The U.S. Army Corps of Engineers, Albuquerque District (Corps), is evaluating a permit application from the McDonald Ditch Company to construct a new diversion dam in the Rio Grande River approximately 930 feet upstream from an existing structure. The project will result in 0.015 acre of permanent impacts and 0.023 acre of temporary impacts to scrub/shrub wetlands adjacent to the Rio Grande River. Impacts to the Rio Grande river will consist of 0.127 acre of permanent impacts and 0.24 acre of temporary impacts. In addition, approximately 380 linear feet of riprap will be placed along the bank. The existing diversion structure will be dismantled and replaced with a rock grade control structure. The purpose of this public notice is to inform interested parties of the project and to solicit comments.
SUMMARY: The U.S. Army Corps of Engineers, Albuquerque District (Corps), is evaluating a permit application from the McDonald Ditch Company to construct a new diversion dam in the Rio Grande River approximately 930 feet upstream from an existing structure. The project will result in 0.015 acre of permanent impacts and 0.023 acre of temporary impacts to scrub/shrub wetlands adjacent to the Rio Grande River. Impacts to the Rio Grande river will consist of 0.127 acre of permanent impacts and 0.24 acre of temporary impacts. In addition, approximately 380 linear feet of riprap will be placed along the bank. The existing diversion structure will be dismantled and replaced with a rock grade control structure. The purpose of this public notice is to inform interested parties of the project and to solicit comments.
AUTHORITY: This application is being evaluated under Section 404 of the Clean Water Act for the discharge of dredged or fill material in waters of the United States (U.S.).
APPLICANT: McDonald Ditch Company, 2438 U.S. Highway 285 North, Monte Vista, CO 81144
LOCATION: The project site is located near the Sevenmile Plaza Community, Section 6, Township 39 North, Range 7 East, Latitude 37.6470 North, Longitude -106.2404 West, Rio Grande County, Colorado.
PROJECT DESCRIPTION: The applicant is proposing to construct a new diversion dam approximately 930 feet upstream of an existing dam composed of rock and rubble. The new dam will consist of an 88-feet-long concrete weir with a downstream concrete ramp and apron, a 16-feet-wide fish passage structure, and a 18-feet-wide headgate and sluice structure. The dam will be protected on the upstream side with a riprap apron measuring a linear distance of 16 feet, 8 inches and a riprap apron on the downstream side of the dam that will measure 27 linear feet. The total footprint of the project will be approximately 77 feet (stream distance) by 136 feet (stream width), or 0.25 acre. The site will be de-watered by pushing up river rock to construct a temporary coffer dam to divert the river into an existing overflow channel. The applicant does not anticipate modifications to the overflow channel to accommodate the expected flows.
The existing diversion structure will be dismantled. It consists of an old highway bridge piling, concrete rubble and rock that is replenished and reconfigured frequently. The structure is unstable and does not provide a consistent water supply, and it has contributed to bank erosion immediately downstream. This structure will be removed, and a rock grade control structure will be installed to provide protection for a highway bridge that is located immediately upstream. Four rock deflectors will be constructed downstream where bank erosion is occurring. The streambank in this area will also be re-shaped to natural contours, and vegetation will be planted to create a functioning floodplain.
PURPOSE AND NEED: The purpose of the project is to provide water to an existing irrigation system. The project is needed to remove an unstable structure and to improve riparian habitat.
PROPOSED MITIGATION: To compensate for project impacts, the applicant proposes to stabilize approximately 500 feet of eroding streambanks by installing four rock deflectors. The banks will be sloped to create approximately 0.69 acre of riparian floodplain that will be re-vegetated by transplanting wetland plants from a nearby source.
OTHER AUTHORIZATIONS: State Water Quality Certification: The applicant is required to obtain water quality certification, under Section 401 of the Clean Water Act, from the Colorado Department of Public Health and Environment. Section 401 requires that any applicant for an individual Section 404 permit provide proof of water quality certification to the Corps of Engineers prior to permit issuance.
ADDITIONAL INFORMATION:
Environmental Setting. The existing diversion structure is located in the main channel of the Rio Grande River. It is composed of rubble from the old County Road 5 North bridge, rocks, trees, and assorted materials. As such, it is unstable, hazardous to recreationists, and mostly impassible by fish. Additionally, the dam artificially narrows the river, causing flooding in the surrounding community during high flows. The new dam will be constructed approximately 930 feet upstream in a straight reach of the river below an existing riffle. It will be adjacent to a relatively wide floodplain on the south bank of the river. The north bank is steep and mostly unvegetated. It has been determined by the Corps that the new location is more appropriate from a hydraulic standpoint for such a low head, run-of-the-river dam.
Alternatives. The applicant has provided information concerning project alternatives. Alternative #1 considered constructing a new diversion dam at the current diversion site. However, the engineering team determined that an adequate structure at this site would cause flooding at the bridge and in the neighboring communities due to reduced permeability and improved efficiency of the dam. Alternative #2 is the proposed project upstream of the existing structure. Alternative #3 is the No Action alternative, which would result in continued high maintenance, high irrigation inefficiencies, and in-stream and riparian habitat degradation.
EVALUATION FACTORS: The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the described activity will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people. The activity's impact on the public interest will include application of the Section 404(b)(1) guidelines promulgated by the Administrator, Environmental Protection Agency (40 CFR Part 230).
The Corps is soliciting comments from the public, Federal, State, and local agencies and officials, Indian tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
HISTORIC PROPERTIES: A cultural resources survey was conducted. The State Historic Preservation Office provided a letter of concurrence to the applicant that two sites within the project area are not eligible for listing to the National Register of Historic Places. Further evaluation is recommended for a third site that occurs outside the area of potential effects (APE). The Corps is conducting further review to determine effects to cultural resources.
ENDANGERED SPECIES: The Corps is currently conducting informal consultation with the U.S. Fish and Wildlife Service in accordance with Section 7 of the Endangered Species Act (50 CFR 402; 16 U.S.C. 1536 (c)).
FLOODPLAIN MANAGEMENT: The Corps is sending a copy of this public notice to the local floodplain administrator. In accordance with 44 CFR part 60 (Flood Plain Management Regulations Criteria for Land Management and Use), the floodplain administrators of participating communities are required to review all proposed development to determine if a floodplain development permit is required and maintain records of such review.
CLOSE OF COMMENT PERIOD: All comments pertaining to this Public Notice must reach this office on or before August 9, 2014, which is the close of the comment period. Extensions of the comment period may be granted for valid reasons provided a written request is received by the limiting date. If no comments are received by that date, it will be considered that there are no objections. Anyone may request, in writing, that a public hearing be held to consider this application. Requests shall specifically state, with particularity, the reason(s) for holding a public hearing. If the Corps determines that the information received in response to this notice is inadequate for thorough evaluation, a public hearing may be warranted. If a public hearing is warranted, interested parties will be notified of the time, date, and location. Comments and requests for additional information should be submitted to:
Hildreth Cooper, Project Manager
US Army Corps of Engineers, Albuquerque District
1970 E. Third Avenue, Suite 109
Durango, CO 81301
(970) 259-1582
FAX: (970) 259-1658
E-mail: hildreth.l.cooper@usace.army.mil
Please note that names and addresses of those who submit comments in response to this public notice may be made publically available through the Freedom of Information Act.