You can copy from here when filling out the rest of the page.
PERMIT MODIFICATION CLEAR AND FILL FOR A SUBDIVISION IN EAST BATON ROUGE PARISH
NAME OF APPLICANT: Cheval Point Corporation, Attn: David Hebert, 12234 East Sheraton Avenue, Baton Rouge, Louisiana 70815.
LOCATION OF WORK: Located along the West side of LA Highway 327, Sections 44 and 45, Township 8 South, Range 1 West, near Baton Rouge, Louisiana, in East Baton Rouge Parish, Lake Pontchartrain Basin, Hydrologic Unit Code 08070202, as shown on the enclosed drawings.
CHARACTER OF WORK: Clear, grade and install and maintain fill for the construction of a 172 lot single family residential subdivision. The subdivision will include a driveway and green space for each lot, two stormwater retention ponds with outfalls, 6 green space common areas, a sanitary sewer lift station and ingress/egress access drives. This work will require clearing and placement of a combined total of 4,071 cubic yards of earthen and concrete fill material, impacting 5.2 acres of jurisdictional wetlands. Additionally, 1.3 acres of Other Waters of the U.S. subject to Corps of Engineers jurisdiction will be filled for project implementation, as shown on the attached drawings.
The proposed work was originally advertised on public notice on September 10, 2012, and 4.4 acres of wetland impacts were proposed for development. After completion of the engineering review by USACE, it was determined that one of the proposed detention ponds must be located further from the levee. This design modification will result in a 0.7 acre increase of proposed wetlands impacts.
An authorization was granted on October 21, 2004, to clear, grade and fill this site for the construction of a retirement community with appurtenant facilities. Impacts to 3.3 acres of jurisdictional wetlands and 1.2 acres of Others Waters of the U.S. were authorized. Wetland impacts were mitigated through the restoration of 3.7 acres of agricultural lands to bottomland hardwood forested wetlands. Wetland impacts that are currently proposed will be mitigated through the purchase of compensatory mitigation credits from a Corps approved mitigation bank.