The Corps will accept comments regarding this proposal during the period July 3 - Aug 04 2014.

Pioneer Green Energy, through its affiliate, Pioneer Green Wind Assets, LLC (“Pioneer Green”), has submitted a Section 408 Permit Application, to the U.S. Army Corps of Engineers (Corps) for temporary modification of the Middle Breakwater for the purpose of gathering wind and other meteorological data in the vicinity of the Middle Breakwater. To obtain the data, Pioneer Green proposes to install two small electronic measurement systems on the Middle Breakwater for a period of two years. The units utilize laser beam technology to measure wind speed and direction to assess the viability of developing a wind power generation project along the Middle Breakwater that could produce clean electricity in support of State and Federal climate change regulations while meeting consumer demand for such clean electricity. Summaries of the data gathered from the Proposed Action would be provided to both the Port of Los Angeles (POLA) and the Port of Long Beach (POLB). The measurement devices and appurtenances would be removed upon completion of the Project.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas