 8.
77
46.
50 10.
78
13.
66
6.
68
6.
69
13.
87
13.
66
4.
56
10.
79
13.
84
4.
31
Mass Haul-10653.61 C.Y.
6.
22
Fi
ber
35
20.
00 Pr
op.Tr
ack
14.
69 T/
R
10.
00 11.
51
12.
72
13.
84
R /W
35
4.
55
0
17.
45
-10
10.
69
-15
11.
19
-10
4.
38
0
15.
53
-5
7.
29
12.
72
1862+00
7.
29
-10
14.
26
13.
61
6.
32
11.
79
-15
12.
51
13.
84
5.
10
11.
33
11.
79
-10
12.
98
13.
90
4.
47
11.
33
11.
79
-5
9.
35
13.
87
1.
86
0
0.
00 Ex.Tr
ack
14.
52 T/
R
11.
33
27.
70
0
10.
57
13.
86
1861+30
4.
51
-20
13.
60
7.
42
8.
23
33.
20
-20
5.
91
-30
12.
72
-40
9.
93
Area81.52 Fill
-50
-30
11.
14
Volume71.05 Fill
-60
-40
14.
04
-70
9.
04
Area2.16 Cut
-50
18.
96
Volume24.18 Cut
23.
49
15
8.
25
Area88.98 Fill
39.
32
Volume221.02 Fill
-60
7.
62
-80
-70
8.
20
Area1.05 Cut
33.
24
-90
-80
9.
09
-100
-90
45.
58
Volume4.17 Cut
44.
11
40
R /W
-100
9.
08
15
45.
91
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
Mass Haul-11123.65 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
90
100
-20
Mass Haul-10990.63 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
90
100
-20
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1861+30 TO STA.1863+50
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
69.
78 11.
42
62.
50 7.
78
52.
50 7.
78
46.
50 10.
78
10.
00 11.
51
48.
79 9.
63
46.
50 10.
78
10.
00 11.
51
9/6/201
3
Default
12.
50
NOT FOR CONSTRUCTION
-70
Volume76.28 Fill
Area173.01 Fill
-60
-50
-40
-30
-20
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
1864+72
6.
91
Area21.52 Cut
65.
07
-80
5.
83
-90
49.
97
Volume4.97 Cut
5.
17
-100
30.
24
-20
5.
23
-20
28.
05
-15
5.
22
-15
5.
42
-10
8.
76
-10
27.
79
-5
26.
96
-5
18.
88
0
10.
24
0
11.
79
5
15.
38
5
12.
35
-10
0
10
20
30
40
DATE:
MJK
09/06/13
X022of 027
50
6.
38
60.
79
5.
07
50
R /W
R /W
5.
10
29.
26
40
5.
90
5.
10
28.
08
30
53.
95
5.
20
27.
94
20
55.
54 6.
23
9.
36
27.
49
13.
48
6.
43
17.
43
13.
66
5.
86
10.
22
13.
76
4.
81
12.
04
13.
78
4.
57
12.
35
13.
76
3.
20
9.
68
13.
76
4.
35
10.
57
13.
65
5.
34
10
15.
40
13.
59
0
46.
50 10.
75
10.
00 11.
48
13.
43
11.
95
1864+85
5.
70
6.
48
-10
Fi
ber
20.
00 Pr
op.Tr
ack
14.
66 T/
R
10
9.
68
10
11.
29
15
-20
13.
31
15
-30
6.
92
20
-40
13.
65
20
Area175.29 Fill
-50
5.
88
25
Volume83.85 Fill
-60
13.
73
25
-70
13.
78
30
Area20.84 Cut
4.
99
30
-80
4.
54
35
0.
00 Ex.Tr
ack
14.
36 T/
R
40
35
-90
13.
73
40
Volume10.20 Cut
12.
18
-100
10.
00 10.
78
100
9.
92
Fi
ber
0.
00 Ex.Tr
ack
14.
38 T/
R
-20
9.
54
-20
23.
00 10.
52
24.
32 10.
50
-15
9.
69
-15
31.
41
-10
28.
84
-10
30.
15
-5
9.
07
7.
39
-5
45.
65
69.
02
0
R /W
62.
88 7.
97
62.
50 7.
78
Fi
ber
0
13.
73
100
5
13.
64
90
5
2.
02
80
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
67 T/
R
R /W
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
65 T/
R
10
5.
22
-20
10
4.
38
5
15
13.
53
10
15
5.
89
Mass Haul-11295.22 C.Y.
20
11.
97
70
90
20
13.
23
60
80
25
7.
33
50
70
25
12.
15
9.
08
45.
68
40
60
30
10.
26
9.
82
88.
79
30
50
R /W
R /W
5.
77
46.
29
40
52.
50 7.
78
46.
50 10.
78
30
30
26.
26
7.
65
58.
47
Fi
ber
5.
26
31.
14
-20
35
9.
61
7.
74
49.
35
5.
35
5
40
35
9.
16
6.
83
37.
93
5.
62
5.
34
8.
20
20.
22
28.
02
10.
26
10
40
30.
03
5.
80
32.
90
20
27.
66
11.
55
15.
37
20
26.
48
12.
35
9.
68
11.
95
13.
15
7.
38
Mass Haul-11634.23 C.Y.
33.
66
5.
95
27.
90
10
5.
91
0
27.
00
-10
6.
43
-15
6.
94
-10
10.
26
20
24.
82
25
15.
57
30
20.
00 Pr
op.Tr
ack
14.
69 T/
R
35
23.
45
-5
10
10.
37
12.
37
9.
65
0
13.
71
-10
13.
64
13.
77
4.
52
-15
0.
00 Ex.Tr
ack
14.
35 T/
R
-10
5.
90
13.
71
0.
94
-5
5.
15
13.
71
4.
41
0
15.
30
13.
58
5.
99
10.
00 11.
51
13.
47
13.
63
5.
10
1864+60
6.
07
20
10.
38
13.
58
5.
98
13.
05
8.
11
25
12.
36
13.
74
4.
40
12.
00
12.
13
30
9.
68
13.
59
0
0.
00 Ex.Tr
ack
14.
27 T/
R
8.
81
10.
58
R /W
35
15.
27
13.
59
4.
49
1864+00
4.
54
-20
13.
59
-30
-20
4.
54
-40
-30
13.
19
-50
29.
92
-40
23.
88
-50
6.
95
Area136.74 Fill
12.
14
Volume218.30 Fill
-60
11.
83
-70
10.
30
Area1.03 Cut
12.
03
Volume46.72 Cut
13.
05
15
9.
52
Area170.24 Fill
35.
74
Volume341.09 Fill
-60
7.
05
-80
-70
9.
09
Area0.85 Cut
29.
37
-90
-80
8.
52
-100
-90
45.
70
Volume2.09 Cut
41.
26
40
R /W
-100
9.
10
15
45.
83
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
Mass Haul-11779.19 C.Y.
40
35
30
25
20
60
70
60
70
DRAWN BY:
CHECKED BY:
HRD
15
10
5
0
-5
-10
-15
80
80
90
90
100
-20
Mass Haul-11705.53 C.Y.
40
35
30
25
20
15
10
5
0
-5
-10
-15
100
-20
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1864+00 TO STA.1864+85
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
55.
91 6.
04
46.
50 10.
74
10.
00 11.
47
10.
00 10.
80
24.
04 10.
52
24.
08 10.
50
55.
20 6.
41
46.
50 10.
76
10.
00 11.
49
9/6/201
3
Default
13.
61
13.
78
13.
78
13.
79
13.
78
13.
68
13.
63
12.
35
12.
27
10.
20
9.
91
5.
01
4.
98
4.
98
4.
98
5.
68
5.
94
9.
04
9.
59
9.
64
11.
58
11.
96
13.
50
4.
28
4.
59
4.
64
5.
84
5.
98
9.
69
9.
90
15.
41
16.
09
27.
97
28.
07
28.
10
28.
36
49.
43
57.
16
45.
58
33.
14
29.
78
14.
15
11.
89
5.
96
1864+97
13.
66
10
10
-10
-10
-15
-15
-20
-20
-25
-25
-100
Volume8.62 Cut
-90
-80
Area18.89 Cut
NOT FOR CONSTRUCTION
-70
Volume73.15 Fill
Area151.97 Fill
-60
-50
-40
-30
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
-20
-10
6.
99
0
10
1865+12
5.
04
5.
10
27.
60
35.
46
30
20
30
DATE:
MJK
09/06/13
X023of 027
5.
75
6.
99
23.
66
20
54.
50
10.
31
12.
81
8.
28
10.
90
13.
66
5.
31
12.
30
13.
73
4.
52
5.
83
9.
99
13.
80
1.
23
15.
60
13.
79
4.
40
13.
70
13.
71
13.
79
5.
13
13.
67
1865+37
5.
54
10
40
40
50
60
50
60
DRAWN BY:
CHECKED BY:
HRD
R /W
R /W
12.
07
13.
18
11.
23
0
46.
50 10.
71
10.
00 11.
44
10.
87
18.
27
9.
51
29.
23
-10
5.
87
15
-20
56.
16
15
-30
Fi
ber
20
-40
5.
00
20
Area149.56 Fill
-50
30.
44
25
Volume139.60 Fill
-60
4.
98
25
-70
5.
60
30
19.
95 Pr
op.Tr
ack
14.
63 T/
R
30
Area17.84 Cut
10.
22
100
35
-80
15.
47
90
40
35
-90
27.
95
-25
40
Volume17.01 Cut
26.
70
10
-100
10.
38
80
100
12.
34
Mass Haul-11848.35 C.Y.
Fi
ber
Fi
ber
0.
00 Ex.Tr
ack
14.
40 T/
R
-20
9.
78
70
90
-25
14.
96
60
80
-15
12.
49
50
70
-20
9.
25
40
60
-10
13.
67
30
50
-15
13.
70
20
40
-5
9.
41
-25
-10
36.
77
0
9.
03
-5
45.
52
5
13.
79
5.
03
0
5
5
5
0
0
0
0
-5
-5
0.
00 Ex.Tr
ack
14.
40 T/
R
4.
95
0
10.
00 10.
82
4.
95
30.
55
10
25.
00 10.
52
4.
95
28.
11
28.
14
30
5.
93
4.
96
28.
10
20
56.
96
10.
05
28.
09
5
5.
67
10
10.
20
5
4.
57
0
15.
41
15
5.
83
-10
15.
75
10
R /W
R /W
R /W
19.
76 Pr
op.Tr
ack
14.
59 T/
R
R /W
R /W
20.
00 Pr
op.Tr
ack
14.
64 T/
R
20
13.
79
-20
12.
33
15
3.
53
-15
9.
74
25
13.
79
20
13.
67
20
13.
68
25
12.
35
30
5.
37
30
9.
69
25
4.
34
-10
10
25.
77 10.
14
1865+00
5.
86
0
13.
68
-10
13.
79
-20
5.
84
35
0.
00 Ex.Tr
ack
14.
40 T/
R
-15
4.
60
10
40
30
R /W
13.
79
4.
60
20
56.
14 5.
91
13.
79
4.
55
25
R /W
R /W
13.
79
4.
32
-10
46.
50 10.
73
13.
66
5.
48
-5
Fi
ber
35
20.
00 Pr
op.Tr
ack
14.
64 T/
R
10.
00 11.
46
13.
66
5.
48
30
35
R /W
25.
52 10.
26
56.
15 5.
90
46.
50 10.
73
10.
00 11.
46
10.
00 10.
82
25.
00 10.
52
46.
50 10.
68
10.
00 11.
41
10.
00 10.
82
20.
00 10.
62
20.
34 10.
62
Mass Haul-11865.79 C.Y.
13.
66
-5
5
0.
00 Ex.Tr
ack
14.
40 T/
R
11.
91
13.
66
5.
49
11.
86
12.
21
12.
66
9.
70
35
5.
50
-20
4.
33
-30
5.
45
-40
-20
13.
64
-50
-30
10.
00 10.
82
9.
68
30.
04
-40
5.
53
Area176.95 Fill
11.
92
Volume78.28 Fill
-60
5.
69
-70
12.
20
Area20.18 Cut
11.
07
Volume9.12 Cut
19.
16
15
31.
39
Area177.21 Fill
-50
25.
00 10.
52
25.
45 10.
29
Volume19.68 Fill
-60
9.
71
-80
-70
9.
05
Area19.90 Cut
9.
70
-90
-80
30.
10
-100
-90
45.
61
Volume2.23 Cut
30.
96
40
R /W
-100
9.
06
15
45.
62
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
40
Mass Haul-12052.92 C.Y.
40
35
30
25
20
70
70
15
10
5
0
-5
-10
-15
80
80
90
90
100
-20
Mass Haul-11930.33 C.Y.
40
35
30
25
20
15
10
-5
-10
-15
-20
100
-25
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1864+97 TO STA.1865+37
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
9/6/201
3
Default
13.
70
13.
70
13.
79
13.
83
13.
83
13.
62
13.
62
5.
66
5.
65
4.
53
4.
37
4.
39
5.
82
5.
82
1866+00
NOT FOR CONSTRUCTION
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
1868+00
3.
82
3.
82
3.
82
3.
82
43.
27
45.
63
50.
21
62.
96
Fi
ber
20
30
DATE:
MJK
09/06/13
X024of 027
35
30
30
25
25
20
20
15
15
10
10
5
5
5
0
0
0
-5
40
50
R /W
R /W
4.
31
4.
31
4.
29
100.
00
4.
31
56.
21
4.
31
50.
91
50
52.
50
51.
42
5.
56
44.
69
4.
31
9.
83
4.
62
9.
99
27.
74
50.
61
11.
08
46.
96
12.
08
27.
30
12.
08
9.
25
14.
96
12.
08
9.
22
9.
23
13.
11
4.
43
12.
95
4.
50
12.
95
13.
10
4.
55
5.
88
13.
10
4.
56
5.
87
12.
77
13.
10
5.
66
40
58.
58 3.
82
46.
50 9.
86
10.
00 10.
59
12.
76
5.
68
30
60
60
DRAWN BY:
CHECKED BY:
HRD
3.
82
3.
82
41.
83
35
5.
04 Pr
op.Tr
ack
14.
07 T/
R
11.
61
11.
63
10.
73
17.
69
12.
62
8.
57
12.
70
8.
52
29.
87
20
100.
00
3.
82
36.
48
10
6.
07
0
29.
07
-10
6.
26
-20
11.
05
-30
28.
30
-40
15.
00
Area162.70 Fill
-50
11.
05
Volume489.38 Fill
-60
14.
99
-70
1869+00
11.
05
Area5.63 Cut
10
14.
98
-80
0
13.
41
-90
13.
41
Volume17.14 Cut
-10
12.
20
-100
-20
6.
21
-25
8.
67
Fi
ber
0.
00 Ex.Tr
ack
13.
70 T/
R
R /W
R /W
11.
56 Pr
op.Tr
ack
14.
25 T/
R
30
35
25
30
20
25
15
20
10
15
5
5
10
0
0
R /W
R /W
56.
67 4.
31
46.
50 9.
39
10.
00 10.
12
54.
00 6.
43
46.
50 10.
18
10.
00 10.
91
0.
01 Pr
op.Tr
ack
13.
70 T/
R
40
R /W
35
9.
54
-20
-30
6.
20
-20
-40
13.
45
-15
Area65.02 Fill
-50
4.
45
-15
Volume421.70 Fill
-60
13.
45
-10
-70
13.
45
100
-10
Area15.04 Cut
4.
45
90
-5
-80
4.
45
-20
40
0.
00 Ex.Tr
ack
14.
07 T/
R
40
-90
12.
99
80
100
Volume38.27 Cut
30.
05
6.
43
100.
00
-100
34.
48
6.
43
89.
93
-20
12.
89
5
-25
4.
53
10
-15
6.
09
Mass Haul-12371.11 C.Y.
-20
12.
89
70
90
-10
12.
86
60
80
-15
6.
09
50
70
-5
6.
24
40
60
-10
11.
87
7.
63
28.
46
30
50
0
11.
90
7.
64
28.
77
6.
43
65.
37
40
-5
9.
03
6.
43
55.
27
-20
5
46.
10
6.
43
49.
77
Fi
ber
5
R /W
6.
43
46.
30
30
R /W
R /W
46.
50 10.
54
6.
43
33.
09
10
10.
31
8.
32
Fi
ber
7.
72
7.
73
26.
97
29.
29
10.
92
10.
89
15.
39
12.
17
11.
85
15.
34
9.
85
12.
50
11.
25
13.
25
8.
63
0.
00 Ex.Tr
ack
14.
29 T/
R
Mass Haul-12813.61 C.Y.
10.
46
8.
95
45.
37
37.
49
20
8.
96
10
45.
71
0
5.
44
-10
50.
31
-15
5.
37
20
48.
13
25
5.
19
30
26.
72
-10
5.
86
1867+00
20
10.
52
-5
10
10.
49
13.
48
4.
55
0
16.
00
13.
48
-10
15.
93
13.
65
4.
54
-15
12.
22
13.
65
4.
40
-10
12.
22
35
17.
83 Pr
op.Tr
ack
14.
49 T/
R
10.
00 11.
27
13.
65
4.
42
-5
10.
51
-20
4.
42
0
10.
52
0
0.
00 Ex.Tr
ack
14.
41 T/
R
20
13.
62
-30
10.
91
10.
91
-20
13.
37
10.
89
14.
07
14.
00
25
13.
08
-40
-30
6.
40
8.
27
-40
13.
98
8.
24
30
5.
82
-50
29.
36
-50
31.
10
R /W
35
7.
63
Area143.12 Fill
13.
69
Volume341.47 Fill
-60
5.
68
-70
12.
34
Area2.11 Cut
9.
58
15
9.
29
Volume23.27 Cut
-60
27.
37
-80
-70
8.
51
Area101.56 Fill
9.
18
-90
-80
28.
01
-100
-90
41.
28
Area3.63 Cut
Volume453.12 Fill
8.
95
Volume10.62 Cut
44.
86
40
R /W
-100
8.
96
15
45.
23
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
40
Mass Haul-13669.28 C.Y.
40
35
30
25
20
70
70
15
10
-5
-10
-15
-20
80
80
90
90
100
-25
Mass Haul-13285.85 C.Y.
40
35
30
25
20
15
10
-5
-10
-15
-20
100
-25
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1866+00 TO STA.1869+00
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
9/6/201
3
Default
12.
79
13.
03
13.
04
13.
05
12.
93
12.
91
12.
65
4.
49
2.
10
4.
46
5.
52
5.
91
6.
89
NOT FOR CONSTRUCTION
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
1869+67
30
DATE:
MJK
09/06/13
X025of 027
35
30
30
30
30
25
25
25
25
20
20
20
20
15
15
10
10
40
50
57.
49 3.
75
46.
50 9.
25
10.
00 9.
98
10.
00 9.
98
25.
00 9.
68
29.
98 7.
19
39.
98 7.
19
41.
47 7.
93
12.
89
4.
81
60
DRAWN BY:
CHECKED BY:
HRD
3.
28
3.
28
100.
00
3.
59
44.
67
84.
15
4.
70
3.
28
5.
59
32.
51
34.
64
75.
30
10.
07
18.
65
3.
28
10.
32
15.
75
69.
81
11.
87
11.
65
9.
61
10.
83
12.
82
12.
93
12.
05
12.
90
4.
51
8.
89
12.
89
4.
37
2.
48
5.
99
12.
67
12.
83
12.
43
7.
47
4.
60
11.
58
13.
22
6.
01
10.
92
7.
31
7.
45
7.
95
16.
92
29.
52
33.
49
46.
21
60
R /W
R /W
R /W
3.
63
4.
34
42.
27
100.
00
5.
06
50
70
70
80
80
3.
43
20
40
100.
00
10
30
3.
43
Fi
ber
35
R /W
55.
45 4.
86
7.
15
35.
82
20
92.
13
0
3.
43
-10
83.
44
-20
3.
92
-30
43.
60
-40
4.
86
Area121.36 Fill
-50
6.
28
Volume63.16 Fill
-60
35.
17
-70
1869+79
31.
75
Area41.57 Cut
10
10.
05
-80
0
20.
09
-90
-10
11.
57
Volume24.08 Cut
-20
10.
44
-100
-30
11.
90
-25
-40
9.
55
-25
Area130.71 Fill
-50
11.
47
-20
Volume56.02 Fill
-60
15.
63
-20
-70
12.
19
-15
Area39.35 Cut
8.
43
100
-15
-80
12.
84
90
-10
-90
12.
90
-25
-10
Volume17.98 Cut
12.
96
5
5
5
0
0
0
0
-5
-5
0.
00 Ex.Tr
ack
13.
56 T/
R
40
35
Mass Haul-13709.36 C.Y.
-100
5.
97
80
100
4.
98
11.
58
13.
13
70
90
4.
50
10.
56
18.
89
60
80
12.
93
7.
50
29.
60
50
70
Fi
ber
5
5
5
0
0
0
0
-5
-5
Fi
ber
0.
00 Ex.Tr
ack
13.
53 T/
R
-25
12.
93
7.
70
35.
49
40
60
-25
1.
42
8.
12
46.
19
30
50
-20
4.
40
3.
95
100.
00
20
40
-20
12.
82
3.
95
91.
37
10
30
-15
4.
76
3.
95
82.
66
10
40
35
R /W
46.
50 9.
33
10.
03
30.
80
20
-15
12.
31
4.
62
74.
96
Fi
ber
10.
58
21.
89
10
-10
12.
68
5.
05
11.
46
15.
48
-25
-10
5.
95
5.
40
36.
91
40.
05
11.
94
9.
48
12.
36
7.
86
12.
25
12.
91
5
0.
00 Ex.Tr
ack
13.
59 T/
R
10
40
35
35
35
30
30
30
30
25
25
25
25
20
20
20
20
15
15
10
10
R /W
R /W
R /W
R /W
R /W
R /W
40
35
Mass Haul-13751.52 C.Y.
8.
26
8.
59
1869+27
29.
22
0
9.
99
-10
10.
83
-20
24.
89
-15
15.
23
-10
12.
87
12.
99
4.
48
0
5.
95
12.
97
-10
5.
18
12.
81
12.
97
4.
97
0.
10
1869+52
4.
43
-20
12.
01
12.
70
-15
11.
27
10.
00 10.
06
12.
15
5.
89
11.
59
13.
02
-20
9.
24
10.
12
21.
35
7.
73
29.
70
-10
9.
36
-5
5
0.
00 Ex.Tr
ack
13.
64 T/
R
10.
00 10.
06
23.
00 9.
80
27.
99 7.
31
8.
01
37.
98
-5
13.
57
-20
12.
74
-30
5.
77
-40
5.
30
Area83.31 Fill
-50
11.
61
Volume74.16 Fill
-60
11.
90
-70
10.
89
Area53.14 Cut
-30
12.
83
Volume34.09 Cut
8.
11
15
-40
9.
37
40.
31 8.
47
Area106.02 Fill
-50
37.
99 7.
31
Volume87.66 Fill
-60
29.
87
-80
-70
8.
33
Area45.11 Cut
25.
45
-90
-80
8.
53
-100
-90
46.
17
Volume45.49 Cut
42.
14
40
R /W
-100
8.
69
15
46.
14
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
Mass Haul-13828.64 C.Y.
40
15
10
-5
-10
-15
-20
90
90
100
-25
Mass Haul-13790.61 C.Y.
40
15
10
-5
-10
-15
-20
100
-25
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1869+27 TO STA.1869+79
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
41.
81 8.
16
58.
11 3.
42
46.
50 9.
22
10.
00 9.
95
10.
00 9.
95
22.
60 9.
70
27.
70 7.
15
37.
70 7.
15
38.
70 7.
65
56.
73 4.
17
46.
50 9.
28
10.
00 10.
01
10.
00 10.
01
25.
00 9.
71
29.
95 7.
24
39.
95 7.
24
9/6/201
3
Default
12.
86
12.
90
12.
89
12.
80
11.
90
11.
83
11.
75
10.
20
10.
09
4.
84
4.
53
3.
22
3.
11
3.
11
3.
11
3.
11
3.
11
3.
11
7.
59
7.
33
6.
93
6.
93
6.
94
11.
53
11.
57
12.
52
12.
62
12.
65
12.
84
12.
88
12.
88
12.
86
12.
77
12.
73
3.
63
4.
52
4.
64
6.
01
9.
39
9.
67
10.
15
15.
88
17.
09
33.
33
34.
07
45.
82
55.
05
57.
07
60.
31
66.
43
82.
27
100.
00
46.
25
39.
53
29.
38
29.
35
29.
33
13.
36
13.
32
6.
90
6.
17
6.
04
4.
34
4.
15
4.
52
4.
56
6.
00
6.
15
1869+92
12.
86
NOT FOR CONSTRUCTION
Volume6.26 Fill
Area34.75 Fill
-60
-50
-40
-30
-20
- PRELIMINARY -
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
-10
0
10
1870+04
20
35
35
30
30
30
30
25
25
25
25
20
20
20
20
15
15
10
10
10.
61
10.
62
10.
63
12.
24
12.
24
12.
81
12.
81
12.
60
12.
59
7.
81
7.
77
4.
71
4.
70
4.
91
23.
08
12.
65
4.
96
28.
80
3.
02
100.
00
5.
29
3.
01
5.
40
3.
01
49.
01
45.
60
3.
01
47.
58
46.
88
3.
01
3.
01
46.
46
47.
19
4.
42
33.
79
3.
01
4.
43
33.
68
47.
00
6.
83
26.
28
46.
90
10.
11
11.
81
11.
81
11.
81
9.
71
10.
12
12.
79
6.
02
16.
13
12.
85
5.
07
9.
70
15.
96
12.
88
9.
73
12.
88
4.
53
30
DATE:
MJK
09/06/13
X026of 027
2.
45
2.
45
2.
45
2.
82
6.
66
37.
25
37.
40
67.
01
100.
00
7.
57
17.
33
2.
45
9.
30
14.
49
36.
96
10.
95
10.
11
35.
79
11.
28
9.
22
9.
23
2.
46
11.
28
9.
21
35.
67
11.
28
6.
39
3.
68
12.
09
5.
33
3.
76
12.
39
5.
33
23.
95
12.
39
4.
28
23.
70
12.
81
12.
86
4.
68
40
50
40
60
50
60
DRAWN BY:
CHECKED BY:
HRD
R /W
R /W
37.
85 3.
90
26.
50 9.
57
12.
88
4.
52
30
70
70
80
80
2.
99
-70
1871+00
20
100.
00
Area6.39 Cut
10
2.
99
-80
0
80.
55
-90
-10
2.
99
Volume0.97 Cut
-20
61.
18
-100
-30
2.
99
-25
-40
2.
99
-25
Area88.80 Fill
-50
53.
37
100
-20
Volume219.65 Fill
-60
55.
86
90
-20
-70
2.
99
80
-15
Area2.16 Cut
51.
92
70
-15
-80
2.
99
60
-10
-90
46.
03
-25
-10
Volume15.20 Cut
Fi
ber
40
35
Mass Haul-13860.76 C.Y.
-100
4.
34
50
100
4.
40
40
90
33.
86
30
80
33.
29
20
70
5
5
5
5
0
0
0
0
-5
-5
Fi
ber
0.
00 Ex.Tr
ack
13.
49 T/
R
Fi
ber
0.
00 Ex.Tr
ack
13.
33 T/
R
-25
9.
94
10
60
-25
16.
18
0
50
-20
10.
09
-10
40
-20
15.
93
-20
30
-15
10.
14
-15
4.
53
1870+00
20
-15
11.
79
-10
10
10.
00 9.
90
12.
84
0
-10
R /W
12.
64
4.
32
-10
R /W
12.
64
6.
10
-25
-10
5
5
5
0
0
0
0
-5
-5
0.
00 Ex.Tr
ack
13.
48 T/
R
10
40
35
R /W
12.
63
6.
11
-20
48.
53 3.
19
12.
33
6.
14
-15
36.
10 9.
40
11.
56
8.
19
-10
Fi
ber
10.
00 9.
93
11.
54
13.
47
13.
38
29.
37
-5
9.
69
-5
5
0.
00 Ex.Tr
ack
13.
51 T/
R
10.
00 9.
93
20.
00 9.
73
7.
01
6.
99
29.
99
10
40
35
35
35
30
30
30
30
25
25
25
25
20
20
20
20
15
15
10
10
R /W
R /W
R /W
R /W
R /W
R /W
40
35
Mass Haul-13873.37 C.Y.
15.
78
-20
4.
34
-30
12.
83
-40
-20
4.
43
-50
-30
12.
65
Area81.79 Fill
-40
6.
07
Volume51.16 Fill
-60
11.
57
-70
12.
56
Area39.76 Cut
6.
62
Volume19.04 Cut
13.
32
15
-50
25.
22 7.
12
Area49.77 Fill
11.
31
35.
69 7.
35
Volume19.49 Fill
-60
14.
79
-80
-70
35.
22 7.
12
7.
65
Area6.65 Cut
7.
11
-90
-80
29.
43
-100
-90
7.
18
46.
23
Volume6.88 Cut
31.
33
40
R /W
-100
7.
76
15
46.
22
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
Mass Haul-14083.12 C.Y.
40
15
10
-5
-10
-15
-20
90
90
100
-25
Mass Haul-13878.67 C.Y.
40
15
10
-5
-10
-15
-20
100
-25
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1869+92 TO STA.1871+00
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
40.
37 2.
48
26.
50 9.
42
10.
00 9.
75
41.
64 3.
55
29.
70 9.
52
10.
00 9.
91
9/6/201
3
Default
12.
44
12.
48
12.
48
12.
48
12.
48
12.
52
10.
19
9.
72
9.
60
9.
60
9.
53
8.
03
10.
76
10.
38
10.
35
10.
30
10.
34
10.
36
10.
41
10.
55
10.
37
10.
89
11.
34
11.
37
11.
40
11.
26
11.
25
11.
19
11.
18
11.
10
11.
05
11.
04
39.
36
44.
56
47.
93
49.
59
50.
57
52.
40
56.
62
63.
43
72.
13
78.
40
79.
25
80.
00
87.
77
88.
06
91.
54
91.
98
96.
10
99.
14
100.
00
10
33.
58
0
10.
91
11.
86
8.
72
-10
27.
85
11.
86
8.
71
-15
20
Fi
ber
30
40
11.
96
11.
86
11.
79
11.
54
11.
53
11.
49
66.
29
72.
45
77.
12
96.
97
98.
28
99.
94
5
-20
60
50
70
60
80
70
90
Mass Haul-14038.68 C.Y.
5
-20
80
90
11.
49
12.
05
61.
20
Fi
ber
0.
00 Ex.Tr
ack
13.
15 T/
R
R /W
R /W
R /W
Mass Haul-13964.42 C.Y.
100.
00
12.
12
57.
28
50
R /W
R /W
12.
11
12.
19
53.
29
12.
09
49.
18
40
49.
69
12.
05
12.
03
40.
21
42.
66
12.
13
30
50.
71 10.
37
42.
50 6.
26
12.
19
31.
89
12.
74
20.
15
29.
43
13.
22
13.
08
8.
94
13.
23
13.
23
13.
23
5.
17
5.
15
20
32.
50 6.
26
26.
50 9.
26
10.
00 9.
59
10
11.
22
11.
86
8.
71
-10
13.
11
0
11.
82
12.
55
6.
42
-5
13.
14
1872+14
2.
51
-10
5.
11
-15
11.
80
12.
55
6.
42
13.
11
5.
12
-10
9.
51
12.
66
4.
90
13.
11
5.
13
-5
9.
04
12.
56
0.
18
0
0.
00 Ex.Tr
ack
13.
17 T/
R
13.
17
13.
18
10.
61
0
22.
50
12.
47
5.
04
1872+00
12.
57
-20
10.
39
12.
27
12.
86
12.
25
28.
17
-20
12.
50
-30
19.
40
12.
03
31.
33
-30
6.
22
-40
27.
71
11.
74
37.
16
-40
5.
48
Area0.00 Fill
-50
11.
98
Volume164.45 Fill
-60
31.
32
-70
12.
27
Area110.64 Cut
12.
23
Volume208.89 Cut
12.
12
Area0.00 Fill
12.
15
Volume0.00 Fill
-50
37.
46
-80
-60
37.
76
-90
-70
40.
07
12.
04
45.
67
Area175.78 Cut
44.
02
11.
79
48.
32
-80
12.
27
11.
30
61.
66
-90
12.
30
20
R /W
10.
70
65.
20
Volume74.26 Cut
37.
87
8.
78
59.
48
11.
41
11.
22
86.
87
20
38.
72
9.
13
74.
39
-100
9.
98
40
88.
67
-100
82.
21
X:
\201
00S\201
52.
03\Eng_Docs\Sheets\X001
.
dgn
R:
\M S V8\W orkspace\Projects\UPRR\printing\benesch\Pen\Color_Half_UP.
tbl
Color table:UPRR.
tbl
40
35
40
35
30
30
25
25
15
20
15
10
10
5
0
-5
-10
-15
100
-20
35
40
35
30
30
25
25
15
20
15
10
10
5
0
-5
-10
-15
100
-20
- PRELIMINARY -
NOT FOR CONSTRUCTION
DRAWN BY:
CHECKED BY:
HRD
Alfred Benesch & Company
4633 Washington Road
Kenosha, WI 53144
Job No. 20152.03
262-652-6677
DATE:
MJK
09/06/13
X027of 027
Office of Assistant Vice President
Engineering Design/Construction
LOCATION & DESCRIPTION:
SHEET NUMBER
CONSTRUCT CALCASIEU RUN-THROUGH SLOT
LAFAYETTE SUBDIVISION (MP 221.31 - MP 222.92)
SHEET TITLE:
CROSS SECTIONS STA.1872+00 TO STA.1872+14
X:\20100S\20152.03\Eng_Docs\Sheets\X001.dgn
54.
36 12.
17
42.
50 6.
24
32.
50 6.
24
26.
50 9.
24
10.
00 9.
57