SPECIAL PUBLIC NOTICE: The St. Paul District of the U.S. Army Corps of Engineers has reauthorized the General Permits (GPs) for the City of Superior, Wisconsin, Special Area Management Plan (SAMP). The GPs were initially issued in December 1996 and reauthorized in May 2002 (SAMP I) and November 2008 (SAMP II). In accordance with Corps regulations, the GPs will expire in 5 years.
SPECIAL PUBLIC NOTICE: REAUTHORIZATION of the GENERAL PERMITS for the CITY of SUPERIOR SPECIAL AREA MANAGEMENT PLAN. The St. Paul District of the U.S. Army Corps of Engineers has reauthorized the General Permits (GPs) for the City of Superior, Wisconsin, Special Area Management Plan (SAMP). The GPs were initially issued in December 1996 and reauthorized in May 2002 (SAMP I) and November 2008 (SAMP II). In accordance with Corps regulations, the GPs will expire in 5 years.
APPLICANT:
Public Notice
General Public
ISSUED: January 27, 2014
REFER TO:
SECTION:404 - Clean Water Act
96-06788-GP-SDE
96-06789/06790-GP-SDE
96-06791-GP-SDE
96-06792-GP-SDE
REAUTHORIZATION of the GENERAL PERMITS for the
CITY of SUPERIOR SPECIAL AREA MANAGEMENT PLAN
________________________________________________________________________________
1. The St. Paul District of the U.S. Army Corps of Engineers has reauthorized the General Permits (GPs) for the
City of Superior, Wisconsin, Special Area Management Plan (SAMP). The GPs were initially issued in
December 1996 and reauthorized in May 2002 (SAMP I) and November 2008 (SAMP II). In accordance with
Corps regulations, the GPs will expire in 5 years.
2. A public notice soliciting comments on the proposed reauthorization of the SAMP II GPs was issued on
September 25, 2013. The U.S. Fish and Wildlife Service and U.S. Environmental Protection Agency had no
comments on the proposal. No comments were received from any other agencies, entities, or individuals.
3. SAMP II GPs have a limit of 10.0 acres of adverse impacts to wetlands for a single and complete project. A
pre-discharge notification to the Corps is required for each proposed project.
4. Section 401 Water Quality Certification: Each applicant for a SAMP II - GP will need to comply with the
Wisconsin Department of Natural Resources SAMP General Permit (WDNR-GP8-2013). Any conditions
required for Section 401 WQC would become conditions of a SAMP II GP authorization.
5. SAMP II applies a 10-year timeframe with a cap of 140.0 acres of wetland impacts broken out by
categories of activities that are similar in nature (Table 1). During the first 5 years of SAMP II (2008-2013),
approximately 8.86 acres of wetland impacts were authorized by SAMP II GPs.
Table 1: City of Superior Special Area Management Plan (SAMP)
General Permits
Project Classification
Total Acres (10-year period)
Residential
Public
Institutional
Commercial/Industrial
Up to 40
Up to 15
Up to 10
Up to 75
Operations Regulatory (96-06788 to 06792 GP-SDE)
SUBJECT: Reauthorization of the City of Superior SAMP II General Permits
6. The City of Superior facilitates implementation of SAMP II through its building permit process. If you are
planning a project within the City of Superior municipal boundaries that may impact wetlands, you should
consult the City to determine whether your project is eligible for authorization by a SAMP II GP.
7. Corps contacts:
SAMP II GP applications for specific projects are reviewed by Bill Sande at (651) 290-5882 or
William.M.Sande@usace.army.mil
The Corps Project Manager for the overall City of Superior SAMP is Steve Eggers at (651) 290-5371 or
steve.d.eggers@usace.army.mil
FOR THE DISTRICT ENGINEER:
Tamara E. Cameron
Chief, Regulatory Branch