The applicant proposes a phased redevelopment of the Beaumont Storage and Loading Terminal.
Full Public NoticeProject Plans Mitigation Plan
PROJECT DESCRIPTION: The applicant proposes to discharge fill material into 8.28 acres of palustrine emergent and palustrine scrub-shrub wetlands adjacent to the Neches River during the grading of the project site for a phased redevelopment of the Beaumont Storage and Loading Terminal. The applicant proposes to redevelop, in three phases, the terminal to import and export petroleum products from the facility. Phase 1 will rehabilitate existing tanks, add two new large tanks and five smaller tanks, and grade the entire site. Phase 2 will construct an ethane export facility. Phase 3 will construct eight additional storage tanks, new office/control room, and truck loading area.