Home

Norfolk District

Run scraper

The applicant proposes to construct an earthen berm along the southern property boundary of the property known as Curles Neck Farm in order to protect the wetland system from sea level rise. The applicant proposes to convert an onsite borrow pit into a mitigation area and create 3.1 acres of tidal forested wetlands and 0.5 acres of emergent tidal wetlands. Public comment period ends Feb. 4

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to construct an earthen berm along the southern property boundary of the property known as Curles Neck Farm in order to protect the wetland system from sea level rise. The applicant proposes to convert an onsite borrow pit into a mitigation area and create 3.1 acres of tidal forested wetlands and 0.5 acres of emergent tidal wetlands. Public comment period ends Feb. 4, 2013.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas