The applicant proposes drainage and roadway improvements to the Tri-County and Laurel Fork sections of the U. S. Route 58 corridor. Both sections will be expanded from an existing two-lane configuration to a 4-lane

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes drainage and roadway improvements to the Tri-County and Laurel Fork sections of the U. S. Route 58 corridor. Both sections will be expanded from an existing two-lane configuration to a 4-lane, divided highway with median-separated twin 2-lane pavement in each direction.