Home

Norfolk District

Run scraper

Gamesa Energy USA

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Gamesa Energy USA, LLC has requested a permit to install, maintain, and operate a single 5-Megawatt offshore turbine generator prototype and its supporting infrastructure near Cape Charles, Virginia. The project will include the permanent alteration of 215 square feet of subaqueous bottom for the installation of a monopole foundation, and approximately 16, 240 square feet of subaqueous bottom at the base of the monopole foundation will be permanently altered by the installation of rock armoring for scour protection. Public comment period ends March 29, 2013.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas