Home

South Pacific Division

Run scraper

This process applies to wetland determinations or delineations made or verified by South Pacific Division (SPD) subordinate Districts on irrigated land. This includes

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

This process applies to wetland determinations or delineations made or verified by South Pacific Division (SPD) subordinate Districts on irrigated land. This includes, but is not limited to, areas in rice production and irrigated pastureland, and is intended solely to address identifying wetlands that would exist absent irrigation. It does not address the jurisdictional status of any such wetlands, issues relative to permitting discharges of dredged or fill material in jurisdictional wetlands, or mitigating impacts to jurisdictional wetlands. This is consistent with all applicable Corps wetland identification and delineation standards and practices, and with applicable guidance for wetland identification and delineation. Wetland determinations and wetland delineation verifications within SPD are to be conducted in accordance with Corps regulations, guidance, and technical standards.

This provides notice of procedures to be followed in South Pacific Division’s subordinate districts (Albuquerque, San Francisco, Sacramento, and Los Angeles districts) for determining whether, and to what extent, wetlands occurring on irrigated land would persist in the absence of irrigation and meet the definition of wetlands under the 1987 Corps of Engineers (Corps) Wetland Delineation Manual (1987 Manual) and the appropriate regional supplement. The intent of this process is to improve the accuracy, quality, and consistency of wetland delineations on irrigated land. This process supersedes previous SPD district-specific standards and policies related to delineating irrigated land. As many wetland delineations are prepared by consultants and provided to districts for verification, consultants are advised to be aware of and follow these procedures when preparing delineations of irrigated land for verification by one of SPD’s subordinate districts. The attached document is for “Information Only.” The controlled version resides on the SPD QMS SharePoint Portal. Please verify that the version you are using is current prior to proceeding This process applies to wetland determinations or delineations made or verified by South Pacific Division (SPD) subordinate Districts on irrigated land. This includes, but is not limited to, areas in rice production and irrigated pastureland, and is intended solely to address identifying wetlands that would exist absent irrigation. It does not address the jurisdictional status of any such wetlands, issues relative to permitting discharges of dredged or fill material in jurisdictional wetlands, or mitigating impacts to jurisdictional wetlands. This is consistent with all applicable Corps wetland identification and delineation standards and practices, and with applicable guidance for wetland identification and delineation. Wetland determinations and wetland delineation verifications within SPD are to be conducted in accordance with Corps regulations, guidance, and technical standards. Corps contacts: South Pacific Division: Thomas Cavanaugh (415) 503-6574 (Thomas.J.Cavanaugh@usace.army.mil) Sacramento District: Michael Finan (916) 557-5324 (Michael.C.Finan@usace.army.mil) San Francisco District: Paula Gill (415) 503-6776 (Paula.C.Gill@usace.army.mil) Los Angeles District: James Mace (951) 276-6624 x263 (James.E.Mace@usace.army.mil) Albuquerque District: Van Truan (505) 342-3280 (Van.A.Truan@usace.army.mil)

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas