Run scraper

POA-2014-182

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Mr. Gene Cheeseman's stated purpose is to construct a 40 foot by 60 foot boat garage. Mr. Gene Cheeseman requests authorization to place 137 cubic yards of clean shot rock and rip rap below the High Tide Line (HTL) (approximate elevation +20.8 feet above the 0.0 foot contour) to construct a 40 foot by 60 foot boat garage with a concrete foundation. The project would result in the placement of fill into 0.053 acres of waters of the United States. All work would be performed in accordance with the enclosed plan (sheets 1-4), dated July 1, 2014. Please contact Matthew Brody at (907) 790-4493, or by email at Matthew.T.Brody@usace.army.mil if further information is desired concerning this notice.

Mr. Gene Cheeseman's stated purpose is to construct a 40 foot by 60 foot boat garage. Mr. Gene Cheeseman requests authorization to place 137 cubic yards of clean shot rock and rip rap below the High Tide Line (HTL) (approximate elevation +20.8 feet above the 0.0 foot contour) to construct a 40 foot by 60 foot boat garage with a concrete foundation. The project would result in the placement of fill into 0.053 acres of waters of the United States. All work would be performed in accordance with the enclosed plan (sheets 1-4), dated July 1, 2014. Please contact Matthew Brody at (907) 790-4493, or by email at Matthew.T.Brody@usace.army.mil if further information is desired concerning this notice.

POA-2014-182, Gastineau Channel_PN POA-2014-182, Gastineau Channel_PN Drawings

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas