Home

Norfolk District

Run scraper

Navy Region Mid-Atlantic proposes to upgrade a section of the existing tactical vehicle trail located along the southern boundary of the Small Arms Testing and Evaluation Compound (SATEC) at Joint Expeditionary Base Fort Story in Virginia Beach to create an approximately 2

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Navy Region Mid-Atlantic proposes to upgrade a section of the existing tactical vehicle trail located along the southern boundary of the Small Arms Testing and Evaluation Compound (SATEC) at Joint Expeditionary Base Fort Story in Virginia Beach to create an approximately 2,000-foot roadway section that replicates an improved road surface. The purpose of the project is to upgrade the straightway section of the trail network to replicate an improved roadway layout and surface to develop more realistic scenarios that work in concert with the existing SATEC facilities. The project would impact approximately 2.25 acres of historically disturbed nontidal, emergent wetlands. The applicant proposes to provide compensatory mitigation by purchasing credits at a 1:1 ratio from the Middle Peninsula Environmental Properties Inc.’s Wetland Mitigation Bank. The comment period ends on December 13, 2013.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas