This public notice is to notify the public that the St. Paul District Corps of Engineers (Corps) has revoked GP-001-WI.
PURPOSE OF THIS PUBLIC NOTICE:This public notice is to notify the public that the St. Paul District Corps of Engineers (Corps) has revoked GP-001-WI. GP-001-WI is a regional, programmatic general permit (GP) which provided Federal authorization under Section 10 of the Rivers and Harbors Act(Section 10) and Section 404 of the Clean Water Act (Section 404) to conduct certain activities in waters of the United States that are regulated and approved by the Wisconsin Department of Natural Resources (WDNR).
Public Notice
ISSUED: 25-February-2013
REFER TO: GP-001-WI (2012-03486-RMG)
AUTHORITIES:
Section 404, Clean Water Act
Section 10, Rivers and Harbors Act
REVOCATION OF REGIONAL GENERAL PERMIT GP-001-WI IN THE STATE OF
WISCONSIN
1.
PURPOSE OF THIS PUBLIC NOTICE. This public notice is to notify the public that the St. Paul
District Corps of Engineers (Corps) has revoked GP-001-WI. GP-001-WI is a regional,
programmatic general permit (GP) which provided Federal authorization under Section 10 of the
Rivers and Harbors Act (Section 10) and Section 404 of the Clean Water Act (Section 404) to
conduct certain activities in waters of the United States that are regulated and approved by the
Wisconsin Department of Natural Resources (WDNR).
2.
BACKGROUND. In a public notice dated January 9th, 2013, the Corps suspended GP-001-WI and
solicited comments on its proposed revocation. At the same time, the Corps issued GP-003-WI and
GP-004-WI to replace and update the coverage under Section 404 and Section 10 afforded by GP001-WI.
As indicated in our January 9, 2013 notice, projects confirmed in writing as eligible for
authorization under Part A prior to the suspension date remain valid until the expiration date
indicated in our confirmation letter. No extensions of time are available for these projects. No new
confirmations of coverage are available under Part A of GP-001-WI.
Projects eligible for authorization under Part B of GP-001-WI which commenced work prior to the
suspension date of GP-001-WI continue to be authorized through April 9, 2013. No extensions of
time are available for these projects. No coverage is available for projects otherwise eligible under
Part B of GP-001-WI which have not commenced as of January 9, 2013.
It is the permittee's responsibility to remain informed regarding changes to GP-001-WI.
3.
FINDINGS. Retention of GP-001-WI is not in the public interest. The decision to revoke GP-001WI was based on an evaluation of the probable impact, including cumulative impacts, of the
proposal on the public interest as described in 33 Code of Federal Regulations 325.7. The decision
reflects the national concern for both protection and utilization of important resources. The benefits
which reasonably may be expected to accrue from the proposal have been balanced against its
reasonably foreseeable detriments. The following four points represent the relevant public interest
factors evaluated regarding the revocation of GP-001-WI:
CEMVP-OP-R (2012-03486-RMG)
Revocation of GP-001-WI
a. Changes to circumstances relating to authorized activity
Part A of GP-001-WI authorized discharges of dredged and/or fill materials for projects approved
by the WDNR pursuant to Trans 207 (WI Chapter 30.1235). 2011 Act 167 (Act 167) repealed this
statute, leaving the underpinning State program tied to GP-001-WI invalid.
b. Statutory and/or regulatory authority revision
Act 167 exempted piers and wharves, dredging, and stormwater discharge grading projects from
state review. Due to its programmatic nature, GP-001-WI is no longer available to provide coverage
for these projects.
c. Adequacy of Permit
In addition to the state changes which have limited applicability of GP-001-WI, GP-001-WI as
written may not be utilized to authorize impacts to all types of waters of the United States.
Specifically, GP-001-WI may not be used to authorize projects which include a discharge of
dredged/fill material into wetlands (with case-by-case exception for wetland fills which were
previously eligible for Trans 207). The limited applicability of GP-001-WI to wetlands further
reduces the desirability of retaining GP-001-WI.
d. Extent to which revocation would adversely affect plans
Revocation of GP-001-WI is anticipated to have a negligible potential to impact planned projects
because the majority of projects that could have been authorized under GP-001-WI would be
eligible for authorization under GP-003-WI or GP-004-WI.
4.
FEDERALLY-LISTED THREATENED OR ENDANGERED SPECIES OR THEIR CRITICAL
HABITAT. Revocation of GP-001-WI is not anticipated to affect Federally-listed endangered or
threatened species or their critical habitat.
5.
HISTORICAL/ARCHAEOLOGICAL. Revocation of GP-001-WI is not anticipated to affect known
or unknown archaeological, scientific, or historical resources.
6.
WATER QUALITY CERTIFICATION. Water quality certification is not required for the
revocation of GP-001-WI. However, this notice has been sent to the WDNR, the agency
responsible for water quality certification pursuant to Section 401 of the Clean Water Act in the
State of Wisconsin.
7.
COASTAL MANAGEMENT PROGRAM CONSISTENCY CERTIFICATION. Revocation of
GP-001-WI is not anticipated to result in non-compliance with state policies in Wisconsin's coastal
zone.
8.
CONTACT INFORMATION. Questions regarding revocation of GP-001-WI may be directed to
Ms. Rebecca Graser at 262-717-9531. Information about the Corps Regulatory Program and permit
requirements may be obtained by emailing mvp-reg-inquiry@usace.army.mil or by visiting the
District's web page at https://www.mvp.usace.army.mil or by mail to Regulatory Branch, St. Paul
District, Corps of Engineers, 180 Fifth Street East, Suite 700, St. Paul, Minnesota, 55101-1638.
2